This solicitation requests offers for asphalt paving work at the Lava Lands Visitor Center parking lots. The project includes repaving an existing lot and optional work to pave additional lots and access roads. Work consists of surveying, removing existing pavement, grading, placing aggregate base and asphalt, and striping stalls. If existing base is unsuitable, excavation and waste disposal are included. The estimated value is $1-5 million. Offers are due by April 16, 2021. The period of performance is by October 16, 2021. The solicitation is designated for small businesses and is registered in SAM. The Forest Service Pacific Northwest Region is the agency. Funds are not available and no award will be made until funding is secured, though the solicitation may be cancelled before or after offers are due.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2.pdf | ||
| NewWageRates.pdf | ||
| Amendment1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
1240BH21R0004
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
17 Mar 2021
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
1026026
6. PROJECT NO.
7. ISSUED BY CODE 8. ADDRESS OFFER TO
PROCUREMENT AND PROPERTY SERVICES, NORTHWEST
ZONE, CSA 6
3200 SW JEFFERSON WAY
CORVALLIS, OREGON 97331
Email or Fax Submission Only Note: Due to COVID-19 all proposal documents must be emailed to sm.fs.conwest@usda.gov or faxed to 866.230.8120.
9. FOR INFORMATION
CALL:
A. NAME
CONTRACTING OFFICE
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(541) 750-7116
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
RFP 1240BH21R0004
GAOA LAVA LANDS VISITOR CENTER PARKING LOT IMPROVEMENTS
DESCHUTES NATIONAL FOREST
Price Range The Government's estimate is between $1,000,000 and $5,000,000 (including optional items)
THIS IS A SMALL BUSINESS SET-ASIDE PROJECT. OFFERS RECEIVED FROM OTHER THAN
SMALL BUSINESSES WILL BE REJECTED.
11. The Contractor shall begin performance within 10 calendar days and complete it within 10/16/21 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See F-2.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and -0- copies to perform the work required are due at the place specified in Item 8 by 4:00 PM local time 04/16/21 . If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e) mailto:sm.fs.conwest@usda.gov
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
GAOA LAVA LANDS VISITOR CENTER PARKING LOT IMPROVEMENTS
DESCHUTES NATIONAL FOREST
BEND/FORT ROCK RANGER DISTRICT
DECHUTES COUNTY, OR
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
BID SCHEDULE
BASE ITEMS (SOUTH PARKING LOT)
ITEM NO. DESCRIPTION MOM UNIT ESTIMATED
QUANTITY UNIT PRICE TOTAL
15101 Mobilization LSQ LS 1 n/a $
15201
Construction survey and staking, method (2) Conventional survey, tolerance B LSQ LS 1 n/a $
20301
Removal of Existing Asphalt Concrete, disposal method (j) LSQ LS 1 n/a $
40304
Asphalt Concrete, Oregon State DOT, Type Level 2 CQ Ton 1229 $ $
63401 Pavement Markings Type A, Color White AQ LF 3830 $ $
63405 Pavement Markings Type Wheelchair AQ EA 2 $ $
02450 Wheelstops AQ EA 64 $ $
BASE ITEMS
SUBTOTAL
OPTION ITEMS - A (SOUTH PARKING LOT)
20401A
Roadway Excavation, Compaction Method B, Tolerance B CQ CY 438 $ $
20429A Waste CQ CY 417 $ $
30103A
Aggregate Base, Gradation D, Compaction Method D CQ CY 438 $ $
OPTION ITEMS A
SUBTOTAL
OPTION ITEMS - B (NORTH PARKING LOT)
15201B
Construction survey and staking, method (2) Conventional survey, tolerance B LSQ LS 1 n/a $
20301B
Removal of Existing Asphalt Concrete, disposal method (j) LSQ LS 1 n/a $
20401B
Roadway Excavation, Compaction Method B, Tolerance B CQ CY 496 $ $
20429B Waste CQ CY 473 $ $
30103B
Aggregate Base, Gradation D, Compaction Method D CQ CY 496 $ $
40304B
Asphalt Concrete, Oregon State DOT, Type Level 2 CQ Ton 1385 $ $
63401B Pavement Markings Type A, Color White AQ LF 1664 $ $
OPTION ITEMS B
SUBTOTAL $
OPTION ITEMS - C (NORTH PARKING LOT ACCESS ROADWAY)
20301C
Removal of Existing Asphalt Concrete, disposal method (j) LSQ LS 1 n/a $
20401C
Roadway Excavation, Compaction Method B, Tolerance B CQ CY 267 $ $
20429C Waste CQ CY 254 $ $
30103C
Aggregate Base, Gradation D, Compaction Method D CQ CY 267 $ $
40304C
Asphalt Concrete, Oregon State DOT, Type Level 2 CQ Ton 744 $ $
OPTION ITEMS C
SUBTOTAL $
***Contractor shall submit prices on both base and optional items to be considered for award***
GRAND TOTAL
INCLUDING BOTH BASE
AND OPTIONAL ITEMS
Note:
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.
For technical questions contact Jerold Wesley at 541.383.5626 or jerold.wesley@usda.gov.
DUNS Number________________________
EMAIL ______________________________
Notice to Offerors: Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
NOTE: prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.
C-1 SCOPE OF CONTRACT
This work consists of the construction of base work items for the re-paving of an asphalt paved parking lot. This work may also include the construction of optional work items for another new asphalt paved parking lot and a new asphalt paved parking lot access roadway at the Lava Lands Visitor Center. Project work shall include: existing asphalt paved parking lot shall be surveyed to maintain existing layout for final flow lines, grades, restriping of parking stalls and location of the new wheelstops. Removal of the existing asphalt pavement and (existing) concrete wheelstops, minor grading and compaction of aggregate base material to maintain existing grades. If the government determines the existing aggregate base material is unsuitable for placement of new pavement, the option items for roadway excavation, aggregate base and waste will be exercised; aggregate base waste material shall be hauled to the government supplied disposal site. Work also includes construction of new asphalt paving, parking stall striping, wheelstop installation, placement of directional arrows, placement of stop bars and other related work as described in these documents, specifications, and contract documents, by the reference made a part hereof.
Contractor shall furnish all necessary personnel, labor, materials, equipment, services, facilities, transportation, and incidentals to perform the Scope of Contract and Specifications provided in regards to this project.
The Contractor shall utilize products and materials that promote energy conservation, pollution prevention, waste reduction, use of recovered materials, that are environmentally preferable, with recycled content and that are recyclable, are made from biobased materials, and are energy efficient (Energy Star-qualified) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered.
C-2 PROJECT LOCATION
The project is located on the Deschutes National Forest. From Deschutes National Forest Administration Headquarters, 63095 Deschutes Market Road, Bend, OR 97701, head north on Deschutes Market Road for 0.2 miles. Turn left onto Yeoman Road travel for 0.7 miles. Turn left onto NE Purcell Blvd and travel for 0.3 miles. Turn right onto Empire Blvd and travel for 0.4 miles at the traffic circle, take the 2nd exit and stay on Empire Blvd and travel for 1.1 miles. Turn left to merge onto US-97 S/Bend Pkwy and travel for 0.3 miles. Merge onto US-97 S/Bend Pkwy and travel south on US-97 S for approximately 13 miles, then make a slight right onto Crawford Road/Forest Service Road 9702, then travel 338 feet and turn right onto Forest Service Road 100, then travel 197 feet to the Lava Lands Visitor Center at 58201 South Hwy 97 Bend, OR 97707. The South Parking Lot will be to the left and the North Parking Lot will be to the right. Latitude: 43.90993, Longitude: -121.35616
C-3 MAGNITUDE OF CONSTRUCTION PROJECT
The Government's estimate is between $1,000,000 and $5,000,000 (including optional items)
C-4 FEDERAL HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES
The Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 Customary Units 2014 or newer Forest Service approved editions, are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Delete any reference to Department of Transportation Acquisition Regulations (TAR) wherever shown.
C-5 APPLICABLE SPECIFICATIONS (CSI PROJECTS)
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
C-6 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS - AGAR
452.211-73 (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-7 STATEMENT OF WORK/SPECIFICATIONS (452.211-72) (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-8 BIO-PREFERRED PROGRAM REQUIREMENTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products meeting the health and environmental specifications.
Operations and Maintenance Penetrating Lubricants Greases
Gear Lubricants Pneumatic Equipment Lubricants Fuel Conditioners Gasoline Fuel Additives Hydraulic Fluids Safety Equipment (Protective Helmets)
Construction Dust Suppressants Concrete/Asphalt Release Fluids Asphalt Restorers Asphalt/Tar Removers Traffic/Zone Marking Paints Erosion Control
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov.
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
C-9 SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of contractor, subcontractor, supplier and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor’s stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents.
Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
E-2 INSPECTION AND ACCEPTANCE (AGAR 452.246-70) (FEB 1988)
(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project location.
(End of clause)
E-3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT
The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Supplemental Specifications.
E-4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
http://www.arnet.gov/far/
SECTION F--DELIVERIES OR PERFORMANCE
F-1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)
F-2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 16 October 2021. The time stated for completion shall include final cleanup of the premises.
The Contractor may have access to the site beginning 2 August 2021, however, asphalt shall not be broken until 16 August 2021. Additionally, the Contractor shall not close the South parking lot until 16 August 2021.
F-3 SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S
CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of:
(1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or
(2) Failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
http://www.arnet.gov/far/
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 POST AWARD CONFERENCE (AGAR 452.215-73)(NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within TBD days after the date of contract award. The conference will be held via phone or Microsoft TEAMS or a mutually agreed upon location.
G-2 DESIGNATION OF CONTRACTNG OFFICER’S REPRESENTATIVE
The Contracting Officer’s Representative (COR) is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order or other matter deviating from the terms of this contract be effective or binding upon the government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract. The Contracting Officer should be informed as soon as possible or any actions, or inactions, by the Contractor, or the Government, which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly.
(This does not apply to individual assignments which were issued by the COR provided they do not affect the delivery schedule or the performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing, if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 PRODUCT SUBSTITUTION
Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H-2 SUBMITTALS, SHOP DRAWINGS, MATERIAL CERTIFICATIONS AND TESTING
REPORTS
The following shall be submitted on this project:
Title Referenced by
Specification No.
Time of Government
Approval After Submittal Project Schedule FAR 52.236-15 5 days
Health and Safety Plan (Accident Prevention) 107.08
Bring with you to the Pre-work meeting.
Hazardous Spill Plan 107.10 5 days
Traffic Control Plan
FP-14 156, FP-14 635
& MUTCD Part 6 14 days Fire Plan R6-FS-6300-55 and
Certification that your Fire Tools and Equipment are in full compliance with the contract requirements R6-FS-6300-52 part 2 in Section J N/A
Designation of Representative R6-FS- 6300-6
Superintendence By The Contractor [FAR
52.236-6] N/A
Shop Drawings The following shop drawings shall be submitted on this project:
Title Referenced by
Specification No.
Time of Government
Approval After Submittal
Wheelstops CSI Specification
02450 14 days
Material Certifications and Testing Reports The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced by Specification No.
Target Value Ranges for Aggregate Base
Gradation FP-14 301, FP-14 FS Supplemental Specifications
(National), Section 703.05, Table 703-2 Emulsified Asphalt Tack Coat
Information FP-14 412.02 Hot Mixed Asphalt (HMAC) for a dense graded Level 2 Mix FP-14 403.02
H-3 MOISTURE SENSITIVE SOILS
Contractors are cautioned that the roadway structure is designed so that the completed road will support highway legal loads during a limited use season. Construction equipment often subjects the uncompleted roadway structure to loadings it is not designed to support. This is especially critical during periods of excessive moisture. Materials on this project are sensitive to excessive moisture and will require careful selection and scheduling of equipment to permit efficient operation. Any damage resulting from operations, which renders the material unsuitable for use or results in potential siltation of streams, will be corrected by the Contractor at Contractor's expense.
H-4 LANDSCAPE PRESERVATION
The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.
a. Prevention of the Landscape Defacement. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.
b. Protection of Streams, Lakes, and Reservoirs. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt, or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Contracting Officer.
H-5 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H-6 CONSTRUCTION STAKES, LINES, AND GRADES
(a) Unless a Pay Item for Construction Staking is included in the Schedule of Items, the Government will set initial construction stakes establishing lines, slopes, and continuous control points, reference lines, and bench marks for other structures and improvements and will furnish the Contractor with all necessary information relating to lines, slopes, and grades.
(b) These stakes and control points shall constitute the field control from which the Contractor shall establish other necessary controls and execute the work. The Contractor shall furnish, without additional compensation, all additional stakes, all templates, batter boards, and other materials and supplies necessary for marking and maintaining points and lines established. If any construction control points have been destroyed or displaced or are erroneous, the Contractor shall promptly notify the Contracting Officer.
(c) The Contractor is responsible for the preservation of all stakes and control points. The cost of replacing them will be charged to the Contractor when destroyed due to Contractor's negligence or operation.
(d) In the case of alterations which involve any changes in construction staking, the Contractor shall cooperate with the Contracting Officer and facilitate the prompt re-establishment of the field control for the altered or adjusted work.
H-7 CONTRACTOR’S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
H-8 ROAD MAINTENANCE REQUIREMENTS
In order to fulfill the obligation to protect existing facilities, material source, and disposal site access roads from seasonal weather damage, to safeguard soil and water quality, and to repair damage commensurate with his use, the Contractor shall perform road maintenance work on these roads in accordance with the following:
1. While performing ordinary road maintenance work, the Contractor shall avoid permanent fouling of gravel or bituminous surfaces through covering them with earth or debris from side ditches, slides, or other sources. The Contractor shall avoid blading surface material off the surface of roads.
2. While performing all phases of construction, the Contractor shall minimize damage to ditches, slopes and road surfaces. Where damage does occur, the Contractor shall restore the road to its prior condition within a reasonable period of time.
3. The Contractor shall remove all excess materials and debris from asphalt roadways and trails immediately after backfilling has been completed. This may require brooming and hosing down with water.
4. On completion and acceptance of work requirements, including acceptance of road maintenance by the Forest Service, Contractor road maintenance responsibility shall terminate.
H-9 ROAD USE AND MAINTENANCE
Use of Roads
(a) The Contractor is authorized to use roads that are a part of the construction project and those Forest Service roads designated below for performance of work under this contract.
Road No.
Termini
Authorizations, Restrictions & Requirements
Maintenance Required (Yes or No)
End Section of South Parking Lot Access
Roadway
From West Parking Lot Area of South
Parking Lot Access Roadway to West
Parking Lot Area of South Parking Lot
Entrance Way
Close until construction is finished No
North Parking Lot Access Roadways
FS Road 9702-100 to North Parking Lot
Close until construction is finished (Only if Option Items are constructed) No
FS Road 9702-100 M.P. 0.0 to M.P. 0.2
Close until construction is finished (Only if Option Items are constructed) No
South Parking Lot Access Roadway/ Exit Roadway to FS Road
From West Parking Area of South Parking Lot Entrance Access Roadway to South Parking Lot Area Access Roadway
Do not close this access roadway, it is the only exit roadway to leave the Visitor Center from the North
Parking Lot. No
(b) If the Contractor requests use of a National Forest road or segment not designated for his use, the Forest Service may authorize such use if not in conflict with the current Road Rules document.
Authorization to use such additional roads may include maintenance requirements and use limitations.
(c) The roads authorized for use will be subject to the following provisions:
1. The Road Rules in the current Umatilla National Forest Road Rules Document are applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of the contract.
2. State laws governing traffic rules and equipment requirements on State and County highways.
3.Federal regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State and Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may be otherwise provided in the contract.
Load Limits --All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the District Ranger.
4. Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions and closures any time conditions warrant. Such closures will be in addition to those shown in the current Road Rules Document and will be posted on the road.
H-10 TRAFFIC CONTROL
The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H-11 CONTROL OF MATERIAL
Rights In and Use of Materials
(a) The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of the work which was originally contemplated to be constructed with such material.
(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.
Material Sources
(a) Designated Sources - Sources of local materials are designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with Clauses 52.243-5, Changes and Changed Conditions or Clause 52.236-2, Differing Site Conditions.
(b) Contractor Furnished Sources - When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor furnished source material result in financial disadvantage to the Government. Quality Testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
Storage Stockpiling of Materials
Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at Contractor's expense.
Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.
Earthwork Tolerance
Changes within specified tolerances (such as adjustment of horizontal or vertical alignment) shall be made as necessary to maintain earthwork quantities substantially as designed within balance points. Such adjustments shall not be considered as "Changes" under Clause 52.243-5.
H-12 SAFETY
Identify inherently hazardous conditions that could lead to serious injury or loss of life.
Identify and describe inherently hazardous conditions.
Recognize hazards when contracting for inherently hazardous working conditions.
When inherently hazardous conditions exist, the contract should require a written, job-specific safety plan for information and discussion at the post award meeting.
Plan to reduce safety hazards and the costs of litigation.
Make sure that inherently hazardous conditions are documented and are written up in a job-specific Job Hazard Analysis (JHA) for Forest Service employees involved. This will help identify hazards involved in the job.
For each contract evaluate working conditions to determine if specific inherently hazardous conditions will be encountered as part of the needed construction work. If these conditions do exist, they need to be listed in the contract.
H-13 ADDITIONAL REQUIREMENTS OR RESTRICTIONS
Indicate any other special conditions, site restrictions, or use limitations on this project including, but not limited to, the following:
• Clean all heavy equipment prior to entering National Forest System Lands to prevent the spread of weeds (USDA FS 2005, R6 Standard #2).
• Use only weed free sources of gravel, fill and rock that is judged to be weed free by the District or Forest weed specialists (USDA FS 2005, R6 Standard #7).
• The Lava Lands Visitor Center receives many visitors once open and will require an approved Traffic Control Plan to address pedestrian and vehicular traffic. The Lava Lands Visitor Center is estimated to be open to visitors from June 5, 2021 to September 15th, 2021.
• The North Parking Lot shall remain open and accessible to the public for parking during construction of the South Parking Lot. If the North Parking Lot Construction Option Items are funded, the South Parking Lot shall remain open and accessible to the public for parking during construction of the North Parking Lot. Also, the North Parking Lot Access Roadway/ Lava Lands Visitor Center Exit Roadway must remain open to allow visiting vehicle traffic to leave the site.
H-14 NOXIOUS WEED CONTROL
(a) In order to prevent the potential spread of noxious weeds onto the Deschutes National Forest, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment before entering the National Forest.
(b) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Oregon Department of Agriculture or the Crook, Wheeler, Deschutes, or Grant County Weed Board or by other appropriate agencies having jurisdiction.
(c) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use, as well as on road use, whether they are owned, leased, or borrowed by the Contractor or subcontractor.
(d) Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose. Cleaning shall occur off Federal lands.
(e) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the Forest Officer in advance of equipment and material arrival. Equipment and vehicles are expected to proceed directly to the job site following the inspection. Materials to be used on the project will be delivered to the job site following the inspection. Materials to be used on the project will be delivered to the project after inspection and approval.
(f) Certification shall remain valid for each identified piece of equipment or vehicle only for the duration of the specified project and only as long as the vehicle or equipment remains at the job site. Equipment and vehicles (excepting passenger vehicles - this includes pickups and vans) that leave the job site will need to be recertified as weed free before they are allowed to return to the job site or re-enter the National Forest.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses: https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:
https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.202-1 Definitions (JUN 2020) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (JUN 2020) 52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (JUN 2020) 52.203-17 Contractor Employee Whistleblower Rights and Requirement To Inform Employees of
Whistleblower Rights (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(JAN 2017)
52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance
Services or Equipment (AUG 2020) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (OCT
2018) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm
52.210-1 Market Research (JUN 2020) 52.215-2 Audit and Records -- Negotiation (JUN 2020) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (MAR 2020) 52.219-8 Utilization of Small Business Concerns (OCT 2018) 52.219-14 Limitations on Subcontracting (MAR 2020) 52.219-28 Post Award Small Business Program Rerepresentation (NOV 2020) 52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards Act -- Overtime Compensation (MAY
2018) 52.222-6 Construction Wage Rate Requirements (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (AUG 2018) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2012) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-40 Notification of Employee Rights Under National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons (OCT 2020) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages under Executive Order 13658 (NOV 2020) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction
Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction
Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.227-1 Authorization and Consent (JUN 2020) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC…
This is the start of the file's text. The full file is on GovTribe.