Task Assignment Summary

This is a Waste Tire Site Abatement Task Assignment Notification under DEP Contract No. SW 230, issued by the Florida Department of Environmental Protection (DEP) to Wheelabrator Ridge Energy Inc. The task assignment, designated as SW 230-9, was assigned on October 10, 2016, and concerns the abatement and removal of waste tires from the Westcoast Tire Recycling Waste Tire Site located in Lehigh Acres, Florida. The document establishes the contractual relationship between DEP (represented by Project Manager Michelle Mason Smith and Lauren O'Connor) and the contractor (represented by Jim Robertson, Plant Manager), with oversight from a DEP-assigned Site Supervisor from the South District Office.

The task involves the removal of approximately 1,500 tons of waste tires from the site, their transportation to Wheelabrator Ridge Energy's processing facility in Auburndale, Florida, and processing or disposal in compliance with applicable regulations and the Solid Waste Management Trust Fund requirements under Florida Statute Section 403.709(3)(c). The total task assignment amount is $165,000.00, consisting of a fee schedule amount of $165,000.00 with no fixed price component and a cost reimbursement amount of $165,000.00. The fee schedule itemizes costs at $600.00 per trailer for loading and transportation of 100 trailers and $70.00 per ton for processing of 1,500 tons. The period of performance runs from October 10, 2016, through June 30, 2017. The contractor must provide certified waste tire collector registration documentation, maintain current liability insurance ($1,000,000 per occurrence and $2,000,000 annual aggregate), and workers' compensation coverage. All work is contingent on DEP Site Supervisor presence, and a final report with invoicing and weight documentation is required upon completion.

View the file

Other files

File Type Posted
CN-370000-SW230-A3.pdf PDF
CN-370000-SW230-A6.pdf PDF
CN-370000-SW230-T6.pdf PDF
CN-370000-SW230-T7A1.pdf PDF
CN-370000-SW230-TA1.pdf PDF
CN-370000-SW230-TA3.pdf PDF
CN-370000-SW230-A4.pdf PDF
CN-370000-SW230-A5.pdf PDF
CN-370000-SW230-A7.pdf PDF
CN-370000-SW230-A8.pdf PDF
CN-370000-SW230-A9.pdf PDF
CN-370000-SW230-T10.pdf PDF
CN-370000-SW230-T11.pdf PDF
CN-370000-SW230-T13.pdf PDF
CN-370000-SW230-T14.pdf PDF
CN-370000-SW230-T14CO1.pdf PDF
CN-370000-SW230-T5.pdf PDF
CN-370000-SW230-T7.pdf PDF
CN-370000-BS028-TA1.pdf PDF
CN-370000-SW230-A1.pdf PDF
CN-370000-SW230-T12.pdf PDF
CN-370000-SW230-T15CO1.pdf PDF
CN-370000-SW230-T2.pdf PDF
CN-370000-SW230-A2.pdf PDF
CN-370000-SW230-T13CO1.pdf PDF
CN-370000-SW230-T15.pdf PDF
CN-370000-SW230-T4.pdf PDF
CN-370000-SW230-T8.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .