This file is a complete set of construction bid documents issued by the State of Louisiana Coastal Protection and Restoration Authority (CPRA) for the GIWW Bank Restoration of Critical Areas-Segment 4 2026 Maintenance Event (Project No. TE-0043) located in Terrebonne Parish, Louisiana. The project involves repair, maintenance, and structural restoration of critical bank and rock dike protection systems along Segment 4 of the Gulf Intracoastal Waterway, with typical activities including topographic and centerline profile surveys, assessment of rock dike settlement, placement/replenishment of rock armor or fill material, and shoreline/bank stabilization to counter erosion. The bid documents specify unit price work including mobilization and demobilization (1 lump sum), surveys (1 lump sum), pilings (49 each), and timberwork (10.50 MFBM). Sealed bids are due by 2:00 PM on Thursday, November 19, 2026, at the CPRA office in Baton Rouge, Louisiana. A non-mandatory pre-bid conference is scheduled for 10:00 AM on Friday, November 13, 2026, at NSU Coastal Center in Thibodaux, Louisiana, with site visits required for all bidders. The successful contractor must complete all work within 90 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $1,500 per day for each day beyond the completion deadline.
Bid security in the amount of five percent (5.0%) of the base bid and all alternates must accompany each bid in the form of a certified check, cashier's check, or bid bond. The successful bidder must furnish a Performance and Payment Bond equal to 100% of the contract amount. Contractors must be licensed in Louisiana under R.S. 37:2150-2192 for Heavy Construction and/or Coastal Restoration and Habitat Enhancement classifications. The project is financed by the State, and award is contingent upon availability of state bond or federal funds. The contract documents require compliance with prevailing wage requirements under the Davis-Bacon Act, and include mandatory provisions for equal employment opportunity, non-discrimination, suspension/debarment verification, Louisiana First Hiring Act compliance, and verification of employee legal status. The bidding documents include comprehensive general provisions, special provisions, and technical specifications for mobilization/demobilization, surveys, pilings, and timberwork, along with required submittals including a detailed work plan, progress schedule, hurricane and severe storm plan, and health and safety plan prior to the pre-construction conference.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G
CONSTRUCTION DOCUMENTS
BANK RESTORATION OF CRITICAL
AREAS – SEGMENT 4 (TE-0043)
2026 MAINTENANCE EVENT
TERREBONNE PARISH, LOUISIANA
PROTE
CTION AN
D RES
TORA
TI
C O A S T A L P R O
K I O
N AUTHORITY
CPRA
USTICEU
N I O
* STAT
E OF LOUI
SIANA
CONFIIDENC
STATE OF LOUISIANA
COASTAL PROTECTION AND RESTORATION AUTHORITY
SEPTEMBER 2026
F LOUISIANASTA
TE O
F
KEVIN P. RIZZO
License No. 30575
PROFESSIONAL ENGINEERNI
CINIL ENGINEERING
ISSUE FOR BIDDING
09/2 3 7
TABLE OF CONTENTS
GENERAL REQUIREMENTS Pages Included
Project Title Page 1 Table of Contents 3 List of Drawings 1
Procurement Requirements Invitation to Bidders 1
Instruction for Procurement Instructions to Bidders 7
Procurement Forms and Supplements Louisiana Uniform Public Works Bid Form 2 Bid Security Form 1 Attestations 2
Contracting Requirements Contract between Owner & Contractor & Performance & Payment Bond &
Affidavit 4
Section Title Page No.
GP-1 DEFINITION OF TERMS
GP-2 BID REQUIREMENTS
GP-3 AVAILABILITY OF PLANS AND SPECIFICATIONS
GP-4 LAWS, REGULATIONS, STANDARDS, SPECIFICATIONS, AND CODES
GP-5 PRE-BID CONFERENCE AND SITE VISIT
GP-6 NOTICE OF AWARD
GP-7 NOTICE TO PROCEED AND CONTRACT TIME
GP-8 WORK PLAN
GP-9 PROGRESS SCHEDULE
GP-10 DAILY PROGRESS REPORTS
GP-11 HURRICANE AND SEVERE STORM PLAN
GP-12 HEALTH AND SAFETY PLAN AND INSPECTIONS
GP-13 PROGRESS MEETINGS AND REPORTS
GP-14 PRE-CONSTRUCTION CONFERENCE
GP-15 CONTRACT INTENT
GP-16 ENGINEER AND AUTHORITY OF ENGINEER
GP-17 CONFORMITY WITH PLANS AND SPECIFICATIONS
GP-18 CLARIFICATIONS AND AMENDMENTS TO CONTRACT DOCUMENTS
GP-19 SUBCONTRACTS
GP-20 WORKERS, METHODS, AND EQUIPMENT
GP-21 ACCIDENT PREVENTION, INVESTIGATIONS, AND REPORTING
GP-22 PRESERVATION AND RESTORATION OF PROPERTY, MONUMENTS, ETC
GP-23 PROTECTION OF THE WORK, MATERIALS, AND EQUIPMENT
GP-24 LAND RIGHTS
GP-25 UTILITIES
GP-26 PERMITS
GP-27 PROJECT SITE CLEAN-UP
GP-28 OWNER INSPECTION
GP-29 DUTIES OF RESIDENT PROJECT REPRESENTATIVE
GP-30 CONSTRUCTION STAKES, LINES, AND GRADES
GP-31 CONTRACTOR’S RESPONSIBILITY FOR WORK
GP-32 ENVIRONMENTAL PROTECTION
GP-33 SANITARY PROVISION
GP-34 PAYMENT OF TAXES
GP-35 RADIO AND TELEPHONES
GP-36 NAVIGATION
GP-37 OBSTRUCTION TO NAVIGATION
GP-38 MARINE VESSELS AND MARINE ACTIVITIES
GP-39 RECORD KEEPING
GP-40 CERTIFICATES OF COMPLIANCE
GP-41 SUBMITTALS
GP-42 CLAIMS FOR EXTRA COST
GP-43 ALTERATION OF THE CONTRACT AND COMPENSATION
GP-44 EXTENSION OF CONTRACT TIME
GP-45 OWNER’S RIGHT TO TERMINATE CONTRACT FOR CAUSE OR CONVENIENCE
GP-46 TEMPORARY SUSPENSION OF WORK
GP-47 NON-CONFORMING AND UNAUTHORIZED WORK
GP-48 CONTRACTOR’S RIGHT TO TERMINATE CONTRACT
GP-49 BREACH OF CONTRACT
GP-50 NO WAIVER OF LEGAL RIGHTS
GP-51 LIABILITY FOR DAMAGES AND INJURIES
GP-52 LIABILITY FOR LOSSES BY ACTS OF THE GOVERNMENT
GP-53 FINAL INSPECTION AND ACCEPTANCE
GP-54 AS-BUILT DRAWINGS
GP-55 COMPLETION OF CONTRACT
GP-56 CONTRACTOR’S GUARANTEE
GP-57 DISPUTE RESOLUTION
GP-58 PAYMENT
GP-59 PAYMENTS WITHHELD
GP-60 LIENS
GP-61 EQUAL EMPLOYMENT OPPORTUNITY
GP-62 ANTI-KICKBACK CLAUSE
GP-63 SUSPENSION/DEBARMENT
GP-64 LOUISIANA FIRST HIRING ACT
GP-65 PROHIBITION OF DISCRIMINATORY BOYCOTTS OF ISRAEL
GP-66 PROHIBITION OF DISCRIMINATION OF FIREARM ENTITY
GP-67 DBE, MINORITY OWNED, AND WOMEN’S BUSINESS ENTERPRISES
PART II SPECIAL PROVISIONS
SP-1 LOCATION OF WORK
SP-2 WORK TO BE DONE
SP-3 SITE EXAMINATION
SP-4 CONTRACT MILESTONES AND SUBMITTALS
SP-5 DELIVERABLES
SP-6 CONTACT INFORMATION
SP-7 LANDOWNER AND PIPELINE REQUIREMENTS
SP-8 PROTECTION OF WORK
SP-9 WORK PLAN SUPPLEMENTAL
SP-10 FAILURE TO COMPLETE ON TIME
SP-11 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
SP-12 TRANSPORTATION
SP-13 COLONIAL NESTING BIRD’S HABITAT AREAS
SP-14 SITE ACCESS
SP-15 OYSTER LEASE AND SEED GROUND RESTRICTIONS
SP-16 INSURANCE AND BONDS
SP-17 CONTRACTOR’S GUARANTEE SUPPLEMENTAL
SP-18 DAVIS-BACON ACT
PART III TECHNICAL SPECIFICATIONS
TS-1 MOBILIZATION AND DEMOBILIZATION
TS-2 SURVEYS
TS-3 PILINGS
TS-4 TIMBERWORK
APPENDIX A: REQUEST FOR INFORMATION, CHANGE ORDERS, AND ACCEPTANCE
Attachment A1: Request for Information Form Attachment A2: Change Order Form Attachment A3: Recommendation of Acceptance
APPENDIX B: LAND RIGHTS CONTACTS
APPENDIX C: PERMITS OBTAINED BY OWNER
APPENDIX D: SURVEY MONUMENT DATA
LIST OF DRAWING SHEETS
SHEET NO. DESCRIPTION
1 TITLE SHEET
2 GENERAL NOTES & QUANTITIES
3 OVERALL SITE PLAN
4 SITE 3 & 4 – EXISTING SITE PLAN
5 SITE 5 – EXISTING SITE PLAN
6 SITE 3 & 4 – PROJECT LAYOUT
7 SITE 5 – PROJECT LAYOUT
8 SITE 3 – PLAN & PROFILE
9 SITE 4 – PLAN & PROFILE
10 SITE 5 – PLAN & PROFILE
11-12 TYPICAL DETAILS
13 SITE 3 - TRANSECTS
14 SITE 4 – TRANSECTS
15 SITE 5 - TRANSECTS
ADVERTISEMENT FOR BIDS
Sealed bids will be received for the State of Louisiana by the Coastal Protection and Restoration Authority, 150 Terrace Avenue, 4th Floor Conference Center, Baton Rouge, Louisiana 70802 until 2:00 P.M., Thursday, November 19, 2026
ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY THE COASTAL PROTECTION AND RESTORATION AUTHORITY OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS
BEFORE THE BID OPENING.
FOR: GIWW Bank Restoration of Critical Areas-Segment 4 2026 Maintenance Event Terrebonne Parish, Louisiana
PROJECT NUMBER: TE-0043
Complete Bid Documents for this project are available in electronic form. They may be obtained without charge and without deposit from http://coastal.la.gov/resources/rfps-rsiqs-contracts/bids/. Printed copies can also be obtained from:
COASTAL PROTECTION AND RESTORATION AUTHORITY (CPRA)
150 Terrace Avenue Baton Rouge, LA 70802 Attn: Shabrion Hawkins
E-mail: cpra.bidding@la.gov Phone: (225) 342-7310 Fax: (225) 800-5599
All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project.
The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project.
A NON-MANDATORY PRE-BID CONFERENCE WILL BE HELD at 10:00 AM on Friday, November 13, 2026 at NSU Coastal Center, 426 Ardoyne Drive, Thibodaux, La. 70301
Contact Brian Babin at (985) 447-0956 if assistance is needed for the Non-Mandatory Pre-Bid Conference.
It is the responsibility of all potential bidders to visit the Project Site to assess the location, logistics, and site conditions prior to bidding.
Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification Heavy Construction and/or Coastal Restoration and Habitat Enhancement. In accordance with LA. R.S. 37:2165(C), anyone objecting to the classification must send a certified letter to both the Louisiana State Licensing Board for Contractors and the CPRA at the address listed above. The letter must be received no later than ten (10) working days prior to the day on which bids are to be opened.
Bidder is required to comply with provisions and requirements of LA R.S.38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) calendar days after receipt of bids, except under the provisions of LA. R.S. 38:2214.
The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity.
When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract between Owner and Contractor is fully executed.
Coastal Protection and Restoration Authority is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the Veteran-Owned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation. Information is available from Coastal Protection and Restoration Authority or on its website at http://www.coastal.la.gov/.
STATE OF LOUISIANA, COASTAL PROTECTION AND RESTORATION AUTHORITY
MICHAEL HARE, EXECUTIVE DIRECTOR
CPRA - IB -1
INSTRUCTIONS TO BIDDERS
COMPLETION TIME:
The Bidder shall agree to fully complete the contract within Ninety (90) consecutive calendar days for the Base Bid. The completion time is subject to such extensions as may be granted under Section GP-44 of the General Provisions and acknowledges that this construction time will start on or before the date specified in the written “Notice to Proceed” from the Owner.
LIQUIDATED DAMAGES:
The Bidder shall agree to pay as Liquidated Damages the amount of One Thousand, Five Hundred Dollars ($1,500.00) for each consecutive calendar day for which the work is not complete, beginning with the first day beyond the contract completion date stated on the “Notice to Proceed” or as amended by change order.
ARTICLE 1
DEFINITIONS
1.1 The Bid Documents include the following:
Advertisement for Bids Instructions to Bidders Bid Form Bid Bond General Provisions Special Provisions Technical Specifications Construction Drawings Contract Between Owner and Contractor and Performance and Payment Bond Affidavit User Agency Documents (if applicable) Change Order Form Recommendation of Acceptance Other Documents (if applicable) Addenda issued during the bid period and acknowledged in the Bid Form
1.2 All definitions set forth in the General
Provisions and the Special Provisions are applicable to the Bid Documents, unless otherwise specifically stated or written.
1.3 Addenda are written and/or graphic
instruments issued by the Engineer prior to the opening of bids which modify or interpret the Bid Documents by additions, deletions, clarifications, corrections and prior approvals.
1.4 A bid is a complete and properly signed
proposal to do the work or designated portion thereof for the sums stipulated therein supported by data called for by the Bid Documents.
1.5 Base bid is the sum stated in the bid for which
the Bidder offers to perform the work described as the base, to which work may be added, or deleted for sums stated in alternate bids.
1.6 An alternate bid (or alternate) is an amount
stated in the bid to be added to the amount of the base bid if the corresponding change in project scope or materials or methods of construction described in the Bid Documents is accepted.
1.7 A Bidder is one who submits a bid for a prime
Contract with the Owner for the work described in the Bid Documents.
1.8 A Sub-bidder is one who submits a bid to a
Bidder for materials and/or labor for a portion of the work.
1.9 Where the word "Engineer" is used in any of
the documents, it shall refer to the Prime Designer of the project, regardless of discipline.
ARTICLE 2
PRE-BID CONFERENCE
2.1 A Pre-Bid Conference may be held at the time
and location described in the Advertisement for Bids. The purpose of the Pre-Bid Conference is to familiarize Bidders with the requirements of the Project and the intent of the Bid Documents, and to
CPRA - IB -2
receive comments and information from interested Bidders. If the Pre-Bid Conference and/or Job Site Visit is stated in the Advertisement for Bids to be a Mandatory Pre-Bid Conference and/or Mandatory Job Site Visit, bids shall be accepted only from those bidders who attend the Pre-Bid Conference and/or Job Site Visit. Contractors who are not in attendance for the entire Pre-Bid Conference and/or Job Site Visit will be considered to have not attended.
2.2 Any revision of the Bid Documents made as a
result of the Pre-Bid Conference shall not be valid unless included in an addendum.
ARTICLE 3
BIDDER'S REPRESENTATION
3.1 Each Bidder by making his bid represents that:
3.1.1 He has read and understands the Bid
Documents and his bid is made in accordance therewith.
3.1.2 He has visited the site and has familiarized
himself with the local conditions under which the work is to be performed.
3.1.3 His bid is based solely upon the materials, systems and equipment described in the Bid Documents as advertised and as modified by addenda.
3.1.4 His bid is not based on any verbal instructions
contrary to the Bid Documents and addenda.
3.1.5 He is familiar with the Code of Governmental
Ethics requirement that prohibits public servants and/or their immediate family members from bidding on or entering into contracts; he is aware that the Designer and its principal owners are considered Public Servants under the Code of Governmental Ethics for the limited purposes and scope of the Design Contract with the State on this Project (see Ethics Board Advisory Opinion, No.
2009-378 and 2010-128); and neither he nor any principal of the Bidder with a controlling interest therein has an immediate family relationship with the Designer or any principal within the Designer’s firm. (see La. R.S.
42:1113). Any Bidder submitting a bid in violation of this clause shall be disqualified and any contract entered into in violation of this clause shall be null and void.
3.2 The Bidder must be fully qualified under any
State or local licensing law for Contractors in effect at the time and at the location of the work before submitting his bid. In the State of Louisiana, Revised Statutes 37:2150, et seq. will be considered, if applicable.
The Contractor shall be responsible for determining that all of his Sub-bidders or prospective Subcontractors are duly licensed in accordance with law.
ARTICLE 4
BID DOCUMENTS
4.1 Copies
4.1.1 Bid Documents may be obtained from the
Coastal Protection and Restoration Authority as stated in the Advertisement for Bids.
4.1.1.2 In addition to the availability of printed Bid
Documents, the Coastal Protection and Restoration Authority will provide the Bid Documents in electronic format. They may be obtained without charge and without deposit as stated in the Advertisement for Bids.
4.1.1.2.2 Where electronic distribution is
provided, all other plan holders are responsible for their own reproduction costs.
4.1.2 Complete sets of Bid Documents shall be
used in preparing bids; neither the Owner nor the Engineer assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bid Documents.
4.1.3 The Owner or Engineer in making copies
of the Bid Documents available on the above terms, do so only for the purpose of obtaining bids on the work and do not confer a license or grant for any other use.
4.2 Interpretation or Correction of Bid Documents
4.2.1 Bidders shall promptly notify the Coastal
CPRA - IB -3
Protection and Restoration Authority contact person listed in the Advertisement for Bids of any ambiguity, inconsistency or error which they may discover upon examination of the Bid Documents or of the site and local conditions.
4.2.2 Bidders requiring clarification or
interpretation of the Bid Documents shall make a written request to the Coastal Protection and Restoration Authority contact person listed in the Advertisement for Bids, to reach him/her at least seven days prior to the date for receipt of bids.
4.2.3 Any interpretation, correction or change of
the Bid Documents will be made by addendum.
Interpretations, corrections or changes of the Bid Documents made in any other manner will not be binding and Bidders shall not rely upon such interpretations, corrections and changes.
4.3 Substitutions
4.3.1 The materials, products and equipment
described in the Bid Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. No substitutions shall be allowed after bids are received.
4.3.2 No substitution will be considered unless
written request for approval has been submitted by the Proposer and has been received by the Engineer at least seven (7) working days prior to the opening of bids. (La. R.S. 38:2295(C)) Each such request shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including model numbers, drawings, cuts, performance and test data and any other information necessary for an evaluation. A statement setting forth any changes in other materials, equipment or work that incorporation of the substitute would require shall be included. It shall be the responsibility of the proposer to include in his proposal all changes required of the Bid Documents if the proposed product is used. Prior approval is given contingent upon supplier being responsible for any costs which may be necessary to modify the space or facilities needed to accommodate the materials and equipment approved.
4.3.3 If the Engineer approves any proposed
substitution, such approval will be set forth in an addendum. Bidders shall not rely upon approvals made in any other manner.
4.4 Addenda
4.4.1 Addenda will be mailed or delivered to all
who are known by the Coastal Protection and Restoration Authority to have received a complete set of Bid Documents.
4.4.2 Copies of addenda will be made available
for inspection wherever Bid Documents are on file for that purpose.
4.4.3 Except as described herein, addenda shall not
be issued within a period of seventy-two (72) hours prior to the advertised time for the opening of bids, excluding Saturdays, Sundays, and any other legal holidays. If the necessity arises of issuing an addendum modifying the Bid Documents within the seventy-two (72) hour period prior to the advertised time for the opening of bids, then the opening of bids shall be extended at least seven but no more than twenty-one (21) working days, without the requirement of re-advertising. The revised time and date for the opening of bids shall be stated in the addendum.
4.4.4 Each Bidder shall ascertain from the
Coastal Protection and Restoration Authority prior to submitting his bid that he has received all addenda issued, and he shall acknowledge their receipt on the Bid Form.
4.4.5 The Owner shall have the right to extend
the bid date by up to (30) thirty days without the requirement of re-advertising. Any such extension shall be made by addendum issued by the Coastal Protection and Restoration Authority.
ARTICLE 5
BID PROCEDURE
5.1 Form and Style of Bids
5.1.1 Bids shall be submitted on the Louisiana
Uniform Public Work Bid Form provided by the Engineer.
5.1.2 The Bidder shall ensure that all applicable
blanks on the Bid Form are completely and
CPRA - IB -4
accurately filled in.
5.1.3 Bid sums shall be expressed in both words
and figures, and in case of discrepancy between the two, the written words shall govern.
5.1.4 Any interlineation, alteration or erasure
must be initialed by the signer of the bid or his authorized representative.
5.1.5 Bidders are cautioned to complete all
alternates should such be required in the Bid Form.
Failure to submit alternate prices will render the bid non responsive and shall cause its rejection.
5.1.6 Bidders are cautioned to complete all unit
prices should such be required in the Bid Form.
Unit prices represent a price proposal to do a specified quantity and quality of work. Unit prices are incorporated into the base bid or alternates, as indicated on the Unit Price Form, but are not the sole components thereof.
5.1.7 Bidder shall make no additional
stipulations on the Bid Form nor qualify his bid in any other manner.
5.1.8 Written evidence of the authority of the
person signing the bid for the public work shall be submitted in accordance with La. R.S.
38:2212(B)(5).
5.1.10 On any bid in excess of fifty thousand
dollars ($50,000.00), the Contractor shall certify that he is licensed under R.S. 37: 2150-2173 and show his license number on the bid above his signature or his duly authorized representative.
5.2 Bid Security
5.2.1 No bid shall be considered or accepted
unless the bid is accompanied by bid security in an amount of five percent (5.0%) of the base bid and all alternates.
The bid security shall be in the form of a certified check or cashier's check drawn on a bank insured by the Federal Deposit Insurance Corporation, or a Bid Bond written by a surety company licensed to do business in Louisiana and signed by the surety's agent or attorney-in-fact. The Bid Bond shall be written on the Coastal Protection and Restoration Authority Bid Bond Form, and the surety for the bond must meet the qualifications stated thereon. The Bid Bond shall include the legal name of the bidder be in favor of the State of Louisiana, Coastal Protection and Restoration Authority, and shall be accompanied by appropriate power of attorney. The Bid Bond must be signed by both the bidder/principal and the surety in the space provided on the Coastal Protection and Restoration Authority Bid Bond Form. Failure by the bidder/principal or the surety to sign the bid bond shall result in the rejection of the bid.
Bid security furnished by the Contractor shall guarantee that the Contractor will, if awarded the work according to the terms of his proposal, enter into the Contract and furnish Performance and Payment Bonds as required by these Bid Documents, within fifteen (15) days after written notice that the instrument is ready for his signature.
Should the Bidder refuse to enter into such Contract or fail to furnish such bonds, the amount of the bid security shall be forfeited to the Owner as liquidated damages, not as penalty.
5.2.2 The Owner will have the right to retain the
bid security of Bidders until either (a) the Contract has been executed and bonds have been furnished, or (b) the specified time has elapsed so that bids may be withdrawn, or (c) all bids have been rejected.
5.3 Submission of Bids
5.3.1 The Bid shall be sealed in an opaque
envelope. The bid envelope shall be identified on the outside with the name of the project, and the name, address, and license number of the Bidder.
The envelope shall not contain multiple bid forms, and will be received until the time specified and at the place specified in the Advertisement for Bids.
It shall be the specific responsibility of the Bidder to deliver his sealed bid to the Coastal Protection and Restoration Authority at the appointed place and prior to the announced time for the opening of bids. Late delivery of a bid for any reason, including late delivery by United States Mail, or express delivery, shall disqualify the bid.
If the bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope
CPRA - IB -5
with the notation "Bid Enclosed" on the face thereof. Such bids shall be sent by Registered or Certified Mail, Return Receipt Requested, addressed to:
Coastal Protection and Restoration Authority P. 0. Box 44027 Baton Rouge, Louisiana, 70804-4027.
Bids sent by express delivery shall be delivered to:
Coastal Protection and Restoration Authority
150 Terrace Avenue Suite 100 Baton Rouge, Louisiana 70802
5.3.2 Bids shall be deposited at the designated
location prior to the time on the date for receipt of bids indicated in the Advertisement for Bids, or any extension thereof made by addendum. Bids received after the time and date for receipt of bids will be returned unopened.
5.3.3 Bidder shall assume full responsibility for
timely delivery at location designated for receipt of bids.
5.3.4 Oral, telephonic or telegraphic bids are
invalid and shall not receive consideration. Owner shall not consider notations written on outside of bid envelope which have the effect of amending the bid. Written modifications enclosed in the bid envelope, and signed or initialed by the Contractor or his representative, shall be accepted.
5.4 Modification or Withdrawal of Bid
5.4.1 A bid may not be modified, withdrawn or
canceled by the Bidder during the time stipulated in the Advertisement for Bids, for the period following the time and bid date designated for the receipt of bids, and Bidder so agrees in submitting his bid, except in accordance with R.S. 38:2214 which states, in part, "Bids containing patently obvious, unintentional, and substantial mechanical, clerical or mathematical errors, or errors of unintentional omission of a substantial quantity of work, labor, material, or services made directly in the compilation of the bid, may be withdrawn by the Contractor if clear and convincing sworn, written evidence of such errors is furnished to the public entity within forty eight hours of the Bid Opening excluding Saturdays, Sundays and legal holidays".
5.4.2 Prior to the time and date designated for
receipt of bids, bids submitted early may be modified or withdrawn only by notice to the party receiving bids at the place and prior to the time designated for receipt of bids.
5.4.3 Withdrawn bids may be resubmitted up to
the time designated for the receipt of bids provided that they are then fully in conformance with these Instructions to Bidders.
5.4.4 Bid Security shall be in an amount
sufficient for the bid as modified or resubmitted.
5.5 Prohibition of Discriminatory Boycotts of
Israel
By submitting its bid, the bidder certifies and agrees that the following information is correct:
In preparing its bid, the bidder has considered all proposals submitted from qualified, potential subcontractors and suppliers, and has not, in the solicitation, selection, or commercial treatment of any subcontractor or supplier, refused to transact or terminated business activities, or taken other actions intended to limit commercial relations, with a person or entity that is engaging in commercial transactions in Israel or Israel-controlled territories, with the specific intent to accomplish a boycott or divestment of Israel. The bidder has also not retaliated against any person or other entity for reporting such refusal, termination, or commercially limiting actions. The state reserves the right to reject any bids if this certification is subsequently determined to be false and to terminate any contract awarded based on such a false response.
ARTICLE 6
CONSIDERATION OF BIDS
6.1 Opening of Bids
6.1.1 The properly identified Bids received on
time will be opened publicly and will be read aloud, and a tabulation abstract of the amounts of the base bids and alternates, if any, will be made available to Bidders.
CPRA - IB -6
6.2 Rejection of Bids
6.2.1 The Owner shall have the right to reject any
or all bids and in particular to reject a bid not accompanied by any required bid security or data required by the Bid Documents or a bid in any way incomplete or irregular.
6.3 Acceptance of Bid
6.3.2 It is the intent of the Owner, if he accepts
any alternates, to accept them in the order in which they are listed in the Bid Form. Determination of the Low Bidder shall be on the basis of the sum of the base bid and the alternates accepted. However, the Owner shall reserve the right to accept alternates in any order which does not affect determination of the Low Bidder.
ARTICLE 7
POST-BID INFORMATION
7.1 Submissions
7.1.1 The Contractor shall submit a Work Plan
and Progress Schedule prior to the Pre- Construction Conference in conformance with applicable sections of the General and Special Provisions.
It is the preference of the Owner that, to the greatest extent possible or practical, the Contractor utilize Louisiana Subcontractors, manufacturers, suppliers and labor.
7.1.2 The General Contractor shall be
responsible for actions or inactions of Subcontractors and/or material suppliers.
The General Contractor is totally responsible for any lost time or extra expense incurred due to a Subcontractor's/or Material Supplier's failure to perform. Failure to perform includes, but is not limited to, a Subcontractor's financial failure, abandonment of the project, failure to make prompt delivery, or failure to do work up to standard.
Under no circumstances shall the Owner mitigate the General Contractor's losses or reimburse the General Contractor for losses caused by these events.
7.1.3 In accordance with La. R.S. 38:2227
[references La. R.S. 38:2212(A)(3)(c)(ii), which has since been renumbered as La. R.S.
38:2212(B)(3)], La. R.S. 38:2212.10 and La. R.S.
23:1726(B) the apparent low bidder on this project shall submit the completed Attestations Affidavit (Past Criminal Convictions of Bidders, Verification of Employees and Certification Regarding Unpaid Workers Compensation Insurance) form found within this bid package to the Coastal Protection and Restoration Authority contact person listed in the Advertisement For Bids within 10 days after the opening of bids.
ARTICLE 8
PERFORMANCE AND PAYMENT BOND
8.1 Bond Required
8.1.1 The Contractor shall furnish and pay for a
Performance and Payment Bond written by a company licensed to do business in Louisiana, which shall be signed by the surety's agent or attorney-in-fact, in an amount equal to 100% of the Contract amount. Surety must be listed currently on the U. S. Department of Treasury Financial Management Service List (Treasury List) as approved for an amount equal to or greater than the contract amount, or must be an insurance company domiciled in Louisiana or owned by Louisiana residents. If surety is qualified other than by listing on the Treasury list, the contract amount may not exceed fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance and may not exceed the amount of $500,000.
However, a Louisiana domiciled insurance company with at least an A- rating in the latest printing of the A. M. Best's Key Rating Guide shall not be subject to the $500,000 limitation, provided that the contract amount does not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide nor fifteen percent of policyholders' surplus as shown by surety's most recent financial statements filed with the Louisiana Department of Insurance. The Bond shall be signed by the surety's agent or attorney-in-fact. The Bond shall be in favor of the Coastal Protection and Restoration Authority.
CPRA - IB -7
8.2 Time of Delivery and Form of Bond
8.2.1 The Bidder shall deliver the required bond
to the Owner simultaneous with the execution of the Contract.
8.2.2 Bond shall be in the form furnished by the
Coastal Protection and Restoration Authority, entitled CONTRACT BETWEEN OWNER AND
CONTRACTOR AND PERFORMANCE AND
PAYMENT BOND, a copy of which is included in the Bid Documents.
8.2.3 The Bidder shall require the
Attorney-in-Fact who executes the required bond on behalf of the surety to affix thereto a certified and current copy of his power of Attorney.
ARTICLE 9
FORM OF AGREEMENT BETWEEN OWNER
AND CONTRACTOR
9.1 Form to be Used
9.1.1 Form of the Contract to be used shall be
furnished by the Coastal Protection and Restoration Authority, an example of which is bound in the Bid Documents.
9.2 Award
9.2.1 After award of the Contract, the successful
Bidder, if a corporation, shall furnish to the Owner the most current copy of a Disclosure of Ownership Affidavit on file with the Secretary of State.
9.2.2 In accordance with Louisiana Law, when
the Contract is awarded, the successful Bidder shall, at the time of the signing of the Contract, execute the Non-Collusion Affidavit included in the Contract Documents.
9.2.3 When this project is financed either
partially or entirely with State Bonds, the award of this Contract is contingent upon the sale of bonds by the State Bond Commission. The State shall incur no obligation to the Contractor until the Contract between Owner and Contractor is duly executed.
LOUISIANA UNIFORM PUBLIC WORKS BID FORM
TO: Coastal Protection and Restoration Authority
150 Terrace Avenue Suite 100 Baton Rouge, LA 70802
(Owner to provide name and address of owner)
BID FOR: GIWW Bank Restoration of Critical Areas - Segment 4 (TE-0043) 2026 Maintenance Event
Project (TE-0043) (Owner to provide name of project and other identifying information)
The undersigned bidder hereby declares and represents that she/he; a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: DELTA COAST CONSULTANTS, LLC. and dated: September 15, 2026.
(Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging) _____________________________________.
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid” * but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Additive Alternate No. 1 for the sum of:
N/A Dollars ($ )
Additive Alternate No. 2 for the sum of:
Additive Alternate No. 3 for the sum of:
NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA UNIFORM PUBLIC
WORK BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form.
The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA RS 38:2218(A) is attached to and made a part of this bid.
LOUISIANA UNIFORM PUBLIC WORKS BID FORM
UNIT PRICE FORM
TO: Coastal Protection and Restoration Authority 150 Terrace Avenue Suite 100 Baton Rouge, LA 70802
BID FOR: GIWW Bank Restoration of Critical Areas- Segment 4 (TE-0043) 2026 Maintenance Event
Project (TE-0043)
(Owner to provide name and address of owner) (Owner to provide name of project and other identifying information)
UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.
DESCRIPTION: Base Bid or Alt.# ___ Mobilization and Demobilization REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
1 1 LUMP SUM
DESCRIPTION: Base Bid or Alt.# ___ Surveys
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
2 1 LUMP SUM
DESCRIPTION: Base Bid or Alt.# ___ Pilings REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
3 49 EACH
DESCRIPTION: Base Bid or Alt.# ___ Timberwork
REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
4 10.50 MFBM
DESCRIPTION: Base Bid or Alt.# REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
Wording for “DESCRIPTION” is to be provided by Owner.
All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner
BID BOND
FOR
COASTAL PROTECTION AND RESTORATION AUTHORITY PROJECTS
Date:
KNOW ALL MEN BY THESE PRESENTS:
That of , as Principal, and , as Surety, are held and firmly bound unto the State of Louisiana, Coastal Protection and Restoration Authority (Obligee), in the full and just sum of five percent (5%) of the total amount of this proposal, including all alternates, lawful money of the United States, for payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally firmly by these presents.
Surety represents that it is listed on the current U. S. Department of the Treasury Financial Management Service list of approved bonding companies as approved for an amount equal to or greater that the amount for which it obligates itself in this instrument or that it is a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A. M. Best's Key Rating Guide. If surety qualifies by virtue of its Best's listing, the Bond amount may not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide.
Surety further represents that it is licensed to do business in the State of Louisiana and that this Bond is signed by surety's agent or attorney-in-fact. This Bid Bond is accompanied by appropriate power of attorney.
THE CONDITION OF THIS OBLIGATION IS SUCH that, whereas said Principal is herewith submitting its proposal to the Obligee on a Contract for:
NOW, THEREFORE, if the said Contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract with surety acceptable to the Obligee, then this obligation shall be void; otherwise this obligation shall become due and payable.
PRINCIPAL (BIDDER) SURETY
BY: BY:
AUTHORIZED OFFICER-OWNER-PARTNER AGENT OR ATTORNEY-IN-FACT (SEAL)
Name of Project Project No.
GIWW BANK RESTORATION OF CRITICAL AREAS - TE-0043 .
SEGMENT 4 (TE-0043) 2026 MAINTENANCE EVENT __________________________________
STATE OF LOUISIANA
PARISH OF TERREBONNE
ATTESTATIONS AFFIDAVIT
Before me, the undersigned notary public, duly commissioned and qualified in and for the parish and state aforesaid, personally came and appeared Affiant, who after being duly sworn, attested as follows:
LA. R.S. 38:2227 PAST CRIMINAL CONVICTIONS OF BIDDERS
A. No sole proprietor or individual partner, incorporator, director, manager, officer, organizer, or member who has a minimum of a ten percent (10%) ownership in the bidding entity named below has been convicted of, or has entered a plea of guilty or nolo contendere to any of the following state crimes or equivalent federal crimes:
(a) Public bribery (R.S. 14:118) (c) Extortion (R.S. 14:66)
(b) Corrupt influencing (R.S. 14:120) (d) Money laundering (R.S. 14:23)
B. Within the past five years from the project bid date, no sole proprietor or individual partner, incorporator, director, manager, officer, organizer, or member who has a minimum of a ten percent (10%) ownership in the bidding entity named below has been convicted of, or has entered a plea of guilty or nolo contendere to any of the following state crimes or equivalent federal crimes, during the solicitation or execution of a contract or bid awarded pursuant to the provisions of Chapter 10 of Title 38 of the Louisiana Revised Statutes:
(a) Theft (R.S. 14:67)
(b) Identity Theft (R.S. 14:67.16)
(c) False accounting (R.S. 14:70)
(d) Issuing worthless checks (R.S. 14:71)
(e) Bank fraud (R.S. 14:71.1)
(f) Forgery (R.S. 14:72)
(g) Contractors; misapplication of payments (R.S. 14:202)
(h) Malfeasance in office (R.S. 14:134)
LA. R.S. 38:2212.10 Verification of Employees
A. At the time of bidding, Appearer is registered and participates in a status verification system to verify that all new hires in the state of Louisiana are legal citizens of the United States or are legal aliens.
B. If awarded the contract, Appearer shall continue, during the term of the contract, to utilize a status verification system to verify the legal status of all new employees in the state of Louisiana.
C. If awarded the contract, Appearer shall require all subcontractors to submit to it a sworn affidavit verifying compliance with Paragraphs (A) and (B) of this Subsection.
Name of Project Project No.
GIWW BANK RESTORATION OF CRITICAL AREAS - TE-0043 .
SEGMENT 4 (TE-0043) 2026 MAINTENANCE EVENT ________________________
LA. R.S. 23:1726(B) Certification Regarding Unpaid Workers Compensation Insurance
A. R.S. 23:1726 prohibits any entity against whom an assessment under Part X of Chapter 11 of Title 23 of the
Louisiana Revised Statutes of 1950 (Alternative Collection Procedures & Assessments) is in effect, and whose right to appeal that assessment is exhausted, from submitting a bid or proposal for or obtaining any contract pursuant to Chapter 10 of Title 38 of the Louisiana Revised Statutes of 1950 and Chapters 16 and 17 of Title 39 of the Louisiana Revised Statutes of 1950.
B. By signing this bid /proposal, Affiant certifies that no such assessment is in effect against the bidding / proposing entity.
NAME OF BIDDER NAME OF AUTHORIZED SIGNATORY OF BIDDER
DATE TITLE OF AUTHORIZED SIGNATORY OF BIDDER
SIGNATURE OF AUTHORIZED
SIGNATORY OF BIDDER/AFFIANT
Sworn to and subscribed before me by Affiant on the _____ day of _____________, 20___.
Notary Public
FOR INFORMATION ONLY
This document will be prepared by the Coastal Protection and Restoration Authority in the form appropriate for the project.
CONTRACT BETWEEN OWNER AND CONTRACTOR
AND PERFORMANCE AND PAYMENT BOND
This agreement entered into this day of , 2026 by (CONTRACTOR NAME) hereinafter called the "Contractor", whose business address is_________ _____, and the State of Louisiana Coastal Protection and Restoration Authority, herein represented by its Executive Director executing this contract, and hereinafter called the "Owner".
Witnesseth that the Contractor and the Owner, in consideration of premises and the mutual covenants; consideration and agreement herein contained, agree as follows:
Statement of Work: The Contractor shall furnish all labor and materials and perform all of the work required to build, construct and complete in a thorough and workmanlike manner:
Project No. _____________ Project Name ______________________________________________________ in strict accordance with Contract Documents prepared by Owner.
It is recognized by the parties herein that said Contract Documents, including by way of example and not of limitation, the Plans, Specifications (including General Provisions, Special Provisions, and Technical Specifications), Any Addenda thereto, Instructions To Bidders, this Contract, Invitation To Bidders, Affidavit, Bid Form, Bonds (Bid, Performance, and Payment),any Submitted Post-Bid Documentation, Notice of Award, Notice to Proceed, Change Orders, and Claims, if any, impose duties and obligations upon the parties herein, and said parties thereby agree that they shall be bound by said duties and obligations. For these purposes, all of the provisions contained in the aforementioned Contract Documents are incorporated herein by reference with the same force and effect as though said Contract Documents were herein set out in full.
Time for Completion: The work shall be commenced on a date to be specified in a written order of the Owner and shall be completed within 60 consecutive calendar days from and after the said date.
Liquidated Damages: Contractor shall be assessed Liquidated Damages in the amount of $1,500.00 per day for each consecutive calendar day which work is not complete beginning with the first day beyond the completion time.
Compensation to be paid to the Contractor: The Owner will pay and the Contractor will accept in full consideration for the performance of the Contract the sum of ________________Dollars ($) which sum represents the Contract Price.
Performance and Payment Bond: To these presents personally came and intervened
, herein acting for , a corporation organized and existing under the laws of the State of , and duly authorized to transact business in the State of Louisiana, as surety, who declared that having taken cognizance of this Contract and of the Construction Documents mentioned herein, he hereby in his capacity as its Attorney in Fact obligates his said company, as Surety for the said Contractor, unto the said Owner, up to the sum of ___________Dollars ($). By issuance of this bond, the surety acknowledges they are in compliance with R.S. 38:2219.
The condition of this performance and payment bond shall be that should the Contractor herein not perform the Contract in accordance with the terms and conditions hereof, or should said Contractor not fully indemnify and save harmless the Owner, from all cost and damages which he may suffer by said Contractor's non-performance or should said Contractor not pay all persons who have and fulfill obligations to perform labor and/or furnish materials in the prosecution of the work provided for herein, including by way of example workmen, laborers, mechanics, and furnishers of materials, machinery, equipment and fixtures, then said Surety agrees and is bound to so perform the Contract and make said payment(s).
Provided, that any alterations which may be made in the terms of the Contract or in the work to be done under it, or the giving by the Owner of any extensions of time for the performance of the Contract, or any other forbearance on the part of either the Owner or the Contractor to the other shall not in any way release the Contractor or the Surety from their liability hereunder, notice to the Surety of any such alterations, extensions or other forbearance being hereby waived.
The Contractor agrees to abide by the requirements of the following as applicable: Title VI of the Civil Rights Act of 1964 and Title VII of the Civil Rights Act of 1964, as amended by the Equal Opportunity Act of 1972, Federal Executive Order 11246 as amended, the Federal Rehabilitation Act of 1973, as amended, the Vietnam Era Veteran's Readjustment Assistance Act of 1974, Title IX of the Education Amendments of 1972, the Age Discrimination Act of 1975, the Fair Housing Act of 1968 as amended, and Contractor agrees to abide by the requirements of the Americans with Disabilities Act of 1990.
Contractor agrees not to discriminate in its employment practices, and will render services under this Contract without regard to race, color, religion, sex, sexual orientation, national origin, veteran status, political affiliation, disability, or age in any matter relating to employment. Any act of discrimination committed by Contractor, or failure to comply with these statutory obligations when applicable shall be grounds for termination of this Contract.
In Witness whereof, the parties hereto on the day and year first above written have executed this agreement in seven (7) counterparts, each of which shall, without proof or accountancy for the other counterparts, be deemed an original thereof.
WITNESSES: COASTAL PROTECTION AND
RESTORATION AUTHORITY
______________________________ BY: _______________________________
Michael Hare, Executive Directive
______________________________ BY: _______________________________
SURETY: _____________________________
BY:
ATTORNEY IN FACT
ADDRESS
TELEPHONE NUMBER
PARISH OF _____________________
PROJECT NO. TE-0043
NAME: GIWW BANK RESTORATION OF CRITICAL AREAS –
SEGMENT 4 (TE-0043) 2026 MAINTENANCE EVENT
LOCATION: TERREBONNE PARISH
A F F I D A V I T
Before me, the undersigned authority, duly commissioned and qualified within and for the State and Parish aforesaid, personally came and appeared representing who, being by me first duly sworn deposed and said that he has read this affidavit and does hereby agree under oath to comply with all provisions herein as follows:
PART I.
Section 2224 of Part II of Chapter 10 of Title 38 of the Louisiana Revised Statutes, as amended.
(1) That affiant employed no person, corporation, firm, association, or other organization, either directly or indirectly, to secure the public contract under which he received payment, other than persons regularly employed by the affiant whose services in connection with the construction, alteration or demolition of the public building or project or in securing the public contract were in the regular course of their duties for affiant; and
(2) That no part of the Contract price received by affiant was paid or will be paid to any person, corporation, firm, association, or other organization for soliciting the Contract, other than the payment of their normal compensation to persons regularly employed by the affiant whose services in connection with the construction, alteration or demolition of the public building or project were in the regular course of their duties for affiant.
PART II.
Section 2190 of Part I of Chapter 10 of Title 38 of the Louisiana Revised Statutes, as amended.
That affiant, if an architect or engineer, or representative thereof, does not own a substantial financial interest, either directly or indirectly, in any corporation, firm, partnership, or other organization which supplies materials for the construction of a public work when the architect or engineer has performed architectural or engineering services, either directly or indirectly, in connection with the public work for which the materials are being supplied.
For the purposes of this Section, a "substantial financial interest" shall exclude any interest in stock being traded on the American Stock Exchange or the New York Stock Exchange.
That affiant, if subject to the provisions of this section, does hereby agree to be subject to the penalties involved for the violation of this section.
AFFIANT
SWORN TO AND SUBSCRIBED BEFORE ME THIS DAY OF , 2026.
NOTARY
PART I GENERAL PROVISIONS
GP-1 DEFINITION OF TERMS
Whenever used in the Bidding Requirements or Contract Documents and printed with initial capital letters, the terms listed below will have the meanings indicated which are applicable to the singular or plural thereof. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs and the titles of other documents or forms.
Unless stated otherwise in the Contract Documents, words or phrases which have a well-known technical or construction industry or trade meaning are used in the…