Contract Summary

This is a Waste Tire Site Abatement Task Assignment Notification (Task Assignment No. SW 230-2) issued by the Florida Department of Environmental Protection (FDEP) to Wheelabrator Ridge Energy, Inc. under DEP Contract No. SW 230. The task assignment, dated October 1, 2015, represents a state environmental remediation project located in Broward County, Florida, with project management oversight by FDEP Environmental Manager Michell Mason Smith and contractor project management by Chris Eckert of Wheelabrator Ridge Energy, Inc.

The contract requires Wheelabrator Ridge Energy, Inc. to provide site management and abatement services for the removal and processing of an estimated 100,000 waste tires from the Osborne Reef. Services include providing and staging trailers at Port Everglades (Berth 28F), transporting loaded trailers to Wheelabrator processing facilities, processing tires for electricity generation, and maintaining detailed weight tickets and transportation logs. The fixed-price task assignment amount is $50,000.00, covering an estimated 250 tons of tires across 25 trailer loads. The fee schedule itemizes transportation costs at $1,300.00 per trailer ($32,500.00 total) and processing costs at $70.00 per ton ($17,500.00 total). The period of performance runs from May 1, 2015 through December 31, 2016. All trailers must be removed from the port within 24 hours of loading, and tires must be weighed at certified scales with weight tickets required for invoicing purposes.

View the file

Other files

File Type Posted
CN-370000-SW230-A2.pdf PDF
CN-370000-SW230-T13CO1.pdf PDF
CN-370000-SW230-T15.pdf PDF
CN-370000-SW230-T4.pdf PDF
CN-370000-SW230-T8.pdf PDF
CN-370000-SW230-A4.pdf PDF
CN-370000-SW230-A5.pdf PDF
CN-370000-SW230-A7.pdf PDF
CN-370000-SW230-A8.pdf PDF
CN-370000-SW230-A9.pdf PDF
CN-370000-SW230-T10.pdf PDF
CN-370000-SW230-T11.pdf PDF
CN-370000-SW230-T13.pdf PDF
CN-370000-SW230-T14.pdf PDF
CN-370000-SW230-T14CO1.pdf PDF
CN-370000-SW230-T5.pdf PDF
CN-370000-SW230-T7.pdf PDF
CN-370000-BS028-TA1.pdf PDF
CN-370000-SW230-A1.pdf PDF
CN-370000-SW230-T12.pdf PDF
CN-370000-SW230-T15CO1.pdf PDF
CN-370000-SW230-TA9.pdf PDF
CN-370000-SW230-A3.pdf PDF
CN-370000-SW230-A6.pdf PDF
CN-370000-SW230-T6.pdf PDF
CN-370000-SW230-T7A1.pdf PDF
CN-370000-SW230-TA1.pdf PDF
CN-370000-SW230-TA3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASTE TIRE SITE ABATEMENT TASK ASSIGNMENT NOTIFICATION

CONTRACTOR: WHEELABRATOR RIDGE ENERGY, INC.

DEP CONTRACT NO. SW 230

Task Assignment No.: SW 230-2 Assigned By: Michell Mason Smith

Site Name: Osborne Reef Tire Processing

Location: Broward County

Date: October 1, 2015

DEP Contract Project Manager: Michell Mason Smith, Environmental Manager Address:· Florida Department Of Environmental Protection

2600 Blair Stone Road MS4565 Tallahassee's, Florida 32399-2400

Phone: (850} 245-8721

FAX: (850) 245-8811

DEP Task Project Manager: Michell Mason Smith, Environmental Manager Address: Florida Department Of Environmental Protection

2600 Blair Stone Road MS4565 Tallahassee's, Florida 32399-2400

Phone: (850) 245-8721

FAX: (850) 245-8811

Contractor's Project Manager: Chris Eckert Address: Wheelabrator Ridge Energy, Inc.

3131 K-Vitle Avenue Auburndale, Florida 33823

Phone: (863) 665-2255 ext. 111

FAX: (863) 665-0400

Task Description (use additional pages if necessary): Provide site management and abatement services as indicated in the "SCOPE OF SERVICES" (ATTACHMENT A), "ABATEMENT SPECIFICATIONS FOR THE OSBORNE REEF WASTE TIRE REMOVAL" (ATTACHMENT B}, "WHEELABRATOR RIDGE ENERGY, INC., REQUESTED RESPONSE AND COST ESTIMATE" (ATTACHMENT C), and "FEE SCHEDULE" (ATTACHMENT 0).

Special Reports or Instructions: A weight tickets are required with the invoice.

Period of Performance:

Task Assignment Amount:

Fee Schedule Amount:

May 1, 2015 through December 31, 2016

$ 50,000.00 Fixed Price Amount:

$ 50,000.00

Date:

Date:

$ N/A

)D/1/15 f �

Jo/1 J 15

DEP Contract No. SW 230, Task Assignment 2 Task Assignment Notification

Page 1 of2

List of Attachments to be provided by the FDEP:

_X_ (ATTACHMENT A) Scope of Services

"SCOPE OF SERVICES OSBORNE REEF TIRE REMOVAL PROGRAM"

X (ATTACHMENT B) Specifications

"ABATEMENT SPECIFICATIONS FOR THE OSBORNE REEF WASTE TIRE REMOVAL"

_X_ (ATTACHMENT C) Wheelabrator Ridge Energy, Inc. Response to Quotation

"REQUESTED RESPONSE AND COST ESTIMATE"

X (ATTACHMENT D) Fee Schedule cc:

"FEE SCHEDULE FOR TASK ASSIGNMENT SW 230-2"

Contracting Michell Mason Smith, Environmental Manager Bureau of Finance and Accounting

MS#93

MS# 4565

MS#75

DEP Contract No. SW 230, Task Assignment 2

Task Assignment Notification

ATTACHMENT A

WHEELABRATOR RIDGE ENERGY, INC.

TASK ASSIGNMENT SW 230-2

SCOPE OF SERVICES

OSBORNE REEF TIRE REMOVAL PROGRAM

The present scope of services is to abate waste tires from the Osborne Reef. The goal of the abatement is to protect the Osborne Reef, ultimately by removing those tires that are currently endangering the Reef, and also to prevent further endangerment to the living Reef and its surrounding habitat. The following outline of services will implement the abatement plan.

I. ABATEMENT AND SITE INFORMATION

A. Tire Processing and Transport

1. Provide, stage, and transport an open top, trailers for loading the tires removed from the ocean floor at Port Everglades, at all times. Three (2) trailers will be staged at the designated area located at Port Everglades Birth 28F, Fort Lauderdale, Florida. Two trailers are to be staged on-location at time of staged trailer pick up. When one trailer is filled with tires, Industrial Divers will notify Wheelabrator for pick up. Trailers must be removed from the Port the following day.

2. Each trailer must be weighed at the Port before leaving the site. The trailers will need to be weighed again on certified scales when they arrive at Ridge Generating Station, Wheelabrator North Broward, or Wheelabrator South Broward. The lower of the two net weights will provide the basis for invoicing.

3. Weigh tickets must be attached to each invoice. Invoices will be itemized according to the “Fee Schedule” as shown in Attachment C. All trucks hauling the full trailers need to be be logged by time, date, and truck identification number by Wheelabrator.

4. All trailers will be hauled to Ridge Generating Station, Wheelabrator North Broward, or Wheelabrator South Broward, and will be processed according to the contractor’s response. All tires will be processed at a Wheelabrator facility for the generation of electricity, as proposed by the contractor.

If the tires cannot be processed for any reason, they must go to an alternate, pre-approved processing facility. Any alternate processing facility or end user must be approved by DEP.

5. All trucks removing tire-filled trailers from Sails Marina by Wheelabrator Ridge Energy, Inc., or its subcontractors, must be registered with the Department as a Waste Tire Collector, if transporting on public roads. Proof of Waste Tire Collector Registration must be provided by a fixed decal on the truck or with driver’s paperwork, as well as proper documentation.

DEP Contract No. SW 230, Task Assignment 2 Attachment A, Scope of Services

ATTACHMENT B

ABATEMENT SPECIFICATIONS FOR THE OSBORNE REEF WASTE TIRE REMOVAL

PLANNED PROJECT – May 2015 – December 2016

Project Parameters

Tire Quantity – An estimated 100,000 tires will be retrieved from 60 – 70 feet of water in the Osborn Reef area and brought to shore at Port Everglades, Florida. This estimate is based on projected diver productivity and may vary with actual experience.

Tire Characteristics

Size – Predominantly passenger/light truck tires, occasional medium truck and a few OTR tires

Contamination – About 80% of the tires are located along the reef in a long narrow accumulation 3-6 tires deep and appear to have limited sea growth, but will contain sea water and sand. Initial removal efforts will focus on these tires because they pose the greatest danger to the reef. Tires located in the outer areas will have more organic matter, sand and barnacles (significant coral growth will have been removed before retrieval), and some of these tires will be removed during the trial to enhance overall project assessment. Tires with organic growth or other aquatic life may cause an adverse reaction upon human contact (for example, stinging sensation), so contractor personnel should exercise caution and avoid unprotected skin contact with retrieved tires.

Current Retrieval Plan

Methodology – (1) Divers will link tires by cable or cargo nets under water; (2) Tires will be raised onto an vessel by a crane and dumped directly into cargo net lined holding area within the vessel deck; (3) The vessel will then proceed to Port Everglades, where the contractor or its designated agent is responsible for loading the tires into the empty trailers in the staging area. The loaded trailers must be transported off the site by the contractor expediently.

Retrieval Rate – Initial estimates range from 300 to 400 per day depending on diving resources, efficiency and weather conditions. Weekly retrieval is expected to be 1,500 to 1,600 tires, weather permitting.

Contractor Responsibility

Objective – All tires retrieved during the project must be promptly removed from site by the contractor and then processed and properly disposed of in accordance with the contract unless otherwise mutually agreed to by all parties due to extenuating conditions.

Incorporation of Contractor Response

Methodology – The Contractor has agreed upon methodology of planned trailer provision, retrieval, whole tire transport destinations, processing capabilities (capacity and products) and planned product markets or disposal locations. The Contractor stated that contamination with minimal sand or organic matter would not impact its planned methods. Maximum costs associated with “normal” processing/ disposal method were provided. Contractor must continue to remove, replace and transport trailers to the designated site, unless otherwise agreed by DEP in writing.

Transportation – The Contractor has agreed to provide, stage and transport up to 2 trailers/week from the staging are to the processing/disposal site, assuming that the vessel loads daily with a loaded trailer each week at the staging area at Port Everglades. Loaded trailers must be transported and empty trailers must

DEP Contract No. SW 230, Task Assignment 2, Attachment B, Page 1 of 2

Attachment B, Page 2 of 2 be staged. Loaded trailers must be removed from staging area within 24 hours to minimize any odor impact near the dock areas that also serve passenger ships.

Processing and Products – The Contract describes the processing location, capability, and the basis for identified costs. The Contractor must conform to the response unless otherwise agreed by DEP in writing

Additional Information

Transport - All tires and other wastes will be transported directly to DEP-approved sites (unless otherwise accepted by DEP in writing) in appropriate vehicles in full compliance with all applicable Federal, State and local regulations. The contractor must immediately notify DEP if any tires/wastes are rejected at the approved destination. Rejected tires/wastes may be transported to an approved reprocessing facility and then be returned to the initial destination at the contractor's option and expense. In this case, the contractor must document rejected quantities, reprocessed product and waste quantities, and the ultimate disposal site for any waste quantities.

Weighing - All tires and other wastes will be weighed as they are transported to DEP-approved sites outside of Port Everglades. All loads will also be weighed will provide the basis for invoicing. DEP will designate a scale at a mutually agreeable location. Weight slips will be obtained and submitted as part of the contractor's invoice.

Movement Logistics - If tires are moved to an interim staging area, the resulting storage must be in full compliance with all applicable regulations.

ATTACHMENT C

“WHEELABRATOR RIDGE ENERGY, INC

AND QUOTE FOR THE TRANSPORTATION AND PROCESSING

OSBORNE REEF WASTE TIRE ABATMENT PROCESSING

TASK ASSIGNMENT SW230-2

BROWARD COUNTY, FLORIDA

DEP Contract No. SW 230, Task Assignment 2 Attachment D, Response to Quotation

DEP Contract No. SW 230, Task Assignment 2

DEP Contract No. SW 230, Task Assignment 2

Attachment D, Budget

ATTACHMENT D

WHEELABRATOR RIDGE ENERGY, INC.

TASK ASSIGNMENT SW 230-2

FEE SCHEDULE

OSBORNE REEF WASTE TIRE ABATMENT PROCESSING

No, of Item Description Units Units Unit Cost Total Cost

1. Transportation of tires 25 trailer $ 1300.00 $ 32,500.00

2. Processing of tires 250 tons $ 70.00 $ 17,500.00

ESTIMATED BUDGET ASSUMING 250 TONS: $ 50,000.00

TOTAL $ 50,000.00