This is a Task Assignment (TA) document issued under Contract Number HW689 between the State of Florida Department of Environmental Protection (FDEP) and Aptim Environmental & Infrastructure, LLC. The task assignment authorizes work at the Citrus County Fire Training College site located at 1300 South Lecanto Highway, Lecanto, Florida 34461, identified as project ERIC_7394. The parties to the contract are the FDEP, represented by Department Project Manager Allison Hankins, and Aptim, represented by Contractor's Project Manager Eric Kramer, a Senior Environmental Engineer.
Under this Task Assignment PA380, Aptim is authorized to produce an Initial Notice of Contamination (INOC) report on groundwater impacts at the site, including the preparation of Property Identification Maps, revised Impacted Groundwater Figures, completion of the Noticing Table, and completion of Initial Notice Forms. The deliverable is due July 31, 2025, with a task completion date of September 25, 2025. The contract is structured as a fixed unit rate arrangement with a total task value of $1,947.89, comprising direct labor costs of $747.43, overhead of $639.65, general and administrative costs of $144.85, and fringe benefits of $238.88, plus a completion fee of $177.08. Payment is contingent upon submittal and FDEP approval of the INOC package. The scope was revised to focus exclusively on groundwater data, excluding soil analysis, as soil contamination was not a concern at the site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN825-T14.pdf | ||
| CN-370000-CN825-T18.pdf | ||
| CN-370000-CN825-T2.pdf | ||
| CN-370000-CN825-T20.pdf | ||
| CN-370000-CN825-T22.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN825-T6.pdf | ||
| CN-370000-CN825-CMC1.pdf | ||
| CN-370000-CN825-T15.pdf | ||
| CN-370000-CN825-T21.pdf | ||
| CN-370000-CN825-T3.pdf | ||
| CN-370000-CN825-T3CO1.pdf | ||
| CN-370000-CN825-T4.pdf | ||
| CN-370000-CN825-T7.pdf | ||
| CN-370000-CN825-T7CO1.pdf | ||
| CN-370000-CN825-T1.pdf | ||
| CN-370000-CN825-T11.pdf | ||
| CN-370000-CN825-T16.pdf | ||
| CN-370000-CN825-T24.pdf | ||
| CN-370000-CN825.pdf | ||
| CN-370000-CN825-T10.pdf | ||
| CN-370000-CN825-T10CO1.pdf | ||
| CN-370000-CN825-T12.pdf | ||
| CN-370000-CN825-T13.pdf | ||
| CN-370000-CN825-T17.pdf | ||
| CN-370000-CN825-T22.pdf | ||
| CN-370000-CN825-T23.pdf | ||
| CN-370000-CN825-T26.pdf | ||
| CN-370000-CN825-T5.pdf | ||
| CN-370000-CN825-T8.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW689
PA380 Completion September 25, 2025
This Task Assignment authorizes Aptim to produce an Initial Notice of Contamination INOC) report on impacts at Citrus County Fire Training College, ERIC_7394, as detailed in the June 26, 2025, revised proposal for an INOC. Aptim will provide an INOC package as the deliverable.
Allison Hankins 850-245-8922 Contractor Aptim Contractor
Contractor Eric Kramer Contractor 407-287-3216
ERIC_7394
1300 S Lecanto Hwy, Lecanto, FL 34461
Citrus County Fire Training College - Initial Notice of Contamination June 2025
Contractor Contractor
$ 0.00 ✔ $ 1,947.89
$ 0.00
$ 1,947.89
Scope of Work
Aptim Contractor Eric Kramer
Senior Environmental Engineer
Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2025.06.27 13:12:38 -04'00'
John Travis
John Travis Digitally signed by John Travis Date: 2025.06.27 09:38:40 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Initial Notice of Contamination (INOC) Report and Project Management (Subtasks 1 & 2) 07/31/2025
Submittal and FDEP Approval of Initial Notice of Contamination (INOC) package and Project Management (Subtasks 1 & 2) $ 1,947.89
$ 1,947.89
HW689
PA380
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Alexiss A.. Lambert Secretary
Memorandum
TO: Site # ERIC_7394 Citrus County Fire Training College Site File
FROM: Allison Hankins, Project Manager
SUBJECT: Negotiation Summary
HW689 PA380
DATE: June 26, 2025
This Task Assignment authorizes Aptim to produce an Initial Notice of Contamination (INOC) report on impacts at Citrus County Fire Training College, ERIC_7394, as detailed in the June 26, 2025, revised proposal for an INOC. Aptim will provide an INOC package as the deliverable.
The proposal was revised to only include groundwater data, as soil is not a concern at this time.
Total task amount is $1,947.89. Aptim’s time and labor costs for this activity have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. The final deliverable is due July 31, 2025. The task completion date is September 25, 2025.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
A pt im E nv iro nm en ta l &
In fra st ru ct ur e, L
LC
D at e:
6/
/2
Ta sk
H W
P A
S ub
Ta sk
P ro je ct M an ag em en t S ub Ta sk
S ite
C itr us
C ou nt y
Fi re
T ra in in g C en te r E
R
IC
_7
S ub Ta sk
2- C
C
FT
C N ot ic in g
P re pa ra tio n
S ub
Ta sk
A ct iv ity
/P ha se
S ite
A ss es sm en t
S ub
Ta sk
S ub Ta sk
P ro je ct
M an ag er
R ob er t C ile k (F
D E
P )/E ric K ra m er (A
P
TI
M
S ub
Ta sk
S ub Ta sk
S ub
Ta sk
S ub Ta sk
TT
ot al s
La bo r R at e
C at eg or y $7
3.
P P ro je ct
M an ag er
E
. K ra m er
1.
$7
3.
En gi ne er
/S ci en tis t 5 E
. K ra m er
$6 8.
En gi ne er /S ci en tis t 5
G . R ob er ts
$3
5.
D es ig ne r 2 S
. F er ia nc
$0 .0
T ot al
H ou rs
D ire ct L ab or
$7
.4
$8
5.
$6
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
O ve rh ea d
.5 8%
$6
.6
$7 3.
$5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
G en
A dm in
.3 8%
$1
.8
$1 6.
$1
.1
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fr in ge
.9
6% $2
.8
$2
7.
$2
.4
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al L ab or
$1
,7
.8
$2
.7
$1 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
T ra ve l
V eh ic le
R en ta l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
M ile ag e
C os ts $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
A ir Fa re $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P er d ie m
H ot el
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l T ra ve l
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t)
D ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
H an dl in g
Fe e
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
La bo ra to ry
A na ly tic al C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or at or y $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
Fi el d
E xp en se s
P er so na l P ro te ct io n
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E xp en da bl es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t (
ID
W re la te
d) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E qu ip m en t ( O th er
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l F ie ld
E xp en se s $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $1
,7
.8
$2
.7
$1 ,5
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C om pl et io n Fe e $1
.0
$2
0.
$1
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
T ot al E st im at ed
C os t $1
,9
.8
$2
.0
$1 ,7
.8
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
RE
V:
2/
CE
F
SH
AW
Pa ge
LEVEL OF EFFORT / EXPENSE WORKSHEET
SITE :
SUBTASK:
DATE: June 26, 2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Engineer/Scientist 5 E. Kramer 1
Engineer/Scientist 5 G. Roberts
Designer 2 S. Ferianc 3
TOTAL LABOR: 11
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST TOTALS
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC TOTALS
EPA Method 8260 (VOHs) GW $73.00 0 0 $0.00 EPA Method 8260 (Full List) Well $150.00 0 0 $0.00 Sample Shipping (Small cooler) $110.00 0 $0.00 Sample Shipping (large cooler) $150.00 0 $0.00
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 Day 0 $0.00 Shallow GW Sampling Kit $290.00 Day 0 $0.00 55 Gallon Drums $100.00 each 0 $0.00
TOTAL EQUIPMENT $0.00
Preparation of Noticing Maps, Upload Appraiser Data to Base Map (3 hrs)
Citrus County Fire Training Center
Compile Noticing Package and Submittal (1 hr)
Preparation of Noticing Documents for Offsite Contamination: Research and Compile Information for Surrounding Properties, Preparation and Review of Noticing Maps and Table (4 hrs), Preparation of Initial Notice of Contamination Forms (2 hrs), Revisions to initial Package based on Review (1 hr).
2-CCFTC Noticing Preparation
2-CCFTC Noticing Page 3 of 3 HW689 PA### est (Citrus County)_
Proposed Scope of Work Citrus County Fire Training Center 1300 South Lecanto Highway Lecanto, Citrus County, Florida 34461 Contamination Noticing Proposal Task Assignment PA380
ERIC_7394
APTIM Environmental & Infrastructure, LLC 6/26/25
Aptim Environmental and Infrastructure, LLC (APTIM) has prepared the attached cost estimate as requested by the FDEP to provide contamination noticing tables, figures and forms to complete a CCFTC Noticing Package for the site. This proposal is divided by subtask, covering the proposed work scope to be completed.
Subtask - 1: Project Management This task includes project management activities associated with the completion of the following Subtasks, as calculated in accordance with Contract HW689.
Subtask - 2: Noticing Documents Preparation A Noticing Package will be prepared based on the most recent analytical results for groundwater to include the preparation of Property Identification Maps, Revision of Impacted Groundwater Figures (as appropriate), completion of the Noticing Table, and completion of the Initial Notice Forms.
Upon approval of the Task Assignment by the FDEP, the noticing documents will be initiated with the first draft submitted by June 27, 2025, or within three weeks of approval. A Task Completion date should be set for July 31, 2025, to allow for review and approval of the Notification Package.
APTIM proposes to perform this scope of work in accordance with the terms and conditions of the Contract between the Florida Department of Environmental Protection and APTIM dated December 21, 2021 (DEP Contract No. HW689). APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.
If you have any questions, please contact us for clarification.
From: Kramer, Eric To: Hankins, Allison M Cc: Roberts, Gregg; Cilek, Robert; Travis, John Subject: RE: Proposal for Offsite Noticing for Impacts to Citrus County FTC Date: Thursday, June 26, 2025 11:41:29 AM Attachments: HW689 PA### est (Citrus County).xlsx
HW689 PA### Scope of Work (CCFTC) revised.doc
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Please see revised proposal, thank you
ERIC K. KRAMER, P.E.
Senior Environmental Engineer
APTIM I Environmental & Energy Solutions
O 407 287 3216 M 352 235 1789 E eric.kramer@APTIM.com
From: Hankins, Allison M <Allison.M.Hankins@FloridaDEP.gov> Sent: Thursday, June 26, 2025 11:26 AM To: Kramer, Eric <Eric.Kramer@aptim.com> Cc: Roberts, Gregg <Gregg.Roberts@aptim.com>; Cilek, Robert <Robert.Cilek@FloridaDEP.gov>;
Travis, John <John.Travis@FloridaDEP.gov> Subject: RE: Proposal for Offsite Noticing for Impacts to Citrus County FTC
EXTERNAL SENDER
We have a few suggestions on the proposal:
We are primarily interested in groundwater and not soil No need to list soil exceedances in the proposal No need to present soil concentrations on the figure
I’ve attached a recent proposal for one of our other sites as an example.
Thanks, Allison Hankins Environmental Specialist II Site Investigation Section Waste Cleanup Program Division of Waste Management
Phone: 850-245-8922
From: Kramer, Eric <Eric.Kramer@aptim.com> Sent: Thursday, June 26, 2025 11:14 AM To: Hankins, Allison M <Allison.M.Hankins@FloridaDEP.gov> Cc: Roberts, Gregg <Gregg.Roberts@aptim.com> Subject: FW: Proposal for Offsite Noticing for Impacts to Citrus County FTC
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Looks like we sent this to Bob a while ago so let us if this works for you, thanks.
ERIC K. KRAMER, P.E.
Senior Environmental Engineer
APTIM I Environmental & Energy Solutions
O 407 287 3216 M 352 235 1789 E eric.kramer@APTIM.com
From: Kramer, Eric Sent: Friday, May 9, 2025 3:38 PM To: Cilek, Robert <robert.cilek@floridadep.gov> Cc: Roberts, Gregg <Gregg.Roberts@aptim.com> Subject: Proposal for Offsite Noticing for Impacts to Citrus County FTC
Good afternoon, please find attached the proposal for offsite noticing. Let us know if you have any questions, thank you.
ERIC K. KRAMER, P.E.
Senior Project Engineer
APTIM I Environmental & Energy Solutions
O 407 287 3216 M 352 235 1789 E eric.kramer@APTIM.com