This is a Performance Work Statement (PWS) for crane services to relocate two Haas milling machines for the 172d Airlift Wing at Thompson Field in Jackson, Mississippi. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control necessary to complete the work, with performance required within 30 days of award. The specific requirements include relocating a Haas TM2 milling machine (approximately 120"x60"x96" and 4,000 lbs) from its current location in Building 102 to a location outside the building, and repositioning a Haas VF4 milling machine (approximately 120"x82"x94" and 14,000 lbs) from outside Building 102 to its final position inside the building. Services must be performed Monday through Friday, 0800-1700 hours, excluding recognized U.S. federal holidays and when the installation is closed due to emergencies or administrative closings.

The contractor is responsible for furnishing all property, materials, and equipment except workspace and utilities, which the Government will provide. The Government will evaluate contractor performance through visual inspection by the Contracting Officer (KO) or Contracting Officer Representative (COR) against an Acceptable Quality Level of 100 percent for proper machine placement in final positions. The contractor must comply with all federal, state, local, and 172d AW regulations, security requirements including background checks and personal identification verification, installation access procedures, and zero-tolerance policies regarding trafficking in persons. All contractor employees must possess required operating licenses and certifications, with copies provided to the KO or COR. The location of performance is 172d AW, 141 Military Drive, Jackson, MS 39232.

View the file

Other files

File Type Posted
CNC Move PreAnnouncement Sheet.xls XLS spreadsheet
MS WD 15-5153 rv29 3Dec25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milling Machine Move 1 11 March 2026

PERFORMANCE WORK STATEMENT (PWS)

FOR

Milling Machine Move

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Crane Services to move a Two (2) Haas Milling Machines for the 172d Airlift Wing, Thompson Field, Jackson, MS as defined in this PWS. The contractor shall comply with all federal, state, local, and 172nd AW laws and regulations related to performing this service.

1.2 Background: A Haas TM2 Milling Machine must be repositioned and relocated within the 172d AW Maintenance workshop. Additionally, a Haas VF4 Milling Machine must be repositioned within the workshop.

1.3 Period of Performance (PoP): The Period of Performance shall be within 30 days after receipt of award.

1.4 General Information:

1.4.1 Reserved

1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.3 Recognized Holidays: The following are recognized United States (US) holidays.

The contractor shall not perform services on these days:

1.4.3.1 New Year’s Day: January 1st

1.4.3.2 Martin Luther King, Jr.’s Birthday

1.4.3.3 President’s Day

1.4.3.4 Memorial Day

1.4.3.5 Independence Day: July 4th

1.4.3.6 Juneteenth; June 19th

1.4.3.7 Labor Day

1.4.3.8 Columbus Day

1.4.3.9 Veteran’s Day: November 11th

1.4.3.10 Thanksgiving Day

Milling Machine Move 2 11 March 2026

1.4.3.11 Christmas Day: December 25th

1.4.4 Place and Performance of Services: The contractor shall provide services between the hours of _0800-1700__ on Monday - Friday except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 172d AW, 141 Military Dr., Jackson, MS 39232. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.4.1 Reserved

1.4.4.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.4.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times, and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance. The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

Milling Machine Move 3 11 March 2026

1.4.5.1 Reserved

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a government representative).

1.4.5.3 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.4 – 1.4.5.13 Reserved

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.6.1 Reserved

1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating All Equipment used in the performance of this contract.

This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. A copy of the operator(s) certification/license(s) MUST be provided to the KO or COR. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified and qualified to provide services.)

1.4.8 – 1.4.10 Reserved

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period

Milling Machine Move 4 11 March 2026 of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at

FAR 22.17.

1.4.12 – 1.4.15 Reserved

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications.

This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.5 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

Milling Machine Move 5 11 March 2026

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEI Army Enterprise Infostructure AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive KO Contracting Officer NGB National Guard Bureau PII Personally Identifiable Information POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS.

Milling Machine Move 6 11 March 2026

3.2 Materials: None

3.3 Equipment: None

3.4 Services: None

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The contractor shall:

5.1 Reposition milling machines as necessary from present location to final position.

5.1.1 Haas TM2 Milling Machine

5.1.1.1 The TM2 must be removed from current location in Bldg. 102 to a location outside of the building. Approximate dimensions and weight of machine is 120”x60”x96” and 4,000 lbs.

5.2.1 Haas VF4 Milling Machine

5.2.1.1 The VF4 must be positioned from its current location outside Bldg. 102 to its final position inside the building. Approximate dimensions and weight of machine is 120”x82”x94” and 14,000 lbs.

6.0 Contract Manpower Reporting Application (CMRA): Service Contract Reporting in SAM is only required for certain contracts that are equal to or greater than $3M; DoD logistics management services, equipment related services, knowledge-based services, or electronics and communications services. Contracts or task orders below $3M do not require reporting. Contracts or task orders that do not fall within the DoD designated portfolios/PSC categories do not require reporting. A DFARS case will amend the threshold and portfolio groups via two new DFARS clauses.

Milling Machine Move 7 11 March 2026

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective

Performance Standard Acceptable Quality Levels (AQL)

Surveillance Method / By Whom

5.1 Relocate Machines

Placed in final positions as necessary

100% Visual inspection by COR or KO

File details come from the government source that posted it. Updated .