TRANSIENT PAD

PANTON PAD

ROKAF

NORTH

LOOP

NORTH DV PAD

SOUTH DV PAD

WRM PARKING AREA

TREE

AREA

JUVAT

PAD

SOUTH

LOOP

PAINT VARIOUS FACILITIES

NOT TO SCALE

NORTH

SHT. NO. REF. NO. DESCRIPTION

DRAWING SCHEDULE

DRAWN BY:

DESIGNED BY:

CHECKED BY:

SCALE:

DRAWING NO:

PROJECT NO:

REF. NO:

CHIEF, CONSTRUCTION MANAGEMENT

CHIEF OF DESIGN

CHIEF OF CONTRACTS

ENVIRONMENTAL FLIGHT

FIRE DEPARTMENT

CORROSION ENGINEER

COMMUNICATIONS

BIOENVIRONMENTAL ENGINEERING

SAFETY

SECURITY POLICE

USING AGENCY

CHIEF, OPERATIONS FLIGHT

CHIEF, ENGINEERING FLIGHT

BASE CIVIL ENGINEER

AS SHOWN

KUNSAN AB, KOREA

COVER SHEET/LOCATE MAP

MLWR17-1045

YUN

LOCATION MAP AND DRAWING SCHEDULE

NEW 2ND FLOOR PLAN FOR B-1305

PAINT VARIOUS FACILITIES

MLWR17-1045 (TRIRIGA# 1013499)

SHEET 1 OF 9

NEW FLOOR PLAN FOR B-2719

C-1

NEW FLOOR PLAN FOR B-511

NEW 1ST FLOOR PLAN FOR B-1305

C-1

A-1

A-2

A-3

A-4

BASE HOSPITAL

BASE CIVIL ENGINEER

ENGINEERING FLIGHT

CONSTRUCTION MANAGEMENT

YUN

KIM, YONG HYON

UNITED STATES AIR FORCE

8th CIVIL ENGINEER SQUADRON

KUNSAN AIR BASE, REPUBLIC OF KOREA

THIS PROJECT

B-511, 1305 AND 2719

MAIN GATE

A-5

NEW ELEVATIONS FOR B-511

NEW ELEVATIONS FOR B-27199 OF 9

NEW ELEVATIONS FOR B-1305

A-6

A-7

NEW SITE PLAN FOR B-2719

C-2

SCOPE OF WORK

1. NEW PAINT (COLAR #33617, BEIGE ON EXISTING EXTERIOR INSULATION

AND FINISH SYSTEM (EIFS), EXTERIOR STAIRS & METAL GUARDRAIL,

METAL DOORS & FRAMES AND METAL GUTTER AND DOWNSPOUT, ETC.

AND FINISH SYSTEM (EIFS), EXTERIOR STAIRS & METAL GUARDRAIL,

METAL DOORS & FRAMES AND METAL GUTTER AND DOWNSPOUT, ETC.

AND FINISH SYSTEM (EIFS), EXTERIOR STAIRS & METAL GUARDRAIL,

METAL DOORS & FRAMES AND METAL GUTTER AND DOWNSPOUT, ETC.

1 2 3

A B DC E

ABD CE

EXIST STANDING SEAM

METAL ROOFING

NEW PAIN EXIST EIFS

(TYP)

GUARD RAIL

(TYP)

NEW PAINT EXISTING

METAL SIDING

NEW PAIN PROTECTED

METAL FLASHING

NEW PAINT

MET DOOR

NEW PAINT EXISTING

EXTERIOR MET DOOR

(TYP)

NEW PAINT

MET DOOR

NEW PAINT EXISTING

EXTERIOR MET DOOR

(TYP)

PAINT EXIST CMU

WALL & CONC COLUMN

(TYP)

NEW PAINT EXTERIOR INSUL

& FINISH SYSTEM (EIFS)

NEW PAIN PROTECTED

METAL FLASHING

NEW PAINT EXIST

METAL SIDING

GROUND FL

WORK POINT

GROUND FL

WORK POINT

NEW PAINT GUTTER

& DOWNSPOUT

EXISTING

METAL ROOFING

TO REMAIN

EXISTING

METAL ROOFING

TO REMAIN

NEW PAINT EXISTING CMU

WALL & CONC COLUMN

(TYP)

NEW PAINT EXISTING CMU

WALL & CONC COLUMN

(TYP)

EXISTING

METAL ROOFING

TO REMAIN

NEW PAINT ON EIFS

NEW PAINT EXIST

METAL GUTTER

NEW PAINT EXIST

GUTTER & FLASHING

NEW BUILDING

AL LOUVER(TYP)

BLOCK

NEW PAINT GALV STL

(TYP)

TO REMAIN

NEW PAINT CONC WALL

NEW PAINT CONC WALL

CONC SPLASH

IDENTIFICATION

1_MLWR17-1045C-1 (Location Map and Drawing Schedule)-Layout1
2_MLWR 17-1045C-2, New Site Plan for B-2719-Layout1
3_MLWR17-1045A-1, New floor Plan for B-511-FLOOR PLAN
4_MLWR17-1045A-2, 1st Floor Plan for B-1305-1ST FL
5_MLWR17-1045A-3, 2nd Floor Plan for B-1305-2ND FL
6_MLWR 17-1045A-4, New Floor Plan for B-2719-Layout1
7_MLWR17-1045A-5, New Elevations for B-511-1ST FL
8_MLWR 17-1045A-6, New Eelvations for B-1305-Layout1
9_MLWR 17-1045A-7, New Elevations for B-2719-Layout1