Combined Drawings.pdf
PDF 4 MB Posted
- Attached to
- Repair Visitor Control Center, B-2003
- Solicitation number
- W90VN721R0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W90VN721R0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSIENT PAD
PANTON PAD
ROKAF
NORTH
LOOP
NORTH DV PAD
SOUTH DV PAD
WRM PARKING AREA
TREE
AREA
JUVAT
PAD
SOUTH
LOOP
B-2003
NOT TO SCALE
NORTH
SHT. NO. REF. NO. DESCRIPTION
DRAWING SCHEDULE
DRAWN BY:
DESIGNED BY:
CHECKED BY:
SCALE:
DRAWING NO:
PROJECT NO:
REF. NO:
CHIEF, CONSTRUCTION MANAGEMENT
CHIEF OF DESIGN
CHIEF OF CONTRACTS
ENVIRONMENTAL FLIGHT
FIRE DEPARTMENT
CORROSION ENGINEER
COMMUNICATIONS
BIOENVIRONMENTAL ENGINEERING
SAFETY
SECURITY POLICE
USING AGENCY
CHIEF, OPERATIONS FLIGHT
CHIEF, ENGINEERING FLIGHT
BASE CIVIL ENGINEER
AS SHOWN
KUNSAN AB, KOREA
LOCATE MAP
MLWR19-1013
YUN
LOCATION MAP
REPAIR VISIT CONTROL CENTER, B-2003
MLWR19-1013
SHEET 1 OF 19
C-1
NEW SITE PLAN
NEW BOLLARD DETAILS
C-1
C-2
C-3
BASE HOSPITAL
BASE CIVIL ENGINEER
ENGINEERING FLIGHT
CONSTRUCTION MANAGEMENT
YUN
KYH
UNITED STATES AIR FORCE
8th CIVIL ENGINEER SQUADRON
KUNSAN AIR BASE, REPUBLIC OF KOREA
THIS PROJECT
MLWR 19-1013, B-2003
MAIN GATE
ARCH DRAWINGS
EXIST FLOOR PLAN
A-14 OF 19
REMOVAL FLOOR PLAN
A-25 OF 19
NEW FLOOR PLAN FOR B-2003
A-36 OF 19
REPAIR VISIT CONTRAL CENTER,
NEW CEILING PLAN FOR B-2003
A-47 OF 19
NEW INTERIOR AND EXTERIOR FINISH SCHEDULE
REMOVAL FLOOR PLAN FOR MECH WORK
NEW PLUMBING AND HVAC FLOOR PLAN
A-5
M-1
M-2
REMOVAL/NEW COLD AND HOT WATER PIPING PLAN
M-311 OF 19
REMOVAL/NEW DRAIN AND VENT PIPING PLAN
M-412 OF 19
EQUIPMENT SCHEDULE
M-513 OF 19
EXTERIOR ELECTRICAL SITE PLAN
E-114 OF 19
EXIST LIGHTING/POWER PLAN FOR DEMOLITION
ONE-LINE DIAGRAM
NEW LIGHTING PLAN
E-2
E-3
E-4
NEW POWER PLAN
E-518 OF 19
REFERENCE DETAILS
E-619 OF 19
1B REMOVABLE BOLLARD
NTS
C-3
SCALE
EXST EXTERIOR ELECTRICAL SITE PLAN FOR DEMOLITION
1/200 SCALE
NEW EXTERIOR ELECTRICAL SITE PLAN (CONCEPTUAL)
1/200
DEMOLITION WORK
SCALE
EXST LIGHTING/POWER PLAN FOR DEMOLITION
1/50
EXST/REMOVAL ONE LINE DIAGRAM
: NOT TO SCALE SCALE
NEW ONE LINE DIAGRAM (CONCEPTUAL)
: NOT TO SCALE
NEW LIGHTING PLAN (CONCEPTUAL)
NEW POWER PLAN (CONCEPTUAL)
REFERENCE DETAILS (CONCEPTUAL)
: NOT TO SCALE
| 1_MLWR19-1013C-1, Location Map-Layout1 |
| 2_MLWR19-1013C-2, New Site Plan-Layout1 |
| 3_MLWR19-1013C-3, Bollard Details-Layout1 |
| 4_MLWR19-1013A-1, Exist Floor Plan-Layout1 |
| 5_MLWR19-1013A-2, Remove Floor Plan-Layout1 |
| 6_MLWR19-1013A-3, New Floor Plan-Layout1 |
| 7_MLWR19-1013A-4, New Ceiling Plan-Layout1 |
| 9_M-1-Layout1 |
| 10_M-2-Layout1 |
| 11_M-3-Layout1 |
| 12_M-4-Layout1 |
| 13_M-5-Layout1 |
| 14_E-1 SITE PLAN-E-1 |
| 15_E-2 EXST LIGHTING POWER PLAN-E-1 |
| 16_E-3 ONE-LINE-E-1 |
| 17_E-4 NEW LIGHTING PLAN-E-1 |
| 18_E-5 NEW POWER PLAN-E-1 |
| 19_E-6 REFERENCE DETAILS-E-1 |
File details come from the government source that posted it. Updated .