Task Assignment Change Order Form Summary
This is a Task Assignment Change Order Form (DRP-085) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for Contract No. 825. The change order applies to Task Assignment No. 3 at Perdido Key State Park and authorizes Change Order No. 1. The consultant performing the work is JGP Structural Group, Inc., represented by Jeffrey G. Parzych. The FDEP Contract Manager is Laurinda Micheels. The project involves Hurricane Sally Building & Structure Repairs at Perdido Key State Park.
The change order authorizes additional design and construction administration services totaling $5,615.00 in fixed fees to address extensive termite damage discovered during demolition. Subtask 1A includes modifications to final drawings for the west building area to provide repair details for termite-damaged load-bearing walls, estimated at $3,110.00 and requiring 10 calendar days for completion. Subtask 2A encompasses construction administration services valued at $2,505.00, consisting of three components: contractor RFI responses ($445.00), shop drawing reviews ($350.00), and one site visit with field observation report ($1,710.00). The wage rates utilized are those stipulated in previous contract CN217. No reimbursable costs are included in this change order. The task end date remains 06/30/2026 with no time extension, and funding is sourced through FLAIR code 6S103C FD084. Payment will be made upon FDEP approval of deliverables for each subtask.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CN-370000-CN825-T14.pdf | ||
| CN-370000-CN825-T18.pdf | ||
| CN-370000-CN825-T2.pdf | ||
| CN-370000-CN825-T20.pdf | ||
| CN-370000-CN825-T22.pdf.crdownload | CRDOWNLOAD file | |
| CN-370000-CN825-T6.pdf | ||
| CN-370000-HW689-PA380.pdf | ||
| CN-370000-CN825-T1.pdf | ||
| CN-370000-CN825-T11.pdf | ||
| CN-370000-CN825-T16.pdf | ||
| CN-370000-CN825-T24.pdf | ||
| CN-370000-CN825.pdf | ||
| CN-370000-CN825-CMC1.pdf | ||
| CN-370000-CN825-T15.pdf | ||
| CN-370000-CN825-T21.pdf | ||
| CN-370000-CN825-T3.pdf | ||
| CN-370000-CN825-T4.pdf | ||
| CN-370000-CN825-T7.pdf | ||
| CN-370000-CN825-T7CO1.pdf | ||
| CN-370000-CN825-T10.pdf | ||
| CN-370000-CN825-T10CO1.pdf | ||
| CN-370000-CN825-T12.pdf | ||
| CN-370000-CN825-T13.pdf | ||
| CN-370000-CN825-T17.pdf | ||
| CN-370000-CN825-T22.pdf | ||
| CN-370000-CN825-T23.pdf | ||
| CN-370000-CN825-T26.pdf | ||
| CN-370000-CN825-T5.pdf | ||
| CN-370000-CN825-T8.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Recreation and Parks
Task Assignment Change Order Form
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
DRP-085
Rev. /2025 1 of 2
FDEP Contract No: Project Number:
Task Assignment No: Change Order No:
Project Location Project
Consultant’s Name:
Consultant’s Representative:
Phone: Email:
FDEP Contract Manager:
Phone: Email:
Description of Change:
Change in Task Amount
Item Reimbursement Fixed Fee Total Original Task Amount Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders
825 6S103C
3 1
Perdido Key State Park Hurricane Sally Building & Structure Repairs
JGP Structural Group, Inc.
Jeffrey Parzych
(850) 574-2888 contact@jgpstructural.com
Laurinda Micheels
(850) 245-2781 laurinda.micheels@floridadep.gov
Additional design and construction administration services to address the extensive termite damage discovered during demolition, per proposal dated 1/29/26. Subtasks utilizing rates per CN217 are indicated with an asterisk (*) in the subtask heading.
$ 100.00 $ 19,795.00
$ 100.00 $ 19,795.00
$ 0.00 $ 5,615.00
$ 100.00 $ 25,410.00
$ 19,895.00
$ 19,895.00
$ 5,615.00
$ 25,510.00
FFLORIDAA DEPARTMENTT OF Divisionn off Recreationn andd Parks ENVIRONMENTALL PROTECTIONN Task Assignment Change Order Form
Change in Task Time
Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date
Funding Information
29 Digit FLAIR Code:
Project # Grant # Org Code Cat/Year Fund Module Object Code
EO Amount
Total
Approval Signatures
Budget Representative, FDEP
Project Manager, FDEP
Contract Authority, FDEP
Signature
Signature
Signature
Signature
Signature
Date
Date
Date
Date
Date
DRP-085
Rev. 2 of 2 d nta atu
04/04/2025 06/30/2026 06/30/2026 06/30/2026
6S103C FD084 37501000135 080039/25 408001 U3200 131500 PF $ 5,615.00
$ 5,615.00
Tamika Bass
Kenny Franklin
Jeffrey G. Parzych
Laurinda Micheels
David Matson
Tamika Bass Digitally signed by Tamika Bass Date: 2026.02.12 09:41:29 -05'00'
Kenny Franklin Digitally signed by Kenny Franklin Date: 2026.02.12 09:02:06 -06'00'
Jeffrey Parzych Digitally signed by Jeffrey Parzych Date: 2026.02.19 11:02:16 -05'00'
Laurinda Micheels
Digitally signed by Laurinda Micheels Date: 2026.02.19 16:36:19 -05'00'
David Matson Digitally signed by David Matson Date: 2026.02.20 09:28:55 -05'00'
JGP STRUCTURAL GROUP, INC.
January 29, 2026
Mr. Kenny Franklin, Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard 260K, MS 520 Tallahassee, FL 32399
RE: CN825, TA 3, Change Order 1 Perdido Key State Park – Hurricane Sally Building & Structure Repairs
For your review, JGP Structural Group, Inc., has provided a proposal summary and man-hour documentation for the services tasks identified below:
The wage rates utilized for this project and noted in the following pages are the wage rates stipulated in our previous contract CN217.
Please review the attached Proposal Summary and deliverables.
Sincerely, JGP Structural Group, Inc.
Jeffrey G. Parzych, PE President
1221 W. Tharpe Street, Tallahassee, Florida 32303 email:contact@jgpstructural.com Phone: 850-574-2888
JGP Structural Group, Inc.
Hurricane Sally Building & Structure Repairs Perdido Key State Park
CN825, TA #3, Change Order #1
Subtask 1A: Final Drawings (Modify Drawings-Additional Repairs)*
Description:
1A - JGP shall modify the final drawings for the building at the west area to provide additional repair details that address damage to load bearing walls caused by termites. The work will consist of repairing the exterior stud walls at each elevation of the building. It is anticipated that new studs, wall plates, exterior wall sheathing and tie down strapping will be necessary.
Deliverable: Modifications to the current design documents will be provided to address the noted conditions. Signed and sealed documents indicating the new repairs will be provided in pdf format for permitting. It is anticipated that the modified drawings can be issued within 10 days after receipt of the executed TA CO.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
1A* Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost JGP Structural Group, Inc. Principal Engineer $160.00 5 $800.00 Project Engineer $95.00 12 $1,140.00 CADD Designer/Tech $60.00 18 $1,080.00 Clerical $45.00 2 $90.00 Total for Subtask 1A: $3,110.00
Subtask 2A: Construction Administration Services (Added CA work)*
Description: JGP will provide limited construction administration for the additional work associated with the noted damage described in subtask 1. This work will include the following:
Review of the contractor’s sumbittals for the additional of work.
Responding to contractor’s RFIs for the noted portions of work.
JGP will perform one (1) additional trip to review conditions during construction regarding the noted portions of work. JGP will develop a field observation report for this task based on information collected during the site visit.
JGP will not be responsible for additional time and expenses that could be incurred due to contractor errors, delays, mistakes, etc. that would extend the project completion date. Additional time required by JGP to address any re-engineering, additional correspondence and re-inspection of any work will be submitted as an additional service to the project. These fees will be billed at our standard hourly rates.
Deliverable: Construction Administration services include the following deliverable items:
2A1 - Review and respond to contractor RFI’s (request for information) in pdf format within 3 days.
2A2 - Review and provide responses/comments to shop drawings submitted by the contractor in pdf format within 5 days after receipt of the information.
2A3 - Provide one (1) additional site visit and provide an on-site observation report in pdf format within 3 days after visiting the site.
Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.
2A1* Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00 Project Engineer $95.00 3 $285.00 Total for Subtask 2A1: $445.00 2A2* Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost JGP Structural Group, Inc. Principal Engineer $160.00 1 $160.00 Project Engineer $95.00 2 $190.00 Total for Subtask 2A2: $350.00 2A3* Fixed Price Cost:
Firm Name Position Classification Hourly Rate Hours Total Fixed
Price Cost JGP Structural Group, Inc. Principal Engineer $160.00 3 $480.00 Project Engineer $95.00 12 $1,140.00 Clerical $45.00 2 $90.00 Fixed Price per Trip $1,710.00 Total for Subtask 2A3: $1,710.00/trip
Project Schedule:
Activity Duration (Calendar Days) Subtask 1A: Modify drawings for West side area
- 10 days
Subtask 2A: Added CA work -
Summary of Fees:
Subtask Subtask Fixed Price Cost Subtask Reimbursable Subtask 1A: Modify drawings for West side area
$3,110.00 $0.00
Subtask 2A: Added CA work (2A1, 2A2 & 2A3)
2A1: $445.00 2A2: $350.00 2A3: $1,710.00 Total:$2,505.00
$0.00
Total Fixed Price Cost: $5,615.00 Total Reimbursable Cost $-
Overall Total Cost: $5,615.00
Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.