This is a Task Assignment Notification Form (TA DC002H) issued under Florida Department of Environmental Protection (FDEP) Contract No. HW559 with Wood Environment & Infrastructure Solutions, Inc. The task assignment authorizes work at the Baymeadows Place Cleaners site located at 9551 Baymeadows Road, Jacksonville, Duval County, Florida (DEP Site #ERIC_4558). The primary contacts include Ron White as the Contractor Representative and Crystal Posey as the DEP Contract Manager. The work falls under the Monitoring phase of the contract and is governed by the scope of work, cost estimate form, and bid documentation dated March 16, 2020 (revised April 17, 2020).
The task assignment authorizes Wood to conduct one annual natural attenuation monitoring (NAM) groundwater sampling event at the site, including collection of groundwater samples from 20 micro-wells, water level measurements, laboratory analysis of samples for chlorinated volatile organic compounds (CVOCs) and total recoverable petroleum hydrocarbons (TRPHs), preparation of an Annual NAM Report with updated data tables and groundwater flow figures, and ADaPT/GIS updates. The final deliverable is the Annual NAM Report and ADaPT/GIS update (submitted electronically) with a due date of July 30, 2020, and task completion through October 30, 2020. The task assignment type is fixed price in the amount of $8,137.51, with no retainage, for a total task assignment value of $8,137.51. Invoice is due upon FDEP approval of the Annual NAM Report and supporting deliverables. Cost details include $557.25 for project management (Subtask 1) and $7,580.26 for annual NAM sampling activities (Subtask 2), inclusive of labor, analytical laboratory services through Advanced Environmental Laboratories, field equipment, travel, supplies, and waste disposal services through Capitol Environmental Services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW559
D000 N/ADC002H
Wood Environment & Infrastructure Solutions
Ron White
850-245-8851Crystal Posey
ERIC_4558
Baymeadows PlaceCleaners
9551 Baymeadows Rd, Jacksonville, Duval County
Monitoring
This Task Assignment authorizes Wood to conduct annual groundwater sampling in accordance with the Wood scope of work, cost estimate form, and bid documentation dated March 16th, 2020.
Annual NAM Report and ADaPT/GIS update (submitted electronically)
07/30/2020
10/30/2020
$ 8,137.51 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Crystal Posey Digitally signed by Crystal Posey Date: 2020.04.20 15:43:13 -04'00'
Crystal Posey Digitally signed by Crystal Posey Date: 2020.04.20 15:43:22 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.04.21 09:27:36 -04'00'
Ron.White Digitally signed by Ron.White DN: cn=Ron.White Date: 2020.04.21 12:08:02 -04'00'
$ 8,137.51
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 1 & 2: Annual NAM Report and ADaPT/GIS update (submitted electronically); Project Management 07/30/2020
FDEP Approval of Annual NAM Report and ADaPT/GIS update (submitted electronically); Project Management - Subtask 1 & 2 $ 8,137.51
$ 8,137.51
HW559
DC002H
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 3
2399-2400
Memorandum
TO:
FROM:
SUBJECT:
DATE:
HW559 Contract File
Crystal Posey, Project Manager
Baymeadows Place Cleaners
ERIC_4558
HW559 DC002H
Task Assignment
April 20th, 2020
This Task Assignment authorizes Wood to conduct annual groundwater sampling in accordance with the Wood scope of work, cost estimate form, and bid documentation dated March 16th, 2020.
The proposal has been revised to fit the Department's requests to conduct annual groundwater sampling instead of quarterly sampling events that was in the previous proposal.
The FDEP Project Manager agrees to the scope of work and final cost associated with this Task Assignment (TA), total task amount is now $8,137.51.
The final task completion date is October 30th, 2020.
FDEP COST ESTIMATE - HW559 - DC007G Original Contractor: Wood E&IS
Date: 4/17/2020
Task #: HW559-DC002G SubTask 1
Site: SubTask 2 Activity/Phase: SubTask 3
Project Manager: Crystal Posey (FDEP) / Ron White (Wood) SubTask 4 6090170093 SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$46.94 Project Manager RW 4 4.2 $36.45 Program Manager 0 0 0 0 0 $46.94 Project Manager RW 0 0 0 0 0 $53.87 Consulting Eng/Sci GS 0 0 0 0 0 $46.94 Principal Eng/Sci RW 2 2 0 0 0 $53.87 Senior Scientist 0 0 0 0 0 $42.79 Senior Engineer 0 0 0 0 0 $28.44 Project Engineer 0 0 0 0 0 $28.85 Project Scientist AH 16 16 0 0 0 $18.51 Staff Scientist NS 22 22 0 0 0 $19.23 Staff Scientist ZL 24 24 0 0 0 $35.63 Technical Editor 0 0 0 0 0 $24.59 Construction Supervisor 0 0 0 0 0 $18.78 O&M Specialist 0 0 0 0 0 $25.53 Drafter GB 4 4 0 0 0 $27.95 Senior Technician 0 0 0 0 0 $25.57 Senior Technician 0 0 0 0 0 $19.28 Project Assistant RP 2 2 0 0 0 $15.15 Field Technician 0 0 0 0 0 $22.61 Project Accountant 0 0 0 0 0 $28.57 Contracts/Purchasing 0 0 0 0 0 $12.15 Clerical 0 0 0 0 0 $18.16 Word Processing 0 0 0 0 0
Total Hours 74 4 70 0 0 0 Direct Labor $1,760.51 $195.61 $1,564.90 $0.00 $0.00 $0.00
Overhead 111.08% $1,955.57 $217.28 $1,738.29 $0.00 $0.00 $0.00 Gen & Admin 8.36% $147.18 $16.35 $130.83 $0.00 $0.00 $0.00 Fringe 35.00% $616.18 $68.46 $547.72 $0.00 $0.00 $0.00 Total Labor $4,479.44 $497.70 $3,981.74 $0.00 $0.00 $0.00
Other Direct Costs $88.03 $9.78 $78.25 $0.00 $0.00 $0.00 Travel
Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $344.00 $344.00 $0.00 $0.00 $0.00 Total Travel $538.00 $538.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $300.00 $300.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $300.00 $300.00 $0.00 $0.00 $0.00 Handling Fee $30.00 $30.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $330.00 $330.00 $0.00 $0.00 $0.00
Project Management
Annual NAM Sampling Annual NAM Groundwater Sampling Baymeadows Place Cleaners
REV: 02/11 AMEC Page 1
FDEP COST ESTIMATE - HW559 - DC007G Original Contractor: Wood E&IS
Date: 4/17/2020
Task #: HW559-DC002G SubTask 1
Site: SubTask 2 Activity/Phase: SubTask 3
Project Manager: Crystal Posey (FDEP) / Ron White (Wood) SubTask 4 6090170093 SubTask 5
Totals 1 2 3 4 5
Project Management
Annual NAM Sampling Annual NAM Groundwater Sampling Baymeadows Place Cleaners
Laboratory Analytical Costs $1,668.00 $1,668.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 Total Laboratory $1,772.00 $1,772.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $417.10 $417.10 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $482.10 $482.10 $0.00 $0.00 $0.00
Subtotal $7,689.57 $507.48 $7,182.09 $0.00 $0.00 $0.00 Completion Fee $447.94 $49.77 $398.17 $0.00 $0.00 $0.00
Total Estimated Cost $8,137.51 $557.25 $7,580.26 $0.00 $0.00 $0.00
REV: 02/11 AMEC Page 2
HW559 - DC007G - Original
SITE : Baymeadows Place Cleaners SUBTASK 2: Annual NAM Sampling
DATE: 4/17/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Scientist RW 2 Staff Scientist NS 6
Staff Scientist ZL 6
Drafter GB 4 Project Assistant RP Subcontractor set-up, invoicing 2 Project Scientist AH 16
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Shallow GW Sampling Kit $834.20 week 0 $0.00 $208.55 day 2 $417.10
$417.10
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00
$97.00 day 2 $194.00
Truck $420.00 week 0 $0.00 $97.00 day 0 $0.00
$194.00
PER DIEM STAFF RATE UNIT USAGE
motel 2 $100.00 day 1 $200.00 meal 2 $36.00 day 2 $144.00
$344.00
LABORATORY COSTS
Advanced Environmental Laboratory
PARAMETER RATE # SAMPLES #QAQC
Groundwater VOAs TCL (8260) $66.00 20 4 2 Dups / TripBlk / IDW $1,584.00
TRPH MW-1 $84.00 1 $84.00
TOTAL LAB $1,668.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS $35.00 2 Day 0 $0.00 Large - 25 to 50 LBS Samples to lab $104.00 Overnight 1 $104.00 Ice $5.00 per cooler 0 $0.00
TOTAL SHIPPING $104.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Capitol Env. Services IDW disposal $300.00
TOTAL $300.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 2 $65.00 Encore samplers $9.00 each $0.00
TOTAL SUPPLIES $65.00
TOTAL PER DIEM
TOTAL VEHICLE
TOTAL EQUIPMENT
Stage & De-stage
TOTAL LABOR
Prepare Annual NAM report summarizing 4 Qrts, tabulate data, ADaP
Update GW figures with new data
Sample 13 wells (MW-1, 2I, 3, 4, 5, 6, 8, 10I, 11I, 12, 13, 16, DW-1) Collect synoptic round of water levels from all 20 MWs
Review Annual NAM report Mobilization (Round Trip) Sample 20 wells Collect synoptic round of water levels from all 20 MWs Mobilization (Round Trip)
‘Wood’ is a trading name for John Wood Group PLC and its subsidiaries
Wood Environment & Infrastructure Solutions, Inc.
2533 Greer Road, Suite 6
Tallahassee, Florida 32308 USA
T: 850-656-1293 www.woodplc.com
March 16, 2020 (Revised April 17, 2020)
Ms. Crystal Posey Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400
RE: Cost Proposal to Conduct One Annual NAM Groundwater Sampling Event
9551 Baymeadows Road Jacksonville, Duval County, Florida FDEP FAC ID No: 16/9502088
ERIC_4558
Task Assignment No: HW559-DC002G Wood Project No: 6090170093
Dear Ms. Posey, Wood Environment & Infrastructure Solutions, Inc. (Wood) is pleased to provide this cost proposal to conduct one annual natural attenuation monitoring (NAM) groundwater sampling event at the Baymeadows Place Cleaners site located in Jacksonville, Florida (Figure 1). Wood conducted a complete groundwater sampling event at the site in July 2019 which included collecting groundwater samples from 20 micro-wells. Based on the results of the groundwater sampling activities, Wood prepared an Annual Groundwater Monitoring Report dated August 30, 2019. The July 2019 analytical results obtained from this sampling event indicated that the groundwater plume appears to have shrunk in size and remains on the Baymeadows Place shopping center property. Based on the fluctuation of analytical results since groundwater sampling began, Wood recommended conducting a year of quarterly NAM sampling of the micro-wells to monitor the size, movement and concentrations of the chlorinated volatile organic compounds (CVOC) plume and to verify the reported tetrachloroethene (PCE) concentrations detected in five micro-wells for the first time (which also correlated with of the detection of PCE in the laboratory method blank at a concentration above its laboratory method detection limit).
In the May 2018 sampling event, six micro-wells (MW-10I, MW-11I, MW-12, MW-13, MW-16 and DW-1) reported PCE or vinyl chloride at concentrations above their GCTLs; however, in the July 2019 sampling event, PCE and vinyl chloride were reported at concentrations below the laboratory method detection limit (MDL). These micro-wells need to be sampled again to verify sample results from the last two sampling events to ensure that the groundwater plume is delineated. FDEP agreed with the recommendations in the Annual Groundwater Monitoring Report but requested a proposal for one complete groundwater sampling event at the site. This cost proposal has been prepared to resample the all micro-wells at the site. The cost summary spreadsheets detailing the level of effort necessary to conduct these activities are attached.
NAM Sampling Proposal March 16, 2020 (Rev. 4/17/20)
Annual NAM Groundwater Sampling Event
Wood will mobilize a two-person crew to the site to conduct the groundwater sampling activities.
Prior to collecting groundwater samples, all 20 micro-wells will be opened and allowed to equilibrate and then a synoptic round of water level measurements will be collected.
Groundwater samples will be collected from all 20 micro-wells at the site.
Groundwater sampling will adhere to the FDEP SOP FS 2200 using low flow purging techniques with a peristaltic pump and new HDPE tubing. Field parameters including temperature, pH, specific conductance, turbidity, dissolved oxygen (DO) and oxygen reduction potential (ORP) will be measured following removal of each well volume. A minimum of three well volumes will be purged from each monitoring well. If the field parameters have stabilized (i.e., three consecutive measurements are within ranges specified in SOPs) and the water turbidity is less than 20 nephelometric turbidity units (NTU) after three well volumes, the groundwater sample will be collected. If turbidity below 20 NTU cannot be attained, the well will be purged until the turbidity measurements become stable, or once five well volumes has been purged, at which time the groundwater sample will be collected.
The groundwater samples will be analyzed for CVOCs using USEPA Method 8260B.
Additionally, the groundwater sample collected from source area micro-well MW-1 will be analyzed for total recoverable petroleum hydrocarbons (TRPHs) using the FL-PRO method to monitor for potential groundwater impacts from the EOS-PRO amendment that was placed in the source removal open excavation. Samples will be shipped overnight under standard chain of custody protocol to Advanced Environmental Laboratories (AEL) in Tallahassee, Florida.
All purge water will be containerized onsite in 55-gallon drums pending laboratory analysis. At the end of the event, an IDW sample will be collected from the drummed purge water and submitted for laboratory analysis. The drums will be staged at a secure location onsite pending the analytical results. Once the analytical results are received, the drums will be transported from the site for disposal.
Upon completion of the annual NAM sampling field activities and receipt of the analytical data, Wood will provide an Annual NAM Report detailing the activities and findings of the sampling event and will include updated tables with analytical data and groundwater elevations and figures showing analytical results, groundwater plumes and groundwater flow at the site, as well as conclusions and recommendations. Field notes and laboratory analytical reports will also be included.
Based on the results of the sampling events, Wood will make recommendations to address remedial actions that may be necessary at the site.
Invoice & Deliverable Schedule
Subtask Deliverable Deliverable Due Date
Invoice Amount
Annual NAM Report with updated tables & figures, field notes, GW sample logs, laboratory report, ADaPT files
6/29/20* $7,580.26 + T1 $557.25
*Assuming FDEP tasks project by April 30, 2020
SITE LOCATION
AAD4073 AAI0198
1/2 Mile Radius 1/4 Mile Radius
N
SITE
SOURCE:
USGS Quadrangle:
BAYARD, FLA.
Copyright 2013 Maptech
LEGEND
AAD4073
FIGURE:
DRAWNDESIGNED
DATENO. REVISIONS
CHECKED DATE
Environment & Infrastructure Solutions, Inc.
Tallahassee, Florida 850-656-1293
SITE VICINITY MAP
BAYMEADOWS PLACE CLEANERS
NATURAL ATTENUATION MONITORING REPORT
9521 BAYMEADOWS ROAD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
RW GB
0 Aug-19 Initial Submittal
AutoCAD SHX Text PLOTTED: August 26, 2019 - 11:10 AM, BY: Burton, George AAugust 26, 2019 - 11:10 AM, BY: Burton, George A - 11:10 AM, BY: Burton, George A11:10 AM, BY: Burton, George A, BY: Burton, George ABurton, George A
AutoCAD SHX Text P:\CAD\HW559\DRY CLEANING\BAYMEADOWS PLACE\NAM\2019-08\FIG-1.dwg
AutoCAD SHX Text
SCALE: 1 INCH =
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text 2,000
AutoCAD SHX Text 1,000
AutoCAD SHX Text 2,000
AutoCAD SHX Text Duval County
AutoCAD SHX Text
%%UINSET
AutoCAD SHX Text Not To Scale
AutoCAD SHX Text APPROXIMATE SITE LOCATION Section 23, Township 3 South, Range 27 East Latitude: 30° 13' 19.40" North Longtitude: 81° 33' 31.89" West
AutoCAD SHX Text Approximate site boundary
AutoCAD SHX Text Potable well location and identification
GW-8
GW-9
GW-10
GW-11
GW-12
GW-2
GW-14
Adjacent Lease Space (Not included)
GW-5
GW-6
GW-3
GW-4
GW-1
GW-7
GW-13
Dry cleaning machines
GW-23
GW-18
GW-24
GW-19
GW-20
GW-21
GW-15
GW-16
GW-17
GW-22
N
LEGEND
GW-1
NO. DATE REVISIONS
CHECKED DATE
FIGURE:
DESIGNED DRAWN
Environment & Infrastructure Solutions, Inc.
Tallahassee, Florida 850-656-1293
SITE MAP WITH SAMPLE LOCATIONS
BAYMEADOWS PLACE CLEANERS
NATURAL ATTENUATION MONITORING REPORT
9551 BAYMEADOWS ROAD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
RW GB
0 Aug-19 Initial Submittal
AutoCAD SHX Text
DW-1
AutoCAD SHX Text
MW-3
AutoCAD SHX Text
MW-4
AutoCAD SHX Text
MW-5
AutoCAD SHX Text
MW-6
AutoCAD SHX Text
MW-1
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text
DW-2
AutoCAD SHX Text
MW-7
AutoCAD SHX Text
MW-13
AutoCAD SHX Text
MW-14
AutoCAD SHX Text
MW-12
AutoCAD SHX Text
MW-15
AutoCAD SHX Text
MW-17
AutoCAD SHX Text
MW-16
AutoCAD SHX Text
MW-9
AutoCAD SHX Text
MW-11I
AutoCAD SHX Text
MW-8
AutoCAD SHX Text
MW-18I
AutoCAD SHX Text
MW-10I
AutoCAD SHX Text
SCALE: 1 INCH =
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PLOTTED: August 29, 2019 - 3:01 PM, BY: Burton, George AAugust 29, 2019 - 3:01 PM, BY: Burton, George A - 3:01 PM, BY: Burton, George A3:01 PM, BY: Burton, George A, BY: Burton, George ABurton, George A
AutoCAD SHX Text P:\CAD\HW559\DRY CLEANING\BAYMEADOWS PLACE\NAM\2019-08\FIG-2.dwg
AutoCAD SHX Text
DW-1
AutoCAD SHX Text Deep monitoring well location and designation
AutoCAD SHX Text DPT groundwater sample location and designation
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text Intermediate monitoring well location and designation
AutoCAD SHX Text
MW-1
Shallow monitoring well location and designation
Adjacent Lease Space (Not included)
25.0
26.0 27.0
24.0
27.0
26.0
.0
.0
(26.52)
(23.55)
(24.95)
(25.83)
(24.86)
(24.37)
(27.01)
(25.77)
(24.30)
(24.79)
(25.00)
(24.87)
(24.77)
(23.51)
(23.57)
(24.74)
(22.92)
(22.86)
(25.02)
23.0
23.0
(Obstruction
@6.54')
Dry cleaning machines
N
NO. DATE REVISIONS
CHECKED DATE
FIGURE:
DESIGNED DRAWN
Environment & Infrastructure Solutions, Inc.
Tallahassee, Florida 850-656-1293
GROUNDWATER FLOW MAP - SHALLOW ZONE SURFICIAL AQUIFER
JULY 8, 2019
BAYMEADOWS PLACE CLEANERS
NATURAL ATTENUATION MONITORING REPORT
9551 BAYMEADOWS ROAD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
RW GB
0 Aug-19 Initial Submittal
47.95 (47.95)
LEGEND
AutoCAD SHX Text
DW-1
AutoCAD SHX Text
MW-3
AutoCAD SHX Text
MW-4
AutoCAD SHX Text
MW-5
AutoCAD SHX Text
MW-6
AutoCAD SHX Text
MW-1
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text
DW-2
AutoCAD SHX Text
MW-10I
AutoCAD SHX Text
MW-7
AutoCAD SHX Text
MW-13
AutoCAD SHX Text
MW-18I
AutoCAD SHX Text
MW-14
AutoCAD SHX Text
MW-12
AutoCAD SHX Text
MW-15
AutoCAD SHX Text
MW-17
AutoCAD SHX Text
MW-16
AutoCAD SHX Text
MW-9
AutoCAD SHX Text
MW-11I
AutoCAD SHX Text
MW-8
AutoCAD SHX Text
SCALE: 1 INCH =
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PLOTTED: August 29, 2019 - 11:58 AM, BY: Burton, George AAugust 29, 2019 - 11:58 AM, BY: Burton, George A - 11:58 AM, BY: Burton, George A11:58 AM, BY: Burton, George A, BY: Burton, George ABurton, George A
AutoCAD SHX Text P:\CAD\HW559\DRY CLEANING\BAYMEADOWS PLACE\NAM\2019-08\FIG-3.dwg
AutoCAD SHX Text Groundwater elevation contour and designation
AutoCAD SHX Text Groundwater flow direction
AutoCAD SHX Text NOTES: 1. Micro-well top of casing elevations provided by a Micro-well top of casing elevations provided by a Professional Land Surveyor and tied to NAVD88 vertical datum.
AutoCAD SHX Text Groundwater elevation
AutoCAD SHX Text
DW-1
AutoCAD SHX Text Deep monitoring well location and designation
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text Intermediate monitoring well location and designation
AutoCAD SHX Text
MW-1
Shallow monitoring well location and designation
Dry cleaning machines
Adjacent Lease Space (Not included)
N
3,900
4,200
2,800
1,100 2,500 4,700
7.6
190 3.3
NO. DATE REVISIONS
CHECKED DATE
FIGURE:
DESIGNED DRAWN
Environment & Infrastructure Solutions, Inc.
Tallahassee, Florida 850-656-1293
GROUNDWATER ANALYTICAL DATA - MONITORING WELLS
CHLORINATED VOLATILE ORGANIC COMPOUNDS (CVOC)
BAYMEADOWS PLACE CLEANERS
NATURAL ATTENUATION MONITORING REPORT
9551 BAYMEADOWS ROAD
JACKSONVILLE, DUVAL COUNTY, FLORIDA
FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
RW GB
0 Aug-19 Initial Submittal
LEGEND
96 I,V
5.5
9.6 10,000
5,500 5.6
9.2 2,800
3,000 5.8
4.4 I,V 33
1,100
97 V
3,200
17 130
4.6 I
3.5 I,V
3.8 I,V
3.6 I,V
7.6
7.5 V
4.9
4.6
1,200
AutoCAD SHX Text
MW-4
AutoCAD SHX Text
MW-5
AutoCAD SHX Text
MW-6
AutoCAD SHX Text
MW-1
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text
DW-2
AutoCAD SHX Text
MW-7
AutoCAD SHX Text
MW-13
AutoCAD SHX Text
MW-18I
AutoCAD SHX Text
MW-14
AutoCAD SHX Text
MW-12
AutoCAD SHX Text
MW-15
AutoCAD SHX Text
MW-17
AutoCAD SHX Text
MW-16
AutoCAD SHX Text
MW-9
AutoCAD SHX Text
MW-11I
AutoCAD SHX Text
MW-8
AutoCAD SHX Text
MW-3
AutoCAD SHX Text
MW-10I
AutoCAD SHX Text
DW-1
AutoCAD SHX Text
SCALE: 1 INCH =
AutoCAD SHX Text
AutoCAD SHX Text
FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PLOTTED: August 30, 2019 - 12:21 PM, BY: Burton, George AAugust 30, 2019 - 12:21 PM, BY: Burton, George A - 12:21 PM, BY: Burton, George A12:21 PM, BY: Burton, George A, BY: Burton, George ABurton, George A
AutoCAD SHX Text P:\CAD\HW559\DRY CLEANING\BAYMEADOWS PLACE\NAM\2019-08\FIG-4.dwg
AutoCAD SHX Text NOTES: 1. Concentrations in micrograms per liter.Concentrations in micrograms per liter.
AutoCAD SHX Text Analyte, if present, was at a concentration below its method detection limit
AutoCAD SHX Text U
AutoCAD SHX Text The reported value is between the laboratory method detection limit and the laboratory practical quantitation limit
AutoCAD SHX Text I
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE TRPH
AutoCAD SHX Text
10-15 MW-1 2'-12' 36 U 29 U 20 U 18 U NA
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE Fe
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE Fe
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
10-15 MW-2I 16'-26' 6.3 0.40 U 0.64 I 0.36 U NA
AutoCAD SHX Text
10-15 MW-3 2'-12' 31 NA
AutoCAD SHX Text
10-15 MW-4 2'-12' 15
AutoCAD SHX Text
10-15 MW-5 2'-12' 0.48 U 0.74 U 0.59 U 0.47 U
AutoCAD SHX Text
10-15 MW-6 2'-12' 1 I 15 0.40 U 0.36 U
AutoCAD SHX Text
10-15 DW-1 62'-67' 0.36 U 0.29 U 0.24 U 0.20 U 0.24 U 0.18 U
AutoCAD SHX Text
10-15 DW-2 63'-68' 2.8 0.29 U 0.24 U 0.20 U 0.24 U 0.18 U
AutoCAD SHX Text 10-15 MW-Dupe01 2'-12' 18 U 14 U 9 U 9U NA
AutoCAD SHX Text PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE Fe TRPH
AutoCAD SHX Text Tetrachloroethene Trichloroethene cis-1,2 Dichloroethene trans-1,2 Dichloroethene Vinyl Chloride 1,1-Dichloroethene Iron Total Recoverable Petroleum Hydrocarbons
AutoCAD SHX Text Estimated extent of CVOC groundwater plume (dashed where inferred)
AutoCAD SHX Text
DW-1
AutoCAD SHX Text Deep monitoring well location and designation
AutoCAD SHX Text
MW-2I
AutoCAD SHX Text Intermediate monitoring well location and designation
AutoCAD SHX Text
MW-1
AutoCAD SHX Text Shallow monitoring well location and designation
AutoCAD SHX Text
5-18 MW-1 2'-12' 1.4 V 0.46 U 8 0.47 U NA
AutoCAD SHX Text
5-18 MW-2I 16'-26' 13 1 0.12 U 0.47 U
AutoCAD SHX Text
5-18 MW-3 2'-12' 0.91 I,V 22
AutoCAD SHX Text 5-18 MW-Dupe01 2'-12' 0.78 I,V 0.59 U
AutoCAD SHX Text Analyte was detected in both the sample and the associated method blank
AutoCAD SHX Text V
AutoCAD SHX Text
5-18 MW-4 2'-12' 2.3 U 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text 5-18 MW-Dupe02 2'-12' 3.8 I 2.6 I
AutoCAD SHX Text
5-18 MW-5 2'-12' 28
AutoCAD SHX Text
5-18 MW-6 2'-12' 0.48 U 0.46 U 0.59 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-7 2'-12' 2.4 U 2.3 U 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-8 2'-12' 0.80 I,V 2 37 0.59 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-9 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-10I 16'-26' 2.8 I 20 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-11I 16'-26' 2.3 U 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-12 2'-12' 2.3 U 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-13 2'-12' 2.3 U 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-14 2'-12' 0.82 I,V 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-15 2'-12' 0.77 I,V 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-16 2'-12' 0.76 I,V 0.68 I 4 0.59 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-17 2'-12' 0.69 I,V 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text DATE SAMPLE DEPTH PCE TCE cis-1,2 DCE trans-1,2 DCE VC 1,1-DCE
AutoCAD SHX Text
5-18 MW-18I 16'-26' 0.59 I,V 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
5-18 DW-1 62'-67' 2.3 I 2.4 U 3.0 U 0.60 U 2.4 U
AutoCAD SHX Text
5-18 DW-2 63'-68' 0.84 I,V 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-1 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.47 U 1,400
AutoCAD SHX Text
7-19 MW-2I 16'-26' 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U NA
AutoCAD SHX Text
7-19 MW-3 2'-12' 4.8 U 5.9 U 4.7 U NA
AutoCAD SHX Text 7-19 MW-Dupe01 2'-12' 4.8 U 5.9 U 4.7 U NA
AutoCAD SHX Text
7-19 MW-4 2'-12' 0.48 U 0.59 U 0.47 U
AutoCAD SHX Text 7-19 MW-Dupe02 2'-12' 0.48 U 0.59 U 0.47 U
AutoCAD SHX Text
7-19 MW-5 2'-12' 41 0.59 U
AutoCAD SHX Text
7-19 MW-6 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.47 U
AutoCAD SHX Text
7-19 MW-7 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-8 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.47 U
AutoCAD SHX Text
7-19 MW-9 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-10I 16'-26' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-11I 16'-26' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-12 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-13 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-16 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-15 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-17 2'-12' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 MW-18I 16'-26' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 DW-1 62'-67' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text
7-19 DW-2 63'-68' 0.48 U 0.46 U 0.48 U 0.59 U 0.12 U 0.47 U
AutoCAD SHX Text Not analyzed
NA
April 16, 2020
Alexandra Horne Technical Professional 2 - Geology Wood Environment & Infrastructure Solutions 1441 Maclay Commerce Drive – Suite 102 Tallahassee, FL 32312
RE: CEWW # 041620.4 – DRYCLEANER GROUNDWATER DRUM TRANSPORT & DISPOSAL
LOC: BAYMEADOWS CLEANERS – 9551 BAYMEADOWS ROAD, JACKSONVILLE, FLORIDA
Good day Ms. Horne, Capitol Environmental Services, Inc., in association with Whatever Waste, LLC is pleased to provide this pricing for the transport and disposal of preliminarily characterized non-hazardous groundwater.
Scope of Services:
• Waste characterization and profiling of (2) 55-gallon drums of drycleaner site groundwater including manifesting, transporting, and disposing at a permitted facility.
DESCRIPTION UM QUANTITY UNIT PRICE TOTAL
Transportation and Disposal Drums 2 x 55-gallon $ 150.00 $ 300.00
Notes:
• Disposal acceptance includes review of a completed, submitted profile based on generator knowledge and pending Wood Environmental supplied analytical testing data.
• Demurrage charged after 1 hour waiting time on site is $ 120.00 per hour
• DOT shippable drums must be staged on a hard surface at an accessible location.
• No-load charge is $ 160.00 if transporter is called off in transit or if unable to pick up the drums once on-site.
• Payment terms as established between Wood Environmental and Capitol Environmental
Should you require additional information, or have any questions, please do not hesitate to contact John Russell at 904-881-1957, or me at 352-514-0604 or bfrenchman@capitolenv.com.
Sincerely yours, Brandt Frenchman
Senior Business Manager www.capitolenv.com
CEWW Proposal No. 041620.4 Acceptance, Dated: _____________________________
By:_______________________________________________________________________
Name/Title:_______________________________________________________________
Purchase Order: _____________________________________________________________ mailto:bfrenchman@capitolenv.com file://///CESIFP01/Users/TSRedirections/bfrenchman/AppData/Roaming/Microsoft/Word/www.capitolenv.com
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Baymeadows NAM CP 3.16.20.pdf |
| PermaFix Qte 3.16.20.pdf |
| Est. Total |
| LTL Transportation, per drum (55-gallon) |
| Transportation Stop Fee |
| Unit Price |
| Quantity/Size |
| Copy of Baymeadows Annual NAM CP 4.17.20 - Original.pdf |
| Cost Estimate |
| T2-1st NAM |
File details come from the government source that posted it. Updated .