This is a set of architectural plans and construction documents for the Collin College Frisco Library Roof Replacement Project located at 9700 Wade Boulevard, Frisco, Texas 75035. The project involves the installation of a Thermoplastic Polyolefin (TPO) roofing membrane on low-slope roof areas totaling approximately 75,565 square feet and a standing seam metal roofing system on sloped roof sections. The project includes 23 designated roof areas (R1 through R23) with varying square footages, ranging from 228 square feet to 14,813 square feet. The construction documents were issued for bid on October 9, 2026, and include comprehensive architectural specifications, roof plans with wind zone designations, detailed construction specifications, and material requirements. The documents specify compliance with ASCE 7-22 wind standards and address wind uplift design across three zones with varying pressure requirements (21.4 psf to 49.2 psf). The project encompasses removal of abandoned equipment, replacement of deteriorated roof deck materials, installation of new insulation systems, roof drain modifications, equipment curb installation, and coordination of mechanical, electrical, and plumbing utilities on the roof structure.
The contract documents incorporate AIA Document A201 General Conditions of the Contract for Construction, designating Collin College as the Owner and PBK Architects, Inc. as the Architect. All work must comply with applicable safety and building codes as approved by the authority having jurisdiction, with contractors responsible for securing all required permits and scheduling inspections. The contractor must verify existing conditions, protect existing finishes and materials to remain, and provide shop drawings and manufacturer cut sheets for all equipment including light fixtures, plumbing equipment, electrical equipment, and hardware. New materials and equipment must be of recent manufacture and standard quality, free from defects, with the Architect serving as the final judge of quality. The documents require adherence to manufacturer specifications for all materials and systems, daily debris removal, continuous verification of dimensions and field conditions, coordination between all trades, submission of construction schedules identifying long lead items, and execution of all work in industry standard or better quality. Completion of construction is expected to deliver extended service life, reduced maintenance requirements, improved energy performance, and reliable weather protection for the building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Frisco_Library_Roof_Replacement.pdf | ||
| CollinCollegeFrisco_Library_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A299
A299
ROOM
REFERENCE
DETAIL NUMBER
CALLOUT
CENTER LINE, & SYMBOL
BEYOND LINE
ABOVE LINE
REFERENCE
COLUMN LINE
PLAN NORTH
NORTH ARROW
TRUE NORTH
NORTH ARROW
WINDOW & LOUVER TAG
REVISION TAG
LEVEL POINT
BREAK LINE
SHEET NUMBER
ELEVATION NUMBER
BUILDING SECTION
REFERENCE
LEVEL
DOOR SEQUENCE
(RE: DOOR SCHEDULE)
LEVEL
DATUM POINT
EXIT SIGN
ROOM NAME
REFERENCE
MATCHLINE
REFERENCE
WALL SECTION
REFERENCE
REFERENCE
ROOM SEQUENCE
SHEET NUMBER
ELEVATION NUMBER
REFERENCE
EXTERIOR
INTERIOR
MATERIAL TAG
(RE: ROOM FINISH SCHEDULE)
REFERENCE
EXISTING/NEW
COLUMN LINE
CASEWORK TYPE (CDS NUMBER)
SIZE (WxD)
DIRECTION SYMBOL
VIEW REFERENCE
MATERIAL INDICATIONS
EXISTING CONSTRUCTION TO
REMAIN
EXISTING CONSTRUCTION TO BE
DEMOLISHED
NEW NON-RATED
CONSTRUCTION
CONSTRUCTION TYPE SYMBOLSPROJECT SYMBOLSPROJECT SYMBOLS
PROJECT GRAPHIC REFERENCES
SHEET NUMBER
A7.10
SIM
SIM
A
CW1
AB-1
30x34
SIM
A101
A
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
DETAIL NUMBER
LOCK
RE
WORKING POINT
SPOT ELEVATION
TOP OF FRAMING/STEEL
CURTAINWALL TAG
STOREFRONT TAG
CONCRETE
BRICK
CONC. MASONRY UNITS
(CMU)
RIGID INSULATION
BATT INSULATION
ACOUSTICAL TILE /
FABRIC PANEL
GYPSUM BOARD
PLASTER ON METAL LATH
FINISH WOOD
CONTINUOUS WOOD
BLOCKING / SHIM
PLYWOOD
EARTH
CAST STONE / SPRAY ON INSULATION
/ SAND / MORTAR
STEEL
ALUMINUM
STONE
GRAVEL
SEALANT
ROD STOCK & SEALANT
N
KEYNOTE TAGC01
BUILDING NAME (If Applicable)
SHEET SERIES TYPE
DISCIPLINE
AA-201A
LEVEL REFERENCE
BUILDING AREA (If Applicable)
0 GENERAL
1 PLANS (Site, Floor, Finish, Graphics)
2 CEILING
3 ROOF
4 ENLARGED PLANS
5 ELEVATIONS (Exterior) 6 SECTIONS (Bldg & Wall)
7 BLDG DETAILS
8 DIAGRAMS/COMPILED SCHEDULES
(Partition Types, Door & Panel/Frame Types, Window Types)
9 INTERIOR FINISHES/SCHEDULES (Finish Plan, Interior Elevations, Casework/Millwork Elevations & Details, Locker Types & Details)
G GENERAL
C CIVIL
CA SPORTS CIVIL
SA SPORTS ARCH
S STRUCTURAL
L LANDSCAPE
D DEMOLITION
A ARCHITECTURAL
M MECHANICAL
E ELECTRICAL
P PLUMBING
T TECHNOLOGY
FS FOOD SERVICE
AV ACOUSTICAL
TH THEATRICAL
SUBDISCIPLINE
- NOT USED
S SITE
D DEMO
F FURNITURE
G GRAPHICS & SIGNAGE
Q EQUIPMENT
PROJECT GRAPHIC REFERENCES
BLDG AREA
BLDG AREA
RE: 01 / A-101B
SIM
A101
1 / A101
101A
ACT-1
8'-0"
CEILING TYPE
CEILING HEIGHT
CL
A7.10
S 3.
C
PARTITION TYPE TAG
(RE: PARTITION SCHEDULE)
PARTITION TYPE
STRUCTURAL CORE WIDTH
FIRE RATING TYPE
PARTITION MODIFIER
PROJECT LOCATION
N
H O
U S
T O
N
T X
-9
-0
T
X F
IR
M
: B R
KEY PLAN
DATE PROJECT NUMBER
CLIENT
DRAWING HISTORY
w w w .p bk .c om
PLAN TRUE
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G /O
C R
Plot Stamp:
1"
0"
NORTH:
DRAWN BY:
CHECKED BY:
10/9/2026 11:31:37 AM
L ib ra ry
R o o f
R e p la c e m e n t
IS
S
U E
D F
O R
B
ID
G-000
COVER SHEET
2026/10/09 260155
COLLIN COLLEGE
W ad e B lv d.
F ris co , T
X
G -000
C O
V E
R S
H E
E T
DAS
CG
DISCIPLINE
SHEET
NUMBER SHEET NAME
ARCHITECTURAL GENERAL
G-000 COVER SHEET
ARCHITECTURAL
A-301 OVERALL ROOF PLAN
A-322 ROOF DETAILS - SINGLE PLY
A-323 ROOF DETAILS - ADD ALT 01
N.T.S.2 VICINITY MAP
N.T.S.3 SITE AERIAL
LIBRARY ROOF REPLACEMENT
A. THE CONTRACT DOCUMENTS ARE TO INCLUDE AIA DOCUMENT A201 "GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION". CLIENT SHALL BE DESIGNATED AS "THE OWNER", PBK ARCHITECTS, INC. SHALL BE DESIGNATED AS "THE ARCHITECT". FACILITY SHALL BE DESIGNATED AS "THE LANDLORD". THE CONTRACT DOCUMENT SHALL ALSO INCLUDE THE AGREEMENT, PERFORMANCE AND
PAYMENT BONDS, GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, THE SPECIFICATIONS,
CONTRACT DRAWINGS ADDENDA, AND CONTRACT MODIFICATIONS, BUILDING RULES AND REGULATIONS
& ANY OTHER DOCUMENTS REQUIRED BY THE OWNER.
B. THE WORK SHALL BE DONE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF ALL APPLICABLE
SAFETY AND BUILDING CODES, AND AS APPROVED BY THE AUTHORITY HAVING JURISDICTION.
CONTRACTOR IS RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS REQUIRED FOR THE WORK AND FOR THE SCHEDULING OF ALL REQUIRED INSPECTIONS DURING THE COURSE OF THE WORK.
C. CONTRACTOR SHALL REVIEW AND VERIFY EXISTING CONDITIONS AS PROVIDED IN THE CONSTRUCTION
DOCUMENTS. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ALL DISCREPANCIES, ERRORS,
INCONSISTENCIES OR AMBIGUITIES PRIOR TO PROCEEDING WITH THE WORK.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR, AND PROVIDE PROTECTION OF, ANY EXISTING FINISHES, MATERIALS, AND EQUIPMENT TO REMAIN. CONTRACTOR SHALL REPAIR OR REPLACE ANY DAMAGED FINISHES, MATERIALS, AND EQUIPMENT AS A RESULT OF THE WORK. ALL EXISTING FINISHES TO
REMAIN SHALL BE CLEANED AT THE COMPLETION OF CONSTRUCTION. CONTRACTOR SHALL
PHOTOGRAPH AND DOCUMENT ALL EXISTING DAMAGES, AND PROVIDE TO THE ARCHITECT, PRIOR TO
PROCEEDING WITH THE WORK.
E. ALL MATERIALS AND SYSTEMS SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. ALL CONSTRUCTION SHALL BE OF INDUSTRY STANDARD OR BETTER. THE ARCHITECT SHALL BE FINAL
JUDGE OF QUALITY.
F. ONLY NEW MATERIALS AND EQUIPMENT OF RECENT MANUFACTURE, OF STANDARD QUALITY, AND FREE
FROM DEFECTS, WILL BE PERMITTED IN THE WORK, UNLESS OTHERWISE NOTED. REJECTED
MATERIALS AND EQUIPMENT SHALL BE REMOVED IMMEDIATELY FROM THE WORK AND REPLACED WITH MATERIALS AND EQUIPMENT OF THE QUALITY SPECIFIED. FAILURE TO REMOVE REJECTED MATERIALS AND EQUIPMENT SHALL NOT RELIEVE CONTRACTOR FROM THE RESPONSIBILITY FOR QUALITY OF MATERIAL AND EQUIPMENT USED NOR FROM ANY OTHER OBLIGATION IMPOSED BY THE CONTRACT.
G. DO NOT SCALE DRAWINGS. STATED & WRITTEN DIMENSIONS GOVERN. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND SHALL BE RESPONSIBLE FOR THEIR ACCURACY. NO EXTRA CHARGE OR COMPENSATION SHALL BE ALLOWED BECAUSE OF DIFFERENCE BETWEEN ACTUAL DIMENSIONS AND THOSE INDICATED ON THE DRAWINGS, UNLESS THEY CONTRIBUTE TO A CHANGE IN THE SCOPE OF THE WORK. ANY DIFFERENCE FOUND SHALL BE SUBMITTED TO THE ARCHITECT FOR COORDINATION PRIOR
TO ORDERING, MANUFACTURING, OR PROCEEDING WITH THE WORK. HORIZONTAL DIMENSIONS
INDICATED ARE TO/FROM FACE OF FINISH, UNLESS NOTED OTHERWISE. VERTICAL DIMENSIONS ARE FROM TOP OF FLOOR SLAB EXCEPT WHERE NOTED TO BE ABOVE FINISHED FLOOR (AFF). DIMENSIONS
ARE NOT ADJUSTABLE WITHOUT APPROVAL OF ARCHITECT UNLESS NOTED +/-.
H. CONTRACTOR SHALL VERIFY THAT NO CONFLICTS EXIST BETWEEN THE LOCATIONS OF EXISTING AND PROPOSED NEW MECHANICAL, ELECTRICAL, PLUMBING, DATA, AND SPRINKLER EQUIPMENT (INCLUDING BUT NOT LIMITED TO STRUCTURAL MEMBERS, PIPING, DUCT WORK, CONDUIT AND SPRINKLERS) AND THAT CLEARANCES FOR INSTALLATION AND MAINTENANCE OF EQUIPMENT ARE PROVIDED. ELEMENTS IN CONFLICT SHALL BE DOCUMENTED AND PROVIDED TO THE ARCHITECT PRIOR TO PROCEEDING WITH
THE WORK.
J. CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH SHOP DRAWINGS FOR REVIEW AND APPROVAL, FOR ALL, BUT NOT LIMITED TO, THE FOLLOWING: SHOP-FABRICATED MILLWORK, CARPET LAYOUT, FLOORING, LIGHT FIXTURES, DOORS, MISC. STEEL, METAL FABRICATION, GLASS/GLAZING, SPRINKLER LAYOUTS, HARDWARE. SHOP DRAWINGS SHALL BE SUBMITTED IN THE FORM OF 3 SETS OF PRINTS.
SHOP DRAWINGS SHALL NOT BE REPRODUCTIONS OF CONTRACT DOCUMENTS. MATERIAL SUBMITTALS (3 SAMPLES) SHALL BE PROVIDED FOR WOOD, FASTENERS, ACRYLIC, CARPET, TILE, BASE, PAINT, LAMINATE AND ANY OTHER MATERIALS INDICATED IN THE SHOP DRAWING.
K. CONTRACTOR SHALL PROVIDE THE ARCHITECT WITH MANUFACTURER'S CUT SHEETS AND
SPECIFICATIONS FOR ALL EQUIPMENT INCLUDING BUT NOT LIMITED TO: LIGHT FIXTURES, PLUMBING EQUIPMENT, ELECTRICAL EQUIPMENT, FANS, SUPPLEMENTARY HEATING AND COOLING ELEMENTS, ALL
HARDWARE AND SECURITY EQUIPMENT.
L. CONTRACTOR SHALL NOT PROCEED WITH WORK FOR WHICH ADDITIONAL COMPENSATION BEYOND THE
CONTRACT AMOUNT IS EXPECTED WITHOUT WRITTEN AUTHORIZATION FROM THE ARCHITECT AND
OWNER. FAILURE TO OBTAIN SUCH AUTHORIZATION SHALL INVALIDATE A CLAIM FOR EXTRA
COMPENSATION. CONTRACTOR SHALL NOT PROCEED WITH WORK WHICH, IF COMPLETED IN STRICT CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS, WILL RESULT IN ADDITIONAL WORK BEYOND
THE SCOPE OF THE CONTRACT WITHOUT WRITTEN AUTHORIZATION FROM THE ARCHITECT AND
OWNER. ANY FIELD CONDITIONS THAT SIGNIFICANTLY VARY FROM THE CONTRACT DOCUMENTS OR WILL RESULT IN ADDITIONAL WORK, SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR
TO PROCEEDING WITH WORK.
M. CONTRACTOR SHALL REVIEW AND COORDINATE THE SIZE AND LOCATION OF ALL SLAB OPENINGS WITH ALL RELATED DISCIPLINES. CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS OF CORE DRILLING
AND SLAB OPENINGS TO ARCHITECT AND STRUCTURAL ENGINEER OF RECORD FOR REVIEW AND
APPROVAL PRIOR TO PROCEEDING WITH THE WORK.
N. PATCH, REPAIR, AND INSTALL ALL FIREPROOFING AS REQUIRED BY CODE. FIREPROOF ALL NEW
PENETRATIONS AS REQUIRED FOR APPROVAL BY THE AUTHORITY HAVING JURISDICTION.
P. WHERE BUILDING THERMAL EXPANSION JOINTS ARE LOCATED, CONTRACTOR SHALL COMPLY WITH APPLICABLE CODE AND INDUSTRY BEST PRACTICES FOR ROUTING OF ALL PIPING, DUCTS, CONDUITS
AND OTHER CONTINUOUS RUNS.
Q. CONTRACTOR SHALL CONTINUOUSLY CHECK ARCHITECTURAL AND STRUCTURAL CLEARANCES FOR ACCESSIBILITY OF EQUIPMENT AND MECHANICAL AND ELECTRICAL SYSTEMS. NO ALLOWANCES OF ANY KIND WILL BE MADE FOR THE GENERAL CONTRACTOR'S NEGLIGENCE TO FORESEE MEANS OF
INSTALLING EQUIPMENT INTO POSITION.
R. FINISHED WORK SHALL BE FIRM, WELL-ANCHORED, IN TRUE ALIGNMENT, PLUMB, LEVEL, WITH SMOOTH, CLEAN, UNIFORM, APPEARANCE WITHOUT WAVES, DISTORTIONS, HOLES, MARKS, CRACKS, STAINS, OR DISCOLORATION. JOINTING SHALL BE CLOSE FITTING, NEAT AND WELL SCRIBED. FINISHED WORK
SHALL HAVE NO EXPOSED UNSIGHTLY ANCHORS OR FASTENERS AND SHALL NOT PRESENT
HAZARDOUS, UNSAFE CORNERS. ALL WORK SHALL HAVE THE PROVISION FOR EXPANSION,
CONTRACTION AND SHRINKAGE AS NECESSARY TO PREVENT CRACKS, BUCKLING, AND WARPING DUE
TO TEMPERATURE AND HUMIDITY CONDITIONS.
S. ATTACHMENTS, CONNECTIONS OR FASTENERS OF ANY NATURE ARE TO PROPERLY AND PERMANENTLY BE SECURED IN CONFORMANCE WITH INDUSTRY BEST PRACTICES. THE DRAWINGS HIGHLIGHT SPECIAL
CONDITIONS ONLY AND BY NO MEANS ILLUSTRATE EVERY CONNECTION. THE CONTRACTOR IS
RESPONSIBLE FOR IMPROVING CONNECTION ACCORDINGLY.
T. CONTRACTOR SHALL WAIVE "COMMON PRACTICE" AND "COMMON USAGE" AS CONSTRUCTION CRITERIA
WHEREVER DETAILS AND CONTRACT DOCUMENTS OR GOVERNING CODES, ORDINANCES, ETC.
REQUIRE QUANTITY OR BETTER QUALITY THAN COMMON PRACTICE OR COMMON USAGE WOULD
REQUIRE.
U. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND SUBMITTALS AND SHALL ORDER AND SCHEDULE
DELIVERY OF MATERIALS TO AVOID DELAYS IN CONSTRUCTION. IF AN ITEM IS FOUND TO BE
UNAVAILABLE OR TO HAVE A LONG LEAD TIME, THE GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT
IMMEDIATELY WITH A PROPOSED ALTERNATIVE.
V. CONTRACTOR SHALL NOTIFY THE OWNER, THE LANDLORD, AND THE ARCHITECT IN WRITING OF ANY
DEFICIENCIES IN BASE BUILDING WORK PRIOR TO THE COMMENCEMENT OF THE WORK. ANY
UNREPORTED DEFICIENCIES WILL BECOME THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO
CORRECT.
W. CONTRACTOR SHALL EXERCISE INDUSTRY BEST PRACTICES FOR CARE AND CAUTION DURING THE
CONSTRUCTION OF THE WORK, AND SHALL SCHEDULE WORK TO MINIMIZE DISTURBANCES TO
OCCUPANTS, ADJACENT SPACES AND/OR STRUCTURES, PROPERTY, PUBLIC THOROUGHFARES, ETC.
THE GENERAL CONTRACTOR SHALL TAKE PRECAUTIONS AND BE RESPONSIBLE FOR THE SAFETY OF ALL BUILDING OCCUPANTS DURING CONSTRUCTION PROCEDURES. THE GENERAL CONTRACTOR SHALL
BE RESPONSIBLE FOR ANY COSTS INCURRED.
X. ALL DEBRIS SHALL BE REMOVED FROM THE SITE ON A DAILY BASIS, OR AS DIRECTED BY THE AUTHORITY HAVING JURISDICTION. UPON COMPLETION OF THE WORK, REMOVE ALL DEBRIS FROM THE WORK PROVIDED UNDER THIS CONTRACT AND LEAVE ALL AREAS CLEAN. TRASH IS NOT PERMITTED TO
BE BURNED ON SITE.
Y. ALL ABANDONED AND MISCELLANEOUS NAILS, HANGERS, STAPLES, WIRES, CONDUITS AND DEBRIS SHALL BE REMOVED FROM EXPOSED AREAS OF THE FLOORS, WALLS, AND CEILINGS. REMOVE ALL ABANDONED PIPE SLEEVES IN FLOOR SLABS. PATCH EXISTING SLAB AS REQUIRED TO MAINTAIN UL
FIRE RATING OF FLOOR SLAB WHERE PIPES AND CONDUITS HAVE BEEN REMOVED.
Z. SLAB PENETRATIONS SHALL BE SEALED AS REQUIRED TO MAINTAIN FIRE RATING, USING MATERIALS AND METHODS APPROVED BY THE AUTHORITY HAVING JURISDICTION. EXPANSION MATERIAL SHALL BE
APPROVED BY THE ARCHITECT.
ZA. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY ACCESS PANELS WHICH MAY BE REQUIRED PRIOR TO PROCEEDING WITH THE WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES. REQUIRED ACCESS PANELS SHALL BE INCLUDED IN THE CONTRACTOR'S SCOPE OF
WORK.
ZB. CONTRACTOR SHALL PROVIDE THE TEAM WITH A CONSTRUCTION SCHEDULE SHOWING THE PROPOSED PHASING. LONG LEAD ITEMS THAT WILL AFFECT THE SUBSTANTIAL COMPLETION DATE SHALL BE
BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY.
A
ABV above
ACOUS acoustical
ACT acoustical ceiling tile
AD area drain
ADJ adjustable
AFF above finished floor
ALT alternate
ALUM aluminum
APPROX approximate
ARCH architect / architectural
B
B.O. bottom of
BALC balcony
BD board
BET between
BLDG building
BLKG blocking
BLW below
BM beam
BOT bottom
BRKT bracket
BULKHD bulkhead
BUR built up roof
C
C.G. corner guard
CAB cabinet
CALK caulking
CDS cabinet design series
CEM cement
CER ceramic
CJ control joint
CLG ceiling
CLOS closet
CLR clear
CO cased opening
COL column
CONC concrete
CONT continous
CPT carpet
CT ceramic tile
CTR center
CW curtain wall
D
DBL double
DET detail
DIA diameter
DIM dimension
DN down
DR door
DS down spout
DW dishwasher
DWG drawing
E
E east
EA each
EIFS exterior insulation & finish system
ELEC electric(al)
ELEV elevation
EMER emergency
ENCL enclosure
EOS edge of slab
EQ equal
EQUIP equipment
ETR existing to remain
EW each way
EXP. JT. expansion joint
EXST existing
F
F.O. face of
FA fire alarm
FAP fire annunciuator panel
FD floor drain
FE fire extinguisher
FEC fire extinguisher cabinet
FG finish group
FH fire hydrant
FHC fire hose cabinet
FIN finish
FLR floor
FLUOR fluorescent
FT foot or feet
FUR furring
G
GAL gallon
GALV galvanized
GB grab bar
GC general contractor
GL glass
GND ground
GWB gypsum wall board
GYP gypsum
H
H.W.H. hot water heater
HC handicapped
HDWD hardwood
HDWR hardware
HM hollow metal
HORIZ horizontal
HR hour
HT height
I
ID inner diameter
INCAN incandescent
INSUL insulation
INT interior
J
JAN janitor
JST joist
JT joint
L
LAM laminate
LAV lavatory
LB pound(s)
LDG landing
LT light
M
MAX maximum
MECH mechanical
MEMB membrane
MFR manufacturer
MIN minimum
MISC miscellaneous
MO masonry opening
MTD mounted
MTL metal
N
N north
NIC not in contract
NO number
NOM nominal
NTS not to scale
O
O.P. overflow pipe
OA overall
OC on center
OD outside diameter
OFF office
OH opposite hand
OPG opening
OPP opposite
P
PART partition
PCT porcelain tile
PERM perimeter
PG paint grade
PLAM plastic laminate
PLAS plaster
PLYWD plywood
POLYISO polyisocyanurate
PR pair
PT paint
PTD painted
R
R riser
RAD radius
RCP reflected ceiling plan
RD roof drain
RE: refer
REF refrigerator
REINF reinforced
REQD required
RESIL resilient
RM room
RO rough opening
RTU root top unit (mech)
S
S south
SAFB sound attenunation fiber batt
SC scupper
SCHED schedule
SEAL sealant
SECT section
SF square foot
SHT sheet
SIM similar
SPEC specification
SQ square
SS stainless steel
STD standard
STF storefront
STL steel
STOR storage
STRUCT structural
SUSP suspended
SYM symmetrical
T
T tread
T&G tongue & groove
T.O. top of
TEL telephone
TER terrazzo
THK thick
THR threshold
TYP typical
U
UC undercut
UNFIN unfinished
UNO unless noted otherwise
UON unless otherwise noted
UTIL utility
V
VCT vinyl compostion tile
VERT vertical
VIF verify in field
VTR vent termination pipe
VWC vinyl wall covering
W
W west
W/ with
W/O without
WC watercloset
WIN window
WP waterproof
WS wood, solid core
WSCT wainscot
WT weight
X
XPS extruded polystrene
COLLIN COLLEGE FRISCO
9700 Wade Blvd.
Frisco, TX 75035
ISSUED FOR BID
OCTOBER 9, 2026
No. Description Date
18'-0"
'-0
6'-0" 12'-0"
ZONE 1
ZONE 2
ZONE 3ZONE 3
ZONE 3ZONE 3
ZONE 3
ZONE 3
ZONE 3
ZONE 3
ZONE 2
ZONE 2
ZONE 1
ZONE 2
ZONE 1
ZONE 1
BUILDING INTERIOR
BUILDING INTERIOR
1/A-300
DESIGN STANDARD
EXPOSURE CATAGROY
RISK CATEGORY
SAFETY FACTOR
PERIMETER
CORNERS
ZONE 1' (FIELD')
ZONE 1 (FIELD)
ZONE 2 (PERIMETER)
ZONE 3 (CORNER)
ASCE 7-22
III
B
2.0
18'-0"
6'-0"
21.4 psf
37.3 psf
49.2 psf
49.2 psf
NOTE: ROOF SYSTEM DESIGNS MUST MEET EITHER FLORIDA FPA OR
MIAMI-DADE NOA APPROVALS. THIS WIND UP LIFT DESIGN HAS BEEN
PROVIDED USING https://roofwinddesigner.nrca.net/ AS A GENERAL GUIDE.
N
H O
U S
T O
N
T X
-9
-0
T
X F
IR
M
: B R
KEY PLAN
DATE PROJECT NUMBER
CLIENT
DRAWING HISTORY
w w w .p bk .c om
PLAN TRUE
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G /O
C R
Plot Stamp:
1"
0"
NORTH:
DRAWN BY:
CHECKED BY:
10/9/2026 11:31:37 AM
L ib ra ry
R o o f
R e p la c e m e n t
IS
S
U E
D F
O R
B
ID
A-300
ROOF PLAN - WIND
ZONES
2026/10/09 260155
COLLIN COLLEGE
W ad e B lv d.
F ris co , T
X
A -300
R O
O F
P L
A N
W
IN
D
Z O
N E
S
DAS
CG
DISCIPLINE
1/16" = 1'-0"6 WIND ZONE ROOF PLAN
N.T.S.25 ROOFING - CURRENT ROOF AREAS
1/16" = 1'-0"1 HIGH ROOF WIND ZONE PLAN
R6
R11
R12
R5R10
R9
R19 R20
R21
R13
R14
R15 R16
R17 R18
R7
R8
R22
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
A-322
LOW
A-322
LOW
A-322
LOW
A-322
A-322
A-322
A-322
A-323
A-323
A-323
A-323
A-323
HIGH
A-323
A-323
A-323
A-323
A-323
A-323
A-323
R23 1
A-323
1/4" / 1'-0"
1/ 4"
1'
-0
1/4" / 1'-0"
1/ 4"
1'
-0
1/ 4"
1'
-0
1/ 4"
1'
-0
6" / 1'-0"6" / 1'-0"
6" / 1'-0" 6" / 1'-0"
6" / 1'-0" 6" / 1'-0"
V.I.F.
V .I.
F
V.I.F.
V .I.
F
V.I.F. V.I.F.
V.I.F. V.I.F.
V .I.
F
V .I.
F
6" / 1'-0"
6"
1' -0
6"
1'
-0
6" / 1'-0"
V.I.F.
V.I.F.
V.I.F.V.I.F.
BUILDING INTERIOR
BUILDING INTERIOR
A-322
A-322
A-322
A-322 24/A-301
FLANGE VENT
PITCH PAN
WALL DRAIN
CURB MOUNTED VENT
CURB MOUNTED
INTAKE
ABANDONED CURB TO
BE REMOVED / PATCHED
GUY WIRE
POWER VENT
HEATER VENT
BOILER VENT
TURBINE VENT
GOOSE NECK
VENT
CURB MOUNTED
AC
SPLASH BLOCK
SPLASH PAN
A/C ON POSTS
ROOF HATCH
SKYLIGHTS
ANTENNA
SATELLITE
DISH
SCUPPER
GUTTER
DOWNSPOUT
WALL LADDER
SWING LADDER GAS LINE
ELEC. LINE
PIPE BOX
EXHAUST AND SUPPLY
FAN ON SINGLE CURB
RIDGE LINE
EXISTING AREA
TO REMAIN -NIC
NEW LT. WT. CONCRETE
INSULATION/ CRICKET
TAPERED LIGHT WEIGHT
CONCRETE
DESIGNATES EXTENTS OF
WORK IDENTIFIED BY
KEYED NOTES
AREA DIVIDER
EXPANSION JOINT
CONDENSATE LINE
WATER LINE
A1 ROOF AREA DESIGNATION
PB
EJ
ADS
G
DS
G
E
A ABANDON EQUIP.
V
AC
C
W
SL
NEW TAPERED
INSULATION / CRICKET
NEW ROOF DRAIN
EXIST. ROOF DRAIN
OVERFLOW DRAINS
OF
VENT THROUGH ROOF
1. CONTRACTOR SHALL VISIT SITE TO ASCERTAIN EXACT EXISTING CONDITIONS AND
COMPONENTS RELATED TO THE WORK DESCRIBED BY THESE DOCUMENTS. AFTER AWARD OF
THE CONTRACT, CHANGE ORDER REQUEST FOR ADDITIONAL MONEY SHALL NOT BE APPROVED
IF THE WORK COULD HAVE BEEN ANTICIPATED DURING THE SITE VISIT BY THE CONTRACTOR,
WORK SHALL BE COMPLETED IN ACCORDANCE WITH ACCEPTED MANUFACTURER'S PRINTED
INSTRUCTIONS AND WARRANTY REQUIREMENTS.
2. DIMENSIONS, DETAILS, EQUIPMENT SIZE AND LOCATION SHOWN IN THESE CONSTRUCTION
DOCUMENTS ARE FOR CONVEYANCE OF DESIGN INTENT ONLY. EXACT SIZE, LOCATION, TYPE OF MATERIAL AND TYPE OF CONSTRUCTION OF EXISTING CONDITIONS ARE THE RESPONSIBILITY OF
THE CONTRACTOR TO ASCERTAIN AND CONFIRM.
3. INDICATED ROOF HEIGHTS ARE GENERAL IN NATURE.
4. REFER TO NOMENCLATURE FOR TYPE OF ROOF SYSTEM. AREAS ARE MARKED WITH
DESIGNATED LETTER ON ROOF PLAN.
5. NOTE THAT THE DETAILS DRAWN ARE GENERIC IN NATURE AND ARE NOT NECESSARILY
LOCATED AND KEYED TO THE ROOF PLANS.
6. REMOVE ABANDONED EQUIPMENT IDENTIFIED ON SITE AND AS SHOWN OTHERWISE ON THESE
DOCUMENTS.
7. ALL NEW CRICKETS AND TAPERED INSULATION SHALL BE INSTALLED WITH A FINISHED 1/4" PER
FOOT MIN. SLOPE. CRICKET THE UP SLOPE SIDE OF SQUARE CURBS AND PROJECTIONS OVER
20' IN WIDTH.
8. REPLACE ROTTED AND / OR OTHERWISE DETERIORATED ROOF DECK MATERIALS (AS
APPLICABLE) WITH LIKE MATERIAL AND THICKNESS.
9. REPLACE ROTTEN AND / OR OTHERWISE DETERIORATED WOOD NAILER MATERIAL WITH NEW
LIKE MATERIAL AND THICKNESS.
10. PATCH EXISTING METAL ROOF DECK (AS APPLICABLE) FOR HOLES LESS THAN 10" WIDE BY
ANCHORING 22 GA. STAINLESS STEEL SHEET METAL TO BOTTOM OF EXISTING METAL ROOF
DECK AND ADDING NEW INSULATION TO MATCH THICKNESS. PATCH EXISTING METAL ROOF
DECK FOR HOLES GREATER THAN 10" WIDE BY ANCHORING 22 GA. STAINLESS STEEL SHEET
METAL TO BOTTOM OF EXISTING METAL ROOF DECK SPANNING FROM JOIST TO JOIST.
11. AS APPLICABLE, HVAC AND / OR DX UNITS, ELECTRICAL TRANSFORMERS, ROOF TOP
EQUIPMENT, ETC. THAT ARE ON SLEEPERS SHALL BE DISCONNECTED / REMOVED, RAISED, AND
PLACED ON NEW CURBED PLATFORMS AS DETAILED AND REINSTALLED / RECONNECTED. CURB
MOUNTED HVAC UNITS, EQUIPMENT, ETC. SHALL HAVE A MINIMUM 10" CURB HEIGHT AND ARE TO
BE RAISED AS REQUIRED.
12. WORK TO ANY UTILITY CONDUIT OR PIPE SHALL BE PERFORMED BY SPECIFIC LICENSED
SUBCONTRACTORS SPECIALIZING IN HVAC, PLUMBING AND ELECTRICAL WORK. PERMITS AND
INSPECTIONS ARE REQUIRED. REROUTE AND / OR MODIFY UTILITY CONDUIT OR PIPE AS
REQUIRED TO BE INSTALLED AS DETAILED.
13. PROVIDE A "MERCURY" GAS LINE TEST (COORDINATE WITH OWNER AND ARCHITECT FOR
WITNESS OF TEST). REPAIR ANY FOUND LEAKS AND RETEST AS REQUIRED.
14. UNLESS INDICATED OTHERWISE ON THE CONSTRUCTION DOCUMENTS, REPLACE AND RAISE
EXISTING EXPANSION JOINTS / AREA DIVIDERS / CURB MOUNTED EQUIPMENT / SKYLIGHTS (AS
APPLICABLE) A MIN. 10" ABOVE ROOF DECK.
15. ALL SOIL STACK FLASHING SHALL BE A MIN. 10" ABOVE FINISHED ROOF SURFACE. COUPLE
PVC PIPE ABOVE DECK AND COUPLE CAST IRON PIPE BELOW DECK.
16. ALL PIPING/ CONDUITS/ ETC. SHALL BE A MIN. 10" ABOVE ROOF SURFACE, NEW AND EXISTING.
PROVIDE PORTABLE PIPE HANGERS WITH PROTECTION PADS AS SPECIFIED. RAISE EXISTING
PIPING/ CONDUIT/ ETC. AS REQUIRED. MEP CONTRACTORS SHALL PROVIDE SUPPORTS FOR
UTILITY LINES.
17. PROVIDE SHEET METAL HOODED (WITH METAL FACE CLOSURE) CAPS, WOOD CURB, BOX
COVER AT GAS AND WATER PIPE ROOF PENETRATIONS AS DETAILED. PROVIDE POSITIVE SLOPE
AWAY FROM FACE COVER.
18. PROVIDE WALKWAY PROTECTION PADS AS SPECIFIED AROUND ROOF HATCHES, HVAC
ROOFTOP UNITS, DOORS THAT OPEN ONTO ROOF AND AT TOP AND BOTTOM OF ROOF TOP
ACCESS LOCATIONS.
19. INSTALL NEW SPLASH PAN AT LOCATIONS WHERE ROOF DRAINAGE DISCHARGES ONTO ROOF
AREA. INSTALL NEW SPLASH BLOCKS WHERE ROOF DRAINAGE DISCHARGES ON GROUND.
20. ISOLATE HEAT PIPES / FLUES AS DETAILED AND RECOMMENDED AND OUTLINED IN THE NRCA
MANUAL FOR HOT STACK FLASHING AND AS DETAILED.
21. ALL OUTSIDE AIR INTAKES SHALL BE COVERED TO ELIMINATE ODORS AND FUMES FROM
ENTERING INTO THE BUILDING DURING CONSTRUCTION WORK.
22. AFTER SUBSTANTIAL COMPLETION, THE GENERAL CONTRACTOR SHALL EXAMINE AND CLEAN
NEW DRAIN LINES AND NEW AND EXISTING (AS APPLICABLE) GUTTERS OF DEBRIS AND
BLOCKAGE, FLUSH WITH WATER TO ENSURE THAT DRAINS AND GUTTERS FLOW FREELY.
23. OWNER WILL VERIFY PROPER OPERATION OF ROOF TOP EQUIPMENT BEFORE AND AFTER THE
PROJECT. CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING INOPERABLE EQUIPMENT
PRIOR TO RELEASE OF RETAINAGE.
24. PRIOR TO COMMENCEMENT OF WORK, COORDINATE WALK OF ENTIRE ROOF WITH ROOFING
MANUFACTURER'S TECHNICAL REPRESENTATIVE TO IDENTIFY AND LOCATE AREAS OF HIGH
SLOPE OR OTHER CONDITIONS WHICH MIGHT REQUIRE SPECIAL PROCEDURES FOR SYSTEM
ATTACHMENT.
25. REFER TO MEP DRAWINGS FOR SIZE AND LOCATION OF DECK PENETRATIONS AND ROOF TOP
EQUIPMENT.
26. REFER TO GENERAL DETAILS FOR TYPICAL SPLASH PAN, ROOF DRAIN AND OVERFLOW DRAIN
DETAILS.
27. REPLACE RUSTED AND / OR DETERIORATED EXISTING METAL VENT FLASHING AND FLUES.
28. GENERAL CONTRACTOR TO ENSURE ROOFTOP PENETRATIONS (SOIL STACKS, VENTS, ETC.)
ARE INSTALLED MIN. 4'-0" FROM OTHER DECK PENETRATIONS, RISE WALLS, AND ROOF EDGE.
MECHANICAL EQUIPMENT TO BE LOCATED MIN. 10'-0" FROM PERIMETER EDGE AND NO CLOSER
THAN 4'-0" FROM RISE WALLS, OR ANY OTHER ROOF PENETRATION.
29. LOCATE PERIMETER DRAINS MAX. 6'-0" FROM EDGE TYPICAL UNLESS SHOWN OTHERWISE.
(GENERAL CONTRACTOR TO COORDINATE WITH ROOFING AND PLUMBING CONTRACTOR.)
30. THROUGH WALL BASE FLASHING MIN. HEIGHT 10" AND MAX. HEIGHT 20" FROM FINISH DECK. DO
NOT STEP THROUGH WALL FLASHING CLOSER THAN 5'-0" FROM CORNERS.
31. GENERAL CONTRACTOR SHALL COORDINATE LOCATION AND ORIENTATION OF ROOF HATCH
AND ACCESS LADDER.
32. GENERAL CONTRACTOR SHALL COORDINATE TOP OF STEEL TO TOP OF BLOCKING AND
SUBSTRATE BOARD DIMENSIONS IN FIELD PRIOR TO ORDERING MATERIALS. NO ADDITIONAL
COMPENSATION WILL BE GRANTED FOR FAILURE TO COORDINATE THESE DIMENSIONS.
33. GENERAL CONTRACTOR SHALL VERIFY ROOF SLOPES WILL PROPERLY DRAIN AS SHOWN.
TAPERED INSULATION HATCHING SHOWN IS NOT INTENDED TO ILLUSTRATE THE ENTIRE LIMITS
OF TAPERED INSULATION. ROOF AREAS NOT SLOPED BY STRUCTURE SHALL BE SLOPED WITH
TAPERED INSULATION TO ACHIEVE PROPER DRAINAGE.
34. PROVIDE ONE WAY MOISTURE VENTS AT LIGHTWEIGHT CONCRETE OR GYPSUM OVER POUR
AREAS AS RECOMMENDED BY THE ROOFING SYSTEM MANUFACTURER.
35. PAINT EXISTING GAS PIPE TO REMAIN.
36. PROVIDE RETROFIT DRAIN KIT FOR EACH EXISTING ROOF DRAIN. RE: SPECS.
37. ALL ROOFING WORK SHALL OCCUR IN SUCH A MANNER AS NOT TO VOID ANY EXISTING ROOF
WARRANTIES. CONTRACTOR TO CONTACT ROOFING MANUFACTURER PRIOR TO COMMENCING
THE WORK. NO EXCEPTIONS.
(NEW) 2 LAYERS OF 2.2" POLYISO
INSULATION, FULLY ADHERED
(RE: SPECS)
(NEW) 5/8" STORMX PRIME
COVER BOARD, FULLY
ADHERED (RE: SPECS)
(NEW) 80 MIL FLEECEBACK
TPO MEMBRANE, FULLY
ADHERED (RE: SPECS)
(EXISTING) STRUCTURAL
CONCRETE DECK
(NEW) 4.4" POLYISO
INSULATION DIVIDED IN TWO
LAYERS
(RE: SPECS)
(NEW) 1/2" RECOVERY
BOARD (RE: SPECS)
(NEW) FULLY ADHERED
WATERPROOF MEMBRANE
(RE: SPECS)
(NEW) SLIP SHEET (AS REQUIRED
BY METAL PANEL MANUFACTURER
(NEW) PRE-FINISHED ARCHITECTURAL
METAL ROOFING PANEL
(RE: SPECS)
(EXISTING) METAL DECK
(RE: STRUCTURAL)
A B
(ADD ALT 01)
ROOF HATCH - RE: 15/A-322 (RE: SPECS)
CURB MOUNTED VENT, TYPICAL - RE: 13/A-322 (RE: SPECS)
REMOVE AND SALVAGE EXISTING LIGHTNING PROTECTION
LIGHTNING PROTECTION SYSTEM TO BE REMOVED AND REINSTALLED BY
QUALIFIED LIGHTNING PROTECTION DESIGNER / INSTALLER. ENSURE ALL
LOCATIONS WHERE LIGHTNING PROTECTION IS BEING REINSTALLED IS
MAINTAINED IN WATERTIGHT CONDITION. SUBMIT ALL METHODS OF
ATTACHMENT / DETAILS TO ARCHITECT FOR REVIEW.
ALL EXISTING THYCURBS CURRENTLY SUPPORTING EQUIPMENT TO
REMAIN AND BE REFLASHED / RECAPPED WITH NEW METAL
CONTRACTOR TO VISIT SITE TO DETERMINE TOTAL QUANTITY OF
EXISTING THYCURBS.
A-323
A-323
A-323
A-323
A-323
A-323
A-323
A-323
A-323
A-323
A-3234
A-323
A-323
A-323
LOW
A-323
A-323
A-323
LOW
A-323
A-323
A-323
A-323
A-323
LOW
A-323
LOW
A-323
LOW
A-323
A-323
LOW
A-323
R1 R2
N
H O
U S
T O
N
T X
-9
-0
T
X F
IR
M
: B R
KEY PLAN
DATE PROJECT NUMBER
CLIENT
DRAWING HISTORY
w w w .p bk .c om
PLAN TRUE
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G /O
C R
Plot Stamp:
1"
0"
NORTH:
DRAWN BY:
CHECKED BY:
10/9/2026 11:31:38 AM
L ib ra ry
R o o f
R e p la c e m e n t
IS
S
U E
D F
O R
B
ID
A-301
OVERALL ROOF PLAN
2026/10/09 260155
COLLIN COLLEGE
W ad e B lv d.
F ris co , T
X
A -301
O V
E R
A L
L R
O O
F P
L A
N
DAS
CG
DISCIPLINE
1/16" = 1'-0"6 OVERALL ROOF PLAN
N.T.S.1 ROOFING - LEGEND (DEMO/EXIST)
N.T.S.7 GENERAL NOTES (EXISTING AND NEW)
N.T.S.26 ROOFING (TP) - NOMENCLATURE (INSULATION)
ROOF SCHEDULE
Mark Area NOMENCLATURE Comments
R1 286 SF B Add Alt 01
R2 11,413 SF B Add Alt 01
R3 1,462 SF B Add Alt 01
R4 2,107 SF B Add Alt 01
R5 3,522 SF B Add Alt 01
R6 1,757 SF B Add Alt 01
R7 14,813 SF A
R8 9,251 SF A
R9 2,216 SF B Add Alt 01
R10 2,540 SF B Add Alt 01
R11 2,500 SF B Add Alt 01
R12 2,508 SF B Add Alt 01
R13 907 SF B Add Alt 01
R14 4,887 SF B Add Alt 01
R15 999 SF B Add Alt 01
R16 999 SF B Add Alt 01
R17 958 SF B Add Alt 01
R18 958 SF B Add Alt 01
R19 3,068 SF B Add Alt 01
R20 2,786 SF B Add Alt 01
R21 1,711 SF B Add Alt 01
R22 3,690 SF B Add Alt 01
R23 228 SF B Add Alt 01
Grand total 75,565 SF
N.T.S.14 ROOFING - KEYNOTES
1/16" = 1'-0"24 ROOF PLAN - POP UP AREAS
SHEET METAL OR
MEMBRANE COATED
METAL PARAPET CAP
SHEET METAL OR
MEMBRANE COATED
JOINT COVER PLATE AS
SPECIFIED (6" WIDE MIN.) SET IN
TWO BEDS OF SEALANT
HIGH-DOMED , CAPPED,
GASKETED FASTENERS
(APPROX. 18" O.C. PER
WIND ZONE REQUIREMENTS AS
SPECIFIED)
FASTENERS APPROX. 6" O.C.
EXTEND ROOF MEMBRANE
BELOW WOOD NAILER
AND SECURE
2 WOOD NAILERS WITH
CONTINUOUS BEVELED WOOD
SHIM (E.G. BEVELED CEDAR
SIDING)
CONTINUOUS
CLEAT
* MAXIMUM 12' - 0" LENGTH
EACH PIECE OF PARAPET
CAP
ROOFING SYSTEM (RE:
SPECS)
APPROX.
1/2" GAP
WOOD NAILERS:
RE: STRUCTURAL FOR
ANCHORAGE TO TOP OF WALL.
METAL DECK
(RE: STRUCTURAL)
RIGID POLYISO
INSULATION
RECOVERY BOARD
ROOFING MEMBRANE
AS SPECIFIED
1/2"
4 1/2" MIN.FASTENER DISC PLATE
AS SPECIFIED
1 1/2" MIN. HOT AIR WELD LAP
APPROVED FASTENER
AS SPECIFIED
SILICON
ROLLING
TOOL
1 1/2" MIN. HOT
AIR FIELD WELD
LAP
HOT AIR
WELDER
1/2" GAP
NOTE:
WHEN FASTENING INSULATION
OR SLIP SHEETS, INSTALL
FASTENERS FLUSH WITH TOP
SURFACE OF THE INSULATION
BEING CAREFUL NOT TO BREAK
THE FACER OR CRUSH THE
INSULATION.
REFER TO MANUFACTURERS
RECOMMENDATIONS
M
IN
1/2" MIN.
NOMINAL
CURB HT.
10" MIN.
HIGH-DOMED , CAPPED,
GASKETED STAINLESS STEEL
FASTENERS 18" O.C. (MIN. 2
FASTENERS PER SIDE)
REMOVABLE PRE-FINISHED
SHEET METAL COUNTER
FLASHING
STAINLESS STEEL FASTENERS
APPROX. 8" O.C.
STEEL DECK ANGLES
(RE: STRUCTURAL)
BUILT UP CURB ASSEMBLY (RE:
SPECS)
ROOFING SYSTEM (RE: SPECS)
SEE SECTION DETAIL BELOW FOR
CLARITY
CONTINUOUS SEALING MATERIAL
AT TOP OF CURB (RE: SPECS)
STAINLESS STEEL
FASTENERS 8" O.C.
MECHANICAL UNIT, HOOD,
ETC. BASE EXTENDS 1/2"
MIN. BEYOND EDGE OF
CURB
STAINLESS STEEL RECEIVER
PRE-FINISHED METAL COUNTER
FLASHING
STAINLESS STEEL HOOD/
COVER CROSSBREAK OF
SLOPE FOR DRAINAGE
HIGH-DOMED SS, CAPPED, GASKETED FASTENERS
APPROX. 18" O.C. DEPENDING UPON WIND ZONE
AND CONDITIONS; MIN. 2 FASTENERS PER SIDE
REMOVABLE SHEET
METAL COUNTER
FLASHING
FACE CLOSURE PANEL
12" MIN.
SLOPE PIPES DOWN
AWAY FROM HOOD
FASTENERS
APPROX. 8" O.C.
INSULATE VOID TO PREVENT CONDENSATION
WOOD CANT TO
BRACE CURB
WOOD NAILERS AND CURB
MIN. 4" CLEARANCE FROM
PIPE TO TOP OF CURB: MIN
2" BETWEEN PIPES
OR 45
ROOF DECK
(RE: STRUCTURAL)
N O
M
IN
A L
F
LA
S H
IN
G
H E
IG
H
T
ROOFING SYSTEM
(RE: SPECS)
POLYURETHANE FOAM
POURABLE SEALANT
3" 1" 1"3"
1" EJ
TYPICAL FOR 1" EXPANSION
ADJUST AS NEEDED FOR ADDITIONAL
EXPANSION NEEDS
STRUCTURE VARIES.
SEE STRUCT. DRAWINGS
ROOF DECK. RE: SPEC'S
FULLY ADHERE
CONTINUOUS SEALANT
FLASHING MEMBRANE
BEVELED TOP OF BOTH WOOD
CURBS TO DRAIN TO ONE SIDE
FASTENER'S @8" O.C.
HIGH,DOMED, CAPPED, GASKETED
FASTENERS @ 16" O.C.
FLEXIBLE WATERPROOF
MEMBRANE FASTENER
STANDING SEAM JOINT
STAINLESS STEEL EXPANSION
JOINT COVER
FLEXIBLE VAPOR RETARDER TO
SERVE AS INSULATION RETAINER
TO TOP OF CURB.
WOOD NAILERS
FLEXIBLE VAPOR RETARDER
W/ COMPRESSIBLE INSULATION.
GRAVEL GUARD
NOTE: TAPER EXPANSION JOINT TO EDGE
APPROX. 6'-0" FROM EDGE
STANDING SEAM JOINT
FASTENER W/
WASHER THROUGH
ENLARGED HOLE
BASE FLASHING
NOTE: PROVIDE END COVER IN PRE-
FINISHED COLOR TO MATCH FASCIA. "S"
LOCK TO HOOK ON ADJACENT GRAVEL
GUARD
M
IN
6" M
IN
THERMOPLASTIC ROOF
MEMBRANE
2'-6" 3'-0"
1' -0
5/8" GYP BD ON 2
1/2" METAL STUDS
AT 16" O.C. ALL
AROUND
SCHEDULED
CEILING
ROOF SCUTTLE
PREFABRICATED
INSULATED CURB
STANDARD CURB FLASHING
DETAIL
3 X 3 X 1/4" CONTINUOUS ALL
AROUND
STEEL BRACKET ANCHOR TO
DOUBLE 2X4 TREATED
WOOD BLOCKING WITH 1/2"
LAG BOLT
FACE OF WALL
3/4" GALV STEEL
RUNGS AT 12" O.C. 18"
WIDE ON 2 1/2" X 3/8"
STEEL SIDES
1/2" ANCHOR BOLT
TYPICAL, EA. SIDE
7"
3" MIN
TYPICAL TO ALL RISE WALL TO
LOW ROOF CORNERS
METAL PANEL (RE: SPECS)
SECURE AND SEAL METAL RECIEVER
TO SHEATHING BOARD
NEW STAINLESS STEEL RECEIVER /
REMOVABLE COUNTER FLASHING
WITH 2" WIND CLIPS APPROX. 24" O.C.
ROOF DECK (RE: STRUCTURAL)
SOLID PLYWOOD BACKUP
AIR BARRIER (RE: SPECS)
TERMINATION BAR AND SEALANT
FLEXIBLE SELF ADHERED FLASHING
INSULATION (RE: SPEC)
PREFINISHED CLOSURE METAL
METAL "ZEE"
STRUCTURE
4"
THERMOPLASTIC ROOF
MEMBRANE (RE: SPECS)
SEALANT
FULLY ADHERE
FLASHING MEMBRANE
PLUMBING VENT STACK
CONTINUOUS SEALANT
DRAWBAND
INSTALL SEALANT BETWEEN PIPE AND
PREFABRICATED MEMBRANE
FLASHING
PREFABRICATED MEMBRANE
FLASHING
SEALANT AS REQ'D. BY SPEC'D.
ROOFING SYSTEM
ROOFING SYSTEM
(RE: SPECS)
ROOF DECK
(RE: STRUCTURAL)
INSTALL SHEET METAL UMBRELLA
WITH DRAWBAND AND SEALANT
M
IN
THERMOPLASTIC
ROOF MEMBRANE
HOT AIR WELD SINGLE PLY
FLASHING MEMBRANE
ROOF DECK
(RE: STRUCT.)
NEW REMOVABLE COUNTER
FLASHING ANCHORED 8" O.C. W/
WIND CLIPS @ 3' O.C.
NEW STAINLESS STEEL
RECEIVER/ REMOVABLE
COUNTER FLASHING W/ WIND
CLIPS @3' O.C.
SECURE AND SEAL METAL
RECEIVER TO SHEATHING BOARD
NEW METAL WALL PANEL
(RE:SPECS)
FLEXIBLE VAPOR
RETARDER W/
COMPRESSIBLE
INSULATION
3/4" EXTERIOR GRADE
PLYWOOD SECURED
TO SHEATHING
BOARD
AIR AND WATER
BARRIER
METAL STUD
BACKUP WALL WITH
INSULATION
1" 1"3"
SUMP PERIMETER
FLASHING MEMBRANE
(48" X 48" MIN., FULLY
ADHERED)
ROOF FINISH PLY (FULLY
ADHERED, LAP MIN. 4")
STRAINER AND
CLAMPING RING
4'-0"
DRAIN STRAINER
NOTE: USE EXTREME CAUTION NOT TO
OVERTIGHTEN CLAMPING SCREWS TO PREVENT
BENDING AND PULLING/ WRINKLING OF THE
FLASHING MEMBRANES
CLAMPING RING
FLASHING
MEMBRANE
THERMOPLASTIC
ROOF
MEMBRANE
DRAIN BOWL
DECK CLAMP
HOT-AIR
WELD
SEALANTS AS
RECOMMENDED BY
ROOF SYSTEM
MANUFACTURER.
2' - 0" 2' - 0"
ROOF DRAIN, SUMP
MIN. 1" (RE: SPECS)
OVERFLOW DRAIN, WHERE
APPLICABLE. TOP OF
OVERFLOW DRAIN TO BE
MAX. 2" ABOVE ROOF DRAIN
NOTE: TYPICAL TO ALL RISE WALL TO LOW ROOF CORNERS
HEMMED EDGE
WITH SEALANT TROUGH
"S" LOCK
SLIP JOINT ON CLEATS
3"
HOOK ON PERIMETER
PREFINISHED METAL
EXISTING JOISTS
ANGLE 3 x 3 x 1/4" - WELD
ANGLES SO ONE LEG POINTS
DOWN - TYP.
ANGLE 3 x 3 x 1/4", WELD
WITH LEG DOWN.
WELD ANGLE TO BOTTOM OF
TC ON JOIST - TYP
NOTE: INSTALL BRACING PRIOR TO INSTALLATION OF
NEW EQUIPMENT CURBS. CONTRACTOR TO VERIFY
DIMENSION "X". PROVIDE ANGLE SUPPORTS AT
EQUIPMENT CURBS.
"X
"X"
PLAN VIEW
ROOF DRAIN, WHERE
APPLICABLE
GAS PIPE
SUPPORTS 3"
O.D. AND
SMALLER
ELECTRIC CONDUIT,
HVAC CONDENSATE
AND REFRIGERANT
PIPE SUPPORTS 3"
O.D. AND SMALLER
PROVIDE HOLD
DOWN CLIPS
GAS PIPE SUPPORTS
GREATER THAN 3" O.D.
PROVIDE WITH ROLLER
SUPPORT
ADHERED SUPPORTS ON ISOLATION PAD
PROTECTIVE ISOLATION PAD
ADHERED TO ROOF SYSTEM
WITH APPROVED ADHESIVE.
ADHERED
SUPPORTS ON
ISOLATION PAD.
PROTECTIVE ISOLATION PAD
ADHERED TO ROOF SYSTEM
WITH APPROVED ADHESIVE.
ELECTRIC CONDUIT, HVAC
CONDENSATE AND
REFRIGERANT PIPE
SUPPORTS GREATER THAN 3"
O.D.
CEMENT PLASTER (RE:
SPECS)
M
IN
SECURE AND SEAL METAL
STUCCO RECEIVER TO WALL
STAINLESS STEEL RECEIVER
WITH COUNTER FLASHING WITH
2" WIND CLIPS APPROX. 24" O.C.
MEMBRANE ROOFING AS
SPEC'D.
DAMPPROOFING (RE:SPECS)
3/4" EXTERIOR GRADE
PLYWOOD SECURED TO
BACKUP WALL
EXTERIOR WALL SHEATHING
AS SPEC'D.
MEMBRANE
ROOFING AS
SPEC'D.
STUD
WALL
SHEET METAL OR
MEMBRANE COATED
METAL PARAPET CAP
HIGH-DOMED , CAPPED,
GASKETED FASTENERS
APPROX. 18" O.C. PER WIND
ZONE REQUIREMENTS
(RE: SPECS)
CONTINUOUS
TAPERED WOOD
SHIM (E.G. BEVELED
CEDAR SIDING)
* MAXIMUM 12' - 0" LENGTH EACH
PIECE OF PARAPET CAP
2X TREATED WOOD NAILER
SECURED TO TOP OF WALL
CONTINUOUS CLEAT FASTENED 6" O.C.- MIN.
1" BELOW TOP OF WALL CLADDING
FULLY ADHERED WATERPROOFING
MEMBRANE
SHEET METAL OR MEMBRANE
COATED JOINT COVER PLATE
(6" WIDE MIN.) SET IN TWO
BEDS OF SEALANT- 1 EA. SIDE
OF JOINT (RE: SPECS)1/2"
APPROX.
1/2" GAP
UNISTRUT
NEOPRENE
ISOLATION PAD
NEW STAINLESS STEEL COVER
WITH RECEIVER FOR COUNTER
FLASH
HIGH-DOMED, CAPPED,
GASKETED FASTENERS
18" O.C. - MIN. TWO EA. SIDE
FASTENERS 8" O.C.
REMOVABLE COUNTER
FLASHING FASTENED 8" O.C.
TAPERED EDGE WHERE
APPLICABLE
ROOF DECK
AS REQ'D
2X TREATED WOOD BLOCKING AS
REQUIRED SECURED TO TOP OF
STRUCTURE
M
IN
FLASHING MEMBRANE
SINGLE PLY MEMBRANE
THERMOPLASTIC FIELD
MEMBRANE
N.T.S.1 ROOFING (TP) - PARAPET
N.T.S.30 ROOFING (TP) - MEMBRANE LAP
N.T.S.13 ROOFING (TP) - EQUIPMENT CURB
N.T.S.14 ROOFING (TP) - HOODED CURB
N.T.S.12 ROOFING (TP) - RAISED EXPANSION JOINT WITH COVER
N.T.S.15 ROOFING (TP) - ROOF HATCH
N.T.S.4 ROOFING (TP) - END WALL
N.T.S.3 ROOFING (TP) - PANEL RISE WALL
N.T.S.16 ROOFING (TP) - PENETRATION
N.T.S.8 ROOFING (TP) - WALL PANEL/ EJ
N
H O
U S
T O
N
T X
-9
-0
T
X F
IR
M
: B R
KEY PLAN
DATE PROJECT NUMBER
CLIENT
DRAWING HISTORY
w w w .p bk .c om
PLAN TRUE
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G /O
C R
Plot Stamp:
1"
0"
NORTH:
DRAWN BY:
CHECKED BY:
10/9/2026 11:31:40 AM
L ib ra ry
R o o f
R e p la c e m e n t
IS
S
U E
D F
O R
B
ID
A-322
ROOF DETAILS -
SINGLE PLY
2026/10/09 260155
COLLIN COLLEGE
W ad e B lv d.
F ris co , T
X
A -322
R O
O F
D E
T A
IL
S
S
IN
G
L E
P L
Y
DAS
CG
DISCIPLINE
N.T.S.26 ROOFING (TP) - ROOF DRAIN PLAN
N.T.S.25 ROOFING (TP) - ROOF DRAIN SECTION
N.T.S.20 ROOFING (TP) - ROOF DRAIN SUMP PLAN
N.T.S.9 ROOFING - END WALL @ EJ
N.T.S.19 EQUIP. CURB / SUPPORT / DRAIN FRAMING
N.T.S.18 ROOFING - PIPE SUPPORTS
N.T.S.2 ROOFING (TP) - BASE @ STUCCO
N.T.S.6 ROOFING - COPING CAP
N.T.S.21 ROOFING (TP) - EQUIPMENT SUPPORT CURB
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING PANEL
PANEL CLIP
DOWNSIDE PERIMETER
METAL FLASHING
(STAGGER FASTENERS)
PRE-FINISHED
CONTINUOUS
METAL CLEAT
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER)
FULLY ADHERED
WATERPROOF MEMBRANE,
LAP END MIN. 2" (RE: SPECS)
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
WOOD NAILER, WHERE
APPLICABLE
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING PANEL
PRE-FINISHED
CONTINUOUS
METAL CLEAT
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER)
FULLY ADHERED
WATERPROOF MEMBRANE
UNDERLAYMENT, LAP END
MIN. 2" (RE: SPECS)
EXTENDED RAKE EDGE
METAL FLASHING
(STAGGER FASTENERS)
WOOD NAILER, WHERE
APPLICABLE
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
EXTERIOR SOFFIT
4" MIN. OVERLAP (LAP
JOINTS AWAY FROM
PREVAILING WIND)
4" MIN.
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING PANEL
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER)
FULLY ADHERED
WATERPROOF MEMBRANE
(RE: SPECS)
TURN PANEL PANS UP AT
RIDGE TO PROVIDE
SECONDARY CLOSURE
"Z" CLOSURE (FASTENED
AND SET IN SEALANT OR
SOLDERED AS MATERIAL
PERMITS
SEALANT, MIN. 2 BEADS
(RE: SPECS)
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING RIDGE CAP
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
8" MIN. OVERLAP OF
VALLEY AT JOINTS
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING PANEL
SLIP SHEET (AS
REQUIRED BY METAL
PANEL
MANUFACTURER)
FULLY ADHERED
WATERPROOF MEMBRANE
(RE: SPECS) RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
METAL CLIP (APPROX. 2"
WIDE) BEND BACK OVER TO
COVER FASTENERS
SEALANT, MIN. 2 BEADS
(RE: SPECS)
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING VALLEY
VALLEY CENTER RIB (1"
MIN. HEIGHT)
7" MIN.
LOCK PANEL PANS TO
ENGAGE VALLEY
CONTINUOUS THROUGH-
WALL FLASHING FSAF
SHEET METAL REGLET
FASTENERS @ 24" O.C.
PRE-FINISHED REMOVABLE
SHEET METAL
COUNTERFLASHING
4" MIN.
2" WIDE WIND CLIPS
@ APPROX. 24" O.C.
(RE: SPECS)
CONTINUOUS SHEET
MEMBRANE LINER FSAF
SEALANT AT JOINTS MIN. 2
BEADS (RE: SPECS)
PRE-FINISHED SHEET
METAL TRANSITION
FLASHING
PANEL CLIP MIN. 2
FASTENERS PER CLIP
PRE-FINISHED METAL
ROOFING PANEL
(RE:SPECS)
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER) FULLY ADHERED WATER
PROOF MEMBRANE
(RE: SPECS)
TURN PANEL PANS UP AT
HEADWALL TO PROVIDE
SECONDARY CLOSURE
"Z" CLOSURE FASTENED
AND SET IN SEALANT (RE:
SPECS)
RE: NOMENCLATURE
GUTTER BRACKET
(RE: SPECS)
SHEET METAL GUTTER
(RE: SPECS)
GUTTER PLACED
BETWEEN BRACKETS
DOWNSLOPE PERIMETER
METAL FLASHING
(STAGGER FASTENERS 3"
O.C.)
PANEL CLIP
FULLY ADHERED
WATERPROOF MEMBRANE
(RE: SPECS)
ARCHITECTURAL METAL
ROOFING PANEL
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER)
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
FLUSH MOUNTED METAL WALL PANEL OR
VERTICAL STANDING SEAM METAL WALL PANEL -
WITH "Z" CLOSURE BEHIND GUTTER)
WALL CONSTRUCTION
GUTTER BRACKET
(RE: SPECS)
SHEET METAL GUTTER
(RE: SPECS)
GUTTER SPACER
PLACED BETWEEN
BRACKETS
DOWNSLOPE PERIMETER
METAL FLASHING
(STAGGER FASTENERS 3"
O.C.)
PANEL CLIP
FULLY ADHERED WATERPROOF
MEMBRANE UNDERLAYMENT
(RE: SPECS)
ARCHITECTURAL METAL
ROOFING PANEL
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER)
WOOD NAILER,
WHERE APPLICABLE
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
FABRICATED SHEET
METAL CLOSURE
TURN PANEL PANS UP TO
PROVIDE SECONDARY
CLOSURE
SLIP SHEET (AS REQUIRED
BY METAL PANEL
MANUFACTURER
SHEET METAL HUP CAP
SEALANT, MIN. 2 BEADS (RE:
SPECS)
4" MIN.
"Z" CLOSURE (FASTENED
AND SET IN SEALANT, OR
SOLDERED AS MATERIAL
PERMITS)
ARCHITECTURAL METAL
ROOFING PANEL
FULLY ADHERED
WATERPROOF MEMBRANE
(RE: SPECS)
RE: NOMENCLATURE
ROOF DECK
(RE: STRUCTURAL/
NOMENCLATURE)
4" MIN. OVERLAP (LAP JOINTS
AWAY FROM PREVAILING
WIND)
STRUCTURE/WOOD
NAILER, WHERE
APPLICABLE
TURN PANEL PANS UP AT
HEADWALL TO PROVIDE
SECONDARY CLOSURE
"Z" CLOSURE FASTENED AND SET IN
SEALANT (RE: SPEC'S)
RE: NOMENCLATURE
FULLY ADHERED WATERPROOF
MEMBRANE (RE: SPECS)
SLIP SHEET (AS REQUIRED BY
METAL PANEL MANUFACTURER)
ARCHITECTURAL METAL ROOFING
PANEL (RE: SPECS)
PANEL CLIP MIN. 2
FASTENERS PER CLIP
PRE-FINISHED SHEET METAL
TRANSITION FLASHING
SEALANT AT JOINTS MIN. 2
BEADS (RE: SPECS)
CONTINUOUS SHEET
MEMBRANE LINER
2" WIDE WIND CLIPS
@ APPROX. 24" O.C.
(RE:SPECS)
PRE-FINISHED REMOVABLE SHEET METAL
COUNTERFLASHING
PRE-FINISHED SHEET METAL
REGLET FASTENERS APPROX. 24"
O.C.
TOOLED POLYURETHANE SEALANT
WEEP HOLES
APPROX. 24" O.C.
CONTINUOUS THRU-WALL FLASHING
4" MIN.
PROVIDE STRUCTURAL
SUPPORT AT EACH END OF
ROOF PANEL AND CURB
CRICKET (FLANGES
OVERLAPPED AND SOLDERED)
END CLOSURE
EQUIPMENT CURB WRAP WITH PRE-
FINISHED METAL OR PAINT TO
MATCH ROOF PANELS
METAL ROOF PANELS
(RE: SPECS)
END CLOSURE
8" MIN.
8" MIN.
STAINLESS STEEL
DRAWBAND
SET SECUREMENT RING
IN CONTINUOUS BEAD OF
SEALANT
PIPE PENETRATION
SEALANT BEAD BETWEEN
PIPE AND FLASHING
HIGH-DOMED, CAPPED,
GASKETED FASTENERS
(SECURE FLASHING COLLAR
FLANGE TO ROOF PANEL AND
NOT TO DECK
SHEET METAL RAIN COLLAR
WITH STAINLESS STEEL
DRAWBAND (OVERLAP
FLASHING COLLAR BY 3" TO
4")
PREFORMED PENETRATION
FLASHING COLLAR
NOTE: INSURE LOCATION OF PLUMBING STACK IS A MINIMUM 10" FROM
ANY STANDING SEAM METAL ROOF PANEL JOINT.
4" MIN. OVERLAP (LAP
JOINTS AWAY FROM
PREVAILING WIND)
4" MIN.
PRE-FINISHED
ARCHITECTURAL METAL
ROOFING PANEL
TURN PANEL PANS UP AT
RIDGE TO PROVIDE
SECONDARY CLOSURE
"Z" CLOSURE (FASTENED
AND SET IN SEALANT OR
SOLDERED AS MATERIAL
PERMITS
SEALANT, 2 BEADS
MIN. (RE: SPECS)
PRE-FINISHED ARCHITECTURAL
METAL ROOFING RIDGE CAP
4"MIN. OVERLAP
(LAP JTS AWAY
FROM PREVAILING
WIND)
FULLY ADHERED
WATERPROOFING
MEMBRANE
ARCHITECTURAL METAL
ROOFING PANEL
ROOF DECK (RE:
NOMENCLATURE
SCHEDULED)
SLIP SHEET (AS
REQUIRED BY METAL
PANEL MANUFACTURER)
MIN. (2) BEADS OF SEALANT
"Z" CLOSURE
(FASTENED AND
SET IN SEALANT
OR SOLDERED
AS MATERIAL
PERMITS)
TURN PANEL PANS UP AT
RIDGE TO PROVIDE
SECONDARY CLOSURE
SHEET METAL RIDGE CAP
CLEAT FASTENER 24" O.C.
4 "
SUBSTRATE WALL
INSULATION
WALL VENEER
1" E.J.
REMOVE EXISTING VENEER
AS REQUIRED
BACKER ROD WITH SEALANT
LOOP FLEXIBLE SELF
ADHERED FLASHING INTO
NEW E.J.
INTERIOREXTERIOR
NEW SUBSTRATE WALL
NEW WALL VENEER
AIR BARRIER SYSTEM
4" MIN.
4" MIN.
12" MIN.
C O
N S
T R
U C
T
IO
N C
O N
S T
R U
C T
IO
N
E X
IS
T
IN
G
N E
W
FLEXIBLE SELF ADHERED FLASHING
WITH TERMINATION BAR ON EACH SIDE.
EXISTING AIR BARRIER
SYSTEM
AT EXISTING CONSTRUCTION,
REMOVE EXISTING BRICK VENEER
MIN. 12" ON ALL SIDES ADJACENT
TO NEW CONSTRUCTION.
SEALANT OR LIQUID
MEMBRANE AS
RECOMMENDED BY AIR
BARRIER SYSTEM
MANUFACTURER
INSULATION
4" MIN.
1" E.J.
12" 12"
FLEXIBLE SELF
ADHERED FLASHING
WITH TERMINATION
BAR
BACKER ROD WITH
SEALANT
AT EXISTING CONSTRUCTION,
REMOVE BRICK VENEER 12"
ON ALL SIDES ADJACENT TO
NEW EXPANSION JOINT
SUBSTRATE WALL
INSULATION
WALL VENEER
SEALANT OR LIQUID
MEMBRANE AS
RECOMMENDED BY
AIR BARRIER SYSTEM
MANUFACTURER
AIR BARRIER
SYSTEM
LOOP FLEXIBLE SELF
ADHERED FLASHING INTO
NEW E.J.
4" MIN.
2"
MIN.
SUBSTRATE
WALL
INSULATION
WALL VENEER
AIR BARRIER
SYSTEM
PVC SLEEVE. MAX 1 1/2"
LARGER THAN PIPE CONDUIT
IN DIAMETER
PIPE/CONDUIT
FLEXIBLE SELF
ADHERED FLASHING
WITH TERMINATION
BAR
BACKER ROD/SEALANT
BETWEEN PIPES BOTH
SIDES
SEALANT OR LIQUID
MEMBRANE AS
RECOMMENDED BY
AIR BARRIER SYSTEM
MANUFACTURER
SPRAY
POLYURETHANE
FOAM INSULATION
INSULATION IF
APPLICABLE
SUBSTRATE WALL
INSULATION
WALL VENEER
4" MIN.
2"
MIN.
12" 12"
AT EXISTING CONSTRUCTION,
REMOVE BRICK VENEER 12"
ON ALL SIDES ADJACENT TO
NEW PIPE PENETRATION
SEALANT OR LIQUID
MEMBRANE AS
RECOMMENDED BY
AIR BARRIER SYSTEM
MANUFACTURER
FLEXIBLE SELF
ADHERED
FLASHING WITH
TERMNATION BAR
PIPE/CONDUIT
AIR BARRIER
SYSTEM
4" MIN.
2" MIN.
12" 12"
BACKER ROD
LOUVER OR VENT
PENETRATION
FLEXIBLE SELF
ADHERED FLASHING
WITH TERMINATION
BAR SUBSTRATE WALL
INSULATION
WALL VENEER
AT EXISTING CONSTRUCTION,
REMOVE BRICK VENEER 12"
ON ALL SIDES ADJACENT TO
NEW DUCT PENETRATION
AIR BARRIER
SYSTEM
SEALANT OR
LIQUID
MEMBRANE AS
RECOMMENDED
BY AIR BARRIER
SYSTEM
MANUFACTURER
AT EXISTING
CONSTRUCTION,
REMOVE VENEER 12" ON ALL
SIDES ADJACENT TO NEW
WINDOW/DOOR
AIR BARRIER SYSTEM
SUBSTRATE WALL
AIR BARRIER
FLASHING AND
SEALANT (TURNED
INTO ROUGH
OPENING)
INTERIOR EXTERIOR
HOLLOW METAL FRAME AS
SCHEDULED
WINDOW SYSTEM AS
SCHEDULED
BACKER ROD AND SEALANT
AROUND-TYP.
THROUGH WALL FLASHING
AND SEALANT
WALL VENEER
LOOSE STEEL LINTEL PAINT
(RE: STRUCT.)
TERMINATION BAR AND
SEALANT
INSULATION
MIN. 12" HIGH MINERAL
WOOL INSULATION AT
OPENING; EXTEND 12" PAST
JAMBS
4" M
IN
6" M
IN
AIR BARRIER FLASHING
AND SEALANT
AT EXISTING
CONSTRUCTION,
REMOVE VENEER 12" ON ALL
SIDES ADJACENT TO NEW
WINDOW/DOOR
AIR BARRIER SYSTEM
SUBSTRATE WALL
INTERIOR EXTERIOR
HOLLOW METAL FRAME AS
SCHEDULED
WINDOW SYSTEM AS
SCHEDULED
BACKER ROD AND SEALANT
AROUND-TYP.
WALL VENEER
INSULATION
6" M
IN
AIR BARRIER
FLASHING AND
SEALANT (TURNED
INTO ROUGH
OPENING) AIR BARRIER FLASHING
AND SEALANT
AT EXISTING CONSTRUCTION,
REMOVE VENEER 12" ON ALL
SIDES ADJACENT TO NEW
WINDOW/DOOR
AIR BARRIER SYSTEM
SUBSTRATE WALL
INTERIOR
ALUMINUM WINDOW
SYSTEM WITH CONTINUOUS
ALUMINUM PERIMETER
FILLER.
ALUMINIUM WEATHERING
FLANGE SET IN SEALANT
EXTERIOR
WALL VENEER
LOOSE STEEL LINTEL PAINT
(RE: STRUCT.)
TERMINATION BAR AND
SEALANTINSULATION
AIR BARRIER
FLASHING AND
SEALANT (TURNED
INTO ROUGH
OPENING)
AIR BARRIER FLASHING
AND SEALANT
MIN. 12" HIGH MINERAL
WOOL INSULATION AT
OPENING; EXTEND 12"
PAST JAMBS
BACKER ROD AND SEALANT
AROUND-TYP.
M
IN
AT EXISTING CONSTRUCTION,
REMOVE VENEER 12" ON ALL
SIDES ADJACENT TO NEW
WINDOW/DOOR
AIR BARRIER SYSTEM
SUBSTRATE WALL
INTERIOR
ALUMINUM WINDOW
SYSTEM WITH CONTINUOUS
ALUMINUM PERIMETER
FILLER.
ALUMINIUM WEATHERING
FLANGE SET IN SEALANT
EXTERIOR
WALL VENEER
INSULATION
AIR BARRIER
FLASHING AND
SEALANT (TURNED
INTO ROUGH
OPENING)
BACKER ROD AND SEALANT
AROUND-TYP.
M
IN
TERMINATION BAR AND SEALANT
AT EXISTING
CONSTRUCTION,
REMOVE VENEER 12" ON ALL
SIDES ADJACENT TO NEW
WINDOW/DOOR
ALUMINUM SUB SILL PAN
WITH SEALED END DAMS.
PROVIDE SEALANT AT
ATTACHMENT HOLES
FROM WEATHING
FLANGE.
INTERIOR EXTERIOR
M
IN
BACKER ROD AND
SEALANT AROUND - TYP.
ALUMINUM WEATHERING
FLANGE SET IN SEALANT
TERMINATION BAR
AND SEALANT
AIR BARRIER FLASHING
AND SEALANT (TURNED
INTO ROUGH OPENING)
AIR BARRIER SYSTEM
SUBSTRATE WALL
INSULATION
WALL VENEER
ALUMINUM WINDOW SYSTEM
WITH CONTINUOUS
ALUMINUM PERIMETER
FILLER.
ALL DETAILS ARE INTENDED TO INDICATE GENERIC SUBSTRATE AND
FLASHING/SEALING OF EXTERIOR BUILDING ENVELOPE CONDITIONS.
EXACT PROJECT CONDITIONS AND DETAILS WILL VARY. REFER ALSO TO
ARCHITECTURAL WINDOW, DOOR AND OTHER WALL PENETRATION
OPENINGS FOR ADDITIONAL NOTES AND FINISHES.
ALL DETAILS ARE INTENDED TO CONVEY THE BUILDING CODE
REQUIREMENTS OF A SEALED BUILDING ENVELOPE. OTHER PROJECT
CONDITIONS MAY DICTATE DIFFERING DETAILS, HOWEVER A SEALED
BUILDING ENVELOPE IS TO BE MAINTAINED.
ALL DETAILS INDICATED WITH NOTE TO REMOVE ADJACENT MATERIALS
ARE INTENDED TO ALSO BE UTILIZED ON NEW CONSTRUCTION
CONDITIONS .
ALL LAPS AND EXPOSED EDGES OF FLEXIBLE SELF ADHERED FLASHING
ARE TO BE SEALED ACCORDING TO MANUFACTURER'S WRITTEN
INSTRUCTIONS.
EXPOSED EDGES OF FLEXIBLE SELF-ADEHERED FLASHING ARE NOT TO BE
INSTALLED IN CONTACT WITH POLYURETHANE SEALANTS EXPOSED TO
VIEW.
6 AIR BARRIER SYSTEM IS TO BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN INSTRUCTIONS. ALL AIR BARRIER, FLASHING
AND TRANSITION MATERIALS SHALL BE COMPATIBLE WITH ONE ANOTHER
AND CONSTITUTE THE AIR BARRIER SYSTEM.
N.T.S.1 ALT 01 - METAL EAVE
N.T.S.3 ALT 01 - METAL RAKE EDGE
N.T.S.4 ALT 01 - METAL RIDGE
N.T.S.5 ALT 01 - METAL VALLEY
N.T.S.8 ALT 01 - METAL BASE WALL PANEL FLASHING
N.T.S.7 ALT 01 - METAL GUTTER AT PANEL
N.T.S.2 ALT 01 - METAL GUTTER
N.T.S.6 ALT 01 - METAL HIP
N.T.S.9 ALT 01 - METAL BASE FLASHING
N.T.S.12 ALT 01 - METAL EQUIPMENT CURB
N.T.S.11 ALT 01 - METAL PIPE PENETRATION
N.T.S.10 ALT 01 - METAL RIDGE
N.T.S.18 ALT 01 - METAL HIGH RIDGE
N
H O
U S
T O
N
T X
-9
-0
T
X F
IR
M
: B R
KEY PLAN
DATE PROJECT NUMBER
CLIENT
DRAWING HISTORY
w w w .p bk .c om
PLAN TRUE
F O
R B
LU
E
B E
A M
LA
B
E
LIN
G /O
C R
Plot Stamp:
1"
0"
NORTH:
DRAWN BY:
CHECKED BY:
10/9/2026 11:31:41 AM
L ib ra ry
R o o f
R e p la c e m e n t
IS
S
U E
D F
O R
B
ID
A-323
ROOF DETAILS - ADD
ALT 01
2026/10/09 260155
COLLIN COLLEGE
W ad e B lv d.
F ris co , T
X
A -323
R O
O F
D E
T A
IL
S
A
D D
A L
T
DAS
CG
DISCIPLINE
N.T.S.22 "T" CONNECTION EXPANSION JOINT
N.T.S.23 EXPANSION JOINT CONNECTION
N.T.S.16 SLEEVE PIPE WALL PENETRATION
N.T.S.15 PIPE/CONDUIT WALL PENETRATION
N.T.S.17 DUCT WALL PENETRATION
N.T.S.26 HEAD FLASHING - H.M. FRAME
N.T.S.20 JAMB FLASHING - H.M. FRAME
N.T.S.25 STOREFRONT HEAD AT LOOSE LINTEL
N.T.S.19 STOREFRONT JAMB
N.T.S.13 STOREFRONT SILL
N.T.S.14 GENERAL NOTES