These are construction plans and technical documents for the Clinton River Trail (CRT) Washout and Collapse Project in the City of Rochester, Oakland County, Michigan, prepared by Anderson, Eckstein and Westrick, Inc. The project involves repairing two sections of the Clinton River Trail: one west of Dequindre Road and another east of Main Street. The documents include detailed topographic surveys, construction plans, drainage district maps, soil erosion and sedimentation control plans, and landscape plans. The project scope includes excavation, embankment, culvert installation, riprap placement, trail reconstruction, and landscaping.
Key project details include estimated quantities such as 3,430 cubic yards of earth excavation, 1,000 cubic yards of modified embankment, 4,930 cubic yards of special embankment, and 46 feet of 36-inch concrete culvert. The City of Rochester has stored approximately 5,000 cubic yards of clay material at the old Waste Water Treatment Plant for use in the project. The work involves restoring trail sections affected by washout and collapse, with careful attention to soil erosion control, drainage, and environmental considerations. The project will utilize temporary access areas, implement erosion control measures, and restore the trail with limestone surface course and aggregate base materials.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SpecComplete 0270-0209 250829.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-0
C
LI
N
TO
N
R
IV
ER
T
R
AI
L W
AS
H
O U
T W
ES
T
D
EQ
U
IN
D R
E / 0
0-
C
LI
N
TO
N R
IV
ER
T R
AI
L
C O
LL
AP
SE
E
AS
T
O F
M
AI
N S
TR
EE
T
City of Rochester Oakland County, Michigan
TITLE SHEET 1
TOPOGRAPHIC SURVEY 2
CONSTRUCTION PLAN 3
DRAINAGE DISTRICT MAP & PIPE SIZING CALCULATIONS 4
SOIL EROSION & SEDIMENTATION CONTROL PLAN 5
INDEX TO SHEETS
Clinton River Trail Washout West of Dequindre Road
Clinton River Trail Collapse East of Main Street
ASEEL A PUTROS, P.E. #6201055083 DATE
"I HEREBY CERTIFY THESE PLANS HAVE BEEN PREPARED UNDER MY
DIRECT SUPERVISION IN ACCORDANCE WITH ACT 240, PUBLIC ACTS
OF 1937 AS AMENDED- STATE OF MICHIGAN."
ANDERSON, ECKSTEIN AND
WESTRICK, INC.
CIVIL ENGINEERS SURVEYORS ARCHITECTS
N
W
S
E
CRT WASHOUT SITE
TIENKEN RD.
R O
C H
ES
TE
R R
O
AD
ROMEO
PARKDALE RD.
LE
TI
C A
AVON RD.
23 MILE RD.
D
EQ
U
IN
D R
E R
D
24 MILE RD.
CLINTON RIVER
TRAIL
OLD WASTE WATER
TREATMENT PLANT
LOCATION
2nd ST.
D
EQ
U
IN
D R
E
W
AS
HI
NG
TO
N
CLINTON RIVER
CITY OF ROCHESTER STANDARD STORM SEWER DETAILS STM1, STM2
WATER RESOURCES COMMISSION
SOIL EROSION AND SEDIMENTATION CONTROL DETAILS 1 OF 1
LANDSCAPE PLAN 6
CRT WASHOUT
TOPOGRAPHIC SURVEY & REMOVAL PLAN 7
CONSTRUCTION PLAN 8
CRT COLLAPSE
SOIL EROSION & SEDIMENTATION CONTROL PLAN 9CRT COLLAPSE SITE
CITY OF ROCHESTER STANDARD PAVING DETAILS PAV1, PAV2
B.M.#66
B.M.#67
B.M.#65
B.M.#64
TOPOGRAPHIC
SURVEY
NAC AAP JULY 2025
1" = 30'
15 30 60
0270-0209
CRT - WASHOUT
WEST OF
DEQUINDRE ROAD
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
02_Topo--8/28/2025 12:46:47 PM
M:\0270\0270-0209\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
PARKDALE FOREST CONDOMINIUM
O.C.C.P. No. 1712
15-12-478-001
15-12-351-004
15-12-276-077
15-13-276-005
15-13-276-005
BENCH MARKS
(NAVD88 DATUM)
BENCH MARK NO.64
MAG NAIL NORTH FACE OF MILE
MARKER POST ON SOUTH OF
TRAIL.
ELEVATION: 702.07
BENCH MARK NO.65
MAG SPIKE IN 11" SYCAMORE
BASE ±80' SOUTH OF PATH.
ELEVATION: 690.59
BENCH MARK NO.66
CHIS. "X" IN NORTHEAST RIM
SANITARY M.H. ±20' OF OTHER
SANITARY M.H., ±100' SOUTH OF
TRAIL.
ELEVATION: 691.93
BENCH MARK NO.67
SET MAG SPIKE IN 6" MAPLE ON
EAST SIDE, ±15' SOUTH OF TRAIL.
ELEVATION: 692.61
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
SE
E
A B
O
VE
SE
E
B
EL
O W
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. WETLAND LIMITS
EX. WETLAND LIMITS
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
BOUNDARY LINE
CENTERLINE DITCH
SANITARY MANHOLE
SANITARY SEWER
SPOT ELEVATION ("+" INDICATES
ELEVATION LOCATION UNLESS
OTHERWISE INDICATED)
LEGEND
LOCATION MAP
NOT TO SCALE
SITE
B.M.#65
B.M.#64
CONSTRUCTION
PLAN
NAC AAP JULY 2025
1" = 30'
15 30 60
0270-0209
CRT - WASHOUT
WEST OF
DEQUINDRE ROAD
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
03_Const--8/28/2025 12:47:00 PM
M:\0270\0270-0209\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
Riprap, Plain, LM (TYP.)
(SEE W.R.C. STD. DETAILS)
Culv, Cl IV, Conc, 36 inch (46 Ft) AT 0.07% AND
(2) Culv End Section, Conc, 36 inch AND (2) Culv End Sect, 36 inch, Grate
CONSTRUCT 277 L.F. DITCH @ 0.76%
(PAID FOR AS Station Grading, Trail)
Cofferdam, Temp
LIMITS OF Embankment, CIP, Modified/Special
Limestone Surface Cse, 4 inch ON Aggregate Base, 21AA, 8 inch
PLACE AGGREGATE FROM TOE OF SLOPE TO ELEVATION
693.50 (PAID FOR AS Aggregate, 6A, 12 inch, Modified)
PARKDALE FOREST CONDOMINIUM
O.C.C.P. No. 1712
15-12-478-001
15-12-351-004
15-12-276-077
15-13-276-005
15-13-276-005
BENCH MARKS
(NAVD88 DATUM)
BENCH MARK NO.64
MAG NAIL NORTH FACE OF MILE
MARKER POST ON SOUTH OF
TRAIL.
ELEVATION: 702.07
BENCH MARK NO.65
MAG SPIKE IN 11" SYCAMORE
BASE ±80' SOUTH OF PATH.
ELEVATION: 690.59
BENCH MARK NO.66
CHIS. "X" IN NORTHEAST RIM
SANITARY M.H. ±20' OF OTHER
SANITARY M.H., ±100' SOUTH OF
TRAIL.
ELEVATION: 691.93
BENCH MARK NO.67
SET MAG SPIKE IN 6" MAPLE ON
EAST SIDE, ±15' SOUTH OF TRAIL.
ELEVATION: 692.61
LOCATION MAP
NOT TO SCALE
SITE
10'5' 5'
Embankment, CIP, Modified/Special
Limestone Surface Cse, 4 inch ON Aggregate Base, 21AA, 8 inch
60'
2'
MUCK OUT
EXIST. ORGANIC MATERIAL
SECTION A-A
NOT TO SCALE
EXIST. GROUND
36" IE 691.00
36" IE 690.96
ESTIMATED QUANTITIES
(THIS SHEET)
1. Soil Erosion and Sedimentation Control 1 Ls
2. Temporary Turnaround and Access Area 1 Ls
3. Excavation, Earth 3,430 Cyd
4. Embankment, CIP, Modified 1,000 Cyd
5. Embankment, CIP, Special 4,930 Cyd
6. Culv, Cl IV, Conc, 36 inch 46 Ft
7. Culv End Sect, Conc, 36 inch 2 Ea
8. Culv End Sect, 36 inch, Grate 2 Ea
9. Limestone Surface Cse, 4 inch 260 Syd
10. Aggregate Base, 21AA, 8 inch 310 Syd
11. Limestone Surface Cse, 4 inch, Resurfacing 6,000 Syd
12. Aggregate, 6A, 12 inch, Modified 780 Cyd
13. Aggregate Base, Conditioning, Modified 50 Sta
14. Cofferdam, Temp 1 LS
15. Riprap, Plain, LM 184 Syd
16. Station Grading, Trail 3.0 Sta
100'
WASHOUT AREA
50'
ADDITIONAL
EXCAVATION
50'
ADDITIONAL
EXCAVATION
15'
15'
9" LAYERS
EXIST. TRAILEXIST. TRAIL
SECTION B-B
NOT TO SCALE
LIMITS OF Excavation, Earth
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
Tree Clearing AS REQUIRED FOR CONSTRUCTION
OF NEW GRAVEL PATHWAY AND EMBANKMENT
(PAID FOR AS Station Grading, Trail) INCLUDING
DEAD TREES WITHIN EXISTING WETLAND AREA
60'
SE
E
A B
O
VE
SE
E
B
EL
O W
Temporary Turnaround and Access Area
(12" THICK CRUSHED CONCRETE)
EXIST. GROUND
Excavation, Earth
TREE CLEARING AS REQUIRED FOR CONSTRUCTION
OF TEMPORARY TURNAROUND (PAID FOR AS
Temporary Turnaround and Access Area)
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. WETLAND LIMITS
EX. WETLAND LIMITS
NOTES:
THE CITY OF ROCHESTER HAS STORED APPROXIMATELY
5,000 CUBIC YARDS OF CLAY MATERIAL AT THE OLD
WASTE WATER TREATMENT PLANT LOCATED AT 800 E.
2nd STREET. THE CONTRACTOR SHALL UTILIZE THIS
STORED CLAY MATERIAL FOR THE PROJECT. ALL WORK
ASSOCIATED WITH LOADING, HAULING, AND
COMPACTING THE STORED MATERIAL SHALL BE PAID
FOR UNDER THE PAY ITEM Embankment, CIP, Special.
THE CONDITION OF THE STORED MATERIAL SHALL BE
INSPECTED BY THE GEOTECHNICAL ENGINEER
PROVIDED BY THE CITY. UNSUITABLE MATERIAL SHALL
NOT BE TRANSFERRED OR USED FOR THIS PROJECT.
IF ADDITIONAL MATERIAL IS REQUIRED TO COMPLETE
THE PROJECT, IT SHALL BE THE CONTRACTOR’S
RESPONSIBILITY TO OBTAIN IT. ALL WORK ASSOCIATED
WITH HAULING, AND COMPACTING ANY ADDITIONAL
MATERIAL SHALL BE PAID FOR UNDER THE PAY ITEM
Embankment, CIP, Modified.
A
A B
B
DITCH
689.00
DITCH
686.90
DITCH
687.87
PROPOSED GRADING LIMITS
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
THE EMBANKMENT MATERIAL SHOULD BE PLACED IN HORIZONTAL LIFTS NOT EXCEEDING
9 INCHES IN THICKNESS. THE FILL MATERIAL SHOULD BE COMPACTED TO A MINIMUM OF
95 PERCENT OF THE MODIFIED PROCTOR MAXIMUM DRY DENSITY. THE COHESIVE FILL
SHOULD BE PLACED WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE CONTENT. THE FILL
SOIL SHOULD BE FREE OF ORGANIC MATERIAL OR DELETERIOUS MATERIAL. FROZEN SOIL
SHALL NOT BE PLACED AS FILL NOR SHOULD FILL BE PLACED ON FROZEN SUBGRADE.
DITCH
Aggregate, 6A, 12 inch, Modified
TO ELEVATION 693.50
(TYPICAL, BOTH SIDES)
10' PAY LIMITS FOR Limestone Surface Cse, 4 inch
12' PAY LIMITS FOR Aggregate Base, 21 AA, 8 inch
20'
LIMITS OF CLEAR ZONE (5' PAST EDGE OF PATH)
PLACE LIMESTONE SURFACE
COMPACT TO 95% DENSITY. PAID
FOR AS Limestone Surface Cse, 4 inch
8" AGGREGATE BASE COMPACTED
TO 98% OF MAXIMUM DENSITY.
COMPACT SUBBASE PRIOR TO
PLACING AGGREGATE BASE. PAID
FOR AS Aggregate Base, 21AA, 8 inch)
REGRADE DISTURBED AREA
TO MATCH TOP OF PATH
(PAID FOR AS Limestone Surface Cse, 4 inch)
COMPACT PROPOSED SUBBASE
TO 95% MAX DENSITY PRIOR TO
PLACING AGGREGATE BASE
1.0%
PROPOSED TRAIL CROSS SECTION
(WITHIN WASH OUT AREA)
NOT TO SCALE
10' PAY LIMITS FOR Limestone Surface Cse, 4 inch Resurfacing
14'
LIMITS OF CLEAR ZONE (2' PAST EDGE OF PATH)
PLACE MINIMUM 4" NEW AGGREGATE
MATERIAL PRIOR TO COMPACTION AND
THEN COMPACT TO 95% DENSITY. PAID FOR
AS Limestone Surface Cse, 4 inch Resurfacing
EXISTING RAILROAD BALLAST
REGRADE DISTURBED AREA
TO MATCH TOP OF PATH
(PAID FOR AS Limestone Surface Cse, 4 inch)1.0%
NOTES:
1. DIRECTION OF CROSS SLOPE SHALL BE
DETERMINED IN THE FIELD BY THE ENGINEER
2. PRETREAT WITH HERBICIDE
PROPOSED TRAIL RESURFACING CROSS SECTION
(ALONG ACCESS ROUTE)
(OLD WASTE WATER TREATMENT PLANT TO PROJECT WASHOUT LOCATION)
NOT TO SCALE
SCARIFY TO A DEPTH OF 2" OR AS
DIRECTED BY THE ENGINEER (PAID FOR
AS Aggregate Base, Conditioning, Modified)
TREE CLEARING AS REQUIRED FOR CONSTRUCTION
OF NEW GRAVEL PATHWAY EMBANKMENT AND
DITCH (PAID FOR AS Station Grading, Trail)
2'
5' 5'
M A
TC
H
LI
N
E
15-13-276-005
M A
TC
H
LI
N
E
Limestone Surface Cse, 4 inch, Resurfacing ON Aggregate Base, Conditioning, Modified
Limestone Surface Cse, 4 inch, Resurfacing ON Aggregate Base, Conditioning, Modified
TEMPORARY
TURN-AROUND AREA
DRAINAGE DISTRICT
MAP
PIPE SIZING
CALCULATIONS
NAC AAP JULY 2025
NONE
0270-0209
CRT - WASHOUT
WEST OF
DEQUINDRE ROAD
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
04_Const--8/28/2025 12:47:12 PM
M:\0270\0270-0209\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
D
EQ
U
IN
D R
E R
O A
D
PARKDALE
STONY CREEK RIDGE
DEER RIDGE
CONDO
BOULDER RIDGE
CONDOS OF
ROCHESTER
PARKDALE FOREST
CONDO
15-12-476-006
REGENCY HILLS
SUBDIVISION No. 1
OAKVIEW
ESTATES
07-07-100-023
07-07-100-025
07-07-100-010
DISTRICT AREA
124.69 ACRES
DRAINAGE DISTRICT MAP
CLINTON RIVER TRAIL
APPROX. LOCATION OF 36" CMP
EX. 24" CONCRETE PIPE
STORM OUTLET FROM
PARKDALE FOREST CONDOdischarge
B.M.#65
B.M.#64
SOIL EROSION
SEDIMENTATION
CONTROL PLAN
NAC AAP JULY 2025
1" = 30'
15 30 60
0270-0209
CRT - WASHOUT
WEST OF
DEQUINDRE ROAD
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
05_SESC--8/28/2025 12:47:43 PM
M:\0270\0270-0209\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
Riprap, Plain (TYP.)
Cofferdam, Temp
PARKDALE FOREST CONDOMINIUM
O.C.C.P. No. 1712
15-12-478-001
15-12-351-004
15-12-276-077
15-13-276-005
15-13-276-005
BENCH MARKS
(NAVD88 DATUM)
BENCH MARK NO.64
MAG NAIL NORTH FACE OF MILE
MARKER POST ON SOUTH OF
TRAIL.
ELEVATION: 702.07
BENCH MARK NO.65
MAG SPIKE IN 11" SYCAMORE
BASE ±80' SOUTH OF PATH.
ELEVATION: 690.59
BENCH MARK NO.66
CHIS. "X" IN NORTHEAST RIM
SANITARY M.H. ±20' OF OTHER
SANITARY M.H., ±100' SOUTH OF
TRAIL.
ELEVATION: 691.93
BENCH MARK NO.67
SET MAG SPIKE IN 6" MAPLE ON
EAST SIDE, ±15' SOUTH OF TRAIL.
ELEVATION: 692.61
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
SE
E
A B
O
VE
SE
E
B
EL
O W
Erosion Control, Silt Fence
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. R.O.W.
EX. WETLAND LIMITS
EX. WETLAND LIMITS
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
Erosion Control, Silt Fence
" S
TM
LIMITS OF PROPOSED EARTH CHANGE (TYP.)
LIMITS OF PROPOSED EARTH CHANGE (TYP.)
QUANTITIES (THIS SHEET)
Erosion Control, Silt Fence 900 Ft
1. THIS PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH
PART 91 OF ACT 451 OF 1994, AS AMENDED, THE SOIL EROSION AND
SEDIMENTATION CONTROL ACT AND THE WATER RESOURCE
COMMISSIONER OFFICE ORDINANCE.
2. ALL EROSION AND SEDIMENTATION CONTROL WORK SHALL
CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE WATER
RESOURCE COMMISSIONER OFFICE.
3. EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL
BE CONTAINED ON THE SITE AND NOT ALLOWED TO COLLECT ON ANY
OFF SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH
NATURAL AND MAN MADE OPEN DITCHES, STREAMS, STORM DRAINS,
LAKES, AND PONDS.
4. THE OWNER OR OWNER'S REPRESENTATIVE SHALL BE RESPONSIBLE
FOR INSTALLATION AND MAINTENANCE OF SOIL EROSION AND
SEDIMENTATION CONTROL DEVICES.
5. THE CONTRACTOR'S REPRESENTATIVE SHALL IMPLEMENT AND
MAINTAIN THE SOIL EROSION CONTROL MEASURES AS SHOWN ON
THE PLANS BEFORE AND AT ALL TIMES DURING CONSTRUCTION ON
THIS PROJECT. ANY MODIFICATIONS OR ADDITIONS TO SOIL EROSION
CONTROL MEASURES DUE TO CONSTRUCTION OR CHANGED
CONDITIONS SHALL BE COMPLIED WITH AS REQUIRED OR DIRECTED
BY THE OAKLAND COUNTY RESOURCE COMMISSIONER'S OFFICE.
6. IF ANY OF THE SESC MEASURES ON THE SITE ARE DEEMED
INADEQUATE OR INEFFECTIVE, THE OAKLAND COUNTY WATER
RESOURCE COMMISSIONER SESC DIVISION HAS THE RIGHT TO
REQUIRE ADDITIONAL SESC MEASURES AT THE EXPENSE OF THE
LANDOWNER.
7. INSTALL SILT FENCE AS INDICATED ON THE PLAN AND AT
ADDITIONAL AREAS AS NECESSARY.
A. SILT FENCE SHALL BE INSTALLED PER DETAIL.
B. BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT
ACCUMULATES TO 1/3 TO 1/2 OF THE HEIGHT OF THE SILT
FENCE.
C. IF SILT FENCE FABRIC DECOMPOSES OR BECOMES INEFFECTIVE
PRIOR TO THE END OF EXPECTED USABLE LIFE AND THE
BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE
REPLACED PROMPTLY.
D. SILT FENCE SHALL BE INSPECTED WEEKLY UNDER NORMAL
CONDITIONS, WITHIN 24 HOURS OF RAINFALL AND DAILY DURING
A PROLONGED RAIN EVENT. REQUIRED MAINTENANCE SHALL BE
PROVIDED PROMPTLY.
8. ALL DIRT TRACKED ONTO ANY ROADWAY SHALL BE REMOVED
IMMEDIATELY.
9. STREETS AND OR PARKING AREAS WILL BE SCRAPED ON A DAILY
BASIS AND SWEPT AT A MINIMUM OF ONCE PER WEEK BY THE
LANDOWNER OR LANDOWNER'S REPRESENTATIVE.
10. DURING DRY PERIODS, ALL DISTURBED AREAS SHALL BE WATERED
FOR DUST CONTROL.
11. PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES,
CHANNELS, DITCHES, OR ANY DISTURBED LAND AREA SHALL BE
COMPLETED WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR
THE FINAL EARTH CHANGE HAS BEEN COMPLETED. WHEN IT IS NOT
POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA AFTER
EARTH CHANGE HAS BEEN COMPLETED OR WHERE SIGNIFICANT
EARTH CHANGE HAS BEEN COMPLETED OR WHERE SIGNIFICANT
EARTH CHANGES ACTIVITY CEASES, TEMPORARY SOIL EROSION
CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL
TEMPORARY SOIL EROSION CONTROL SHALL BE MAINTAINED UNTIL
PERMANENT SOIL EROSION CONTROL MEASURES ARE
IMPLEMENTED. ALL PERMANENT SOIL EROSION CONTROL MEASURES
WILL BE IMPLEMENTED AND ESTABLISHED BEFORE A CERTIFICATE
OF COMPLIANCE IS ISSUED.
12. FINAL GRADE, ESTABLISH VEGETATION, AND OR LANDSCAPE ALL
DISTURBED AREAS NOT BUILT OR PAVED UPON.
13. REMOVE ALL TEMPORARY SOIL EROSION DEVICES AFTER
PERMANENT STABILIZATION IS ESTABLISHED.
14. SOIL TYPES: 68
15. NAME OF NEAREST WATERCOURSE AND DISTANCE. CLINTON RIVER
500'± SOUTH.
16. NAME(S) AND PHONE NUMBER(S) FOR THE PERSON(S) RESPONSIBLE
FOR THE MAINTENANCE OF ALL TEMPORARY SOIL EROSION
CONTROL MEASURES WILL BE PROVIDED WHEN THE CONTRACTOR IS
SELECTED.
17. THE SOIL EROSION CONTROLS WILL BE MAINTAINED WEEKLY AND
AFTER EVERY STORM EVENT BY CONTRACTOR REPRESENTATIVE.
LIMITS OF PROPOSED
EARTH CHANGE
Erosion Control, Silt Fence
LEGEND
NO DEWATERING OR STOCKPILING OF MATERIAL IS
ANTICIPATED.
GROSS ACREAGE DISTURBED: 0.71 ACRES
OPERATION TIME SCHEDULE SEP OCT NOV
INSTALL TEMPORARY EROSION SEDIMENTATION CONTROL
TRAIL RECONSTRUCTION
CONSTRUCTION SEQUENCE
RESTORATION AND PERMANENT STABILATION
REMOVE TEMPORARY EROSION SEDIMENTATION CONTROL
DEC
NOTE: INSPECT SOIL EROSION MEASURES WEEKLY OR AFTER EACH RAIN EVENT
SOIL EROSION AND SEDIMENTATION CONTROL NOTES AND MAINTENANCE NOTES
LOCATION MAP
NOT TO SCALE
SITE
TEMPORARY
TURN-AROUND AREA
LANDSCAPE PLAN
CKS AAP JULY 2025
1" = 10'
5 10 20
0270-0209
CRT - WASHOUT
WEST OF
DEQUINDRE ROAD
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
06_Land--8/28/2025 12:48:44 PM
M:\0270\0270-0209\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_LANDSCAPE.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
℄ Ditch
LIMESTONE PATH
LOCATION MAP
NOT TO SCALE
SITE
ESTIMATED QUANTITIES
(THIS SHEET)
1. Biodegradable Straw Blanket 1000 SYD
2. Temporary Cover Crop Seed Mix 0.2 AC
3. Budget Dryland Seed Mix 0.2 AC
4. Landscape Maintenance & Warranty - 2 Years 1 LS
5. Cercis canadensis 'Redbud' 3 Ea
6. Cornus amomum 'Silky Dogwood' 18 Ea
7. Physocarpus opulifolius 'Common Ninebark' 15 Ea
8. Asclepias syriaca 'Common Milkweed' 38 Ea
9. Asclepias tuberosa 'Butterfly Weed' 38 Ea
10. Monarda fistulosa 'Bee-Balm' 38 Ea
11. Solidago speciosa 'Showy Goldenrod' 38 Ea
12. Andropogon gerardii 'Big Bluestem' 38 Ea
EX. 100 YEAR FLOODPLAIN
ELEVATION VARIES FROM 689.1
(FEMA SECTION "I") TO 691.8
(FEMA SECTION "J")
(FIRM 26125C0411F)
EX. R.O.W.
EX. R.O.W.
EX. WETLAND LIMITS
EX. WETLAND LIMITS
GENERAL LANDSCAPE NOTES:
12" MIN.
REMOVE PLASTIC
CONTAINER
PLANTING MIX, 4 PARTS
TOPSOIL TO 1 PART
NO SCALE
STRAW BLANKET
UNDISTURBED SUBGRADE
PERENNIAL PLANTING DETAIL
ORGANIC MATTER
BIODEGRADABLE
1. CONTRACTOR SHALL SUBMIT PLANT AND SEED MIX MATERIALS LIST
TO OWNER'S REPRESENTATIVE FOR APPROVAL PRIOR TO
INSTALLATION. ANY SUBSTITUTIONS OF PLANT MATERIAL OR
ALTERATION IN PLANT SIZES OR SPECIFICATION TO BE APPROVED
BY THE OWNER'S REPRESENTATIVE.
2. ALL CONSTRUCTION SHALL CONFORM TO THE CURRENT
STANDARDS AND SPECIFICATIONS OF LOCAL ORDINANCES.
3. INSTALLATION OF PLANT MATERIAL SHALL BE IN ACCORDANCE WITH
THE AMERICAN STANDARD FOR NURSERY STOCK.
4. ALL CONSTRUCTION AND PLANT MATERIAL LOCATION SHALL BE
ADJUSTED ON SITE IF NECESSARY AS APPROVED BY THE OWNER'S
REPRESENTATIVE.
5. NO PLANT MATERIAL SHALL BE INSTALLED WITHIN 8-FT OF THE
PROPOSED TRAIL CENTERLINE, EITHER SIDE.
6. ALL PLANTING AREAS SHALL BE FREE OF WEEDS, PREPARED WITH
APPROPRIATE SOIL MIXTURES, AND FERTILIZED PRIOR TO PLANT
INSTALLATION. SOIL MIXTURE SHALL BE "SPURT DIRT: 50-50
TOPSOIL/COMPOST PLANTING SOIL" BY SPURT INDUSTRIES, 1741
SCHOOL RD, ROCHESTER HILLS, MI 48307, 947-279-4510, OR
APPROVED EQUAL.
7. PROVIDE CLEAN BACKFILL SOIL, USING MATERIAL STOCKPILED ON
SITE. SOIL SHALL BE SCREENED AND FREE OF ANY DEBRIS, FOREIGN
MATERIAL, AND STONE.
8. PLANTS SHALL BE FULL, WELL-BRANCHED, AND IN HEALTHY
VIGOROUS GROWING CONDITION FREE OF DISEASE AND INSECTS
OR THEIR EGGS.
9. REMOVE ALL TWINE, WIRE, AND BURLAP FROM TREE AND SHRUB
EARTH BALLS, AND FROM TREE TRUNKS.
10. DIG SHRUB PITS 1' LARGER THAN SHRUB ROOT BALLS AND TREE
PITS 2' LARGER THAN ROOT BALL. BACK FILL WITH ONE PART TOP
SOIL AND ONE PART SOIL FROM EXCAVATED PLANTING HOLE.
11. TRUNK FLARE OF ALL WOODY MATERIAL SHALL BE EXPOSED.
12. PLANT MATERIAL, ESPECIALLY EVERGREENS, SHALL BE PLANTED
HIGHER THAN NORMAL WHEN HEAVY SOIL CONDITIONS (CLAY, ETC.)
PREVAIL.
13. PLANTS SHALL BE WATERED BEFORE AND AFTER PLANTING IS
COMPLETE.
14. ALL LARGE TREES AND EVERGREENS SHALL BE STAKED, GUYED,
AND WRAPPED PER DETAILS SHOWN ON PLAN.
15. NO TREES OR EVERGREENS SHALL BE INSTALLED OVER ANY
PROPOSED OR EXISTING UTILITY LINES AS SHOWN ON THE OVERALL
LANDSCAPE PLAN.
16. CONTRACTOR SHALL PROVIDE TREE GUARDS TO ALL WOODY PLANT
MATERIAL.
17. CONTRACTOR SHALL INSTALL BIODEGRADABLE STRAW BLANKET AS
SPECIFIED TO PROTECT ALL SEEDED AREAS.
18. PLANTS LOCATED ON SLOPES TO HAVE A BERM OF PREPARED SOIL
HALF WAY AROUND EACH PLANT ON THE DOWNSLOPE SIDE TO
RETAIN WATER AS SPECIFIED IN THE M.D.O.T. STANDARD
SPECIFICATION FOR LANDSCAPING.
12" MIN.
24" MIN.
2"-3" WIDE BELT LIKE NYLON
OR PLASTIC STRAPS WITH
GROMMETS (TYP.)
DOUBLE STRAND #11 WIRE
2" X 2" X 30" (MIN.)
STAKES SET 120° APART
REMOVE 1/2 BURLAP,
ALL PLASTIC COVERS,
CUT AND REMOVE
ALL NYLON CORD
PLANTING MIX, 4 PARTS TOPSOIL
TO 1 PART ORGANIC MATTER
NO SCALE NO SCALE
BIODEGRADABLE
UNDISTURBED SUBGRADE
TREE PLANTING DETAIL SHRUB PLANTING DETAIL
STRAW BLANKET
PLANT MATERIAL SCHEDULE
LEGEND
PLANT MATERIAL
CC-01
CC-01
CC-01
PO-01
PO-03
AG-05
AG-05
AG-05
AG-03
PO-03
CA-03
CA-03
CA-01
PO-01
PO-01
CA-03
PO-03
PO-01
PO-01
CA-05
AG-05
AG-03
AG-05
AG-07
AS-03
AT-03
SS-05
MF-05
AT-07
AS-07
AT-06
MF-03
MF-03
SS-03
SS-07
AT-05
SS-07
MF-08
MF-03
AT-03
AS-07
SS-07
AT-03
MF-05
SS-05
AT-08
AS-03
AT-03
AS-08
MF-05
SS-04
AS-03
AS-07
MF-03
MF-03
MWF BUDGET DRYLAND SEED MIX
AND COVER CROPPO-01
CA-03
TOPOGRAPHIC
SURVEY
REMOVAL PLAN
NAC AAP JULY 2025
1" = 10'
5 10 20
0270-0207
CRT COLLAPSE
EAST OF
MAIN STREET
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
07_Topo--8/28/2025 12:50:18 PM
M:\0270\0270-0207\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
CLINTON RIVER
CLINTON RIVER
BENCHMARKS
(NAVD88 DATUM)
BENCHMARK NO. 9000
CHIS. "X" NORTH RIM STORM
M.H. SOUTH CORNER OF
PARKING LOT, SOUTH OF MILL
STREET.
ELEVATION: 725.93
BENCHMARK NO. 9001
CHIS. "X" NORTH RIM STORM
M.H. SOUTH OF 158 MILL
STREET, ±1' NORTH OF CURB.
ELEVATION: 726.42
BENCHMARK NO.9002
TOP OF HYDRANT ±60'
SOUTHEAST OF ℄
SOUTHEAST CURVE OF MILL
STREET.
ELEVATION: 728.27
TRIDENT MILLTOWN LLC
15-14-153-043
CITY OF ROCHESTER
15-14-153-044
CITY OF ROCHESTER
15-14-152-001
PROPERTY LINE
EFFECTIVE 100 YEAR FLOODPLAIN
& FLOODWAY BASED FIRM
MAP 26155C0392F
(EFFECTIVE DATE 9/29/2006)
EX. 100 YEAR FLOODPLAIN
BASED ON TOPOGRAPHIC
SURVEY ELEVATION 723.3
PROPERTY LINE
SIGN
STORM SEWER
SPOT ELEVATION ("+" INDICATES
ELEVATION LOCATION UNLESS
OTHERWISE INDICATED)
LEGEND
HMA Surface, Rem
Fence, Rem
REMOVE EX. CONC. HEADWALL
(INCLUDED IN Excavation, Earth, Modified)
REMOVE RETAINING WALL
(INCLUDED IN Excavation, Earth, Modified)
ESTIMATED QUANTITIES
(THIS SHEET)
1. HMA Surface, Rem 226 Syd
2. Fence, Rem 130 Ft
3. Excavation, Earth, Modified 350 Cyd
LOCATION MAP
NOT TO SCALE
SITE
PROPOSED PERMANENT
PATHWAY EASEMEMT
PROPOSED 14' WIDE TEMPORARY
GRADING EASEMEMT
PROPOSED GRADING LIMITS
722724
CONSTRUCTION
PLAN
NAC AAP JULY 2025
1" = 10'
5 10 20
0270-0207
CRT COLLAPSE
EAST OF
MAIN STREET
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
08_Const--8/28/2025 12:50:31 PM
M:\0270\0270-0207\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
CLINTON RIVER
CLINTON RIVER
BENCHMARKS
(NAVD88 DATUM)
BENCHMARK NO. 9000
CHIS. "X" NORTH RIM STORM
M.H. SOUTH CORNER OF
PARKING LOT, SOUTH OF MILL
STREET.
ELEVATION: 725.93
BENCHMARK NO. 9001
CHIS. "X" NORTH RIM STORM
M.H. SOUTH OF 158 MILL
STREET, ±1' NORTH OF CURB.
ELEVATION: 726.42
BENCHMARK NO.9002
TOP OF HYDRANT ±60'
SOUTHEAST OF ℄
SOUTHEAST CURVE OF MILL
STREET.
ELEVATION: 728.27
TRIDENT MILLTOWN LLC
15-14-153-043
CITY OF ROCHESTER
15-14-153-044
CITY OF ROCHESTER
15-14-152-001
PROPERTY LINE
Riprap, Heavy, LM
(36" DIA. NATURAL STONE)
BOTTOM ELEVATION OF THE EMBANKMENT VARIES,
BURY BOTTOM ROW AT LEAST 1.5' BELOW GROUND.
AT LEAST TWO ROWS OF 36" BOULDERS IS
REQUIRED TO BE BURIED TO SUPPORT THE 24"
BOULDERS AT UPPER ELEVATIONS. THE TOP OF
THE 36" BOULDER RANGES BETWEEN 716.8 TO 718.2
DEPENDING ON THE EXISTING GROUND ELEVATION
Cofferdam, Temp
Fence, Split Rail, 48 inch
(2' OFF PROPOSED PATH)
(MATCH EX. FENCE)
MATCH EX.
724.50
724.40 724.00
723.90
724.00
723.90
724.50
724.30
MATCH EX.EFFECTIVE 100 YEAR FLOODPLAIN
& FLOODWAY BASED FIRM
MAP 26155C0392F
(EFFECTIVE DATE 9/29/2006)
EX. 100 YEAR FLOODPLAIN
BASED ON TOPOGRAPHIC
SURVEY ELEVATION 723.3
Riprap, Plain, LM
(24" DIA. NATURAL STONE)
(ELEV. 716.8/718.2 TO ELEV. 722.5)
PROPOSED PERMANENT
PATHWAY EASEMEMT
A
A
10.0'
PATHWAY
2.0'2.0'16.0'6.0'
1 MATCH
EX. GROUND
Fence, Split Rail, 48 inch
Riprap, Plain, LM
(24" DIA. NATURAL STONE)
Riprap, Heavy, LM
(36" DIA. NATURAL STONE)
TOP OF 36" DIA. BOULDER
ELEVATION VARIES 716.8 - 718.2
TOP OF 24" DIA. BOULDER
ELEVATION 722.5
EX. STONE SLABS
TO BE REMOVED
1.
5'
M
IN
BU
R Y
TOP OF WATER
ELEVATION 713.3
SECTION A-A
SCALE: 1" = 3'
GEOTEXTILE FABRIC
PROPERTY LINE
PROPOSED
100 YEAR FLOODPLAIN
R40'
R40'21
3.0'
4% SLOPE
PERMANENT PATHWAY EASEMENT WIDTH VARIES
HMA, 5E3 ON
HMA, 4E3 ON
Aggregate Base, 6 inch
PROPOSED GRADING LIMITS
PROPOSED 14' WIDE TEMPORARY
GRADING EASEMEMT
14' TEMPORARY GRADING EASEMENT
SLOPE VARIES
ESTIMATED QUANTITIES
(THIS SHEET)
1. HMA, 5E3 24 Ton
2. HMA, 4E3 52 Ton
3. Aggregate Base, 6 inch 261 Syd
4. Riprap, Heavy, LM 79 Syd
5. Riprap, Plain, LM 197 Syd
6. Fence, Split Rail, 48 inch 118 Ft
7. Cofferdam, Temp 1 LS
8. Station Grading, Trail 2.0 Sta
NOT TO SCALE
11.5'
10.5'
10.0'
BITUMINOUS PATHWAY DETAIL
Aggregate Base, 6 inch (CIP)
(98% MAX DENSITY)
2" OF HMA, 5E3 AT 92% TO
96% OF THE THEORETICAL
MAX DENSITY (TMD)
4" OF HMA, 4E3 AT 92% TO
96% OF THE THEORETICAL
MAX DENSITY (TMD)
APPLY BIT. BOND TACK COAT SS-1H AT
0.10 GAL/SFT. OR ADJUSTED BY THE
ENGINEER AS CONDITIONS WARRANT
4% SLOPE
3"
6" 6"
3"
REMOVE ALL TOPSOIL, MUCK, MARL AND/OR
ORGANIC MATERIAL FROM UNDER A 1 ON 1
INFLUENCE SLOPE OF LIMITS OF PROP.
AGGREGATE BASE MATERIAL AS SHOWN
(PAID FOR AS "Station Grading, Trail")
APPLY PRAMITOL 25E OR EQUIVALENT (AS
APPROVED BY THE ENGINEER) IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS
COUNTERSINKING DETAIL
NOT TO SCALE
4-5/8" DIA. x 8" BOLTS TYPICAL
AT ALL RAIL SPLICES
16 FT. LONG 2"x10" WOOD TOP RAIL FLUSH
WITH FACE OF SIDE RAILS
(8 FT. RAILS TO BE USED ONLY AT
TERMINATIONS OR DEFLECTIONS)
SECURELY FASTEN TOP RAILS TO
UPPER SIDE RAILS AND POSTS WITH
GALVANIZED LAG BOLTS
POST SHALL BE SPACED 8'-0" C-C
16 FT. LONG 2"x8" WOOD SIDE RAILS ON
PATH SIDE OF POSTS
(8 FT. RAILS TO BE USED ONLY AT
TERMINATIONS OR DEFLECTIONS)
FINISHED GRADE
BACKFILL POST WITH
PEA-GRAVEL
2-5/8" DIA. x 8" BOLTS
TYPICAL WHERE RAIL IS
CONTINUOUS
PLACE 1-5/8" DIA. WASHER UNDER EACH
NUT ON BACK SIDE OF FENCE AND
SPOIL THREADS TO PREVENT
UNAUTHORIZED REMOVAL
SECURELY FASTEN TOP RAILS TO
UPPER SIDE RAILS AND POSTS WITH
GALVANIZED LAG BOLTS
16 FT. LONG 2"x10" WOOD TOP RAIL FLUSH
WITH FACE OF SIDE RAILS
(8 FT. RAILS TO BE USED ONLY AT
TERMINATIONS OR DEFLECTIONS)
BEVEL POSTS @ 30°
16 FT. LONG 2"x8" WOOD SIDE RAILS ON
PATH SIDE OF POSTS
(8 FT. RAILS TO BE USED ONLY AT
TERMINATIONS OR DEFLECTIONS)
NOTE:
ALL WOOD SHALL BE PRESSURE
TREATED ACCORDING TO THE
REQUIREMENT OF A.S.T.M. D-1706
1 4"
1 4"
1 4"
1 4"
1 4"
4' -1
1 4"
3- 6"
M
IN
. D
EP
TH
NOT TO SCALE
RUSTIC RAIL FENCE DETAIL
SET BOLT HEAD
FLUSH WITH RAIL
2"x8" WOOD RAILS
LOCATION MAP
NOT TO SCALE
SITE
VARIES
1% - 2% VARIES
4 INCH OF @@A AGGREGATE
TO BE PLACED BELOW POSTS
FILL ALONG THE EDGE OF THE PATH
TO MATCH TOP OF PATH (PAID FOR
AS "Final Cleanup and Restoration")
COMPACT SUBBASE TO 95% MAX DENSITY
PRIOR TO PLACING AGGREGATE BASE
(PAID FOR AS "Aggregate Base, 6 inch (CIP)")
722724
SOIL EROSION
SEDIMENTATION
CONTROL PLAN
NAC AAP JULY 2025
1" = 10'
5 10 20
0270-0207
CRT COLLAPSE
EAST OF
MAIN STREET
CITY OF ROCHESTER
SHEET TITLE:
COPYRIGHT, 2025, ANDERSON, ECKSTEIN AND WESTRICK, INC.
CHECKED BY:DRAWN BY:
SCALE:
PRELIMINARY
DATE SUBMITTALS/REVISIONS
PROJECT NO.
SHEET NO.
CLIENT:
PROJECT NAME:
CONSTRUCTION RECORD
DATE:
09_SESC--8/28/2025 12:50:44 PM
M:\0270\0270-0207\CAD\DRAWINGS\CONSTRUCTION\CIVIL\01_CONST.DWG
Know what's below.
72 hours before you dig.
Call R
51301 Schoenherr Road Shelby Township, MI 48315
586.726.1234 | aewinc.com
Engineering Strong Communities
CLINTON RIVER
CLINTON RIVER
BENCHMARKS
(NAVD88 DATUM)
BENCHMARK NO. 9000
CHIS. "X" NORTH RIM STORM
M.H. SOUTH CORNER OF
PARKING LOT, SOUTH OF MILL
STREET.
ELEVATION: 725.93
BENCHMARK NO. 9001
CHIS. "X" NORTH RIM STORM
M.H. SOUTH OF 158 MILL
STREET, ±1' NORTH OF CURB.
ELEVATION: 726.42
BENCHMARK NO.9002
TOP OF HYDRANT ±60'
SOUTHEAST OF ℄
SOUTHEAST CURVE OF MILL
STREET.
ELEVATION: 728.27
LOCATION MAP
NOT TO SCALE
SITE
TRIDENT MILLTOWN LLC
15-14-153-043
CITY OF ROCHESTER
15-14-153-044
CITY OF ROCHESTER
15-14-152-001
Riprap, Heavy, LM
(36" DIA. NATURAL STONE)
Cofferdam, Temp
MATCH EX.
724.50
724.40 724.00
723.90 724.00
723.90
724.50
724.40
MATCH EX.
EFFECTIVE 100 YEAR FLOODPLAIN
& FLOODWAY BASED FIRM
MAP 26155C0392F
(EFFECTIVE DATE 9/29/2006)
EX. 100 YEAR FLOODPLAIN
BASED ON TOPOGRAPHIC
SURVEY ELEVATION 723.3
PROPOSED
100 YEAR FLOODPLAIN
Riprap, Plain, LM
(24" DIA. NATURAL STONE)
PROPOSED GRADING LIMITS
Erosion Control, Silt Fence
QUANTITIES (THIS SHEET)
Erosion Control, Silt Fence 150 Ft
1. THIS PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH
PART 91 OF ACT 451 OF 1994, AS AMENDED, THE SOIL EROSION AND
SEDIMENTATION CONTROL ACT AND THE WATER RESOURCE
COMMISSIONER OFFICE ORDINANCE.
2. ALL EROSION AND SEDIMENTATION CONTROL WORK SHALL
CONFORM TO THE STANDARDS AND SPECIFICATIONS OF THE WATER
RESOURCE COMMISSIONER OFFICE.
3. EROSION AND ANY SEDIMENTATION FROM WORK ON THIS SITE SHALL
BE CONTAINED ON THE SITE AND NOT ALLOWED TO COLLECT ON ANY
OFF SITE AREAS OR IN WATERWAYS. WATERWAYS INCLUDE BOTH
NATURAL AND MAN MADE OPEN DITCHES, STREAMS, STORM DRAINS,
LAKES, AND PONDS.
4. THE OWNER OR OWNER'S REPRESENTATIVE SHALL BE RESPONSIBLE
FOR INSTALLATION AND MAINTENANCE OF SOIL EROSION AND
SEDIMENTATION CONTROL DEVICES.
5. THE CONTRACTOR'S REPRESENTATIVE SHALL IMPLEMENT AND
MAINTAIN THE SOIL EROSION CONTROL MEASURES AS SHOWN ON
THE PLANS BEFORE AND AT ALL TIMES DURING CONSTRUCTION ON
THIS PROJECT. ANY MODIFICATIONS OR ADDITIONS TO SOIL EROSION
CONTROL MEASURES DUE TO CONSTRUCTION OR CHANGED
CONDITIONS SHALL BE COMPLIED WITH AS REQUIRED OR DIRECTED
BY THE OAKLAND COUNTY RESOURCE COMMISSIONER'S OFFICE.
6. IF ANY OF THE SESC MEASURES ON THE SITE ARE DEEMED
INADEQUATE OR INEFFECTIVE, THE OAKLAND COUNTY WATER
RESOURCE COMMISSIONER SESC DIVISION HAS THE RIGHT TO
REQUIRE ADDITIONAL SESC MEASURES AT THE EXPENSE OF THE
LANDOWNER.
7. INSTALL SILT FENCE AS INDICATED ON THE PLAN AND AT
ADDITIONAL AREAS AS NECESSARY.
A. SILT FENCE SHALL BE INSTALLED PER DETAIL.
B. BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN SEDIMENT
ACCUMULATES TO 1/3 TO 1/2 OF THE HEIGHT OF THE SILT
FENCE.
C. IF SILT FENCE FABRIC DECOMPOSES OR BECOMES INEFFECTIVE
PRIOR TO THE END OF EXPECTED USABLE LIFE AND THE
BARRIER IS STILL REQUIRED, THE SILT FENCE SHALL BE
REPLACED PROMPTLY.
D. SILT FENCE SHALL BE INSPECTED WEEKLY UNDER NORMAL
CONDITIONS, WITHIN 24 HOURS OF RAINFALL AND DAILY DURING
A PROLONGED RAIN EVENT. REQUIRED MAINTENANCE SHALL BE
PROVIDED PROMPTLY.
8. ALL DIRT TRACKED ONTO ANY ROADWAY SHALL BE REMOVED
IMMEDIATELY.
9. STREETS AND OR PARKING AREAS WILL BE SCRAPED ON A DAILY
BASIS AND SWEPT AT A MINIMUM OF ONCE PER WEEK BY THE
LANDOWNER OR LANDOWNER'S REPRESENTATIVE.
10. DURING DRY PERIODS, ALL DISTURBED AREAS SHALL BE WATERED
FOR DUST CONTROL.
11. PERMANENT SOIL EROSION CONTROL MEASURES FOR ALL SLOPES,
CHANNELS, DITCHES, OR ANY DISTURBED LAND AREA SHALL BE
COMPLETED WITHIN 5 CALENDAR DAYS AFTER FINAL GRADING OR
THE FINAL EARTH CHANGE HAS BEEN COMPLETED. WHEN IT IS NOT
POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA AFTER
EARTH CHANGE HAS BEEN COMPLETED OR WHERE SIGNIFICANT
EARTH CHANGE HAS BEEN COMPLETED OR WHERE SIGNIFICANT
EARTH CHANGES ACTIVITY CEASES, TEMPORARY SOIL EROSION
CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL
TEMPORARY SOIL EROSION CONTROL SHALL BE MAINTAINED UNTIL
PERMANENT SOIL EROSION CONTROL MEASURES ARE
IMPLEMENTED. ALL PERMANENT SOIL EROSION CONTROL MEASURES
WILL BE IMPLEMENTED AND ESTABLISHED BEFORE A CERTIFICATE
OF COMPLIANCE IS ISSUED.
12. FINAL GRADE, ESTABLISH VEGETATION, AND OR LANDSCAPE ALL
DISTURBED AREAS NOT BUILT OR PAVED UPON.
13. REMOVE ALL TEMPORARY SOIL EROSION DEVICES AFTER
PERMANENT STABILIZATION IS ESTABLISHED.
14. SOIL TYPES: 49
15. NAME OF NEAREST WATERCOURSE AND DISTANCE. CLINTON RIVER
ON SITE.
16. NAME(S) AND PHONE NUMBER(S) FOR THE PERSON(S) RESPONSIBLE
FOR THE MAINTENANCE OF ALL TEMPORARY SOIL EROSION
CONTROL MEASURES WILL BE PROVIDED WHEN THE CONTRACTOR IS
SELECTED.
17. THE SOIL EROSION CONTROLS WILL BE MAINTAINED WEEKLY AND
AFTER EVERY STORM EVENT BY CONTRACTOR REPRESENTATIVE.
LIMITS OF PROPOSED
EARTH CHANGE
Erosion Control, Silt Fence
LEGEND
NO DEWATERING OR STOCKPILING OF MATERIAL IS
ANTICIPATED.
GROSS ACREAGE DISTURBED: 0.18 ACRES
OPERATION TIME SCHEDULE SEP OCT NOV
INSTALL TEMPORARY EROSION SEDIMENTATION CONTROL
PATHWAY RECONSTRUCTION
CONSTRUCTION SEQUENCE
RESTORATION AND PERMANENT STABILATION
REMOVE TEMPORARY EROSION SEDIMENTATION CONTROL
DEC
NOTE: INSPECT SOIL EROSION MEASURES WEEKLY OR AFTER EACH RAIN EVENT
SOIL EROSION AND SEDIMENTATION CONTROL NOTES AND MAINTENANCE NOTES
LIMITS OF PROPOSED EARTH CHANGE (TYP.)
| 01_Title |
| 02_Topo |
| 03_Const |
| 04_Drainage map |
| 05_SESC |
| 06_Land |
| 07_Topo_0270-0207 |
| 08_Const_ 0270-0207 |
| 09_SESC_0270-0207 |
| 10_Rochester Storm Standard Details |
| 11_Rochester Paving Standard Details |
| 12_WRC SESC Details |