This is a Statement of Work (SOW) for console refurbishment services at Scott Air Force Base, dated 14 August 2026.
The Scott Air Force Base Command Post requires procurement and installation of four updated multi-level console desks equipped with integrated Harris System communication equipment to maintain continuous 24/7 All-Domain Command & Control (ADC2) operations within mandated facilities. The consoles must support the Wing Commander, 36 mission partners, USTRANSCOM, 3 Wings, and 4 Direct Reporting Units for Command and Control responses and Emergency Action Messages, ultimately directing base emergency response procedures to safeguard 20,000 Scott AFB personnel. All equipment must be new and unused, with console work surfaces independently height-adjustable via electric sit/stand lift columns featuring 800N (179 lbf) weight capacity per column. Manufacturing and delivery lead time cannot exceed 12 weeks from order date and color selection confirmation. The consoles must be configured as a single integrated four-operator system in an "L" shape with outside lengths of 21'4.5" and 20'10.25", with failure to meet this minimum width constituting material failure. Work surfaces must feature 1-1/8" laminated medium-density fiberboard (MDF) with laminate finish and Urethane "Comfort Edge" molded directly to the core, permanently bonded with water-tight seams. Support credenzas require durable high-pressure plastic laminate surfaces available in multiple colors and textures, factory-bonded to 1-1/8" thick MDF cores, with specified edge finishes including "Safeguard Edge" and "Comfort Edge" options.
Section 3.9.1 specifies detailed equipment requirements for each console, including four single-tier and two double-tier monitor arms, Mosso Tasklight, laptop docking stations, four desktop fans, two touch screen controllers, ceramic heaters, millwork bridges, desktop power grommets, USB charging ports, North America power bars, Powerlinc hubs and cables, and CPU towers (SIPR and NIPR). The contractor must provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and services necessary to remove legacy equipment if required and install new console desks integrated with the Harris System. Normal work hours are 0800 to 1600 hours Monday through Friday at Building 470, Room 125, 205 Hangar Road. The contractor must comply with extensive security requirements including LEADS background checks for all personnel, Eagle Eyes training, Level I Anti-Terrorism Awareness training within 30 days, contractor identification badges, vehicle registration, and adherence to controlled/restricted area protocols as defined in Scott Air Force Base Integrated Defense Plan 31-1. Additional requirements include environmental compliance, HAZMAT inventory reporting, asbestos assessments, non-disclosure agreements, Privacy Act adherence, and contractor manpower reporting via http://www.ecmra.mil by 31 October of each calendar year.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clauses and Provisions _FA440726Q8013.pdf | ||
| RFQ Command Console Upgrade.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
System at the Scott AFB Command Post.
5. CONTRACTOR CONTACT INFORMATION. The Contractor shall provide the names and telephone numbers for individuals appointed as project managers for all work requirements stated herein.
6. NORMAL HOURS. Normal hours of operation shall be between the hours of 0800 to 1600 hours, Monday through Friday at 205 Hangar Rd. Scott AFB, IL 62225 Building 470, Room 125. Specific exceptions to these hours are listed in paragraph 12.2.2. The Government reserves the right to change hours of operation or restrict Contractor access.
Should the contractor determine a modification to normal work hours is required, a request should be submitted to the Government POC and the contracting officer. No changes to schedule shall be made until authorized by the Government.
7. FEDERAL HOLIDAYS. The Contractor is not required to provide services on Federal holidays.
8. SECURITY REQUIREMENTS. All personnel employed by the Contractor in the performance of this contract and any representative(s) of the Contractor entering the Government installation shall abide by all security regulations of the installation.
9. CONTRACTOR CONSENT TO BACKGROUND CHECKS. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if
9.1. A Potential Threat relates to:
9.1.1. The health, safety, security, general wellbeing or operational mission of the installation
9.1.2. The safety, security, or health of its employees or population
9.1.3. LEADS checks will verify if a person is wanted by Police, local, county, state, or Federal agencies.
9.2. The contractor (or subcontractor) must not employ persons under this contract who have an outstanding criminal warrant as identified by Law Enforcement Agency Data System (LEADS) through the National Crime Information Center.
9.3. All contractor and subcontractor personnel must consent to LEADS background checks. Contractor and subcontractor personnel who do not consent to an LEADS check will be denied access to the installation. Information required to conduct an LEADS check includes:
birth of the person entering the installation, and completion of a background check questionnaire. The contractor shall provide this information using the Scott AFB Form 21, Contractors Consent for Background Check, and shall submit it in conjunction with
LEADS check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas.
9.4. Contractors shall ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons later found to be undocumented or illegal aliens will be remanded to the proper authorities. The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
10. EAGLE EYES Training. (The following provision/contract text is for contractor employees with an area of performance within an Air Force-controlled installation, facility, or area.) Eagle Eyes. The Eagle Eyes program is a DAF AT initiative that enlists the eyes and ears of all DAF military, civilians, contractors, and dependents. The Eagle Eyes program is a reporting mechanism for the base community on how to report suspicious behavior or possible terrorist activity. Each installation shall outline procedures in the installation AT plan on how to receive and log suspicious activity reports and suspicious incident reports and to pass those reports expeditiously to their servicing Office of Special Investigations (OSI) detachment for appropriate action.
(T-3) OSI provides threat data to the installation commander, the vice commander, and the DFC as appropriate to ensure an optimal common operating picture and an AT/Base accordance with Air Force Mission Directive (AFMD) 39, Air Force Office of Special Investigations (AFOSI) and Air Force Policy Directive (AFPD) 71-1, Criminal Investigations and Counterintelligence. This program implements the spirit and intent of DoDI 2000.26, DoD Use of the Federal Bureau of Investigation (FBI) eGuardian System.
11. AT Level I Training. (The following provision/contract text is for contractor employees with an area of performance within an Air Force-controlled installation, facility, or area.) Coordinate with the installation ATO/ATPM to ensure Level I - AT Awareness Training is completed by all contractors within 30 days of requiring access, and annually thereafter. (T-3) Coordination for training should be done by the requiring unit after contract award.
12. BADGES. The contractor is required to provide identification badges for their employees. All contractor personnel shall wear these badges while on duty on the government site. Badges are required to identify the individual, company name, and be clearly and distinctly marked as contractor. Size, color, style, etc. are to be mutually agreed to by contractor be used as an entry requirement for installation entry or into any government designated controlled or restricted area. All DBIDS cards/passes will be turned in to the Visitors Control Center upon expiration of pass and/or completion of contract.
13. CONTRACTOR REGISTRATION OF VEHICLES ON SCOTT AFB. All shall comply with all local, state and federal regulations. Additionally any pass shall be surrendered to Security Forces upon demand to positively identify a persons need to be on Scott AFB.
14. ACCESS TO INSTALLATION DURING FORCE PROTECTION
CONDITIONS (FPCONS). Contractors will be assigned a mission essential designation IAW requirements contained in Scott Air Force Base Integrated Defense Plan 31-1. Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.
15. PROPERTY PROTECTION. Property protection for facility where the manager and local Government Security Manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense and command/local directives. The contractor shall safeguard all government-owned equipment and materials in his/her possession or use.
16. SAFEGUARDING CLASSIFIED OR UNCLASSIFIED INFORMATION. The Contractor shall meet Air Force standards for storing, processing, handling, safeguarding, and destroying classified, unclassified, or sensitive information and systems (e.g. ATLAS, PPR Log, Radio Communication devices, Flight Information) in accordance with AFI 10-701, Operations Security (OPSEC), AFI 16-1404, Air Force Information Security Program, and AFI 16-1406, Air Force Industrial Security Program. Additionally, the Contractor will complete all protection of classified and sensitive unclassified training provided by the organization. All resources (e.g. maps, publication/instructions, photos, Common Access Card, line badge) provided by the Government to assist the Contractor in the performance of their PWS will be surrendered upon termination of employment or the end of the contract. While on the installation, if the contractor observes any of the critical (sensitive unclassified) information items listed below, the contractor will not photograph the event/item, post about the event on social media sites, blogs, etc., or discuss the critical information off the installation. The critical information you may observe are:
16.1. Effects of adversarial activity, should it ever occur
16.2. Response times of security, fire, emergency management personnel, etc.
16.3. Implemented antiterrorism/security measures and procedures
16.4. Specific number of aircraft and unusual flightline activity
16.5. Aircraft information such as tail numbers, etc.
17. NON-DISCLOSURE AGREEMENTS. To safeguard information, the contractor shall enter into non-disclosure agreements with the responsible local security manager.
18. PRIVACY ACT. Work on this project requires that personnel have access to Privacy Information. Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations.
19. CONTRACTORS WORKING IN CONTROLLED OR RESTRICTED
AREAS. The unit requesting contract support will provide escort(s) for contractors at all times when within a controlled area. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements IAW Scott Air Force Base Integrated Defense Plan 31-1, and command/local directives.
20. ACCESS TO GOVERNMENT FACILITIES WITH CONTROLLED OR
RESTRICTED AREAS. The contractor shall comply with security regulations imposed by the installation commander and/or the agency responsible for the project location. Due to specific mission requirements inherent in the nature of controlled or restricted areas on Scott AFB, the government may direct the contractor to leave the controlled or restricted areas at any given time.
21. CONTRACTORS RESPONSIBILITIES WHILE WORKING IN
CONTROLLED/RESTRICTED AREAS. Only contractor personnel with proper authority and qualifications shall enter a controlled or restricted area. Certain facilities require the issuance of an AF Form 1199. The government, at any time, may revoke the AF Form 1199. The procedures for the issuance of an AF Form 1199 are contained in Scott Air Force Base Integrated Defense Plan 31-1. Contractors shall not escort other contractor employees within controlled or restricted areas. In addition, contractors shall fulfill, maintain, and comply with all security requirements contained in Scott Air Force Base Integrated Defense Plan 31-1.
22. ACCESS TO GOVERNMENT FACILITIES WITH CONTROLLED OR
RESTRICTED AREAS FOR REPLACEMENT CONTRACTORS. The unit requesting contract support will continuously escort replacement contractors, not initially possessing the proper clearances and requiring entry to controlled or restricted areas.
Replacement contractors shall submit paperwork within 30 days of being assigned to obtain an approved security clearance or favorable review. Replacement contractor personnel shall obtain a security clearance prior to working with, or having direct access to, classified material. In addition, replacement contractor personnel shall obtain a shall be submitted to 375 SFS/S5X.
23. CONTINUATION OF ESSENTIAL DEPARTMENT OF DEFENSE
SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND
AUTHORITY OR OVERSEAS COMBATANT COMMANDER. N/A
24. SPECIAL QUALIFICATIONS. The Contractor representative will be licensed by the State in which the work is conducted to provide the services specified in this contract. All work will be performed by personnel who are trained and qualified for the systems and equipment. Contractor personnel shall be certified by appropriate federal and state regulatory agencies to meet federal and local certification requirements (documentation provided to COR upon request) in maintenance of VTE.
25. SCHEDULE COORDINATION. The Contractor, through the COR, shall be responsible for coordinating all phases of his/her operations with the appropriate base personnel. The facilities shall remain in operation while the Contractor is working, and it is up to the Contractor to coordinate around the normal activities of the facility.
26. ENVIRONMENTAL CONTROL. The Contractor shall comply, and assure that all subcontractors comply, with all applicable federal, state, and local laws, regulations, ordinances, policies and standards related to environmental matters. Where applicable, the Contractor shall use environmentally safe products in the course of completion of their project. The Contractor shall maintain, in company vehicle on site, Safety Data Sheets (SDS) for all chemicals. A copy of all SDS will be provided to the COR. The SDS data is subject to random checks by the government. Contractor shall maintain, and provide on demand, an inventory of materials being brought on the Government facility.
The Contractor shall complete, and provide on demand, monthly inventories of HAZMAT used, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils brought on to the Government facility. If the Contractor spills or releases any HAZMAT or other substance contained in 40 CFR 302 into the environment, the Contractor shall immediately notify the COR and appropriate emergency responders. The Contractor is responsible for all costs associated with clean-up and restoration, including any applicable fines and/or penalties. The Contractor shall maintain a spill plan as required by federal, state, and local laws and regulations.
27. ASBESTOS. The Contractor shall comply with Section 29 CFR 1910.1001(j) (7) (IV). The VTE may be located in facilities that may contain ACM or PACM. The Contractor (not the Government) shall determine if any exposure to ACM may result in performing work under the contract.
28. NON-PERSONAL SERVICES AND/OR INHERENTLY GOVERNMENTAL
SERVICES. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor feels that any actions constitute, or are perceived to constitute personal services shall not be used to perform work of a policy/decision making or management nature, (e.g., inherently governmental functions). All decisions relative to programs supported by the contractor shall be the sole responsibility of the Government.
29. CONTRACTOR MANPOWER REPORTING. The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Vertical Transportation Equipment via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.