Combined Drawings Updated.pdf
PDF 12 MB Posted
- Attached to
- Z2DA--Renovate Space in Medical Rehabilitation Building for Adaptive Bowling 657-19-200JB
- Solicitation number
- 36C25520R0135
About this file
This document provides details for a federal contract solicitation to renovate space in a medical rehabilitation building for adaptive bowling. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 seeking a contractor to develop four new bowling lanes to replace six lanes being removed from a building targeted for demolition. The contractor will provide all labor, materials, tools, equipment, supervision and completely prepare the site located at the Jefferson Barracks Division of the St. Louis VAMC to perform the work outlined in the drawings and specifications for project 657-19-200JB Renovate Space in Medical Rehabilitation Building for Adaptive Bowling. The solicitation includes the project name and number, a description of the work required, and identifies the issuing agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0135_1.docx | DOCX document | |
| Combined Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
SITE
H ig hw ay
Koch Rd
Koch Rd Sout h E nt ra nc e
Jefferson Dr
E C ir c le
D r
M ill er S t
G ra v e s S t
Dugan St
J B
N a t'l
C e m
J B
N a t' l
C e m
JB
N at 'l
C em
Mississippi River
N o rth
E n tran ce
PROJECT SITE
N O
R T H
TRUE
NORTH
PLAN
BUILDING
BUILDING
PROJECT
LOCATION
BUILDING
LOADING
DOCK
VA APPROVAL
APPROVED: DIRECTOR, VAPHCS
APPROVED: ASSOCIATE DIRECTOR, VAPHCS
APPROVED: VP, FMS
APPROVED: VISN, FIRE SAFETY PROFESSIONAL
ENGINEER
APPROVED: PROGRAM MANAGER, ENGINEERING
APPROVED: SUPERVISOR, PROJECTS
APPROVED: CONTRACTING OFFICER REPRESENTATIVE
(COR)
APPROVED:
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
VA FORM 08-6231
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
CHIEF ENGINEER -
PRESIDENT -
DECLARATION WRITER -
CONSTITUTION WRITER -
VA CREATOR -Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
COVER
1 5DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
REHAB FACILITY BOWLING
ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER,
ST. LOUIS, MO 63125
VA PROJECT NUMBER: 657-19-200JB
TJS
657-19-200JB
-GI-001
100% CONSTRUCTION DOCUMENTS
U.S. Department of Veterans Affairs VA St. Louis Health Care System
LOCATION MAP LEGEND PROJECT IMAGE
DRAWING INDEX
SHEET NO. SHEET DESCRIPTION DWG OF DWG
GENERAL
54 -GI-001 COVER 1 5
54 -GI-002 GENERAL INFORMATION 2 5
54 -GI-101 INFECTION CONTROL GENERAL NOTES 3 5
54 -GI-102 BASEMENT INFECTION CONTROL PLAN 4 5
54 -LS-101 BASEMENT LIFE SAFTEY PLAN 5 5
STRUCTURAL
54 -SG-101 PLANS AND DETAILS 1 1
ARCHITECTURAL
54 -AD-101 BASEMENT FLOOR DEMOLITION PLAN 1 6
54 -AD-110 BASEMENT FLOOR REFLECTED CEILING DEMOLITION PLAN 2 6
54 -AE-101 BASEMENT FLOOR PLAN 3 6
54 -AC-101 BASEMENT REFLECTED CEILING PLAN 4 6
54 -AE-401 INTERIOR ELEVATIONS 5 6
54 -AE-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 6 6
INTERIORS
54 -I-401 MANUFACTURER EQIUPMENT INFORMATION 1 3
54 -I-402 MANUFACTURER EQIUPMENT INFORMATION 2 3
54 -I-601 EQUIPMENT SCHEDULE 3 3
FIRE PROTECTION
54 FP001 FIRE PROTECTION GENERAL INFORMATION 1 5
54 FD101 BASEMENT BASE BID FIRE PROTECTION DEMOLITION PLAN 2 5
54 FD102 BASEMENT ALT 1 FIRE PROTECTION DEMOLITION PLAN 3 5
54 FP101 BASEMENT BASE BID FIRE PROTECTION PLAN 4 5
54 FP102 BASEMENT ALT 1 FIRE PROTECTION PLAN 5 5
PLUMBING
54 P-001 PLUMBING GENERAL INFORMATION 1 4
54 PD101 BASEMENT BASE BID PLUMBING DEMOLITION PLAN 2 4
54 PP101 BASEMENT BASE BID PLUMBING PLAN 3 4
54 PP102 BASEMENT ALT 1 PLUMBING PLAN 4 4
MECHANICAL
54 M-001 MECHANICAL GENERAL INFORMATION 1 5
54 MH101 BASEMENT BASE BID MECHANICAL PLAN 2 5
54 MH102 BASEMENT ALT 1 MECHANICAL PLAN 3 5
54 MP101 BASEMENT MECHANICAL PIPING PLAN 4 5
54 M-501 MECHANICAL SCHEDULES AND DETAILS 5 5
ELECTRICAL
54 E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 9
54 ED101 BASEMENT ELECTRICAL DEMOLITION PLANS 2 9
54 EL101 BASEMENT LIGHTING PLAN 3 9
54 EP101 BASEMENT POWER PLAN 4 9
54 E-401 ELECTRICAL ENLARGEMENTS 5 9
54 E-501 ELECTRICAL DETAILS A 6 9
54 E-502 ELECTRICAL DETAILS B 7 9
54 E-601 PANEL SCHEDULES 8 9
54 E-602 SINGLE LINE DIAGRAM 9 9
TECHNOLOGY
54 T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 2
54 T-101 BASEMENT SYSTEMS PLAN 2 2
FIRE ALARM
54 FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 2
54 FA101 BASEMENT FIRE ALARM PLAN 2 2
OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR
VA SIGNATURE BLOCK
CONTACT INFORMATION
PROJECT LOCATOR
DocuSign Envelope ID: 86A84093-267A-432F-8EB2-E219E83FB9E5
6/25/2020
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
TRUE NORTH ARROW
PROJECT NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTH
PLAN
NORTH
TRUE
0 4 8 16
# ALTERNATE TAG
DEDUCT ALTERNATE #1 - INSTALL NEW
CEILING AT 9’4” ABOVE BOWLING ALLEY
FINISHED FLOOR. EXISTING FIRE
PROTECTION MAINS AND BRANCHES TO
REMAIN. PROVIDE NEW SEMI-RECESSED,
QUICK-RESPONSE SPRINKLER HEADS IN
THE NEW CEILING. EXISTING SANITARY
WASTE PIPING TO REMAIN.
DEDUCT ALTERNATE #2 - DELETE THE
LAY-IN CEILING IN ITS ENTIRETY. EXISTING
FIRE PROTECTION MAINS, BRANCHES
AND UPRIGHT SPRINKLER HEADS TO
REMAIN. EXISTING SANITARY WASTE
PIPING TO REMAIN. SUSPEND THE LIGHT
FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS.
EXTEND PERIMETER METAL FURRING
AND GYPSUM BOARD UP TO THE BOTTOM
OF THE DECK ABOVE. EXPOSED CEILING
AND SYSTEMS TO BE FOG PAINTED VA
STANDARD CEILNG WHITE.
DEDUCT ALTERNATE #3 - DELETE THE LAY-
IN CEILING IN ITS ENTIRETY. EXISTING FIRE
PROTECTION MAINS, BRANCHES AND
UPRIGHT SPRINKLER HEADS TO REMAIN.
EXISTING SANITARY WASTE PIPING TO
REMAIN. SUSPEND THE LIGHT FIXTURES
FROM THE CONCRETE DECK ABOVE AS
SHOWN ON THE DRAWINGS. DELETE 3 5/8
METAL STUD AND 5/8" GYPSUM BOARD
WALL FURRING ALONG EXISTING MASONRY
WALLS WITH IN BOWLING ALLEY SPACE
ROOM #BA102. WALL SEPARATING
MAINTENANCE (BA102B) BOWLING ALLEY
(BA102) TO REMAIN. USE ALL SURFACE
MOUNTED CONDUIT ADN RACEWAYS.
EXPOSED CEILING AND SYSTEMS TO BE
FOG PAINTED VA STANDARD CEILNG
WHITE.
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
W H
E R
E H
.C
A C
C E
S S
R E
Q 'D
OF DOOR WIDTH WHEN
ON WALL BEYOND
DOOR
COAT RACK / COAT HOOK
T
Y P
M A
X
WALL MOUNTED TACKBOARD
AND MARKERBOARD
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
FIRE ALARM
CHIME WITH
VISUAL
ALARM LIGHT
FIRE ALARM
PULL STATION
FIRE ALARM
ANNUNCIATOR
FIRE ALARM
MISC. WALL DEVICES
T O
B O
T T
O M
O F
R
F
L E
C T
IV
S
U R
F A
C E
O F
M
IR
R
O R
CLOCK
NURSE
CALL
DOME
LIGHT
CLOCK OUTLET
CLOCK & NURSE CALL DEVICES
WALL PROTECTION
AT COORIDOR ONLY
BUMPERGUARD
HANDRAIL
OR DOOR FRAME
3" TO CORNERGUARD
CORNERGUARD
INTERCOM
STATION
INTERCOM
MASTER
STATION
INTERCOM
WALL
OUTLET
INTERCOM STATION
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
-1
GENERAL NOTES
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE AND DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS ARE ALSO ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS USED ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING MATERIAL. NOTIFY THE COR OF ANY
DISCREPANCY DISCOVERED.
6. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD
CONDITIONS NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
8. ANY WORK PERFORMED OUTSIDE THE INDICATED PRIMARY SCOPE OF THE PROJECT IS TO BE DONE AFTER HOURS. THIS INCLUDES ELECTRICAL, PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE PROTECTION TIE
INS, SHUT DOWNS, AND WORK REQUIRING LOCK OUT TAG OUT PROTOCOLS.
9. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
10. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
11. THE CONTRACTOR AND SUBCONTRACTORS INVOLVED IN THIS PROJECT SHALL BE RESPONSIBLE FOR DESIGNING AND INSTALLING THEIR RESPECTIVE WORK AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, LAWS, SAFETY REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE CONTRACTOR
SHALL FURNISH ALL NECESSARY PERMITS.
12. THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS (DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS, AND THE MAJOR STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA SYSTEMS. THE DOCUMENTS DO NOT AND ARE NOT INTENDED TO INDICATE OR DESCRIBE IN DETAIL ALL THE NECESSARY WORK REQUIRED FOR FULL PERFORMANCE OF, AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDICATED IN THESE DOCUMENTS, THE TRADE CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER EXECUTION AND COMPLETION OF THEIR WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR WARRANTY FOR THEIR WORK UNLESS A LONGER WARRANTY IS
INDICATED IN THE SPECIFICATIONS.
13. CONTRACTORS SHALL FOLLOW AND OBEY ALL FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, VA GUIDELINES, ETC.
BOWLING EQUIPMENT NOTE:
1. ALL BOWLING EQUIPMENT TO BE PROVIDED BY BRUNSWICK AND INSTALLED BY BOWLRITE.
2. GC TO COORDINATE ALL CONSTRUCTION FOR THE INSTALLATION REQUIREMENTS OF ALL BOWLING
EQUIPMENT.
3. SEE SPECULATION SECTION 11 90 00 - BOWLING EQUIPMENT.
4. SEE "BRUNSWICK COMPREHENSIVE PLANNING GUIDE" FOR ANY NECESSARY REQUIREMENTS AND
COORDINATE WITH BOWLRITE PRIOR TO INSTALLATION OF ALL BOWLING EQUIPMENT.
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
IDPH ILLINOIS DEPARTMENT OF
PUBLIC HEALTH
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION NOTES
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT
GENERAL WORK AND DO NOT PORTRAY FULL SCOPE OF THE PROJECT. SEE
SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OFF MEDICAL
CENTER GROUNDS.
4. PATCHED WALL OPENINGS SHALL MATCH THE INTEGRITY OF ADJACENT
CONSTRUCTION UNLESS INDICATED OTHERWISE.
5. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR
INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND
INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
6. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
7. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL SYSTEMS.
8. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND
THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE
PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE
DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE
SCOPE OF THE PROJECT.
9. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND
DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF
SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE.
DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT
INDICATED OR THAT ARE NOT IDENTIFIED. SHALL BE REPORTED TO THE
CONTRACTING OFFICER.
10. ANY WORK PERFORMED OUTSIDE THE INDICATED PRIMARY SCOPE OF THE
PROJECT IS TO BE DONE AFTER HOURS. THIS INCLUDES ELECTRICAL,
PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE PROTECTION TIE INS,
SHUT DOWNS, AND WORK REQUIRING LOCK OUT TAG OUT PROTOCOLS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:4
:4
A
M
GENERAL INFORMATION
2 5TJS/DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-GI-002
100% CONSTRUCTION DOCUMENTS
GENERAL SYMBOL LEGEND
BID ALTERNATES
Scale: 3/8" = 1'-0"
STANDARD MOUNTING HEIGHTS
ARCHITECTURAL SYMBOL LEGEND
ABBREVIATIONS
tsmith Stamp
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES, QUANTITY
PER MANUF.
RECOMMENDATIONS
REQU.
AS
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
C E
IL
IN
G
V .I .F
E X
IS
T
IN
G
D O
O R
/W
IN
D O
W O
P E
N
IN
G
ROUTE EXHAUST THROUGH EXISTING
DOOR OR WINDOW OPENING TO VENT
TO OUTSIDE. PROVIDE MINIMUM 7'-0"
HEAD CLEARANCE IN PATHS OF TRAVEL
A P
P R
O X
A .F
.F
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
PLASTIC SHEET ISOLATION
BARRIER
GC CONSTRUCTION MATERIALS
ACCESS
ZIPPER ACCESS
WALK OFF MAT
INFECTION CONTROL LEGEND
TEMPORARY CONSTRUCTION ACCESS NOTE:
THE INDICATED GLAZING PANEL ON THE INFECTION
CONTROL BARRIER PLAN MAY BE REMOVED TO ALLOW
FOR THE INSTALLATION OF BULK MATERIALS SUCH AS
CRUSHER RUN, GRAVEL AND CONCRETE. PROTECT THE
GLAZING PANEL FOR REINSTALLATION AND LIKE NEW
APPEARANCE. WATERTIGHT INTEGRITY OF THE
BUILDING MUST BE MAINTAINED AT ALL TIMES. A
TEMPORARY PANEL MUST BE INSTALLED WHEN
MATERIALS ARE NOT BEING BROUGHT INTO THE
BUILDING AND AT THE END OF ALL WORK DAYS/SHIFTS.
THE TEMPORARY PANEL MUST BE SECURED AND
PROVIDE EQUAL SAFTEY/SECURITY MEASURES AS THE
GLAZING PANEL. ONCE BULK MATERIALS HAVE BEEN
COMPLETELY INSTALLED, THE EXISITING GLAZING
PANEL MUST BE REINSTALLED, AND THE REMAINING
MATERIALS BROUGHT IN THROUGH THE LOADING DOCK.
ALL MATERIALS BROUGHT INTO THE FACILITY ARE TO
COMPLY WITH INFECTION CONTROL REQUIREMENTS
FOR DUST AND CONTAMINANTS.
GENERAL
1. SEE SHEET GI102 FOR PRE-CONSTRUCTION
RISK ASSESSMENT FORMS AND INFECTION
CONTROL PRECAUTIONS.
2. SEE SHEET GI101 AND GI102 FOR ICRA
BARRIER TYPES AND LOCATIONS.
3. ALL APPLICABLE PERMITS AND COR
APPROVALS SHALL BE COMPLETED PRIOR TO
BEGINNING ANY WORK FOR EACH PHASE.
PERMITS INCLUDE: ICRA, ILSM, ABOVE
CEILING FIRE/SMOKE WALL, UTILITY, FIRE
ALARM SYSTEM, MEDICAL GASES, AND
CONFINED SPACES.
4. WORK REQUIRED BY INFECTION CONTROL
SHALL BE PERFORMED FOR EACH PORTION
OF THE PROJECT.
5. COORDINATE LOCATION OF INFECTION
CONTROL BARRIERS WITH LOCATION OF
PERMANENT BARRIERS. INFECTION
CONTROL BARRIERS TO BE MAINTAINED
THROUGHOUT CONSTRUCTION.
6. VERIFY FINAL INFECTION CONTROL BARRIER
LAYOUT PRIOR TO INSTALLATION. MAINTAIN
EGRESS PASSAGE ROUTES AT ALL TIMES
DURING CONSTRUCTION.
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
UP
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE
REHAB FACILITY BOWLING ALLEY PROJECT
• THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA
• PLEASE USE ALTERNATE EXITS AS MARKED
1'-5"
ICRA, ILSM, FIRE WATCH AND
MISC. FORMS
PAPER
CADDY
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
INFECTION CONTROL GENERAL NOTES
3 5TJS
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-GI-101
100% CONSTRUCTION DOCUMENTS
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPES
Scale: 1/2" = 1'-0"
MOBILE CONTAINMENT CART
Scale: 1/2" = 1'-0"
CROSS SECTION CLASS "A"
Scale: 1/2" = 1'-0"
ROOM ELEVATION
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 6" = 1'-0"
ILSM SIGNAGE
ILSM INSPECTION REPORT SAMPLE
CR
UP
UP
F E
C
F E
C
FE
S SS
3 4 5
G
E
D
C
B
A
F
8 9
B.3
B.6
E.2
E.8
4.1
BOWLING
ALLEY
BA102
SHOES / EQUIP
BA102A
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A
SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
MAINTANCE
BA102B
LOADING
DOCK
ACCESS
2 HOUR FIRE SEPARATION
1 HOUR FIRE SEPARATION
SMOKE RATED
WALL RATING LEGEND
PLASTIC SHEET ISOLATION
BARRIER
GC CONSTRUCTION MATERIALS
ACCESS
ZIPPER ACCESS
WALK OFF MAT
INFECTION CONTROL LEGEND
TEMPORARY CONSTRUCTION ACCESS NOTE:
THE INDICATED GLAZING PANEL ON THE INFECTION
CONTROL BARRIER PLAN MAY BE REMOVED TO ALLOW
FOR THE INSTALLATION OF BULK MATERIALS SUCH AS
CRUSHER RUN, GRAVEL AND CONCRETE. PROTECT THE
GLAZING PANEL FOR REINSTALLATION AND LIKE NEW
APPEARANCE. WATERTIGHT INTEGRITY OF THE
BUILDING MUST BE MAINTAINED AT ALL TIMES. A
TEMPORARY PANEL MUST BE INSTALLED WHEN
MATERIALS ARE NOT BEING BROUGHT INTO THE
BUILDING AND AT THE END OF ALL WORK DAYS/SHIFTS.
THE TEMPORARY PANEL MUST BE SECURED AND
PROVIDE EQUAL SAFTEY/SECURITY MEASURES AS THE
GLAZING PANEL. ONCE BULK MATERIALS HAVE BEEN
COMPLETELY INSTALLED, THE EXISITING GLAZING
PANEL MUST BE REINSTALLED, AND THE REMAINING
MATERIALS BROUGHT IN THROUGH THE LOADING DOCK.
ALL MATERIALS BROUGHT INTO THE FACILITY ARE TO
COMPLY WITH INFECTION CONTROL REQUIREMENTS
FOR DUST AND CONTAMINANTS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
BASEMENT INFECTION CONTROL PLAN
4 5TJS
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-GI-102
100% CONSTRUCTION DOCUMENTS
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
Scale: 3/32" = 1'-0"
BASEMENT INFECTION CONTROL PLAN
1 WALK OFF MAT
2 ICARA BARRIER TYPE "A" - PLASTIC SHEET
ISOLATION BARRIER
3 ZIPPER ACCESS
4 REMOVE AND PROTECT GLAZING PANEL
FOR TEMPORARY CONSTRUCTION
MATERIAL ACCESS
5 HEPA NEGATIVE AIR UNIT, ROUTE EXHAUST
OUTSIDE OF BUILDING IN LOCATION
DIRECTED BY COR
0 84 16
NORTH
PLAN
CR
CR
UP
UP
F E
C
F E
C F
E C
FE
EGRESS PATH
TEMPORARY EGRESS PATH
EGRESS PATH TAG
EGRESS PATH TAG - COMMON PATH
EGRESS IDENTIFICATION
AREA OF REFUGE
HAZARDOUS LOCATION
FIRE EXTINGUISHER BRACKET
FIRE EXTINGUISHER CABINET
FIRE BLANKET CABINET
EMERGENCY RESPONSE
REFERENCE
CONTROLLED ACCESS - ALWAYS
UNLOCKED IN DIRECTION OF
EGRESS
KNOX BOX
DELAYED EGRESS W/ ALARM
CA
DE
KB
XXX
XXX
FEB
FEC
FBC
CAPACITYCLR
EXTERIOR
EXIT
XX" ###
EXIT
IDENTIFICATION
EGRESS CLEAR
WIDTH
EGRESS
CAPACITY
3 4 5
G
E
D
C
B
A
F
8 97
B.3
B.6
E.2
E.8
4.1
SHOES / EQUIP
BA102A
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
OFFFICE
SHARED PSAS
BB103
OFFICE,
PROGRAM
MANAGER
BB105
OFFICE,
AMPUTEE
COORD.
BB107
OFFICE,
PROGRAM
MANAGER
BB105
OFFICE, PSA
BB111
OFFICE, MOVE
COORD.
BB112
OFFICE,
SWING/COUNSELING
BB113
ELECTRICAL
ENTRANCE
BB114
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CLASSROOM
BB104
STORAGE
BB106
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-10
TECH
ENTRANCE
BB115
CORRIDOR
CB-4
CORRIDOR
CB-5
CORRIDOR
CB-3
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
BOWLING
ALLEY
BA102
MAINTANCE
BA102B
CAPACITYCLR
EXIT
38" 190
CAPACITYCLR
EXIT
68" 340
A
FEB
FEC
FEC
A
B
B
C
EGRESS WIDTH
(per IBC 1005.1)
COMMON PATH OF TRAVEL
(per IBC Chapter 10)
EXIT ACCESS TRAVEL
(per IBC TABLE 1016.1)
DEAD-END CORRIDOR
(per IBC 1018.4)
EXIT DOORS = 38"/(0.20) = 190 PPL
EXIT DOORS = 68"/(0.20) = 340 PPL
42'-6" MAXIMUM
66'-0" MAXIMUM DISTANCE
N/A
OCCUPANT LOAD
(per IBC TABLE 1004.1)
BOWLING ALLEY - 1,005 NSF =
SEE 1004.5 = 164 PPL - SEE
NOTE 1
MAINTENANCE ROOM - 470 SF =
300 GSF/PERSON = 2 PPL
SHOES & EQUIP. - 399 SF = 300
GSF/PERSON = 2 PPL
TOTAL OCCUPANCY = 168 PPL
GROSS BUILDING AREA
(OUTSIDE FACE WALLS)
15,622 SF TOTAL - 3,942 SF
BOWLING ALLEY
GROSS MEASURED AREA
(INTERIOR FACE WALLS)
14,204 SF TOTAL - 3,533 SF
BOWLING ALLEY
NOTE 1
BOWLING ALLEY CALCULATED
PER TABLE 1004.5 PLUS 5
ADDITIONAL PEOPLE PER LANE
REQUIRED # OF EXITS
(per IBC 1015.1)
2 EXITS REQUIRED
REQUIRED DISTANCE
BETWEEN EXITS
43'-6" MINIMUM, 88'-4" PROVIDED
FLOOR
AGGREGATE FLOOR AREAS (per TABLE 503):
EXISTING NEW TOTAL
AREA TOTAL = 3,533 SF
AREA ALLOWED = N/A - RENOVATION
BASEMENT
TOTAL
N/A 14,204 SF
EGRESS INFORMATION
BUILDING HEIGHT = N/A - RENOVATION
ALLOWABLE HEIGHT = N/A - RENOVATION
AREA AND HEIGHT REQUIREMENTS:
14,204 SF
BOWLING
ALLEY
N/A 3,533 SF2,405 SF
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
VA FORM 08-6231
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:2
P
M
BASEMENT LIFE SAFTEY PLAN
5 5TJS/DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-LS-101
100% CONSTRUCTION DOCUMENTS
PROPOSED USE:
OWNED BY: PRIVATE
LOCAL GOVERNMENT
CITY/COUNTY
STATE
CODE ENFORCEMENT JURISDICTION: CITY
COUNTY
APPLICABLE CODES:
GENERAL CODE INFORMATION:
NEW CONSTRUCTION
RENOVATION (EXISTING BUILDING)
CONSTRUCTION TYPE:
MIXED CONSTRUCTION
SPRINKLERED
MEZZANINE
MIXED OCCUPANCY
PRIMARY OCCUPANCY:
SECONDARY OCCUPANCY:
PROJECT NAME:
PROJECT ADDRESS:
OWNER OR AGENT:
Bowling Alley - Assembly Occupancy
II-A
ASSEMBLY
N/A
2018 International Building Code 2013 Energy Code 2015 Mechanical Code 2018 Fire Code 2015 Electrical Code
2015 Plumbing Code 2010 ADA Code
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA
MEDICAL CENTER, ST. LOUIS, MO
63125
U.S. Department of Veterans Affairs VA St. Louis Health Care System - Jefferson Barracks Division Major Projects Service
CODE INFORMATIONLIFE SAFETY LEGEND
EGRESS PATH "A"
PATH ID LENGTH
A 14' - 11 27/32"
A (COMMON) 42' - 5 27/32"
TOTAL PATH LENGTH 57' - 5 11/16"
EGRESS PATH "B"
PATH ID LENGTH
B 25' - 0 17/32"
B (COMMON) 20' - 2 3/8"
TOTAL PATH LENGTH 45' - 2 7/8"
Scale: 1/8" = 1'-0"
BASEMENT LIFE SAFETY PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
0 4 8 16
NORTH
PLAN
TEMPORARY EGRESS PATH "C"
PATH ID LENGTH
C 66' - 0"
TOTAL PATH LENGTH 66' - 0"
PATH C IS A TEMPORARY EGRESS
PATH USED DURING CONSTRUCTION
UP
UP
F E
C
FE
3 4 5
G
E
D
C
B
A
F
B.3
B.6
E.2
E.8
4.1
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A
SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
UNOCCUPIED
BA102A
SHELL
SPACE
BA102
REMOVE WALL OR PORTION
OF WALL
REMOVE DOOR UNLESS
NOTED OTHERWISE
GENERAL DEMOLITION NOTE:
ANY WORK PERFORMED OUTSIDE THE INDICATED
PRIMARY SCOPE OF THE PROJECT IS TO BE DONE
AFTER HOURS. THIS INCLUDES ELECTRICAL,
PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE
PROTECTION TIE INS, SHUT DOWNS, AND WORK
REQUIRING LOCK OUT TAG OUT PROTOCOLS.th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
BASEMENT FLOOR DEMOLITION PLAN
1 6DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-AD-101
100% CONSTRUCTION DOCUMENTS
1 REMOVE EXISTING DOOR, FRAME, AND
HARDWARE.
2 REMOVE EXISTING STAIRS AND LANDING.
3 REMOVE EXISTING STAIRS FOR REUSE IN
MAINT BA102B.
4 REMOVE EXISTING SECTION OF WALL FOR
DOOR CLEARANCE.
5 RELOCATED FEC FOR REUSE.
6 REMOVE EXISTING DOOR. REPLACE WITH
NEW "DUTCH" DOOR.
7 REMOVE EXISTING LANDING.
8 SALVAGE DOOR AND FRAME FOR REUSE.
9 PREP FLOOR AND PORTION OF WALLS TO
RECEIVE NEW WATERPROOF MEMBRANE.
SEE PLUMBING SHEETS FOR ANY DRAIN
CONDITIONS.
Scale: 1/8" = 1'-0"
BASEMENT FLOOR DEMOLITION PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
0 4 8 16
NORTH
PLAN
DEMOLITION LEGEND
3 4 5
G
E
D
C
B
A
F
B.3
B.6
E.2
E.8
4.1
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
SHELL
SPACE
BA102
UNOCCUPIED
BA102A
DEDUCT ALTERNATE #1 - INSTALL NEW
CEILING AT 9’4” ABOVE BOWLING ALLEY
FINISHED FLOOR. EXISTING FIRE
PROTECTION MAINS AND BRANCHES TO
REMAIN. PROVIDE NEW SEMI-RECESSED,
QUICK-RESPONSE SPRINKLER HEADS IN
THE NEW CEILING. EXISTING SANITARY
WASTE PIPING TO REMAIN.
DEDUCT ALTERNATE #2 - DELETE THE
LAY-IN CEILING IN ITS ENTIRETY. EXISTING
FIRE PROTECTION MAINS, BRANCHES
AND UPRIGHT SPRINKLER HEADS TO
REMAIN. EXISTING SANITARY WASTE
PIPING TO REMAIN. SUSPEND THE LIGHT
FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS.
EXTEND PERIMETER METAL FURRING
AND GYPSUM BOARD UP TO THE BOTTOM
OF THE DECK ABOVE. EXPOSED CEILING
AND SYSTEMS TO BE FOG PAINTED VA
STANDARD CEILNG WHITE.
DEDUCT ALTERNATE #3 - DELETE THE LAY-IN
CEILING IN ITS ENTIRETY. EXISTING FIRE
PROTECTION MAINS, BRANCHES AND UPRIGHT
SPRINKLER HEADS TO REMAIN. EXISTING
SANITARY WASTE PIPING TO REMAIN. SUSPEND
THE LIGHT FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS. DELETE 3
5/8 METAL STUD AND 5/8" GYPSUM BOARD WALL
FURRING ALONG EXISTING MASONRY WALLS
WITH IN BOWLING ALLEY SPACE ROOM #BA102.
WALL SEPARATING MAINTENANCE (BA102B)
BOWLING ALLEY (BA102) TO REMAIN. USE ALL
SURFACE MOUNTED CONDUIT ADN RACEWAYS.
EXPOSED CEILING AND SYSTEMS TO BE FOG
PAINTED VA STANDARD CEILNG WHITE.
GENERAL DEMOLITION NOTE:
ANY WORK PERFORMED OUTSIDE THE INDICATED
PRIMARY SCOPE OF THE PROJECT IS TO BE DONE
AFTER HOURS. THIS INCLUDES ELECTRICAL,
PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE
PROTECTION TIE INS, SHUT DOWNS, AND WORK
REQUIRING LOCK OUT TAG OUT PROTOCOLS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
BASEMENT FLOOR REFLECTED
CEILING DEMOLITION PLAN
2 6DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-AD-110
100% CONSTRUCTION DOCUMENTS
1 EXISTING LIGHTS TO BE REMOVED FROM
SPACE TURN OVER TO VA.
2 EXISTING SPRINKLER AND PLUMBING LINES
TO BE ADJUSTED TO ACCOMODTE NEW
10'-0" CEILING HEIGHT AS REQUIRED.
COORDINATE WITH DIGITAL SCORING
MONITORS, CEILING PLAN, HVAC, AND
ELECTRICAL.
Scale: 1/8" = 1'-0"
BASEMENT FLOOR DEMOLITION CEILING PLAN
N
AREA OF WORK
SCOPE OUTLINE
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
0 4 8 16
NORTH
PLAN
BID ALTERNATES
UP
UP
F E
C
FE
CR
CR
UP
UP
F E
C
FE
3 4 5
G
E
D
C
B
A
F
B.3
B.6
E.2
E.8
4.1
-AE-401
1'-0" 22'-5 1/2" 5'-5"
BOWLING
ALLEY
BA102
SHOES / EQUIP
BA102A
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
5'-8 5/8"
28'-10 1/2"
/8
MAINTANCE
BA102B
1 1 1
BA102D
BA102A
-AE-401
FEC
B A
B
BA102C
/2
/8
5'-4 3/8"
/4
E Q
E Q
/4
/2
Ma3
Ma3
Ma3
Maa3
Maa3
Ma3
Ma3
/8
-AE-601
3 4 5
G
E
D
C
B
A
F
B.3
B.6
E.2
E.8
4.1
BOWLING
ALLEY
BA102
SHOES / EQUIP
BA102A
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
MAINTANCE
BA102B
V E
R
IF
Y
/2
/8
23'-9 1/8"
VERIFY
5'-8 5/8" +/-
/8
-1' - 5" AFF
0" AFF
-1' - 5" AFF
-1' - 5" AFF
-1' - 5"
0"
-AE-401
-AE-401
DEDUCT ALTERNATE #1 - INSTALL NEW
CEILING AT 9’4” ABOVE BOWLING ALLEY
FINISHED FLOOR. EXISTING FIRE
PROTECTION MAINS AND BRANCHES TO
REMAIN. PROVIDE NEW SEMI-RECESSED,
QUICK-RESPONSE SPRINKLER HEADS IN
THE NEW CEILING. EXISTING SANITARY
WASTE PIPING TO REMAIN.
DEDUCT ALTERNATE #2 - DELETE THE
LAY-IN CEILING IN ITS ENTIRETY. EXISTING
FIRE PROTECTION MAINS, BRANCHES
AND UPRIGHT SPRINKLER HEADS TO
REMAIN. EXISTING SANITARY WASTE
PIPING TO REMAIN. SUSPEND THE LIGHT
FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS.
EXTEND PERIMETER METAL FURRING
AND GYPSUM BOARD UP TO THE BOTTOM
OF THE DECK ABOVE. EXPOSED CEILING
AND SYSTEMS TO BE FOG PAINTED VA
STANDARD CEILNG WHITE.
DEDUCT ALTERNATE #3 - DELETE THE LAY-IN
CEILING IN ITS ENTIRETY. EXISTING FIRE
PROTECTION MAINS, BRANCHES AND UPRIGHT
SPRINKLER HEADS TO REMAIN. EXISTING
SANITARY WASTE PIPING TO REMAIN. SUSPEND
THE LIGHT FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS. DELETE 3
5/8 METAL STUD AND 5/8" GYPSUM BOARD WALL
FURRING ALONG EXISTING MASONRY WALLS
WITH IN BOWLING ALLEY SPACE ROOM #BA102.
WALL SEPARATING MAINTENANCE (BA102B)
BOWLING ALLEY (BA102) TO REMAIN. USE ALL
SURFACE MOUNTED CONDUIT ADN RACEWAYS.
EXPOSED CEILING AND SYSTEMS TO BE FOG
PAINTED VA STANDARD CEILNG WHITE.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
BASEMENT FLOOR PLAN
3 6TJS/ DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-AE-101
100% CONSTRUCTION DOCUMENTS
0 4 8 16
NORTH
PLAN
Scale: 1/8" = 1'-0"
BASEMENT FLOOR PLAN
1 BOWLING LANES, RETURNS, MONITORS BY GC
TO INSTALL OWNER SUPPLIED, GC TO
COORDINATE REQUIREMENTS
2 RELOCATED FEC
3 RELOCATED METAL STAIRS AND LANDING. GC
TO CUT AND REWELD CONNECTIONS AND
SUPPORTS TO FIT CONDITIONS
4 FURNITURE BY OWNER, N.I.C.
5 SOLID CONCRETE SLAB OVER EXISTING SLAB,
TOP OF SLAB @ -1'-5" AFF
6 4" CONCRETE SLAB OVER GRAVEL BASE BUILT
UP OVER EXISTING SLAB, TOP OF SLAB @ -1'-5"
AFF
7 4" CONCRETE SLAB OVER GRAVEL BASE BUILT
UP OVER EXISTING SLAB, TOP OF SLAB @ 0'-0"
AFF
8 8" THICK CONCRETE RETAINING WALL, SEE
STRUCTURAL
9 APPLY SHEET WATERPROOFING TO EXISTING
SLAB AND WALLS PRIOR TO NEW FLOOR
CONSTRUCTION. PROTECT MEMBRANE
THROUGHOUT CONSTRUCTION. CONTINUE UP
WALL TO 1" BELOW FINISH FLOOR
10 PAINT AND INSTALL WALL BASE TO MATCH
EXISTING
11 PATCH EXISTING PORCELAIN TILE FLOORING
AND BASE WITH PT-A-1,2,3 & PT-B-1, INSTALL
TO MATCH EXISTING PATTERN. PAINT WALL TO
MATCH EXISTING.
12 INSTALL RA-1 AT FLOORING TRANSITION
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
Scale: 1/8" = 1'-0"
BASEMENT SLAB EDGE PLAN 0 4 8 16
NORTH
PLAN
BID ALTERNATES
BOWLING EQUIPMENT, LANES, RETURNS SHOWN FOR
COORDINATION PURPOSES AS VA PROVIDED, GC
INSTALLED. SEE EQUIPMENT SCHEDULE FOR MORE
INFORMATION.
ALL FURNITURE TO BE PROVIDED BY OTHERS PER
EQUIPMENT SCHEDULE.
TOP OF EXISTING SLAB @ 1'-11 1/2" BELOW FINISH
FLOOR.
TOP OF NEW FLOOR SLAB BELOW BOWLING
EQUIPMENT TO BE @ 1'-5" BELOW FINISH FLOOR.
TOP OF NEW FLOOR SLAB FOR USER ACCESS TO BE
LEVEL WITH FINISH FLOOR OF HOSPITAL.
8" CMU RETAINING WALLS USED TO HOLD NEW GRAVEL
BASE UNDER FLOOR SLABS WHERE INDICATED.
WATERPROOF MEMBRANE TO BE INSTALLED OVER
EXISTING FLOOR SLAB AND UP EXISTING BASEMENT
WALLS TO A HEIGHT OF 1/2" BELOW FINISH FLOOR.
MEMBRANE TO BE PROTECTED THROUGHOUT
CONSTRUCTION PROCESS. DAMAGE TO BE REPAIRED
PRIOR TO NEW FLOOR INSTALLATION.
ANY WORK PERFORMED OUTSIDE THE INDICATED
PRIMARY SCOPE OF THE PROJECT IS TO BE DONE
AFTER HOURS. THIS INCLUDES ELECTRICAL,
PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE
PROTECTION TIE INS, SHUT DOWNS, AND WORK
REQUIRING LOCK OUT TAG OUT PROTOCOLS.
XA-201
4 5
G
E
D
C
B
A
F
B.3
B.6
E.2
E.8
4.1
SHOES / EQUIP
BA102A
DATA
BA100
DATA
BA101
LOUNGE
BB100
WORKSTATIONS
RT (2)
BB101A
COMBINED
BILLARDS/
GAME &
ACTIVITY
BB101A
MECHANICAL
BB116
MOVE
CLASSROOM
BB110
TLT - WOMEN
BB119
TLT - MEN
BB118
STORAGE,
GAME &
ACTIVITY
BB117
POOL
MECHANICAL
BA103A SANITIZER
ROOM
BA103B
WATER METER
BB103C
STAIR
STAIR2
ELEC
BB109
HSKPG
BB120
ELEVATOR
MACHINE
BB108
STAIR
STAIR2
ELEV
P-1
ELEV
P-1
CLOSET
BB104A
CORRIDOR
CB-6
ELEVATOR
LOBBY
CB-1
CORRIDOR
CB-6
CORRIDOR
CB-7
EWC
CB-9
VESTIBULE
BA103
BOWLING
ALLEY - 4 LANE
BA102
MAINTANCE
BA102B
1 2
10' - 0"
ACT
2x4
/2
REFLECTED CEILING PLAN
LEGEND
CEILING HEIGHT
DESIGNATION (WHEN
HEIGHT VARIES FROM
TYPICAL)
EQ. A EQ. A
E Q
B
E Q
B
EXIT SIGN (SHADED
AREA INDICATES
DIRECTION OF EGRESS)
SUPPLY DIFFUSER
RETURN GRILL
DOWN LIGHT
FIXTURE
MEASURE EACH CEILING AREA AND ESTABLISH A
CEILING LAYOUT TO BALANCE BORDER WIDTHS AT
OPPOSITE EDGES OF EACH ROOM. DO NOT USE
LESS-THAN 6" TILES.
1' - 0"
MATL
FIRE ALARM STROBE
FAA
FIRE ALARM
ANNUCIATOR
F
FIRE ALARM PULL
STATION
FIRE ALARM
STROBE LIGHT
S
H
HEAT DETECTOR
SMOKE DETECTOR
FIRE ALARM /
HORN /
STROBE LIGHT -
WALL MOUNTED
FIRE ALARM / HORN /
STROBE LIGHT -
CEILING MOUNTED
SPRINKLER HEAD
2'x4' LAY-IN LED
EXHAUST GRILL
INDUSTRIAL STRIP
LIGHT - LED
10' - 0"
DEDUCT ALTERNATE #1 - INSTALL NEW
CEILING AT 9’4” ABOVE BOWLING ALLEY
FINISHED FLOOR. EXISTING FIRE
PROTECTION MAINS AND BRANCHES TO
REMAIN. PROVIDE NEW SEMI-RECESSED,
QUICK-RESPONSE SPRINKLER HEADS IN
THE NEW CEILING. EXISTING SANITARY
WASTE PIPING TO REMAIN.
DEDUCT ALTERNATE #2 - DELETE THE
LAY-IN CEILING IN ITS ENTIRETY. EXISTING
FIRE PROTECTION MAINS, BRANCHES
AND UPRIGHT SPRINKLER HEADS TO
REMAIN. EXISTING SANITARY WASTE
PIPING TO REMAIN. SUSPEND THE LIGHT
FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS.
EXTEND PERIMETER METAL FURRING
AND GYPSUM BOARD UP TO THE BOTTOM
OF THE DECK ABOVE. EXPOSED CEILING
AND SYSTEMS TO BE FOG PAINTED VA
STANDARD CEILNG WHITE.
DEDUCT ALTERNATE #3 - DELETE THE LAY-IN
CEILING IN ITS ENTIRETY. EXISTING FIRE
PROTECTION MAINS, BRANCHES AND UPRIGHT
SPRINKLER HEADS TO REMAIN. EXISTING
SANITARY WASTE PIPING TO REMAIN. SUSPEND
THE LIGHT FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS. DELETE 3
5/8 METAL STUD AND 5/8" GYPSUM BOARD WALL
FURRING ALONG EXISTING MASONRY WALLS
WITH IN BOWLING ALLEY SPACE ROOM #BA102.
WALL SEPARATING MAINTENANCE (BA102B)
BOWLING ALLEY (BA102) TO REMAIN. USE ALL
SURFACE MOUNTED CONDUIT ADN RACEWAYS.
EXPOSED CEILING AND SYSTEMS TO BE FOG
PAINTED VA STANDARD CEILNG WHITE.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
FULLY SPRINKLERED
S S S S
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:1
P
M
BASEMENT REFLECTED CEILING PLAN
4 6TJS/ DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-AC-101
100% CONSTRUCTION DOCUMENTS
Scale: 1/8" = 1'-0"
BASEMENT REFLECTED CEILING PLAN
1 OVERHEAD SCORING MONITORS GC TO
COORDINATE MOUNTING, POWER AND
DATA/IT REQUIREMENTS.
2 OVERHEAD TV MONITOR OWNER PROVIDED
/ GC INSTALLED, GC TO COORDINATE
MOUNTING, POWER AND DATA/IT
REQUIREMENTS. LOCATION OF A/V
CONTROLS AS SELECTED / PROVIDED BY
OWNER GC INSTALLED.
3 MONITOR MOUNTING TRUSS BY BOWLING
EQUIPMENT MANUF. COORDINATE
ATTACHEMENT TO STRUCTURE ABOVE
WITH BOWLING EQUIPMENT MANUF.
4 NEW GYPSUM BOARD SOFFIT IN HALLWAY
TO MATCH EXISTING.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
0 4 8 16
NORTH
PLAN
A. MONITOR AND MONITOR MOUNTING
TRUSS COORDINATE REQUIRMENTS FOR
OWNER PROVIDED, GC INSTALLED WITH
MANUFACTURE/ INSTALLER. SEE
EQUIPMENT SCHEDULE.
BID ALTERNATES
E D BB.3B.6E.2E.8
BOWLING
ALLEY - 4 LANE
BA102
FECFEC
BUILT UP FLOOR BY
BOWLING EQUIPMENT
MANUFACTURER
5 5 6 78 9
-AE-401
-AE-401
-AE-401
-AE-401
EDB B.3 B.6 E.2 E.8
1 1
10 5696 5658
-AE-401
10_____
-AE-401
BASEMENT FLOOR
-15' - 6 5/8"
/2
/2
EXISTING FLOOR SLAB
GRAVEL BASE FOR
NEW CONCRETE SLAB
CAST IN PLACE RETAINING WALL,
FILL CELLS W/ CONCRETE, SEE
STRUCTURAL FOR REINFORCING
AND ANCHORS
WATERPROOF MEMBRANE
NEW CONCRETE SLAB
1/4" EXPANSION JOINT
DEDUCT ALTERNATE #1 - INSTALL NEW
CEILING AT 9’4” ABOVE BOWLING ALLEY
FINISHED FLOOR. EXISTING FIRE
PROTECTION MAINS AND BRANCHES TO
REMAIN. PROVIDE NEW SEMI-RECESSED,
QUICK-RESPONSE SPRINKLER HEADS IN
THE NEW CEILING. EXISTING SANITARY
WASTE PIPING TO REMAIN.
DEDUCT ALTERNATE #2 - DELETE THE
LAY-IN CEILING IN ITS ENTIRETY. EXISTING
FIRE PROTECTION MAINS, BRANCHES
AND UPRIGHT SPRINKLER HEADS TO
REMAIN. EXISTING SANITARY WASTE
PIPING TO REMAIN. SUSPEND THE LIGHT
FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS.
EXTEND PERIMETER METAL FURRING
AND GYPSUM BOARD UP TO THE BOTTOM
OF THE DECK ABOVE. EXPOSED CEILING
AND SYSTEMS TO BE FOG PAINTED VA
STANDARD CEILNG WHITE.
DEDUCT ALTERNATE #3 - DELETE THE LAY-IN
CEILING IN ITS ENTIRETY. EXISTING FIRE
PROTECTION MAINS, BRANCHES AND UPRIGHT
SPRINKLER HEADS TO REMAIN. EXISTING
SANITARY WASTE PIPING TO REMAIN. SUSPEND
THE LIGHT FIXTURES FROM THE CONCRETE DECK
ABOVE AS SHOWN ON THE DRAWINGS. DELETE 3
5/8 METAL STUD AND 5/8" GYPSUM BOARD WALL
FURRING ALONG EXISTING MASONRY WALLS
WITH IN BOWLING ALLEY SPACE ROOM #BA102.
WALL SEPARATING MAINTENANCE (BA102B)
BOWLING ALLEY (BA102) TO REMAIN. USE ALL
SURFACE MOUNTED CONDUIT ADN RACEWAYS.
EXPOSED CEILING AND SYSTEMS TO BE FOG
PAINTED VA STANDARD CEILNG WHITE.
WALL BASE
3 5/8" METAL STUDS @ 16"
O.C.
NEW 4" CONCRETE SLAB
5/8" GYPSUM WALL BOARD
BATT INSULATION
EXISTING WALL
GRAVEL INFILL
1/2" EXPANISION JOINT
MAT'L
WATERPROOF
MEMBRANE
NEW CONCRETE
SLAB
1/2" EXPANISION
JOINT MAT'L
NEW GRAVEL FILL
WATERPROOF
MEMBRANE
GENERAL CONSTRUCTION NOTE:
ANY WORK PERFORMED OUTSIDE THE INDICATED
PRIMARY SCOPE OF THE PROJECT IS TO BE DONE
AFTER HOURS. THIS INCLUDES ELECTRICAL,
PLUMBING, MECHANICAL, SPRINKLER LINE, AND FIRE
PROTECTION TIE INS, SHUT DOWNS, AND WORK
REQUIRING LOCK OUT TAG OUT PROTOCOLS.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
Engineers Architects
## KEY NOTES:
VA FORM 08-6231
SHEET NOTES:
FULLY SPRINKLERED
Veterans Health
Administration
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
CONSULTANTS:
Drawing # of
VA Health Care System Approval:
Revision: Date:
ARCHITECT/ENGINEER:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
/2
/2
:3
:3
P
M
INTERIOR ELEVATIONS
5 6TJS/ DGC
REHAB FACILITY BOWLING ALLEY
JEFFERSON BARRACKS, VA MEDICAL CENTER, ST. LOUIS, MO
63125
06/26/2020
TJS
657-19-200JB
-AE-401
100% CONSTRUCTION DOCUMENTS
Scale: 1/4" = 1'-0"
EAST SECTION / INTERIOR ELEVATION
0 2 4 8
Scale: 1/4" = 1'-0"
WEST SECTION / INTERIOR ELEVATION
0 2 4 8
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BUILDING
53BUILDING
Scale: 1 1/2" = 1'-0"
NEW FLOOR SLAB DETAIL
BID ALTERNATES
Scale: 3/4" = 1'-0"
FURRING WALL DETAIL
Scale: 3/4" = 1'-0"
FLOOR DETAIL 0 1 20 1 20 1 2
1 BOWLING LANES, RETURNS, MONITORS BY
BOWLING EQUIPMENT COMPANY OR
OWNER SUPPLIED, GC TO COORDINATE
REQUIREMENTS
2 RELOCATED FEC
3 RELOCATED METAL STAIRS AND LANDING.
GC TO CUT AND REWELD CONNECTIONS
AND SUPPORTS TO FIT CONDITIONS
4 MONITOR SUPPORT TRUSS BY BOWLING
EQUIPMENT MANUF.
5 GRAVEL BACK FILL
6 4" CONCRETE SLAB
7 6 1/2" CONCRETE SLAB
8 8" CONC. WALL
9 INSTALL WATERPROOF MEMBRANE OVER
EXISTING FLOOR SLAB AND MASONRY
WALLS UP TO NEW FLOOR LEVEL
REMARKS:
1. REPLACE DOOR SLAB, EXISTING FRAME TO REMAIN.
2. PAIRED 3' - 0" DOORS
3. CARD READER W/ ELECTRIC STRIKE & MAGNETIC HOLD OPEN DEVICE TIED TO FIRE ALARM
4. CARD READER W/ ELECTRIC STRIKE
F
S E
E S
C H
E D
U L E
SCHEDULE
SEE
J
S E
E S
C H
E D
U L E
SCHEDULE
SEE
G
S E
E S
C H
E D
U L E
SCHEDULE
SEE
1 2
2" 2"
SCHEDULE
SEE 2"
SCHEDULE
SEE 2"
S E
E S
C H
E D
U L E
S E
E S
C H
E D
U L E
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Ma0
Ma1
Ma2
Ma3
Ma4
Ma6
Ma8
REFER TO
PARTITION TAG
FOR
INSULATION
INFORMATION
(SHOWN HERE
FOR
REFERENCE
ONLY - MAY NOT
EXIST), AND
FIRE RATING
7/8"
1-5/8"
2-1/2"
3-5/8"
4"
6"
8"
1-1/2"
2-1/4"
3-1/8"
4-1/4"
4-5/8"
6-5/8"
8-5/8"
HOLD SUBSTRATE 1/2"
OFF FINISH FLOOR
TYPICAL, NO
EXCEPTIONS
ONE LAYER 5/8"
GYPSUM WALL BOARD
ON METAL STUDS
SILL
PLAN
HEAD
UNDERSIDE OF
STRUCTURE
CEILING
EXISTING WALL
ACOUSTICAL SOUND
BATTS
DEDUCT ALTERNATE 2 NOTE:
IN THE CASE OF DEDUCT ALTERNATE 2, WALL FRAMING AND
GYPSUM BOARD ARE TO CONTINUE TO THE UNDERSIDE OF THE
DECK
GENARAL NOTE:
ALL PENETRATIONS THROUGH UNRATED PARTITIONS ARE TO
RECEIVE ACOUSTICAL CAULK AND SEALANT AROUND FULL
PERIMETER
ALL PENETRATIONS THROUGH RATED PARTITIONS ARE TO
RECEIVE FIRE CAULK AND SEALANT AROUND FULL PERIMETER
TO MEET ANY NECESSARY FIRE AND SMOKE RATINGS.
HOLD SUBSTRATE 1/2"
OFF FINISH FLOOR
TYPICAL, NO
EXCEPTIONS
ONE LAYER 5/8"
GYPSUM WALL BOARD
EACH SIDE ON METAL
STUDS
SILL
PLAN
HEAD
TAG STUD SIZE OVERALL THICK UL ASSEMB STC*
Maa1
Maa2
Maa3
Maa4
Maa6
Maa8
REFER TO
PARTITION TAG
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .