Combined Synopsis Solicitation.docx
DOCX document 61 KB Posted
- Solicitation number
- 36C24126Q0443
About this file
This is a Combined Synopsis Solicitation and Request for Quote (RFQ) issued by the Department of Veterans Affairs (VA) Veterans Health Administration (VHA) for the West Haven VA Medical Center, with work to be performed at the Newington VA Medical Center in Connecticut. The procurement is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220 with a $19 million size standard, and is classified under FSC/PSC J045. The VA seeks quotations for the furnishing and installation of two Patterson Kelley Compact Model PK08S/2.5E Compact Semi-Instantaneous Domestic Hot Water Heaters or equivalent units to replace existing equipment in Building 2W due to sediment contamination affecting clinical services. The scope of work includes all labor, materials, equipment, disposal, removal of existing equipment, installation, post-installation testing, certification, and a minimum two hours of manufacturer-specific training to VA plumbing and maintenance staff. Contract performance will occur over 180 calendar days from Notice to Proceed, with a contract period running May 15, 2026 through July 14, 2026.
Quoters must attend a mandatory pre-bid walkthrough on April 23, 2026 at 9:30 a.m. at the Newington VA Medical Center and must have a field service representative located within 100 miles of the facility who is trained by the Original Equipment Manufacturer on the specific equipment model. All questions must be submitted in writing by April 28, 2026 at 5:00 p.m. EST to Shawn Lawrence (Shawn.Lawrence@va.gov), and final quotations must be submitted by May 7, 2026 at 5:00 p.m. EST. Award will be made based on comparative evaluation of price, technical capability, and past performance. All quoters must provide labor rates for compliance with Service Contract Labor Standards, confirm acceptance of terms and conditions, and demonstrate compliance with extensive VA security, privacy, infection prevention, records management, and operational requirements outlined in the solicitation appendices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24126Q0443_3.docx | DOCX document | |
| 36C24126Q0443_2.docx | DOCX document | |
| Combined Synopsis Solicitation Amended 1.docx | DOCX document | |
| Combined Synopsis Solicitation Amended.docx | DOCX document | |
| 36C24126Q0443_1.docx | DOCX document | |
| 36C24126Q0443.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Combined Synopsis Solicitation Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.
This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-06; October 1, 2025. The most recent Federal Acquisition Circular can be found at Acquisition.gov.
This solicitation is set-aside for SDVOSB
The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $19 Million.
The FSC/PSC is J045.
The West Haven VA Medical Center 950 Campbell Ave West Haven, CT 06516 is seeking to repair the Supervisory Control and Data Acquisition (SCADA) system.
All interested companies shall provide quotations for the following:
Supplies/Services
| Line Item |
| Description |
| Quantity |
| Unit of Measure |
| Unit Price |
| Total Price |
| 0001 |
| WATER HEATER ISOLATION VALVES |
| 1 |
| JB |
STATEMENT OF WORK
G139 WATER HEATER ISOLATION VALVES
VA CONNECTICUT HEALTHCARE SYSTEM (VACHS)
VA MEDICAL CENTER NEWINGON
555 WILLARD AVENUE
NEWINGTON, CT 06111
BACKGROUND
VA Connecticut Healthcare System requires the replacement of existing hot water heating equipment serving Building 2W at the VA Medical Center Newington.
JUSTIFICATION
Brown water impacting Building 2W and clinical services was discovered. A Water Analysis Report was conducted and sediment in water heater through a likely pinhole leak(s) was identified. Existing equipment requires replacement to restore hot water functionality to Building 2W.
PLACE OF PERFORMANCE
The place of performance for this contract is VA Connecticut Healthcare System, Newington VA Medical Center located at 555 Willard Avenue, Newington, CT 06111.
PERIOD OF PERFORMANCE
The Contract Time Period of Performance will be 180 Calendar Days from Notice to Proceed (NTP) and includes service provider closeout.
QUALIFICATIONS
To be considered eligible for consideration, potential bidders shall have a field service representative located within 100 miles of the Newington Campus of the VA Connecticut Healthcare System and have been trained by the Original Equipment Manufacturer (OEM) on the specific model of equipment that he/she is being asked to provide services for.
Bidders must provide upon request, documentation of factory certified service/maintenance training on the specific equipment under the terms of this contract. The Contracting Officer (CO) and/or Contracting Officer’s Representative (COR) specifically reserve the right to reject any of the Service Provider’s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided.
Bidders will be responsible for complying with the VA Connecticut Healthcare System policy for Lockout Tagout, all equipment, supplies, and external support to perform work.
The Contracting Officer (CO) and/or Contracting Officer’s Representative (COR) specifically reserve the right to reject any of the Service Provider’s personnel and refuse them permission to work on the equipment outlined herein, based upon credentials provided.
Bidders shall be evaluated on past performance, technical capability, and financial capability to perform this work.
Bidders shall perform a mandatory pre-bid walkthrough at 9:30 a.m. on April 23, 2026 at VA Medical Center Newington located at 555 Willard Avenue; Newington, CT 06111. Meet on the 3rd Floor of Building 3 Facilities Management Office and obtain a temporary day badge and complete a sign-in sheet.
SCOPE OF WORK
The Service Provider shall furnish all labor, materials, equipment, tools, supervision, disposal, and all incidentals to complete work for the services described in this document to furnish and install heating water equipment and perform start-up services and training (per cut sheets and O&M Manuals handouts and presentation). The service provider shall work with the VA COR and designated POC to coordinate installation.
A Building 2W water outage is not required because heat exchange unit can be isolated out for service if required.
No work shall be performed on Government Holidays unless an emergency status has been indicated by the Contracting Officer.
US Federal Holidays:
New Year’s Day Martin Luther King Jr. Day President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
Description of Services:
The project will include but not be limited to the following:
1. Service Provider shall schedule and coordinate all work with the VA COR, Maintenance Supervisor, and Chief, Maintenance & Operations.
2. All LOTO requests and procedures shall be in compliance with the VA Connecticut Healthcare System Medical Center Policy 138-075.
3. Coordinate all placement and removal of Lockout Tagout devices for any energy source with the VA COR/Maintenance & Operations.
4. Protect all equipment in place during replacement activities.
5. Coordinate Hot Work Permit with the VA COR and VACHS Safety Department.
6. In accordance with VHA Operational Alert and Guidance, NO cast iron fittings and pipe components (valves, steam traps, etc.) shall be used. Reference VHA Directive 1810(1) as amended on September 11, 2018: 5.a(1) and 5.b(1).
7. ASTM A193 bolts shall be utilized and replace any ASTM A307 bolts at locations of steam piping, flanges, gaskets, and other hardware where piping replacements are included within this scope of work. Reference Veterans Health Administration (VHA) Master Specifications for Hydronic Piping (Specification 23 22 13) and Steam and Condensate Heating Piping (Specification 23 22 13) where applicable.
8. Repair of existing cast iron fittings or piping components is permissible in specific instances but must be reported and coordinated with the CO and COR for approval before starting the work through submittal process with justification as necessary.
9. All new steam and condensation line shall be Schedule 80. All new steam and condensate lines that utilize valves to isolate or divert medium pressure shall be installed new as a double in series valve system where the option exists to utilize welded vs threaded.
10. Facilities Management Service shall disconnect existing Domestic Hot Water Heater.
11. Service Provider shall remove and turn over existing Domestic Hot Water Heater and associated components as desired by the FMS O&M Section at time of removal and to location designated else to be properly disposed of by state and federal rules and regulations.
12. Service Provider shall deliver and install two (2) Patterson Kelley Compact Model PK08S/2.5E Compact Semi-Instantaneous Domestic Hot Water Heaters or equivalent.
Equipment shall have capacity to heat 80GPM of water from 40° F to 140° F when supplied with 4,224 lbs./hr of 25 PSIG Steam to the control valve, 14 PSIG in the coil.
Each packaged water heater shall consist of the following components, completely factory assembled, ready for connection to services:
1. PK COMPACT® water heater with vertical support.
2. 1 ½” Bronze A.S.M.E. rated pressure & temperature relief valve set at 150 psig & 210° F.
3. Bronze circulator pump pre-wired with pilot lighted ON/OFF switch operating at 115-volts/60-hertz/single phase. The purpose of the pump is to prevent scale.
4. Double solenoid temperature limit system.
5. Insulation is flexible foam insulation laminated to a durable, reinforced PVC jacket in accordance with the current A.S.H.R.A.E. standards.
6. Integral Anticipator® temperature control system.
Steam to Water
7. Temperature control valve – 2 ½” RTK Electric Steam Control Valve
8. 1 ½” Float & thermostatic steam trap.
9. Domestic water thermometer (3-1/2” diameter dial minimum) direct mounted with separable thermowell.
10. Steam pressure gauge (3-1/2” diameter dial minimum) with shut off cock.
11. 2 ½” steam Y strainer (shipped loose for field installation).
12. 1 ½” Pressure only relief valve.
13. ½” Auxiliary drip trap.
MATERIALS OF CONSTRUCTION
Shell - 90/10 Copper-Nickel, A.S.M.E. certified for 155 psig working pressure Tubes – 90/10 Copper-Nickel- Single Wall Tube Sheet - Solid Copper Alloy Baffles - Teflon Shell Connections - Solid Copper Alloy
Skid shall fit base dimension of like unit to Patterson Kelley Compact Model PK08S/2.5E Compact Semi-Instantaneous Domestic Hot Water Heater sized unit.
Electrical requirements shall not exceed 20 AMPS 120/240V availability at location of tie in at Panel and circuit as of unit removed.
13. Service provider shall perform all post installation inspections, testing, and certification of work completed. Acceptance testing shall be witnessed by the VA COR and VA qualified staff.
14. Service provider shall provide a minimum of 2 hours of training specific to manufacturer equipment to VACHS plumbing shop and Facilities Maintenance Staff.
SUBMITTALS/DELIVERABLES
1. Service Provider shall furnish disposal manifest for all materials applicable to state and federal codes.
2. Service Provider shall furnish all submittal item documentation (with final disposition) and final documentation report with all tests, photos, corrections made within 14 business days after work is completed.
3. Service Provider shall furnish all material certifications for any replacement parts used.
4. A minimum warranty of two years on all parts, labor, workmanship, and equipment shall be furnished.
All service provider personnel, sub-service providers, and representatives visiting VA sites will be required to sign in upon arrival at Building 3, 3rd Floor Facilities Management Service office and retain a temporary VA badge. Each visiting individual will be required to enter their name, their company’s name, VA project title, reason for visit, and the times of arrival and departure. Arrangements for after normal hour working site visits must be made in advance and during normal working hours.
A. General: The Contracting Officer reserves the right to terminate any services, without payment for services completed, if such services are not needed or are not being adequately completed.
B. Approved Plans and Permits: Prior to the start of work, submit to VA copies of all required permits.
C. Site Visits: Day to day construction administration will be performed by the COR. Periodic reviews, tests, and other field observation by the Government are not to be interpreted as superintendence nor as resulting in any approval of the service provider’s apparent progress toward meeting the Government’s objectives; but are intended to discover any information that the Contracting Officer may be able to call to the service provider’s attention to prevent costly misdirection of effort.
The service provider shall remain responsible for constructing, operating, and maintaining the site in full accordance if the requirements of this solicitation.
The service provider shall provide VA with a copy of all inspection reports for inspections conducted by local, regional, and state code authorities from the start of construction through issuance of the certificate of occupancy or completion.
D. The service provider shall develop and provide to the VA the following:
a. Safety Plan: The service provider shall produce work in accordance with the latest editions of all applicable DVA guidelines (e.g. Construction Standards, Master Specifications, Standard Details, Special Design Criteria to meet Hospital Joint Commission (JCAHO) requirements), NFPA, Federal and State codes pertinent to the project scope.
E. All applicable personnel on site are required to obtain an Occupational Safety and Health Administration (OSHA) 10-hour construction certification, and the site competent person for the service provider must obtain an OSHA 30-hour construction certification.
F. Per VA Directive 1805, smoking vaping, and smokeless tobacco are prohibited on the grounds of VA facilities, including in vehicles. This Directive applies to all Service providers and their employees.
G. No photography of VA premises is allowed without written permission of the contracting officer. Patients and staff are not to be photographed at any time.
H. Prior to commencing work onsite, all Service providers and provider personnel shall furnish proof of receipt of required Tuberculosis testing in compliance with VHA Directive 1131(5), dated June 04, 2021.
I. Parking for Service provider and its employees shall be in designated areas only. Service provider to coordinate with COR.
J. The Service provider shall confine all operations (including storage of materials) on government premises to areas authorized or approved by the VA Contracting Officer. The Service provider shall hold and save the government, its officers, and agents, free and harmless from liability of any nature occasioned by the Service provider’s performance. Working space and space available for storing materials shall be as determined by the COR. Workers are subject to the rules of the Medical Center applicable to their conduct. Execute work in such a manner as to reduce impacts with work being done by others.
K. Billing: Provide COR with a report or statement of work completed and include statements with request for payment. Statement should include service completed and the date each service item was completed. Labor charges shall be billed hourly, and any unused labor totals will be credited back to the VA Medical Center on the next billing cycle, upon receipt of the service report.
Safety Codes / Certification / Licensing:
Environmental abatement work, if necessary, is to be performed by Service provider under supervision and monitoring for the VA by a Certified Industrial Hygienist.
The Service provider shall comply with all codes as described above, as well as codes customarily applied in VA construction jobs such as NFPA fire code, OSHA, VA Design Guides, etc. Labs used by the service provider shall be licensed as required by any applicable governing agencies, and their certifications and licenses shall be included in the reports.
NARA Records Management Requirements
The following standard items relate to records generated in executing this contract:
1. Citations to pertinent laws, codes and regulations such as 44 U.S.C. Chapter 21, 29, 31, and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a); 36 CFR Part 1222 and Part 1228.
2. Contractor shall treat all deliverables under the contract as the property of the U.S. Government for which the Government Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest.
3. Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government ‘IT’ equipment and/or Government records.
4. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act.
5. The Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract.
6. The Government Agency owns the rights to all data/records produced as part of this contract.
7. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.
8. The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.] or state of completion [draft, final, etc.].
9. No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules.
10. The Contractor is required to obtain the Contracting Officer’s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.
APPENDIX A
INFECTION PREVENTION MEASURES
A. Implement the requirements of VA Medical Center’s Infection Control Risk Assessment (ICRA) team. ICRA Group may monitor dust, in the vicinity of the construction work, and require the Service Provider to take corrective action immediately if the safe levels are exceeded.
B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group as specified here. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to Project Manager and Facility ICRA team for review for compliance with contract requirements in accordance with Section 01340, SAMPLES AND SHOP DRAWINGS.
1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.
C. Medical Center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:
1. The Project Manager and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity.
Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.
2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.
D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.
1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by Resident Engineer. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during construction.
2. Analyze each site during design to determine the effects of blocking HVAC ducts and their impact on existing air handling systems that must remain operational before initiating a dust control program. The method of capping ducts shall be dust tight and withstand airflow.
3. Construct anteroom to maintain negative airflow from clean area through anteroom and into work area where required.
4. High risk patient care areas may require additional measures like air locks, special signage, smoke and negative pressure alarms.
5. Identify these areas clearly on the drawings and work with Medical Center personnel to achieve desired level of isolation suited to the scope of risk involved.
6. Do not perform dust- producing tasks within occupied areas without the approval of the Project Manager. For construction in any areas that will remain jointly occupied by the medical Center and Contractor’s workers, the Contractor shall:
a. Provide dust proof fire-rated temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the Resident Engineer and Medical Center.
b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA (High Efficiency Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other pre-filter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.
c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 24” x 36”, shall be used at all Interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.
d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration.
Maintain surrounding area frequently. Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids.
e. The contractor shall not haul debris through patient-care areas without prior approval of the Resident Engineer and the Medical Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.
f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
1. All new air ducts shall be cleaned prior to final inspection. SPEC WRITER NOTE: On small projects developed at Medical Center, Engineering Officer may tag items to be removed and stored, instead of noting such items on drawings or in specifications.
END OF APPENDIX
APPENDIX B
VA INFORMATION AND INFORMATION SYSTEM SECURITY/PRIVACY LANGUAGE FOR
INCLUSION INTO CONTRACTS, AS APPROPRIATE
NOTE: Any sections (1-14) which DO NOT apply should not be included in the Statement of Work (SOW), Performance Work Statement (PWS), Product Description (PD) or contract.
1. GENERAL. This entire section applies to all acquisitions requiring any Information Security and Privacy language. Contractors, contractor personnel, subcontractors and subcontractor personnel will be subject to the same federal laws, regulations, standards, VA directives and handbooks, as VA personnel regarding information and information system security and privacy.
2. VA INFORMATION CUSTODIAL LANGUAGE. This entire section applies to all acquisitions requiring any Information Security and Privacy language. a. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General. The primary clause used to define computer software license (not data/intellectual property first produced under this contractor or order) is FAR 52.227-19, Commercial Computer Software License.
b. Information made available to the contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
c. VA information will not be co-mingled with any other data on the contractor’s information systems or media storage systems. The contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization.
d. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to contractor and subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG), and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.
e. The contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies.
f. The contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service.
g. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contactor.
h. The contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations.
i. The contractor’s firewall and web services security controls, as applicable, shall meet or exceed VA’s minimum requirements.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response.
k. Notwithstanding the provision above, the contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality-assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the contractor is in receipt of a court order or other requests for the above-mentioned information, the contractor shall immediately refer such court order or other requests to the VA CO for response.
l. Information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service.
m. Any data destruction done on behalf of VA by a contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.
n. The contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the contractor shall return all Federal Records to VA for disposition.
o. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA.The contractor shall hold the appropriate material until otherwise directed by the Contracting Officer’s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140-2 (or its successor) and NIST 800-52. If mailed, the contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract.
p. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the contractor at the end of lease, loan, or trade-in. Exceptions to this paragraph will only be granted with the written approval of the VA CO.
3. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS. This section applies when any person requires access to information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract.
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and subcontractors only to the extent necessary to perform the services specified in the solicitation or contract. This includes indirect entities, both affiliate of contractor/subcontractor and agent of contractor/subcontractor.
b. Contractors and subcontractors shall sign the VA Information Security Rule of Behavior (ROB) before access is provided to VA information and information systems (see Section 4, Training, below). The ROB contains the minimum user compliance requirements and does not supersede any policies of VA facilities or other agency components which provide higher levels of protection to VA’s information or information systems. Users who require privileged access shall complete the VA elevated privilege access request processes before privileged access is granted.
c. All contractors and subcontractors working with VA information are subject to the same security investigative and clearance requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors shall be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office of Human Resources and Administration/Operations, Security and Preparedness (HRA/OSP) is responsible for these policies and procedures. Contract personnel who require access to classified information or information systems shall have an appropriate security clearance. Verification of a Security Clearance shall be processed through the Special Security Officer located in HRA/OSP. Contractors shall conform to all requirements stated in the National Industrial Security Program Operating Manual (NISPOM).
d. All contractors and subcontractors shall comply with conditions specified in VAAR 852.204-71(d); Contractor operations required to be in United States. All contractors and subcontractors working with VA information must be permanently located within a jurisdiction subject to the law of the United States or its Territories to the maximum extent feasible. If services are proposed to be performed abroad the contractor must state where all non-U.S. services are provided. The contractor shall deliver to VA a detailed plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the COR/CO in writing prior to access being granted.
e. The contractor shall notify the COR/CO in writing immediately (no later than 24 hours) after personnel separation or occurrence of other causes. Causes may include the following:
(1) Contractor/subcontractor personnel no longer has a need for access to VA information or VA information systems.
(2) Contractor/subcontractor personnel are terminated, suspended, or otherwise has their work on a VA project discontinued for any reason.
(3) Contractor believes their own personnel or subcontractor personnel may pose a threat to their company’s working environment or to any company-owned property. This includes contractor-owned assets, buildings, confidential data, customers, employees, networks, systems, trade secrets and/or VA data.
(4) Any previously undisclosed changes to contractor/subcontractor background history are brought to light, including but not limited to changes to background investigation or employee record.
(5) Contractor/subcontractor personnel have their authorization to work in the United States revoked.
(6) Agreement by which contractor provides products and services to VA has either been fulfilled or terminated, such that VA can cut off electronic and/or physical access for contractor personnel.
f. In such cases of contract fulfillment, termination, or other causes; the contractor shall take the necessary measures to immediately revoke access to VA network, property, information, and information systems (logical and physical) by contractor/subcontractor personnel. These measures include (but are not limited to): removing and then securing Personal Identity Verification (PIV) badges and PIV – Interoperable (PIV-I) access badges, VA-issued photo badges, credentials for VA facilities and devices, VA-issued laptops, and authentication tokens. Contractors shall notify the appropriate VA COR/CO immediately to initiate access removal.
g. Contractors/subcontractors who no longer require VA accesses will return VA-issued property to VA. This property includes (but is not limited to): documents, electronic equipment, keys, and parking passes. PIV and PIV-I access badges shall be returned to the nearest VA PIV Badge Issuance Office. Once they have had access to VA information, information systems, networks and VA property in their possessions removed, contractors shall notify the appropriate VA COR/CO.
4. TRAINING. This entire section applies to all acquisitions which include section 3. a. All contractors and subcontractors requiring access to VA information and VA information systems shall successfully complete the following before being granted access to VA information and its systems: (1) VA Privacy and Information Security Awareness and Rules of Behavior course (Talent Management System (TMS) #10176) initially and annually thereafter.
(2) Sign and acknowledge (electronically through TMS #10176) understanding of and responsibilities for compliance with the Organizational Rules of Behavior, relating to access to VA information and information systems initially and annually thereafter; and
(3) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system or information access [to be defined by the VA program official and provided to the VA CO for inclusion in the solicitation document – i.e., any role-based information security training].
b. The contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the required training is complete.
5. SECURITY INCIDENT INVESTIGATION. This entire section applies to all acquisitions requiring any Information Security and Privacy language. a. The contractor, subcontractor, their employees, or business associates shall immediately (within one hour) report suspected security / privacy incidents to the VA OIT’s Enterprise Service Desk (ESD) by calling (855) 673-4357 (TTY: 711). The ESD is OIT’s 24/7/365 single point of contact for IT-related issues. After reporting to the ESD, the contractor, subcontractor, their employees, or business associates shall, within one hour, provide the COR/CO the incident number received from the ESD.
b. To the extent known by the contractor/subcontractor, the contractor/ subcontractor's notice to VA shall identify the information involved and the circumstances surrounding the incident, including the following: (1) The date and time (or approximation of) the Security Incident occurred.
(2) The names of individuals involved (when applicable).
(3) The physical and logical (if applicable) location of the incident.
(4) Why the Security Incident took place (i.e., catalyst for the failure).
(5) The amount of data belonging to VA believed to have been compromised.
(6) The remediation measures the contractor is taking to ensure no future incidents of a similar nature.
c. After the contractor has provided the initial detailed incident summary to VA, they will continue to provide written updates on any new and relevant circumstances or facts they discover. The contractor, subcontractor, and their employes shall fully cooperate with VA or third-party entity performing an independent risk analysis on behalf of VA. Failure to cooperate may be deemed a material breach and grounds for contract termination.
d. VA IT contractors shall follow VA Handbook 6500, Risk Management Framework for VA Information Systems VA Information Security Program, and VA Information Security Knowledge Service guidance for implementing an Incident Response Plan or integrating with an existing VA implementation.
e. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG, and the VA Office of Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
f. The contractor shall comply with VA Handbook 6500.2, Management of Breaches Involving Sensitive Personal Information, which establishes the breach management policies and assigns responsibilities for the oversight, management and reporting procedures associated with managing of breaches.
g. With respect to unsecured Protected Health Information (PHI), the contractor is deemed to have discovered a data breach when the contractor knew or should have known of breach of such information. When a business associate is part of VHA contract, notification to the covered entity (VHA) shall be made in accordance with the executed BAA.
h. If the contractor or any of its agents fails to protect VA sensitive personal information or otherwise engages in conduct which results in a data breach involving any VA sensitive personal information the contractor/subcontractor processes or maintains under the contract; the contractor shall pay liquidated damages to the VA as set forth in clause 852.211-76, Liquidated Damages—Reimbursement for Data Breach Costs.
6. INFORMATION SYSTEM DESIGN AND DEVELOPMENT. This entire section applies to information systems, systems, major applications, minor applications, enclaves, and platform information technologies (to include the subcomponents of each) designed or developed for or on behalf of VA by any non-VA entity.
a. Information systems designed or developed on behalf of VA at non-VA facilities shall comply with all applicable Federal law, regulations, and VA policies. This includes standards for the protection of electronic Protected Health Information (PHI), outlined in 45 C.F.R. Part 164, Subpart C and information and system security categorization level designations in accordance with FIPS 199, Standards for Security Categorization of Federal Information and Information Systems and FIPS 200, Minimum Security Requirements for Federal Information Systems. Baseline security controls shall be implemented commensurate with the FIPS 199 system security categorization (reference VA Handbook 6500 and VA Trusted Internet Connections (TIC) Architecture).
b. Contracted new developments require creation, testing, evaluation, and authorization in compliance with VA Assessment and Authorization (A&A) processes in VA Handbook 6500 and VA Information Security Knowledge Service to obtain an Authority to Operate (ATO). VA Directive 6517, Risk Management Framework for Cloud Computing Services, provides the security and privacy requirements for cloud environments.
c. VA IT contractors, subcontractors and third-party service providers shall address and/or integrate applicable VA Handbook 6500, VA Handbook 6517, Risk Management Framework for Cloud Computing Services and Information Security Knowledge Service specifications in delivered IT systems/solutions, products and/or services. If systems/solutions, products and/or services do not directly match VA security requirements, the contractor shall work though the COR/CO to identify the VA organization responsible for governance or resolution. Contractors shall comply with FAR 39.1, specifically the prohibitions referenced.
d. The contractor (including producers and resellers) shall comply with Office of Management and Budget (OMB) M-22-18 and M-23-16 when using third-party software on VA information systems or otherwise affecting the VA information. This includes new software purchases and software renewals for software developed or modified by major version change after the issuance date of M-22-18 (September 14, 2022). The term “software” includes firmware, operating systems, applications and application services (e.g., cloud-based software), as well as products containing software. The contractor shall provide a self-attestation that secure software development practices are utilized as outlined by Executive Order (EO)14028 and NIST Guidance. A third-party assessment provided by either a certified Federal Risk and Authorization Management Program (FedRAMP) Third Party Assessor Organization (3PAO) or one approved by the agency will be acceptable in lieu of a software producer's self-attestation.
e. The contractor shall ensure all delivered applications, systems and information systems are compliant with Homeland Security Presidential Directive (HSPD) 12 and VA Identity and Access management (IAM) enterprise identity management requirements as set forth in OMB M-19-17, M-05-24, FIPS 201-3, Personal Identity Verification (PIV) of Federal Employees and Contractors (or its successor), M-21-31 and supporting NIST guidance. This applies to Commercial Off-The-Shelf (COTS) product(s) that the contractor did not develop, all software configurations and all customizations.
f. The contractor shall ensure all contractor delivered applications and systems provide user authentication services compliant with VA Handbook 6500, VA Information Security Knowledge Service, IAM enterprise requirements and NIST 800-63, Digital Identity Guidelines, for direct, assertion-based authentication and/or trust-based authentication, as determined by the design and integration patterns. Direct authentication at a minimum must include Public Key Infrastructure (PKI) based authentication supportive of PIV and/or Common Access Card (CAC), as determined by the business need and compliance with VA Information Security Knowledge Service specifications.
g. The contractor shall use VA authorized technical security baseline configurations and certify to the COR that applications are fully functional and operate correctly as intended on systems in compliance with VA baselines prior to acceptance or connection into an authorized VA computing environment. If the Defense Information Systems Agency (DISA) has created a Security Technical Implementation Guide (STIG) for the technology, the contractor may configure to comply with that STIG. If VA determines a new or updated VA configuration baseline needs to be created, the contractor shall provide required technical support to develop the configuration settings. FAR 39.1 requires the population of operating systems and applications includes all listed on the NIST National Checklist Program Checklist Repository.
h. The standard installation, operation, maintenance, updating and patching of software shall not alter the configuration settings from VA approved baseline configuration. Software developed for VA must be compatible with VA enterprise installer services and install to the default “program files” directory with silently install and uninstall. The contractor shall perform testing of all updates and patching prior to implementation on VA systems.
i. Applications designed for normal end users will run in the standard user context without elevated system administration privileges.
j. The contractor-delivered solutions shall reside on VA approved operating systems. Exceptions to this will only be granted with the written approval of the COR/CO.
k. The contractor shall design, develop, and implement security and privacy controls in accordance with the provisions of VA security system development life cycle outlined in NIST 800-37, Risk Management Framework for Information Systems and Organizations: A System Life Cycle Approach for Security and Privacy, VA Directive and Handbook 6500, and VA Handbook 6517.
l. The Contractor shall comply with the Privacy Act of1974 (the Act), FAR 52.224-2 Privacy Act, and VA rules and regulations issued under the Act in the design, development, or operation of any system of records on individuals to accomplish a VA function.
m. The contractor shall ensure the security of all procured or developed information systems, systems, major applications, minor applications, enclaves and platform information technologies, including their subcomponents (hereinafter referred to as “Information Systems”)…
This is the start of the file's text. The full file is on GovTribe.