Document Summary

This Task Assignment Notification Form (HW559, Task BF10B) represents a fixed-price contract between the Florida Department of Environmental Protection (FDEP) and AMEC Foster Wheeler for environmental assessment services at the US 192 Solid Waste Management Facility in Melbourne, Brevard County, Florida. The contract is managed by DEP Contract Manager Carrie L. Kruchell, with Ron White, P.G., serving as the contractor's representative. The work falls under the SRPPM module with grant number SRP13, and the site assessment is designated as Phase 1 (Site Assessment – Soil & Groundwater).

The task assignment covers three distinct subtasks totaling $48,921.18 in fixed-price compensation: Subtask 1 (Project Management) at $2,470.49, Subtask 2 (Site Assessment Activities) at $40,295.27, and Subtask 3 (Site Assessment Report) at $6,155.42. Work scope includes soil and groundwater sampling with delineation of Arsenic and Organochlorine pesticides at a former ranch property involving advancement of 77 soil borings by hand auger, installation of 15 monitoring wells, and collection of 144 soil samples and groundwater samples from 19 monitoring wells. Deliverables include field documentation due April 1, 2018, and a final Site Assessment Report due May 9, 2018. Labor costs ($19,858.32), travel ($2,049.00), analytical services ($13,270.00), subcontractor drilling and disposal services ($9,256.50), and field expenses ($2,111.30) comprise the cost structure. The contract was executed through digital signature on December 13, 2017, with performance completion by July 1, 2018.

View the file

Other files

File Type Posted
CN-370000-HW559-A1.pdf PDF
CN-370000-HW559-A10.pdf PDF
CN-370000-HW559-A4.pdf PDF
CN-370000-HW559-A7.pdf PDF
CN-370000-HW559-A8.pdf PDF
CN-370000-HW559-BF03A.pdf PDF
CN-370000-HW559-BF04B.pdf PDF
CN-370000-HW559-BF05B.pdf PDF
CN-370000-HW559-BF06A.pdf PDF
CN-370000-HW559-BF07E.pdf PDF
CN-370000-HW559-BF09A.pdf PDF
CN-370000-HW559-BF10BC).pdf PDF
CN-370000-HW559-BF11A.pdf PDF
CN-370000-HW559-BF591B.pdf PDF
CN-370000-HW559-BF592A.pdf PDF
CN-370000-HW559-BF593B-1.pdf PDF
CN-370000-HW559-BF594D-1.pdf PDF
CN-370000-HW559-BF7C.pdf PDF
CN-370000-HW559-BF7DCO1.pdf PDF
CN-370000-HW559-BF7ECO1.pdf PDF
CN-370000-HW559-BF8ACO3.pdf PDF
CN-370000-HW559-BF8BCO2.pdf PDF
CN-370000-HW559-CSS011A.pdf PDF
CN-370000-HW559-CSS05C-1.pdf PDF
CN-370000-HW559-CSS09A.pdf PDF
CN-370000-HW559-CSS11B.pdf PDF
CN-370000-HW559-CSS12A-2.pdf PDF
CN-370000-HW559-CSS18A.pdf PDF
CN-370000-HW559-CSS21B.pdf PDF
CN-370000-HW559-CSS22A-1.pdf PDF
CN-370000-HW559-CSS22ACO.pdf PDF
CN-370000-HW559-CSS23A.pdf PDF
CN-370000-HW559-CSS24A-2.pdf PDF
CN-370000-HW559-CSS24C.pdf PDF
CN-370000-HW559-CSS29B.pdf PDF
CN-370000-HW559-DC006G.pdf PDF
CN-370000-HW559-DC007D.pdf PDF
CN-370000-HW559-DC01A.pdf PDF
CN-370000-HW559-DC02B.pdf PDF
CN-370000-HW559-DC02BCO4.pdf PDF
CN-370000-HW559-DC02BCO6.pdf PDF
CN-370000-HW559-DC02CCO1.pdf PDF
CN-370000-HW559-DC02ECO1.pdf PDF
CN-370000-HW559-DC03A.pdf PDF
CN-370000-HW559-DC03BCO1.pdf PDF
CN-370000-HW559-DC03BCO2.pdf PDF
CN-370000-HW559-DC03DCO1.pdf PDF
CN-370000-HW559-DC03iCO1.pdf PDF
CN-370000-HW559-DC04A.pdf PDF
CN-370000-HW559-DC04B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FDEP COST ESTIMATE - HW559

Contractor: Amec Foster Wheeler

Date: 12/8/2017

Task #: BF10B SubTask 1

Site: US192 Soild Waste Management Facility SubTask 2

Activity/Phase: SubTask 3 Site Assessment Report

Project Manager: SubTask 4

SubTask 5

Totals 1 2 3 4 5

Labor Rate Category

$44.68 Project Manager 19 19.4

$36.45 Program Manager 0 0 0 0 0

$43.59 Project Manager 0 0 0 0 0

$65.18 Consulting Eng/Sci 2 0 2 0 0

$44.68 Associate Eng/Sci 97 65 32 0 0

$43.59 Senior Scientist 0 0 0 0 0

$42.79 Senior Engineer 0 0 0 0 0

$28.44 Project Engineer 0 0 0 0 0

$21.49 Project Scientist 12 0 12 0 0

$26.00 Project Scientist 0 0 0 0 0

$20.71 Staff Scientist 0 0 0 0 0

$35.63 Technical Editor 0 0 0 0 0

$24.59 Construction Supervisor 0 0 0 0 0

$18.78 O&M Specialist 0 0 0 0 0

$25.53 Drafter 12 0 12 0 0

$27.95 Senior Technician 67 67 0 0 0

$25.57 Senior Technician 0 0 0 0 0

$18.16 Project Assistant 2 0 2 0 0

$14.02 Field Technician 0 0 0 0 0

$22.61 Project Accountant 0 0 0 0 0

$28.57 Contracts/Purchasing 0 0 0 0 0

$12.15 Clerical 0 0 0 0 0

$18.16 Word Processing 0 0 0 0 0

Total Hours 211 19 132 60 0 0

Direct Labor $7,804.72 $867.19 $4,776.85 $2,160.68 $0.00 $0.00

Overhead 111.08% $8,669.47 $963.27 $5,306.12 $2,400.08 $0.00 $0.00

Gen & Admin 8.36% $652.47 $72.50 $399.34 $180.63 $0.00 $0.00

Fringe 35.00% $2,731.66 $303.52 $1,671.90 $756.24 $0.00 $0.00

Total Labor $19,858.32 $2,206.48 $12,154.21 $5,497.63 $0.00 $0.00

Other Direct Costs $390.23 $43.36 $238.84 $108.03 $0.00 $0.00

Travel

Vehicle Rental $517.00 $517.00 $0.00 $0.00 $0.00

Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00

Air Fare $0.00 $0.00 $0.00 $0.00 $0.00

Per diem + Hotel $1,532.00 $1,532.00 $0.00 $0.00 $0.00

Total Travel $2,049.00 $2,049.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement)

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00

Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00

Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $7,915.00 $7,915.00 $0.00 $0.00 $0.00

Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00

Surveying $0.00 $0.00 $0.00 $0.00 $0.00

IDW $500.00 $500.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $8,415.00 $8,415.00 $0.00 $0.00 $0.00

Handling Fee $841.50 $841.50 $0.00 $0.00 $0.00

Total Subcontractor Cost $9,256.50 $9,256.50 $0.00 $0.00 $0.00

Project Management

Site Assessment Activities

Site Assessment

Ron King (DEP)/Ron White (Amec)

REV: 02/11 AMEC Page 1

FDEP COST ESTIMATE - HW559

Contractor: Amec Foster Wheeler

Date: 12/8/2017

Task #: BF10B SubTask 1

Site: US192 Soild Waste Management Facility SubTask 2

Activity/Phase: SubTask 3 Site Assessment Report

Project Manager: SubTask 4

SubTask 5

Totals 1 2 3 4 5

Project Management

Site Assessment Activities

Site Assessment

Ron King (DEP)/Ron White (Amec)

Laboratory

Analytical Costs $12,180.00 $12,180.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00

Sample Shipping $1,090.00 $1,090.00 $0.00 $0.00 $0.00

Total Laboratory $13,270.00 $13,270.00 $0.00 $0.00 $0.00

Field Expenses

Personal Protection $280.00 $280.00 $0.00 $0.00 $0.00

Expendables $162.50 $162.50 $0.00 $0.00 $0.00

Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Analytical related) $1,668.80 $1,668.80 $0.00 $0.00 $0.00

Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00

Total Field Expenses $2,111.30 $2,111.30 $0.00 $0.00 $0.00

Subtotal $46,935.35 $2,249.84 $39,079.85 $5,605.66 $0.00 $0.00

Completion Fee $1,985.83 $220.65 $1,215.42 $549.76 $0.00 $0.00

Total Estimated Cost $48,921.18 $2,470.49 $40,295.27 $6,155.42 $0.00 $0.00

REV: 02/11 AMEC Page 2

SITE :

SUBTASK 2

DATE: 12/8/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager

Associate Scientist RW

Senior Technician PC

EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS

MW Installation Kit $737.20 week 0 $0.00

$184.30 day 2 $368.60

Shallow GW Sampling Kit $834.20 week 0 $0.00

$208.55 day 2 $417.10

Soil Assessment Kit $558.80 week 0 $0.00

$139.70 day 3 $419.10

Hand Augers $33.00 week 0 $0.00

$8.25 each 40 $330.00

GPS $101.00 week 0 $0.00

$25.25 day 2 $50.50

Level and Rod $167.00 week 0 $0.00

$41.75 day 2 $83.50

$1,668.80

PPE Level D H&S $28.00 (2 person x 5 days) 10 TOTAL PPE $280.00

VEHICLE TYPE RATE UNIT USAGE

Equipment Van $420.00 week 1 $420.00

$97.00 day 1 $97.00

Truck $420.00 week 0 $0.00

$97.00 day 0 $0.00

$517.00

PER DIEM STAFF RATE UNIT USAGE

motel 2 $110.00 day 5 $1,100.00 meal 2 $36.00 day 6 $432.00

$1,532.00

US192 Soild Waste Management Facility

Site Assessment Activities

Stage for field work

Round trip mobilization to site (will mobilize on Sunday)

Locate historical sample locations with GPS & layout sample locations

Advance 77 soil borings by hand auger and collect 144 soil samples

Field decon 40 hand augers, post assessment decon

Survey top of casing elevations for MWs

Locate historical sample locations with GPS & layout sample locations

Install 15 monitoring wells

GPS all 42 sample locations

Collect GW samples from 19 monitoring wells

TOTAL PER DIEM

TOTAL VEHICLE

TOTAL EQUIPMENT

Advance 77 soil borings by hand auger and collect 144 soil samples

Install 15 monitoring wells

Collect GW samples from 19 monitoring wells

Survey top of casing elevations for MWs

Field decon 40 hand augers, post assessment decon

TOTAL LABOR

Round trip mobilization to site (will mobilize on Sunday)

GPS all 42 sample locations

LABORATORY COSTS

Advanced Environmental Laboratories

Groundwater RATE # SAMPLES #QAQC

OC Pesticides 8081 $90.00 19 4 2 dup/ 2 Eq Blank $2,070.00

Arsenic 6010 $12.50 19 4 2 dup/ 2 Eq Blank $287.50

Soil

Pesticides 8081 $90.00 90 9 duplicate $8,910.00

Arsenic 6010 $12.50 66 7 duplicate $912.50

TOTAL LAB $12,180.00

SHIPPING ITEM RATE COSTING UNIT UNITS

Small - 0 to 25 LBS (for cooler return) $65.00 2 Day $0.00

Large - 25 to 50 LBS Samples to lab $104.00 Overnight 10 $1,040.00

Ice $5.00 per cooler 10 $50.00

TOTAL SHIPPING $1,090.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Preferred Drilling Monitoring Well Installation $7,915.00

PermaFix IDW disposal $500.00

TOTAL $8,415.00

SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS

Expendables $32.50 per day 5 $162.50

TOTAL SUPPLIES $162.50

SITE :

SUBTASK 3

DATE: 12/8/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager

Consulting Sci EB Report Review 2

Principal Sci RW Site Assessment Report 32

Proj Eng/Sci AP Data entry tables, GW Sample Logs, MW Construction Logs 12

Drafter GB Figures 12

Word Proc/Cler RP Report formatting, create PDF 2

60TOTAL LABOR

US192 Soild Waste Management Facility

Site Assessment Report

TA BF10B - HW559 -- US 192-Former Deseret Ranch -- Executed 12-13-17
US192 SWMF SA CP 12.8.17

File details come from the government source that posted it. Updated .