Cole Boulevard Rehabilitation between Scaroni Avenue and the Railroad Tracks.pdf
PDF 2 MB Posted
- Solicitation number
- 2026-500, STPL-5168(037)
- Issued by
- San Diego County, California
About this file
This file is a scope of work document for a California state and local contract opportunity involving Cole Boulevard rehabilitation between Scaroni Avenue and the Railroad Tracks. The project encompasses multiple phases of asphalt work including milling of the top layer of existing Asphalt Concrete (A.C.), installation of an A.C. leveling course, application of 3/8 inch Asphalt Rubber Aggregate Membrane (ARAM), and placement of a 1.5 inch Asphalt Rubber Hot Mix (ARHM) layer. Additional work includes construction of ADA corner ramps, surveying activities, utility adjustments, and traffic control measures throughout the project duration.
The file does not contain specific information regarding pricing terms, contract duration, renewal options, response or due dates, site visit schedules, bidders' conferences, award dates, set-asides, incumbent contractors, funding sources, or budget amounts. These details would typically be found in the associated solicitation documents or bid specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e | 1
CITY OF CALEXICO
STPL-5168(037) COLE BLVD
REHABILITATION BETWEEN SCARONI BLVD
AND THE RAILROAD TRACKS
PROJECT NO. 2026-500
BID OPENING: DECEMBER 1ST, 2026 at 2:00 P.M.
PUBLIC WORKS DEPARTMENT, 549 PIERCE AVENUE, CALEXICO, CA 92231
(760) 768-2160 www.calexico.ca.gov
Docusign Envelope ID: A246DAF4-20E7-8B7E-837C-55CE43237CD1 http://www.calexico.ca.gov/ http://www.calexico.ca.gov/
P a g e | 2
TABLE OF CONTENTS
INVITATION FOR BIDS ______________________________________________________________ 5
GENERAL INFORMATION ________________________________________________________________ 5
SCOPE OF WORK _______________________________________________________________________ 5
PROJECT SCHEDULE ____________________________________________________________________ 5
PROPOSAL REQUIREMENTS ______________________________________________________________ 5
BID REQUIREMENTS _______________________________________________________________ 7
GENERAL CONDITIONS ____________________________________________________________ 11
SUPPLEMENTARY GENERAL CONDITIONS / CALIFORNIA STATE REQUIREMENTS ______________ 38
State Wage Determinations: ____________________________________________________________ 38
Workers' Compensation: _______________________________________________________________ 38
Apprentices on Public Works: ___________________________________________________________ 38
Working Hours: _______________________________________________________________________ 38
CONTRACTOR Not Responsible For Damage Resulting From Certain Acts of God: __________________ 39
Notice of Completion: _________________________________________________________________ 39
Unpaid Claims: _______________________________________________________________________ 39
Concrete Forms, Falsework, and Shoring: __________________________________________________ 39
Retainage From Monthly Payments: ______________________________________________________ 40
Public Works Contracts; Assignment to Awarding Body: ______________________________________ 40
Payroll Records; Retention; Inspection; Noncompliance Penalties; Rules and Regulations: __________ 40
Cultural Resources: ____________________________________________________________________ 42
Protection of Workers In Trench Excavations: ______________________________________________ 42
Travel and Subsistence Pay: _____________________________________________________________ 42
Removal, Relocation, or Protection to Existing Utilities: ______________________________________ 43
Contractor License Requirements: ________________________________________________________ 43
Certain Claims: _______________________________________________________________________ 44
Prohibiting Work by Certain Contactors: ___________________________________________________ 44
SPECIFICATIONS _________________________________________________________________ 46
SPECIAL PROVISIONS _____________________________________________________________ 47
1. ORDER OF WORK ___________________________________________________________________ 47
2. STARTING AND COMPLETION OF WORK _________________________________________________ 47
P a g e | 3
3. FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES _______________________________ 47
4. MAINTAINING TRAFFIC_______________________________________________________________ 47
5. NOTICE AND POSTING REQUIREMENTS __________________________________________________ 47
6. CONSTRUCTION AREA SIGNS __________________________________________________________ 48
7. REPAIR EXISTING ROADBED ___________________________________________________________ 48
7.01 Cold Milling Asphalt Concrete Pavement ______________________________________________________ 48
8. REMOVE PAVEMENT MARKINGS _______________________________________________________ 49
9. CLASS II BASE ______________________________________________________________________ 49
9.01 Placing __________________________________________________________________________________ 49
9.02 Compaction ______________________________________________________________________________ 49
9.03 Payment ________________________________________________________________________________ 50
10. ASPHALT CONCRETE ________________________________________________________________ 50
10.01 Placing _________________________________________________________________________________ 50
10.02 Compacting _____________________________________________________________________________ 51
10.03 Payment _______________________________________________________________________________ 51
13. EXISTING LOOP DETECTORS __________________________________________________________ 51
14. TRAFFIC STRIPING, PAVEMENT MARKINGS, AND PAVEMENT MARKERS ______________________ 51
14.01 Layout, Alignment, and Spotting. ____________________________________________________________ 51
14.02 Application of Paint. ______________________________________________________________________ 52
15. UTILITY COVER ADJUSTMENTS TO GRADE ______________________________________________ 52
15.01 Reference Setting. _______________________________________________________________________ 52
15.02 Adjustment to Grade _____________________________________________________________________ 52
15.03 Payment. _______________________________________________________________________________ 53
16. COOPERATION ____________________________________________________________________ 53
17. SANITARY ARRANGEMENTS __________________________________________________________ 53
18. ACCESS __________________________________________________________________________ 53
19. INSURANCE _______________________________________________________________________ 54
20. CONSTRUCTION CONFERENCE ________________________________________________________ 54
21. CONTRACT DOCUMENTS ____________________________________________________________ 54
WARRANTY _____________________________________________________________________ 55
PROJECT QUANTITIES _____________________________________________________________ 62
PROPOSAL BID FORM _____________________________________________________________ 63
BID BOND ______________________________________________________________________ 65
EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION ___________________________________ 66
DEBARMENT AND SUSPENSION CERTIFICATION ________________________________________ 67
NON-LOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS ___________________________ 68
DISCLOSURE OF LOBBYING ACTIVITIES _______________________________________________ 69
PROPOSAL AGREEMENT ___________________________________________________________ 70
P a g e | 4
CONSTRUCTION AGREEMENT ______________________________________________________ 71
FAITHFUL PERFORMANCE BOND ____________________________________________________ 79
LABOR AND MATERIAL BOND ______________________________________________________ 80
WORKMEN'S COMPENSATION INSURANCE CERTIFICATE _________________________________ 81
SUBCONTRACTORS LISTING ________________________________________________________ 82
NONCOLLUSION AFFIDAVIT ________________________________________________________ 83
DRUG/ALCOHOL TESTING REQUIREMENTS ____________________________________________ 84
CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION ____________________________ 85
CONTRACTOR’S CERTIFICATION OF QUALIFICATION FOR LICENSE CLASSIFICATION ___________ 86
DESIGNATION/CERTIFICATION OF ASPHALT-RUBBER BINDER APPLICATOR(S) ________________ 87
DESIGNATION/CERTIFICATION OF ASPHALT-RUBBER AND AGGREGATE MEMBRENE CONTRACTOR
AND/OR SUBCONTRACTOR(S) ______________________________________________________ 88
ASPHALT- RUBBER BINDER MANUFACTURE TEST RESULTS PROJECT _______________________ 90
FEDERAL PREVAILING WAGE RATES _________________________________________________ 91
CALTRANS FORMS _______________________________________________________________ 93
P a g e | 5
INVITATION FOR BIDS
STPL-5168(037) COLE BOULEVARD REHABILITATION BETWEEN SCARONI AVE AND THE RAILROAD
TRACKS
PROJECT NO. 2026-500
GENERAL INFORMATION
The City of Calexico is inviting bids for the STPL-5168(037) “Cole Boulevard Rehabilitation between Scaroni Avenue and the Railroad Tracks”, Project No. 2026-500.
SCOPE OF WORK
The work shall include, milling of a top layer of the existing Asphalt Concrete (A.C.), installation of a ¾” A.C. leveling course, followed by 3/8” of Asphalt Rubber Aggregate Membrane (ARAM) and a 1.5” Asphalt Rubber Hot Mix (ARHM) layer on top, ADA corner ramps, surveying work, utility adjustments and traffic control.
PROJECT SCHEDULE
To be completed within 90 calendar days from date of contract award.
PROPOSAL REQUIREMENTS
SEALED PROPOSAL will be accepted at the Office of the City Clerk, City Hall, 608 Heber Avenue, Calexico, California until 2:00 p.m. on Tuesday, December 1st, 2026, at which time all proposals will be publicly opened and read aloud. Late, fax or emailed BIDS will be considered unresponsive. A non-mandatory pre-bid meeting will be held on Thursday, November 12, 2026, at 10:00 a.m., in the Public Works office, 549 Pierce Avenue, Calexico CA, 92231.
A summary of the bids will be presented to the City Council at their meeting of Wednesday, December 16, 2026, at 6:30 p.m. in the City Council Chambers, 608 Heber Avenue, Calexico, California.
Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form.
Electronic version on the approved plans and specifications may be obtained by visiting the City’s website at https://www.calexico.ca.gov/bidsandrfps or contact the Public Works Department at
(760) 768-2160.
No bid will be received unless it is made on the prescribed bid form furnished by the Public Works Department. Each bid must be accompanied by a guarantee of cash, certified check, https://www.calexico.ca.gov/bidsandrfps
P a g e | 6 least ten percent of the bid, Such guarantee to be forfeited should the bidder to whom the contract is awarded fails to enter into the contract. All guarantees are to be returned after the contract is awarded.
The bid may be considered incomplete and be disqualified if any of the following information is not provided.
Proposal/Bid Form Bid Bond Proposal Agreement Subcontractor's Listing
Workmen's Compensation Certificate Drug/Alcohol Testing Requirements Noncollusion Affidavit Corporate Certification Partnership Information
1. On the bid form(s), the unit price items and total contract price must be written in words and figures. The words and figures shall appear on the blank spaces provided.
2. On page 74, Subcontractor's Listing shall be completed. If no subcontractor will be used, indicate an "X" mark on the space provided for "No" subcontractor.
Prevailing Wage Rates: In accordance with the provision of Section 1770 to 1781 of the Labor Code as duly enacted by the State of California, the City Council of the City of Calexico has ascertained the general prevailing rate of wages applicable to the work to be done as those shown in the specifications of the work. Information on the current prevailing wages can be obtained by contacting the State of California, Department of Industrial Relations, Division of Labor Statistics and Research, P.O. Box 603, San Francisco, California 94101 (415) 737-2794 or https://www.dir.ca.gov/public-works/prevailing-wage.html
All bids are to be compared on the basis of the Public Works Director/City Engineer's estimate of the quantities of work to be done. A bid will only be accepted from a Contractor who is licensed in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California as amended. In addition, the Contractor, sub-contractors, and suppliers shall also have a business license issued by the City prior to commencing work.
Special attention of all prospective bidders is called to "Proposal Requirements and General Conditions" annexed to the blank form of the Proposal for full directions as to bidding, etc.
If bidder is a corporate entity and is awarded the contract, prior to execution of the contract, Contractor shall submit satisfactory, documentary proof that the person(s) executing said contract on the behalf of said corporation has authority to do so.
CITY'S RIGHT RESERVED: The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City.
DATE:____________________
CITY OF CALEXICO, CALIFORNIA
Benjamin A Martinez, City Manager
11/5/2026 | 2:09:55 PM PST
https://www.dir.ca.gov/public-works/prevailing-wage.html
P a g e | 7
BID REQUIREMENTS
1. Examination of Plans, Specifications, Special Provisions and Site of Work: The bidder is required to examine carefully the site of work contemplated and it will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and quantities of work to be performed and materials to be furnished and as to the requirements of the specifications, special provisions and the contract. It is mutually agreed that submission of a proposal shall be considered prima facie evidence that the bidder has made such examination.
2. Proposal Form: All proposals must be made on the bid forms to be obtained from the
Office of the Public Works Director/City Engineer at 608 Heber Avenue, Calexico, California. All proposals must give the prices proposed both in writing and figures and must be signed by the bidder with bidders’ business address.
If the proposal is made by an individual, the individual's name and post office address must be shown. If made by a firm or partnership, the name and post office address of each member of the firm or partnership must be shown. If made by a corporation, the proposal must show the name of the State under the laws of which the corporation is chartered and the name, titles and business addresses of the President, Secretary and Treasurer. A certification by the legal representative of the firm must be included in the bid.
3. Rejection of Proposal Containing Alterations, Erasures or Irregularities: Proposals may be rejected if they show any alterations of form additions not called for, conditional or alternative bids, incomplete bids, erasures or irregularities of any kind.
4. The Proposal may be withdrawn upon request by the bidder without prejudice prior to, but not after the time fixed for opening of bids, provided that the request is in writing, has been executed by the bidder or the bidders duly authorized representative and is filed with the City Clerk.
4.l Omissions and Discrepancies: Should the bidder find discrepancies in or omissions on the drawings, or other contract documents or should he or she be in doubt as to their meaning, he or she should at once notify the Public Works Director/City Engineer who may send a written instruction to all bidders.
4.2 Interpretations and Addenda: No oral interpretations shall be made to any bidder as to the meaning of any of the contract documents, or be effective to modify any of the provisions of the contract documents. Every request for an interpretation shall be made in writing and addressed and forwarded to the Public Works Director/City Engineer.
4.3 The City of Calexico reserves the right to reject any or all proposals.
P a g e | 8
5. Bidder's Guaranty: All bids shall be presented under sealed cover and shall be accompanied by cash, cashier's check, certified check, or bidder’s bond made payable to the City of Calexico for an amount equal to at least ten percent (10%) of the amount of said bid, and no bid shall be considered unless such cash, cashier's check, certified check or bidder's bond is enclosed therewith.
5.1 Return of Proposal Guaranty: Within ten (10) days after the award of the contract, the
City Council will return the proposal guaranties accompanying the proposals, which are not to be considered in making the award. All other proposal guaranties will be held until the contract has been finally executed, after which they will be returned to the respective bidders whose proposals they accompany.
5.2 Execution of Contract: The contract and contract documents shall be signed by the successful bidder and returned together with the contract bonds, within ten (10) days, not including Sundays, after the bidder has received notice that the contract has been awarded. No proposal shall be considered binding upon the City until the execution of the contract. Failure to execute the contract and file acceptable bonds as provided herein within ten (10) days, not including Sundays, after the bidder has received notice that the contract has been awarded, shall be just cause for the annulment of the award and the forfeiture of the proposal guaranty.
5.3 Sureties: The successful bidder shall also promptly secure with a responsible corporate surety or corporate sureties satisfactory bonds conditioned upon faithful performance by the said bidder of all the requirements under the contract and upon the payment of claims of any material men and laborers there-under.
6. Award of Contract: The award of the contract, if it is awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed. The award, if made, will be made within sixty (60) calendar days after the opening of the proposals. All bids will be compared on the basis of the Public Works Director/City Engineer’s estimate of quantities of work to be done.
7. Projects financed in whole or in part with State or Federal funds shall be subject to inspection at all times by the Public Works Director/City Engineer or his agents.
8. Removal of Defective and Unauthorized Work: All work which is defective in its construction or deficient in any of the requirements of these specifications, special provisions or plans shall be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such correction. Any work done beyond the lines and grades shown on the plans or established by the Public Works Director/City Engineer, or any extra work done without written authority will be considered as unauthorized and will not be paid for.
P a g e | 9
9. Upon failure on the part of the Contractor to comply with any order of the Engineer made under these provisions, the Public Works Director/City Engineer shall be the authority to cause defective work to be removed and to deduct the costs thereof from any monies due or to become due to the Contractor.
10. Final Inspection: Whenever the work provided and contemplated by the contract shall
0have been satisfactorily completed and the final clean up performed, the Public Works Director/City Engineer will make the final inspection at the site.
11. Amount of Bonds: The Faithful Performance Bond shall be in the sum of not less than one hundred percent (100%) of the contract price.
The bond for material men and laborers shall be in an amount equal to not less than one hundred percent (100%) of the contract price. Form of bond required may be examined at the office of the Public Works Director/City Engineer; copies will be furnished, if desired, to prospective bidders.
Payment and performance Bonds shall be executed by a California Admitted Surety insurer with a minimum Best’s Insurance Guide rating of A+, Class VII.
Whenever any surety or sureties on any such bond, or on any bonds required by law for the protection of the claims of laborers and material men, become insufficient or the City Council has cause to believe that such surety or sureties have become insufficient, a demand in writing may be made of the Contractor for such further bond or bonds or additional surety, not exceeding that originally required, as is considered necessary, considering the extent of the work remaining to be done. Thereafter, no payment shall be made upon such contract to the Contractor or any assignee of the Contractor until such further bond or bonds or additional surety has been furnished.
12. Compliance with Laws and Regulations: No proposal for work will be accepted from a
Contractor who is not licensed in accordance with the law under the provisions of Chapter 9 of Division III, of the Business and Professions Code of the State of California, as amended. The Contractor awarded the contract shall also submit the Contractor’s Certification of Qualifications for License Classification contained in these contract documents along with the submission of the executed contract and acceptable sureties.
All bids submitted and all contracts awarded hereunder must be submitted, filed, made and executed in accordance with all applicable laws of the State of California and of the United States of America which relate to bids and contracts of the nature referred to herein, whether such laws are expressly referred to herein or not.
13. MINIMUM WAGES: Pursuant to Federal Decision AG 3295 and in accordance with the provisions of Section 1770 to 1781 of the Labor Code, the City Council of the City of Calexico has adopted the latest publication of the General Prevailing Wage Rates
P a g e | 10 entitled, "State of California, Department of Transportation, Equipment Rental Rates and General Prevailing Wage Rates."
14. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.
END OF BID REQUIREMENTS
P a g e | 11
GENERAL CONDITIONS
1-01 DEFINITIONS.
a) The word "City" shall mean the City of Calexico, California.
b) The term "City Council" shall mean the City Council of the City of Calexico.
c) The word "Contractor" shall mean the party of the second part entering into the contract with the City for the performance of work required by these specifications, and legal representatives of said party, or agent appointed to act for said party in the performance of the work. Said party is referred to throughout the contract documents as if of the singular number and the masculine gender.
d) The word "Public Works Director/City Engineer" shall mean the City of Calexico City
Engineer, Inspector or Engineering Project Manager, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.
e) The word GREENBOOK shall mean the Standard Specifications for Public Works
Construction contained in the 2021 Edition, as written and promulgated by the Joint Cooperative Committee of the Southern California Chapter of the American Public Works Association and the Southern California District of the Associated General Contractors of California. Copies of these Standard Specifications are available from the publisher, Building News, Incorporated, 1612 South Clementine Street, Anaheim, California 92802, telephone (714) 517-0970
1-02 CONTRACT DOCUMENTS
The Notice of Inviting Bids, the Instructions to Bidders, the Proposal, the Specifications, and the Drawings, together with the Agreement, constitute the Contract. These Contract documents are complimentary, and what is called for in any one shall be as binding as if called for in all. The intention of the documents is to require a complete and finished piece of work.
The Contractor at his sole cost and expense shall perform all labor and services and shall furnish all materials, tools, equipment, and facilities necessary for the proper execution of the work, with the exception of such items as are definitely stipulated in the specifications or the drawings to be furnished by the City. Anything shown in the drawings and not in the specifications or in the specifications and not in the drawings shall be performed by the Contractor as though shown in both the drawings and the specifications.
1-03 AUTHORITY OF THE PUBLIC WORKS DIRECTOR/CITY ENGINEER
P a g e | 12
The Public Works Director/City Engineer shall give all orders and directions contemplated under the contract; shall determine the adequacy of the Contractor's methods, plans, and appurtenances; shall determine in all cases the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for; shall determine all questions in relation to said work and the construction thereof; and shall decide in all cases every question, which may arise relative to the fulfillment of this contract on the part of the Contractor. Should any discrepancy appear or any misunderstandings arise as to the import of anything contained in the specifications or drawings, the matter shall be referred to the Public Works Director/City Engineer, who shall decide the same in accordance with the true intent and meaning as construed by him, and his decision shall be binding on the Contractor.
Any differences or conflicts which may arise between the Contractor and other contractors of the City in regard to their work shall be adjusted and determined by the Public Works Director/City Engineer.
1-04 ACCESS TO WORK
The Public Works Director/City Engineer, his assistants, inspectors, agents, and other employees shall at all times and for any purposes have access to the work and the premises used by the Contractor, and the Contractor shall provide safe and proper facilities therefore.
1-05 LINES AND GRADES
All construction staking shall be performed by the contractor. All construction staking shall be performed under the supervision of a licensed surveyor in the State of California.
1-06 LEGAL ADDRESS OF CONTRACTOR
The address given in the Contractor's proposal on which the contract is founded is hereby designated as the place to which all notices, letters, and other communications to the Contractor shall be mailed or delivered. The mailing to or delivering at the above-named place of any notice, letters, or other communication to the Contractor shall be deemed sufficient service thereof upon the Contractor. The date of said service shall be the date of such mailing or delivery. Such address may be changed at any time by a written notice signed by the Contractor and delivered to the Public Works Director/City Engineer.
1-07 CONTRACTOR'S RESPONSIBILITIES
(a) The Contractor shall be responsible for safe, efficient, and adequate methods and equipment during the progress of the work so as to secure the safety of the workmen, the quality of work required and the stipulated rate of progress.
(b) The Contractor shall bear all losses resulting to him on account of the amount of character of the work, or from any unforeseen obstructions or difficulties, which may be encountered, on account of the weather, floods, or other causes.
P a g e | 13
(c) The Contractor shall assume the defense of and indemnify and save harmless the City and its officers and agents from all claims of any kind arising from his own negligence or that of his agents in the performance of the contract.
(d) The Contractor shall be responsible for any materials furnished him and for the care of all work until its completion and final acceptance, and he shall at his own expense replace damaged or lost material and repair damaged parts of the work, or the same may be done at his expense by the City.
(e) During the progress of the work the Contractor shall keep the premises occupied by him in a neat and clean condition, and free from any unsightly accumulation of rubbish, unused material, concrete forms, and other equipment and materials belonging to him or used under his direction during construction, and in the event of his failure to do so, the same may be removed by the City at the expense of the Contractor.
(f) Traffic Control. The Contractor shall be responsible for maintaining traffic control at all times under the guidelines of the State of California Manual and the Uniform Traffic Control. Contractor shall submit two (2) traffic control plans in a minimum of 48 hours for pre-approval by the Engineering Department /City Engineer before starting construction work.
(g) Contractor shall maintain good housekeeping practices and observe Best Management
Practices throughout the execution of the project.
(h) The contractor shall make a special effort to control dust during the execution of work.
Dust shall be maintained to a minimum by regular applications of water as necessary.
It is the responsibility of the contractor to obtain all necessary permits and meet all requirements of the county of Imperial Air Pollution Control District. A copy of said permit shall be submitted to the City of Calexico Engineering Division.
1-08 CONTRACTOR TO FURNISH INFORMATION
(a) Before proceeding with the erection of the construction plant, and other temporary structures, the Contractor shall furnish the Public Works Director/City Engineer with information and drawings of all such structures as may be required.
(b) Drawings and prints in such detail as may be required, or articles, machinery, or fabricated materials entering into permanent construction which are by these specifications required to be furnished by the Contractor and of which detailed drawings are not furnished by the City shall be submitted by the Contractor for approval and shall become the property of the City. Such approval shall not, however, P a g e | 14 operate to waive or modify any provision or requirement contained in these specifications.
1-09 EXAMINATION OF WORK
Bidders must examine the location, physical conditions and surrounding of the proposed work and judge for themselves the nature of the excavations to be made and the work to be done.
The Contract documents for the work show conditions as they are supposed or believed by the Public Works Director/City Engineer to exist, but it is not intended or to be inferred that the conditions as shown therein constitute a representation or warranty, express or implied, by the City or any of its officers or employees, that such conditions are actually existent, nor shall the Contractor be relieved of the liability under his contract, nor shall the City or any of its officers or employees be liable for any loss sustained by the Contractor as a result of any variance between conditions shown in the Contract Documents and the actual conditions revealed during the progress of the work or otherwise.
1-10 PLANS AND DRAWINGS
All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. No changes shall be made of any plan or drawing after the same has been approved by the Public Works Director/City Engineer, except by direction of the Public Works Director/City Engineer.
Deviations from the approved plans, as may be required by the exigencies of construction, will be determined in all cases by the Public Works Director/City Engineer and authorized in writing.
Working drawings or plans for any structure not included in the plans furnished by the Engineering Department /City Engineer shall be approved by the Public Works Director/City Engineer before any work involving these plans shall be performed, unless approval is waived in writing by the Public Works Director/City Engineer.
It is mutually agreed, however, that approval by the Public Works Director/City Engineer of the Contractor's working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall conform with the approved plans and specifications.
1-11 PERSONAL ATTENTION
The Contractor shall give his personal attention constantly to the faithful prosecution of the work, and shall be present, either in person or by a duly authorized and competent representative, on the site of the work, continually during its progress, to receive directions or instructions from the Public Works Director/City Engineer. Whenever the Contractor is not
P a g e | 15 present on any part of the work where it may be desired to give directions, orders may be given by the Public Works Director/City Engineer, and shall be received and obeyed by the superintendent or foreman who may have charge of the particular part of the work in reference to which orders are given.
1-12 PROTESTS
If the Contractor considers any work demanded of him to be outside the requirements of the Contract, or if he considers any order or ruling of the Public Works Director/City Engineer or of any inspector to be unfair, he shall immediately upon such work being demanded or such order or ruling being made, ask for written instructions or decision, whereupon he shall proceed without delay to perform the work or conform to the order or ruling; but unless the Contractor finds such instructions or decision satisfactory, he shall, within ten (10) days after receipt of same, file a written protest with the Public Works Director/City Engineer, stating clearly and in detail his objections and the reason therefore. Except for such grounds of protest or objections as are made of record in the manner specified and within the time stated herein, the Contractor hereby waives all grounds for protests or objections to the orders, ruling, instructions or decisions of Public Works Director/City Engineer, and hereby agrees that as to all matters not included in such protests the orders, instructions and decisions of the Public Works Director/City Engineer shall be final and conclusive.
1-13 RIGHT-OF-WAY
The right-of-way for the work to be constructed will be provided by the City. The Contractor shall make his own arrangements and pay all expenses for additional area required by him outside of the limits of the right-of-way, unless otherwise provided in the special conditions.
1-14 TIME AND ORDER OF WORK
(a) The Contractor shall at all times employ such force, plant, materials and tools as will be sufficient, in the opinion of the Public Works Director/City Engineer, to complete the work or any separable portions thereof in accordance with a progress schedule and within the time limit fixed by the contract. If the Contractor should fail to employ sufficient force, plant, materials and tools or to maintain adequate progress he may, after such failure, be required to increase his progress at any point or points or to modify his plans and procedures in such manners and to such extent as the Public Works Director/City Engineer may direct, any extension of such shall not relieve the Contractor from the necessity of maintaining the required progress. In case of an extension by the Public Works Director/City Engineer of the time for the completion of the contract, as hereinafter provided a revised schedule of progress may be prescribed in accordance with such extension of time.
P a g e | 16
(b) The time in which the various portions and the whole of the contract are to be performed and the work is to be completed is of the essence of the contract.
1-15 ASSIGNMENT FORBIDDEN
The Contractor shall not assign, transfer, convey, or otherwise dispose of this contract, or of his right, title or interest in or to the same or any part thereof, without the previous consent in writing of the Public Works Director/City Engineer and he shall not assign, by power of attorney or otherwise, any of the monies to become due and payable under the contract unless by and with the like consent signified in like manner. If the Contractor shall, without such previous written consent, assign, transfer, convey or otherwise dispose of the contract or of his right, title or interest therein, or of any of the monies to become due under the contract, to any other person, company or other corporation, the contract may at the option of the City be terminated and revoked, and the City shall thereupon be relieved and discharged from any and all liability and obligations growing out of the same to the Contractor, and to his assignee or transferee.
No right under the contract, nor any right to any money to become due hereunder, shall be asserted against the City in law or equity by reason of any so-called assignment of the contract, or any part thereof, or by reason of the assignment of any monies to become due hereunder, unless authorized as aforesaid by the written consent of the Public Works Director/City Engineer.
1-16 SUBLETTING
The Contractor shall give his personal attention of the fulfillment of the contract and shall keep the work under his control. Subcontractors will not be recognized as such, and all persons engaged in the work of construction will be considered as employees of the Contractor, and their work shall be subject to the provisions of the contract and specifications. Where a portion of the work sublet by the Contractor is not being prosecuted in a manner satisfactory to the Public Works Director/City Engineer, the subcontractor shall be removed immediately on the recommendation of the Public Works Director/City Engineer and shall not again be employed on the work.
1-17 SUSPENSION OF CONTRACT
(a) If the work to be done under the contract shall be abandoned by the Contractor, or if the Contractor shall make a general assignment for the benefit of his creditors or be adjudicated a bankrupt, or if a receiver of his property or business is appointed by a court of competent jurisdiction, or if this contract shall be assigned by him otherwise than hereinbefore specified, or if at any time the Public Works Director/City Engineer shall be of the opinion that the performance of the contract is unnecessarily or unreasonably delayed, or that the Contractor is willfully violating any of the conditions or covenants of the contract, or of the specifications, or is executing the same in bad
P a g e | 17 faith or not in the time named in the contract for its completion, or within the time to which the completion of the contract may have been extended as hereinbefore provided, the Public Works Director/City Engineer, acting on behalf of the City, may, by written notice, instruct the Contractor to discontinue all work or any part thereof under this contract.
(b) When such written notice is served upon the Contractor as provided in Section 1-06, he shall immediately discontinue the work or such part thereof as is covered by the notice and shall not resume the same except by written instructions from the Public Works Director/City Engineer. In any such case, the City may take charge of the work and complete it by a new contract or by force account. In so doing, the City may take possession of and use any of the materials, plant, tools, equipment, supplies and property of every kind provided by the Contractor for the purposes of his work. The City may procure other materials and provide labor for the completion of same, or contract therefore and charge the expense of completion by either method to the Contractor. These charges shall be deducted from such monies as may be due or may at any time hereafter become due the Contractor under and by virtue of this contract or any part thereof. In case such expense shall exceed the amount which would have been due the Contractor under the contract if the same had been completed by him, he shall pay the amount of such excess to the City; and in case such expense shall be less than the amount which would have been payable under this contract if the same had been completed by the Contractor, he shall have no claim to the difference except to such extent as may be necessary, in the opinion of the Public Works Director/City Engineer, to reimburse the Contractor or the Contractor's sureties for any expense, properly incurred for plant, equipment, materials, supplies and labor devoted to the prosecution of the work of which the City shall have received the benefit and which shall not have been otherwise paid for by the City. In computing such expense so far as it shall be deducted from the depreciated value thereof at the time taken over by the City and the difference shall be considered as an expense. Evidence of such expense satisfactory to the Public Works Director/City Engineer, shall be required, and all necessary estimates and appraisements shall be made by him.
When any particular part of the work is being carried on for the City by contract or otherwise, under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of his contract, and in such manner as in nowise to hinder or interfere with the persons or workmen employed, as above provided, by the City, by contract or otherwise to do any part of the work or to complete the same under the provisions of this section.
1-18 SUSPENSION OF WORK - EXTENSION OF TIME - NO EXTRA
COMPENSATION
(a) The Public Works Director/City Engineer shall have the authority to suspend the work wholly or in part, for such period as he may deem necessary, due to unsuitable weather, P a g e | 18 or to such other conditions as are considered unfavorable for the suitable prosecution of the work or for such time as he may deem necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the work.
The Contractor shall immediately obey such order of the Public Works Director/City Engineer.
(b) Applications for extension of time must be made promptly in writing, stating cause.
No delay shall be made the basis in any application for extension of time, unless such delay and the cause thereof shall have been called to the attention of the Public Works Director/City Engineer in writing within the ten (10) days from the beginning of such delay. Applications for extension of time shall be addressed to the Public Works Director/City Engineer.
(c) Permitting the Contractor to continue and finish the work, or any part of it, after the date to which the time fixed for its completion may have been extended, shall in nowise operate as a waiver on the part of the City or any of its rights under this contract.
(d) The Contractor shall receive no compensation on account of any suspension of the work either in whole or in part or for any delay or hindrance herein mentioned except as provided in the Detail Specifications.
1-19 FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES
(a) The Contractor shall pay for each and every day, including Sundays and legal holidays that they shall be in default in completing the whole work to be done under this contract, the sum named in the Special Provisions, which sum is by the execution of the Agreement mutually agreed upon as liquidated damages which the City will suffer by reason of such default. The City shall have the right to deduct the amount of such damages from any monies due or to become due the Contractor under this contract.
(b) It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the time specified, the City Council shall have the right to extend the time for completion or not, as may seem best to serve the interest of the City; and if it decides to extend the time limit for the completion of the contract, it shall further have the right to charge to the Contractor, his heirs, assigns or sureties and to deduct from the final payment for the work, all or any part, as it may deem proper of the actual cost of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final surveys and preparation of final estimate shall not be included in such charges.
(c) The Contractor shall not be assessed with liquidated damages nor the cost of engineering and inspection during any delay in the completion of the work caused by the acts of God or of the public enemy, acts of the City, fire, floods, epidemics, P a g e | 19 quarantine restrictions, strikes, freight embargoes and unusually severe weather or delays of subcontractors due to such causes; provided, that the Contractor shall within ten (10) days from the beginning of any such delay notify the Public Works Director/City Engineer in writing of the causes of delay, who shall ascertain the facts and the extent of delay, and his findings of the facts thereon shall be final and conclusive.
1-20 CHANGES
(a) If either the Public Works Director/City Engineer or the Contractor on account of conditions which develop during the progress of the work finds it impracticable to comply strictly with these specifications, the Public Works Director/City Engineer may prescribe a modification of requirements of methods of work. For such purposes, the Public Works Director/City Engineer may at any time during the life of the contract, by written order make such changes as he shall find necessary in the design, line, grade, form, location, dimensions, plan or material of any part of the work or equipment hereinafter specified, or in the quantity or character of the work or equipment to be furnished. If such changes increase or diminish the quantity or amount of work to be done, they shall not constitute the basis for a claim for damages or anticipated profits on the work that may be dispensed with; provided, that if such changes or alterations render useless, any work already done or materials already furnished or used in the work, the Public Works Director/City Engineer shall make reasonable allowance therefore, which action shall be binding upon both parties.
(b) In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the contract, wherever such unit price has been established. In the event no prices are named in the contract to cover such changes or alteration, the cost of such changes shall be covered as hereinafter provided for extra work.
(c) The City reserves the right to increase or decrease the quantity of any item or portion of work or to omit portions of the work as may be deemed necessary or expedient by the Public Works Director/City Engineer.
1-21 EXTRA WORK
(a) If during the performance of the contract, it shall, in the opinion of the Public Works
Director/City Engineer, become necessary or desirable for proper completion of the contract to order work done or materials or equipment furnished which in the opinion of the Public Works Director/City Engineer are not susceptible of classification under the bid items, the Contractor shall do and perform such work and furnish such materials and equipment as extra work, as hereinafter provided. All extra work shall
P a g e | 20 be ordered in writing before it is started. No extra work shall be paid for unless ordered in writing.
(b) Extra work will ordinarily be paid for at a lump sum or unit price agreed upon in writing by the Public Works Director/City Engineer and the Contractor before the extra work shall be ordered.
(c) Whenever in the judgment of the Public Works Director/City Engineer extra work or extra material, as the case may be, is not of like character to and is not susceptible of classification under the bid items of the contract as specified, and it is impracticable because of the nature of the work, or for any other reason to fix the price before the extra work order shall be issued, extra work and material, when furnished by the Contractor, shall be paid for at actual necessary cost of materials, supplies, labor (including foremen’s wages), workmen's compensation insurance, contributions made to the State as required by the provisions of the Unemployment Insurance Act, Chapter 352, Statutes of 1935, as amended, taxes paid to the Federal Government as required by The Social Security Act, approved August 14, 1935, as amended and the reasonable value of the use of equipment for the actual time it is used, all as determined by the Public Works Director/City Engineer, plus fifteen percent (15%) to cover the following:
Profit General Expenses All insurance except workmen's compensation insurance Excise taxes Property taxes Bond premiums License and inspection fees imposed by any governmental authority Any and all other items of expense not specifically mentioned under Subsection (c) herein
The Public Works Director/City Engineer determination and certification of said actual necessary cost shall be binding and conclusive on the Contractor, and the Public Works Director/City Engineer shall be deemed the arbiter to determine the cost of such work.
(d) If any work or materials be ordered under this section on a cost-plus basis, the
Contractor shall, at the times directed during the performing of the work or the furnishing of the materials, render to the Public Works Director/City Engineer, written reports in prescribed form, showing all items that may enter into the cost, the quantity and the character of each such material, from whom purchased and the net amount paid or to be paid therefore, and such other information as directed. If required, the Contractor shall produce any books, vouchers, other
P a g e | 21 records, or memoranda, which will assist the Public Works Director/City Engineer in determining the true, necessary cost of the work and materials to be paid for.
(e) Any extra work performed hereunder shall be subject to all the provisions of the contract and the Contractor's sureties shall be bound with reference thereto as under the original contract.
1-22 COST BREAKDOWN
Within ten (10) days after commencing work, the Contractor shall submit, to the Public Works Director/City Engineer, a cost breakdown in duplicate of all unit and lump sum prices under the contract. The breakdown, as approved, may be used by the Public Works Director/City Engineer to verify the fair value of the work for progress payments.
1-23 PROGRESS ESTIMATES
The Public Works…