This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under Contract HW559. The assignment authorizes Wood Environment & Infrastructure Solutions, Inc. to conduct annual groundwater monitoring activities at the Harveys International Dry Cleaners site (ERIC_4609) located at 6348 103rd Street, Jacksonville, Duval County, Florida. The contract is managed by FDEP Contract Manager Kevin Kane, with Geoff Schaefer serving as the contractor representative. The task assignment is classified as a Fixed Price arrangement with a total not-to-exceed value of $5,081.98 and zero retainage.
The scope of work consists of two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring. Under Subtask 2, Wood will conduct groundwater sampling at four micro-wells (MW-1S, MW-2S, MW-1I, and MW-8I), measure water levels at all ten micro-wells on site, and analyze samples for chlorinated volatile organic compounds (CVOCs) using USEPA Method 8260 by Advanced Environmental Laboratories. The contractor will also manage the disposal of investigation-derived waste (IDW), with Capitol Environmental Services providing non-hazardous IDW drum transport and disposal at $145.00 per 55-gallon drum. The final deliverable—an Annual Groundwater Sampling Report and ADaPT/GIS update submitted electronically—is due October 31, 2021, with task completion scheduled for February 25, 2022. Payment of the full $5,081.98 is conditioned upon FDEP approval of the Annual Groundwater Sampling Report and completion of both subtasks.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW559
D000 N/ADC003i
Wood Environment and Infrastructure Solutions, Inc.
Geoff Schaefer
850-245-8971Kevin Kane
ERIC_4609
Harveys International Dry Cleaners
6348 103rd Street, Jacksonville, Duval County
Monitoring
Wood Environment & Infrastructure Solutions, Inc. will conduct annual groundwater monitoring in accordance with the June 2021 scope of work and cost proposal. An Annual Groundwater Sampling Report will be generated.
Annual Groundwater Sampling Report and ADaPT/GIS update (submitted electronically)
10/31/2021
02/25/2022
$ 5,081.98 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Kevin Kane Digitally signed by Kevin Kane Date: 2021.06.29 08:47:50 -04'00'
Kevin Kane Digitally signed by Kevin Kane Date: 2021.06.29 08:48:06 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.06.29 10:16:03 -04'00'
Digitally signed by Geoffrey Schaefer Date: 2021.06.29 15:12:52 -04'00'
$ 5,081.98
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Annual Groundwater Sampling Report and ADaPT/GIS update (submitted electronically) 10/31/2021
FDEP approval of Annual Groundwater Sampling Report and ADaPT/GIS update (submitted electronically) - Subtasks 1 and 2 $ 5,081.98
$ 5,081.98
HW559
DC003i
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Interim Secretary
Memorandum
TO: HW559 Contract File
FROM: Kevin Kane, Project Manager
SUBJECT: Harveys International Dry Cleaners
ERIC_4609
HW559 DCOO3i Task Assignment
DATE: June 29, 2021
This Task Assignment authorizes Wood Environment & Infrastructure Solutions, Inc. to conduct annual groundwater monitoring activities, as outlined in the May 5, 2021 (Rev.
June 23, 2021) Cost Proposal to Conduct Annual Groundwater Sampling Harvey’s International Drycleaners (former). Specific subtasks are detailed below.
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Wood Environment & Infrastructure Solutions, Inc. will conduct groundwater sampling at micro-wells MW-1S, MW-2S, MW-1I and MW-8I. Additionally, water levels at all 10 micro-wells present on site will be measured. IDW disposal is expected and has been accounted for under this subtask. Wood was unable to obtain a third IDW disposal quote due to a lack of response from Perma-Fix Environmental Services, Inc. Samples will be analyzed for chlorinated volatile organic compounds (CVOCs) using USEPA Method 8260 by Advanced Environmental Laboratories in Tallahassee, Florida. Upon receipt of the data, the contractor will generate a Groundwater Monitoring Report detailing the field activities, procedures, and analytical results.
Wood’s time, labor and subcontractor costs for these activities have been reviewed and are appropriate.
The level-of-effort and final cost of $5,081.98 is reasonable for the scope of services.
Task completion date is February 25, 2022.
COST ESTIMATE LEVEL OF EFFORT SPREADSHEETS
FDEP COST ESTIMATE - HW559 - DC003E - Original Contractor: Wood E&IS
Date: 5/4/2021
Task #: HW559 - DC003H SubTask 1
Site: SubTask 2 Activity/Phase: SubTask 3
Project Manager: Dave Meyers (FDEP) / Ron White (Wood) SubTask 4 6090180015 SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$48.12 Project Manager RW 3 3.3 $36.45 Program Manager 0 0 0 0 0 $46.94 Project Manager 0 0 0 0 0 $55.49 Consulting Eng/Sci GS 2 2 0 0 0 $48.12 Principal Scientist RW 10 10 0 0 0 $53.87 Principal Engineer 0 0 0 0 0 $42.79 Senior Engineer 0 0 0 0 0 $28.44 Project Engineer 0 0 0 0 0 $28.85 Project Scientist AH 4 4 0 0 0 $22.83 Staff Scientist NS 10 10 0 0 0 $19.23 Staff Scientist ZL 12 12 0 0 0 $35.63 Technical Editor 0 0 0 0 0 $24.59 Construction Supervisor 0 0 0 0 0 $18.78 O&M Specialist 0 0 0 0 0 $25.53 Drafter GB 2 2 0 0 0 $27.95 Senior Technician 0 0 0 0 0 $25.57 Senior Technician 0 0 0 0 0 $19.28 Project Assistant RP 2 2 0 0 0 $15.15 Field Technician 0 0 0 0 0 $22.61 Project Accountant 0 0 0 0 0 $28.57 Contracts/Purchasing 0 0 0 0 0 $12.15 Clerical 0 0 0 0 0 $18.16 Word Processing 0 0 0 0 0
Total Hours 45 3 42 0 0 0 Direct Labor $1,413.29 $157.03 $1,256.26 $0.00 $0.00 $0.00
Overhead 111.08% $1,569.88 $174.43 $1,395.45 $0.00 $0.00 $0.00 Gen & Admin 8.36% $118.15 $13.13 $105.02 $0.00 $0.00 $0.00 Fringe 35.00% $494.65 $54.96 $439.69 $0.00 $0.00 $0.00 Total Labor $3,595.97 $399.55 $3,196.42 $0.00 $0.00 $0.00
Other Direct Costs $70.66 $7.85 $62.81 $0.00 $0.00 $0.00 Travel
Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $145.00 $145.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $145.00 $145.00 $0.00 $0.00 $0.00 Handling Fee $14.50 $14.50 $0.00 $0.00 $0.00 Total Subcontractor Cost $159.50 $159.50 $0.00 $0.00 $0.00
Project Management
Annual Groundwater Sampling Event Annual Groundwater Monitoring Harvey's International Drycleaners
REV: 02/11 Wood Page 1
FDEP COST ESTIMATE - HW559 - DC003E - Original Contractor: Wood E&IS
Date: 5/4/2021
Task #: HW559 - DC003H SubTask 1
Site: SubTask 2 Activity/Phase: SubTask 3
Project Manager: Dave Meyers (FDEP) / Ron White (Wood) SubTask 4 6090180015 SubTask 5
Totals 1 2 3 4 5
Project Management
Annual Groundwater Sampling Event Annual Groundwater Monitoring Harvey's International Drycleaners
Laboratory Analytical Costs $396.00 $396.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $104.00 $0.00 $0.00 $0.00 Total Laboratory $500.00 $500.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $266.75 $266.75 $0.00 $0.00 $0.00 Total Field Expenses $299.25 $299.25 $0.00 $0.00 $0.00
Subtotal $4,722.38 $407.40 $4,314.98 $0.00 $0.00 $0.00 Completion Fee $359.60 $39.96 $319.64 $0.00 $0.00 $0.00
Total Estimated Cost $5,081.98 $447.36 $4,634.62 $0.00 $0.00 $0.00
REV: 02/11 Wood Page 2
HW559 DC003E - Original
SITE : Harvey's International Drycleaners SUBTASK 2 Annual Groundwater Sampling Event
DATE: 5/4/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager Consulting Eng/Sci GS 2 Principal Eng/Sci RW 10 Project Scientist NS 10
Project Scientist ZL Round trip travel, collect complete round water levels, sample 7 wells 12
Project Scientist AH 4 Drafter GB 2 Project Assistant RP 2
EQUIPMENT ITEM RATE COSTING UNIT USAGE TOTALS
Shallow GW Sampling Kit $834.20 week 0 $0.00
$208.55 day 1 $208.55
55-gallon drum $58.20 each 1 $58.20
$266.75
VEHICLE TYPE RATE UNIT USAGE
Equipment Van $420.00 week 0 $0.00
$97.00 day 1 $97.00
$97.00
PER DIEM STAFF RATE UNIT USAGE
motel 1 $110.00 day 0 $0.00 meal 1 $36.00 day 0 $0.00
$0.00
LABORATORY COSTS
Advanced Environmental Laboratory
PARAMETER RATE # SAMPLES #QAQC
Groundwater VOAs TCL (8260) $66.00 4 1 1 Dup / 1 Trip Blk $330.00 VOAs TCL (8260) $66.00 1 GW IDW Sample $66.00
TOTAL LAB $396.00
SHIPPING ITEM RATE COSTING UNIT UNITS
Small - 0 to 25 LBS $35.00 2 Day 0 $0.00 Large - 25 to 50 LBS Samples to lab $104.00 Overnight 1 $104.00
TOTAL SHIPPING $104.00
TOTAL PER DIEM
TOTAL VEHICLE
TOTAL EQUIPMENT
TOTAL LABOR
Report preparation
Collect WLs from 10 MWs.
Sample 4 MWs - MW-1S, MW-2S, MW-1I, MW-8I
Updates Figures Report Data Tables, GIS Tables, ADaPT submittal Stage / De-stage
Round trip travel, Report review Prepare Annual NAM Report
Collect WLs from 10 MWs.
Sample 4 MWs - MW-1S, MW-2S, MW-1I, MW-8I
HW559 DC003E - Original
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Capitol Env Services Transport & disposal of IDW purge water $145.00 $0.00
TOTAL $145.00
SUPPLIES ITEM RATE COSTING UNIT UNITS TOTALS
Expendables $32.50 per day 1 $32.50 $0.00 per foot $0.00
TOTAL SUPPLIES $32.50
‘Wood’ is a trading name for John Wood Group PLC and its subsidiaries
Wood Environment & Infrastructure Solutions, Inc.
2533 Greer Road, Suite 6
Tallahassee, Florida 32308 USA
T: 850-656-1293 www.woodplc.com
May 5, 2021 (Rev. June 23, 2021)
Mr. David Meyers Florida Department of Environmental Protection Waste Site Cleanup Section 2600 Blair Stone Road Tallahassee, FL 32399-2400
RE: Cost Proposal to Conduct Annual Groundwater Sampling
Harvey’s International Drycleaners (former) 6348 103rd Street Jacksonville, Duval County, Florida
ERIC_4609
FDEP FAC ID No: 16/9700173
Dear Mr. Meyers, Wood Environment & Infrastructure Solutions, Inc., (Wood) has prepared this cost estimate to continue annual groundwater monitoring at the former Harvey’s International Drycleaner site in Jacksonville, Florida. All sampling activities conducted during this groundwater sampling event will be in accordance with the Standard Operating Procedures (SOPs) described in the original Site Assessment Workplan dated November 6, 2014. The last sampling event at the site took place on May 28, 2021. Figure 3 shows the locations of the existing micro-wells to be sampled.
The proposed scope of work is detailed below:
Annual Groundwater Sampling Event
Wood will mobilize a two-person crew to the site to conduct the groundwater sampling activities.
Prior to collecting groundwater samples, all 10 micro-wells will be opened and allowed to equilibrate and then water level measurements will be collected. Groundwater samples will then be collected from four micro-wells including MW-1S, MW-2S, MW-1I and MW-8I and analyzed for chlorinated volatile organic compounds (CVOCs) using USEPA Method 8260 by Advanced Environmental Laboratories in Tallahassee, Florida. Samples will be shipped overnight under standard chain of custody protocol.
All purge water will be containerized in a 55-gallon drum. At the end of the event, an IDW sample will be collected from the drummed purge water and submitted for laboratory analysis. The drum will be staged at a secure location onsite pending the analytical results. If the analytical results indicate that CVOCs are all below their respective groundwater cleanup target levels (GCTLs), the purge water will be emptied onto an impervious surface. If CVOCs are detected above their respective GCTLs, the drum will need to be transported from the site for disposal since groundwater sampling is occurring on an annual basis.
As a deliverable for this event, Wood will prepare an Annual Groundwater Monitoring Report detailing the activities and findings from the annual sampling event including updated tables and figures. The figures will include the current contaminant plume based on the most recent analytical data, as well as a figure depicting the groundwater flow at the site.
The total estimated cost for the proposed activities is $5,081.98. The sampling event will be conducted within 30 days of receiving a signed Task Assignment.
Invoice & Deliverable Schedule
Subtask Deliverable Deliverable Due Date Invoice Amount
2 Annual Groundwater Sampling Report 9/31/21* $4,634.62 + $447.36
*Assuming FDEP tasks project by May 15, 2021
Based on the results of the sampling events, Wood will make recommendations for future work that may be necessary at the site. Please let me know if there are any questions concerning this proposal.
Sincerely, Wood Environment & Infrastructure Solutions, Inc.
Ron White, PG. Geoff Schaefer, PE.
Project Manager Contract Manager Associate Geologist
June 16, 2021
Ron White, P.G.
Associate Geologist wood.
1441 Maclay Commerce Drive, Suite 102 Jacksonville, FL 32312
CEWW NO. 061521.1 – NON-HAZARDOUS WASTE DRUM TRANSPORT & DISPOSAL
GREATER JACKSONVILLE & TALLAHASSEE DRY CLEANER SITES
Good day Mr. White, Capitol Environmental Services, Inc. in association with Whatever Waste, LLC is pleased to provide this proposal for non-hazardous IDW drum transportation and disposal services to you and wood., from dry cleaners site.
Scope of Services:
• Assist with waste characterization and profiling non-hazardous waste drums containing IDW liquids or solids including soils at dry cleaner sites.
• Manifest, transport & dispose of 55-gallon waste drums containing IDW liquids or solids at permitted facilities.
TRANSPORTATION & DISPOSAL UM ESTIMATED
QUANTITY
UNIT PRICE $ TOTAL $
Greater Jacksonville & Tallahassee
Non-hazardous IDW Liquids or Solids Drums Each 55-gallon 145.00
Notes:
• Disposal acceptance includes review of a submitted non-hazardous waste profile, based on generator knowledge and the appropriate analytical data.
• Demurrage is charged after 1 hour waiting time on site at an hourly rate of $ 100.00. Jacksonville no load charge is $ 125.00 if drums are not available or accessible to pick up at the site.
• Drums must be in DOT shippable condition and staged at an accessible location and on a hard surface.
• Payment terms as established between wood. and Capitol Environmental Services.
Should you require additional information, or have any questions at all, please do not hesitate to contact John Russell, or me at 352-514-0604 or bfrenchman@capitolenv.com.
Sincerely yours, Brandt Frenchman Senior Business Manager www.capitolenv.com mailto:bfrenchman@capitolenv.com file://///CESIFP01/Users/TSRedirections/bfrenchman/AppData/Roaming/Microsoft/Word/www.capitolenv.com
Clean Harbors Environmental Services, Inc.
7001 Kilo Avenue Bartow, FL 33830 www.cleanharbors.com
August 10, 2020
Attn: Mr. Ron White Wood PLC 1441 Maclay Commerce Drive, Suite 102 Tallahassee, FL 32312
Quote #3552209, Harvey’s International Cleaners, Jacksonville, FL
Dear Mr. White:
Thank you for considering Clean Harbors Environmental Services, Inc. (Clean Harbors) for your waste management needs. We are pleased to provide you with pricing for the following waste streams. This quotation is based upon the information that you have provided.
We offer our clients a broad spectrum of environmental services and the ability to dispose of hazardous material at or through a Clean Harbors' owned and operated facility. In addition to managing your waste streams, a Clean Harbors' professional can assist you with:
• Waste Transportation & Disposal
• Laboratory Chemical Packing
• Field Services
• 24-Hour Environmental Emergency Response
• Industrial Services
• InSite Services
Clean Harbors has the appropriate permits and licenses for the acceptance and disposal of the waste streams identified within this quotation.
I look forward to servicing your environmental needs. When you are ready to place an order, please contact our Customer Service group at 800.444.4244. If you have any questions or need further assistance, you may reach me at the number below.
Sincerely, Patrick K Ethridge Account Manager Phone: 954.465.6469 ethridge.patrick@cleanharbors.com
"People and Technology Creating a Safer, Cleaner Environment"
DISPOSAL
Profile/ Waste Code Waste Description Qty UOM Price Total
CH2041377 PERCHLOROETHYLENE LIQUIDS 1 55 gallon drum $310.00 $310.00
Total $310.00
TRANSPORTATION
Dispatch Location Qty Price UOM Total
Bartow, FL Hub 1 $35.00 container *$250.00
*Minimum charge $250.00 per trip.
A demurrage charge of $107.00 per hour will apply as follows:
Number of Containers
Allowable Loading Time
1 to 10 0.5 hour(s) 11 to 15 0.75 hour(s) 16 to 25 1 hour(s) 26 to 35 1.25 hour(s) 36 to 40 1.5 hour(s) 41 to 45 1.5 hour(s) 46 to 50 1.75 hour(s) 51 to 80 2 hour(s)
ESTIMATED E-MANIFEST FEE (quantity 3) $60.00
ESTIMATED RECOVERY FEE $56.00
QUOTE TOTAL ESTIMATE $676.00
GENERAL CONDITIONS
1.Except where superseded by an existing services agreement the following terms and conditions apply to this quoted business.
2.Prices firm for 30 days.
3.Terms: Net 15 Days 4.Interest will be charged at 1.5% per month or the maximum allowed by law for all past due amounts.
5.Local, state and federal fees/taxes applying to the generating location/receiving facilities are not included in disposal pricing and will be added to each invoice as applicable.
6.Materials subject to additional charges if they do not conform to the listed specifications.
7.All drums for disposal must be in D.O.T. approved containers and in good condition.
August 10, 2020 Clean Harbors Quote #3552209
GENERAL CONDITIONS
8.All containers must be marked with Clean Harbors' profile number.
9.Clean Harbors will provide a manifest and necessary labels for transportation with a charge of
$1.25 per label.
10.Electronically submitted profiles will be approved at no charge. Paper profiles will be charged at
$75.00 each.
11.Clean Harbors supports many invoice delivery options (E-mail, Electronic Invoicing, EDI, Etc.).
Pricing is based on Clean Harbors' standard invoice delivery method of E-mail. If another delivery method is required there could be an additional service fee per invoice. Any alternate delivery methods must be reviewed and approved by Clean Harbors prior to acceptance and implementation.
12.Compressed gas cylinders requiring special handling due to inoperable valves will be assessed an additional charge of $400.00 per cylinder. Cylinders larger than medium size will be quoted case by case. This charge may be sent as supplemental invoice.
13.A variable Recovery Fee (that fluctuates with the DOE national average diesel price), currently at 10.0%, will be applied to the total invoice. For more information regarding our recovery fee calculation please go to: www.cleanharbors.com/contact-us/customer-resources.
14.Transportation rates are based on milkrun pickups. Additional costs may be incurred for out of milkrun service.
15.Pickups that require same day or next day service may be subject to additional charges.
16.Pickups cancelled within 72 hours of scheduling will be subject to cancellation charges.
17.Transportation charges to the final disposal facility will be charged in addition to local transportation to our truck to truck hub/local facility and will vary with logistics and routing.
18.Out of Service (OSD) for PCB incinerables should be clearly identified in Section 14 of the manifest. Prices for these items are only effective if received within 6 months of the OSD.
19.Standard disposal conversions (excluding minimums) apply to containers other than 5 gallon drums: 6-20g 60%, 21-30g 75%, 31-55g 100%, 56-85g 145%, FBIN 350%, TOT2(<300gal
TOTE) 500%, TOTE 630%.
20.In the event that legal or other action is required to collect unpaid invoice balances, Customer agrees to pay all costs of collection, including reasonable attorneys' fees, and agrees to the jurisdiction of the Commonwealth of Massachusetts.
21.The USEPA implemented the E-manifest system in June 2018 and charges the receiving TSDF a fee per manifest that is subject to change at USEPA’s discretion. Clean Harbors currently charges $20 per manifest to cover this cost on every invoice. This charge is subject to change if USEPA applies increased charges in the future.
22.Unless specifically noted, these rates are not valid where Prevailing Wages and / or certified payroll apply. Any Prevailing Wage rates will be quoted on a case-by-case basis.
August 10, 2020 Clean Harbors Quote #3552209
WASTE CLASSIFICATIONS SPECIFICATIONS
Waste Code Description
CH2041377 PERCHLOROETHYLENE LIQUIDS
Less than one inch solids in the drum Less than 5 percent other chlorinated solvents Flash point greater than 140°F No PCB's or pesticides pH between 5-10 Minimum yield 30 percent Must be pumpable
PRIMARY DISPOSAL METHOD: SOLVENT RECOVERY
ACKNOWLEDGEMENT
Your signature below indicates your acceptance of the pricing and terms detailed in the quote above.
Thank you for the opportunity to be of service.
Signature PO# Date
Print Name
Quote # 3552209
August 10, 2020 Clean Harbors Quote #3552209
From: Schaefer, Geoff D.
To: Kane, Kevin Subject: FW: Dryclean Site IDW Quote Date: Monday, June 28, 2021 2:22:52 PM Attachments: image001.png
Kevin, See below. This was for all our Jax sites. Baymeadows, Harveys, and Sunbeam.
v/r, Geoff Schaefer +01 850 298 7707 (d) +01 850 591 9249 (m)
From: White, Ron D. <ron.white@woodplc.com> Sent: Monday, June 28, 2021 2:17 PM To: Schaefer, Geoff D. <geoff.schaefer@woodplc.com> Subject: FW: Dryclean Site IDW Quote
FYI
1441 Maclay Commerce Drive, Suite 102 Tallahassee, Florida 32312 Direct: +1 (850) 298-7715 Mobile: +1 (850) 443-2341
From: White, Ron D.
Sent: Wednesday, June 16, 2021 10:10 AM To: mdale@perma-fix.com; ssierens@perma-fix.net Subject: FW: Dryclean Site IDW Quote
Hey Dale
Can you send me a quote with rates for disposal that I can use for drycleaning sites for like the next 6 months? Maybe something with a cost for up to _X_ drums and then a quote per drum for multiple drums over _X_ drums. Please consider all to be non-hazardous.
Please let me know if you have any questions. These sites will be located in North Florida, mainly Jacksonville mailto:geoff.schaefer@woodplc.com mailto:Kevin.Kane@FloridaDEP.gov file:////c/www.woodplc.com mailto:mdale@perma-fix.com mailto:ssierens@perma-fix.net
Thanks Ron
1441 Maclay Commerce Drive, Suite 102 Tallahassee, Florida 32312 Direct: +1 (850) 298-7715 Mobile: +1 (850) 443-2341
This message is the property of John Wood Group PLC and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorized use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system.
If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@woodplc.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications.
Please click http://www.woodplc.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France.
As a recipient of an email from a John Wood Group Plc company, your contact information will be on our systems and we may hold other personal data about you such as identification information, CVs, financial information and information contained in correspondence. For more information on our privacy practices and your data protection rights, please see our privacy notice at https://www.woodplc.com/policies/privacy-notice file:////c/www.woodplc.com http://www.woodplc.com/email-disclaimer https://www.woodplc.com/policies/privacy-notice
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
File details come from the government source that posted it. Updated .