CN-370000-SW230-T14.pdf
PDF 239 KB Posted
- Contract number
- SW230
- Issued by
- Florida
About this file
Document Summary
This is a Waste Tire Site Abatement Task Assignment Notification (Task Assignment SW 230-14) issued by the Florida Department of Environmental Protection (DEP) under DEP Contract No. SW 230 with Wheelabrator Ridge Energy, Inc. The document establishes a task assignment for the Osborne Reef Tire Removal Program located in Broward County, Florida. Key personnel include Michell Mason Smith as the DEP Contract and Task Project Manager, and Jim Robertson as the Contractor's Project Manager for Wheelabrator Ridge Energy, Inc.
The contract covers site management and abatement services for removing an estimated 140,000 waste tires from 60–70 feet of water at the Osborne Reef. Services include tire retrieval, transportation, processing, and proper disposal conducted from December 1, 2015, through December 31, 2018. The contractor will transport tires using trailers to designated processing facilities and ensure all materials are weighed and documented for invoicing purposes. The fee schedule establishes a total task assignment amount of $106,000.00, consisting of $68,900.00 for transportation of 53 trailer loads at $1,300.00 per trailer and $37,100.00 for processing 530 tons of tires at $70.00 per ton. The cost reimbursement amount is $106,000.00 with no additional fixed price amount. Weight tickets are required with all invoices, and all trucks removing tire-filled trailers must be registered as Waste Tire Collectors with the Department when transporting on public roads.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11/16/2017
Item
1.
2.
ATTACHMENT D
WHEELABRATOR RIDGE ENERGY, INC.
TASK ASSIGNMENT SW 230-14
FEE SCHEDULE
OSBORNE REEF WASTE TIRE ABATMENT PROCESSING
No,of Description Units Units Unit Cost
Transportation of tires 53 trailer $1300.00 Processing of tires 530 tons $ 70.00
ESTIMATED BUDGET ASSUMING 530 TONS:
TOTAL
DEP Contract No. SW 230, Task Assignment 14, Attachment D, Budget
Total Cost
$ 68,900.00
$ 37,100.00
$ 106,000.00
$ 106,000.00