This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract HW556 for remedial work at the Star Cleaners Depot facility (ERIC_4613) in Jacksonville, Duval County, Florida. The primary contractor is Cardno, Inc., represented by W. Bruce Moore, with FDEP Contract Manager Walsta Jean-Baptiste overseeing the work. The task assignment, designated DC029D, authorizes implementation of an approved Interim Source Removal Plan through August 31, 2021, with a final deliverable due date of April 30, 2021.
The scope of work encompasses three primary subtasks: Project Management (12.5% of direct labor costs), SVE system construction and installation and startup (including well modifications, trenching, piping installation, system assembly, and utility hookup), and preparation of a Remedial Action Startup Report. The fixed price task assignment is valued at $115,023.75 with no retainage. Deliverables include documentation of field work completion with photographic logs, property reporting forms and proof of purchase for the remedial system, and the startup report, with invoice payments tied to FDEP approval of each deliverable at $75,461.41, $31,800.00, and $7,762.34 respectively. The project comprises 274 total labor hours and includes subcontractor costs for equipment procurement from NDN Companies (selected as the lowest bidder at $81,705.00), laboratory analysis, field expenses, and a completion fee, with the period of performance extending through June 30, 2021.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC029D
Cardno, Inc.
W. Bruce Moore
850-245-8705Walsta Jean-Baptiste
ERIC_4613
Star Cleaners Depot
7181 Crane Avenue, Jacksonville, Duval County
Interim Source Removal
This Task Assignment authorizes Cardno to implement the approved Interim Source Removal Plan in accordance with the Cardno scope of work, cost estimate form, bid documentation, and schedule received on November 2, 2020.
Remedial Action Startup Report (submitted electronically)
04/30/2021
08/31/2021
$ 115,023.75 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.11.02 19:39:32 -05'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.11.02 19:39:49 -05'00'
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2020.11.03 13:30:26 -05'00'
Eric Meyers Digitally signed by Eric Meyers Date: 2020.11.03 14:07:15 -05'00'
$ 115,023.75
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Documentation of field work completion including field notes and photographic log depicting site conditions before and after soil vapor extraction system installation (submitted electronically) - Subtask 2
02/01/2021
Property reporting forms and proof of purchase for remedial system (submitted electronically) - Subtask 2 02/01/2021
Remedial Action Startup Report (submitted electronically) - Subtasks 1 and 3 04/30/2021
FDEP approval of Documentation of field work completion including field notes and photographic log depicting site conditions before and after soil vapor extraction system installation (submitted electronically) - Subtask 2
$ 75,461.41
FDEP approval of Property reporting forms and proof of purchase for remedial system (submitted electronically) - Subtask 2 $ 31,800.00
FDEP approval of Remedial Action Startup Report (submitted electronically) - Subtasks 1 and 3 $ 7,762.34
$ 115,023.75
HW556
DC029D
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: Star Cleaners; Interim Source Removal Implementation; DC029D DATE: November 2, 2020
This Task Assignment authorizes Cardno to implement the approved Interim Source Removal Plan in accordance with the Cardno scope of work, cost estimate form, bid documentation, and schedule received on November 2, 2020.
Subtask 1: Project Management Project management costs are calculated at 12.5 % of the direct labor cost.
Subtask 2: SVE system construction/installation and startup This subtask includes costs for system installation and startup. Based on a review of available FDEP treatment systems, Cardno determined that it was necessary to purchase a system. Because the system is being purchased by the installation subcontractor the cost for SVE equipment has not been broken out separately on the cost estimate form. The subcontractor handling fee is calculated in accordance with the contract at a rate of 10% for the first $50,000 and 7% for the remaining costs. Cardno received three responsive bids and selected the lowest responsive bidder. This subtask also includes $450 in handling fees for utility account setup (electrical and telemetry).
The original property cost was shown as $50,500. The cost has been corrected to exclude carbon and subcontractor costs for SVE equipment assembly. The invoice schedule now shows a cost of $31,800 for property based on the SVE system equipment costs. The adjustment did not result in a cost change.
Subtask 3: Remedial Action Startup Report This subtask includes costs for startup reporting.
The final cost associated with this Task Assignment is $115,023.75 with 274 hours.
FDEP COST ESTIMATEContractor: CARDNO, Inc.
Date:
Task #: HW556 DC029D SubTask 1 SubTask 6
Site: SubTask 2 SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
CARDNO, Inc.
$42.31 Project Manager (EM) 20 19.7 $42.31 Project Engineer (EM) 56 36 20 0 0 0 0 0 0 0 $20.91 Staff Geologist (VG) 186 162 24 0 0 0 0 0 0 0 $32.88 CADD Technician (FN) 12 0 12 0 0 0 0 0 0 0
Total Hours 274 20 198 56 0 0 0 0 0 0 0
CARDNO, Inc.
Direct Labor $7,484.83 $831.65 $4,910.58 $1,742.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 169.58% $12,692.77 $1,410.31 $8,327.36 $2,955.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (CARDNO) $20,177.60 $2,241.96 $13,237.94 $4,697.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
HSW Engineering, Inc.
Sub-Total Labor (HSW) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $20,177.60 $2,241.96 $13,237.94 $4,697.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $374.24 $41.58 $245.53 $87.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $840.00 $840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $840.00 $840.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
11/2/2020
Project Management
Star Cleaners (ERIC_4613)
SVE Installation and Startup
FDEP: W. Jean-Baptiste / Cardno: E. Meyers
Remedial Action System Startup Report
SVE Construction and Installation and Startup
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTIMATEContractor: CARDNO, Inc.
Date:
Task #: HW556 DC029D SubTask 1 SubTask 6
Site: SubTask 2 SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
11/2/2020
Project Management
Star Cleaners (ERIC_4613)
SVE Installation and Startup
FDEP: W. Jean-Baptiste / Cardno: E. Meyers
Remedial Action System Startup Report
SVE Construction and Installation and Startup
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $450.00 $450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 NDN Companies $81,705.00 $81,705.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $82,155.00 $82,155.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $7,219.35 $7,219.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $89,374.35 $89,374.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,328.00 $1,328.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $63.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,391.00 $1,391.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $325.00 $325.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment $232.80 $232.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $848.80 $848.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $113,005.99 $2,283.54 $105,937.62 $4,784.83 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,017.76 $224.20 $1,323.79 $469.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $115,023.75 $2,507.74 $107,261.41 $5,254.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE :
FDEP NO:
SUBTASK 2:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Engineer EM Technical Support (1 hour per day) - 6 days (not including site inspection), property 16 owner communication and scheduling; permitting Weekly Site Inspections (2) - 4 hours each 8 Travel Time (Tallahassee to Jacksonville) - 2 inspections (3 hour 1 way) 12
Staff Geologist VG Travel Time (Tallahassee to Jacksonville) - 4 mobs 4
Construction oversight, record keeping, photodocumentation - 8 days 140 Groundwater Sampling- 8 wells (MW-1 to MW-4, MW-7, MW-8, MW-10, and MW-15 10 SVE Startup - 1 day 8
TOTAL LABOR 198
TRAVEL TYPE RATE UNIT USEAGE Miles Free Truck $420.00 week 2 $840.00
TOTAL VEHICLE $840.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
$0.00 Services Procurement
NAME PURPOSE COST UNIT USEAGE
NDN Companies SVE System $31,800.00 LS 1 $31,800.00 NDN Companies SVE System Assembly and Carbon $18,700.00 LS 1 $18,700.00 NDN Companies Construction activities - piping, utilities, trenchwork $31,205.00 LS 1 $31,205.00 Utility Account Setup Electric and Telemetry $225.00 ea 2 $450.00
TOTAL SUBS $82,155.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs (EPA 8260) - 8 GW samples, 1 duplicate $66.00 8 1 $528.00 VOHs (TO-15) - VE-1, VE-2, Influent, Effluent $200.00 4 $800.00
Shipping (small) $63.00 1 $63.00 Ice $5.00 0 $0.00
TOTAL LAB $1,391.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Shallow Groundwater Sampling Kit $232.80 day 1 $232.80 Construction/O&M/Pilot Test Kit $291.00 day 1 $291.00 Expendables $32.50 day 10 $325.00
Sub-Total $848.80
TOTAL EQUIPMENT $848.80
Star Cleaners (ERIC_4613)
HW556 DC029D
SVE Construction and Installation and Startup 11/2/2020
SITE :
FDEP NO:
SUBTASK 3:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Senior Engineer/Geologist EM Remedial Action Startup Report text, Record Drawings, Recommendations Conclusions, PE Certification 20
Staff Geologist VG Data Tabulation, Figure Development, GIS Data Tables 24
CADD Technician FN Record Drawing Development 12
Project Assistant GD Project Support 0
TOTAL LABOR 56
Star Cleaners (ERIC_4613)
HW556 DC029D
Startup and Remedial Action System Startup Rep 11/2/2020
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya •
Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore •
Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Cardno
2420 Lakeshore Drive
Suite 100
Tallahassee
FL 32312 USA
Phone +1.850.385.8232
Fax 850.385.8233 www.cardno.com
November 2, 2020
Ms. Walsta Jean-Baptiste
Florida Department of Environmental Protection
Waste Site Cleanup Section
Drycleaning Solvent Cleanup Program
2600 Blairstone Road, MS 4520
Tallahassee, FL 32399
RE: Task Assignment Request for Soil Vapor Extraction System
Construction and Installation
Star Cleaners Depot
7181 Crane Avenue, Jacksonville, Duval County, Florida
FDEP Facility ID: ERIC_4613
Task Assignment: HW556-DC029D
Dear Walsta:
Cardno Inc. (Cardno) is pleased to submit this Task Assignment Request for Soil Vapor Extraction (SVE) construction and installation at the Star Cleaners Depot (ERIC_4613) site. Cardno completed an Interim Source
Removal Plan (ISRP), dated March 27, 2020 (revised September 9, 2020) for the above referenced site, and approved by the Florida Department of Environmental Protection (FDEP) on September 16, 2020.
The implementation of the ISRP requires the following tasks:
• Permitting;
• Schedule coordination with property owner and tenant;
• Modification previously installed Modified Active Gas Sampling (MAGS) wells (M-2 and M-4) into vapor extraction (VE) wells (VE-1 and VE-2, respectively);
• Modification of previously installed MAGS wells (M-3 and M-5) into air injection wells;
• Modification of previously installed MAGS wells (M-1) into vacuum measurement points (VMPs) with protective manhole completion;
• Trenching and installation of underground and above ground piping and appurtenances (including pressure testing) to connect VE wells (VE-1 and VE-2) and air injection wells (M-3 and M-5) to the SVE system compound;
• Construction of SVE system compound and manifold;
• Construction of an enclosed skid mounted SVE system with a 3 horsepower (hp) Ametek Rotron
Regenerative Blower (EN656, or equivalent), a 1 hp Ametek Rotron Regenerative Blower (EN404, or equivalent), and condensate tank with a 0.5 hp Myers CT-05 pump for entrained water, control panel including telemetry system with wireless access;
• Utility account setup and utility hookup to the SVE system (electric and telemetry);
• Baseline groundwater sampling (MW-1 to MW-4, MW-7, MW-8, MW-10, and MW-15, and a duplicate sample), per Table 8 of the ISRP, and laboratory analysis of volatile organic halocarbons (VOHs) by
United States Environmental Protection Agency (USEPA) Method 8260;
Ms. Walsta Jean-Baptiste Waste Site Cleanup Section
Star Cleaners Depot (ERIC_4613) SVE Construction and Installation Task Assignment Request
November 2, 2020
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya •
Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore •
Timor-Leste • United Kingdom • United States • Operations in over 100 countries
• SVE system startup;
• Depth to water measurements from MW-1 to MW-4 during startup;
• Vapor sample collection (VE-1 to VE-2, influent, and effluent), per Table 8 of the ISRP, for laboratory analysis of volatile organic carbons (VOCs) by USEPA Method TO-15 and field screening using an organic vapor analyzer (OVA);
• Submittal of property reporting form and associated documentation; and,
• Prepare a Remedial Action System Startup Report to include updated tables, figures, laboratory data, summary of remedial actions, conclusions, and Construction Drawings.
Subcontractor Selection
For the onsite construction activities and the construction of the SVE system, bids were solicited from NDN
Companies, Equipment with Experience, and Petrotech SE. As the lowest bidder, NDN Companies is selected to perform the onsite construction activities. A summary of the bids, a copy of each bid, and the proposed scope of work is provided in Appendix A.
Schedule to Complete
The proposed deliverables and deliverable dates are summarized below and are based on the assumption the SVE system will take approximately 12 weeks to construct prior to being delivered to the site:
Subtask 1: Project Management
Subtask 2: SVE Construction and Installation
Deliverable: Submittal of subcontractor invoices, field documentation, groundwater and vapor laboratory data, property reporting forms, and photodocumentation
Deliverable Due Date: January 31, 2021
Subtask 3: Remedial Action Startup Up Report; submittal of updated tables, figures, and a summary of remedial action construction activities, conclusions, and Construction Drawings
Deliverable Due Date: April 30, 2021
Period of Performance: June 30, 2021
If you have questions regarding this cost proposal, please call me at 850-629-2702 or by email
(eric.meyers@cardno.com).
Sincerely, Eric V. Meyers, P.E.
Project Engineer
For Cardno
Facility Name: Star Cleaners Depot Facility ID#: ERIC_4613
Well ID
Screened Interval
(ft bls) Baseline Annual
Depth to Water
Measurements
During Remedial
Action Visits
MW-1 4.76-14.76 VOHs (8260) - X
MW-2 4.79-14.79 VOHs (8260) VOHs (8260) X
MW-3 25-35 VOHs (8260) VOHs (8260) X
MW-4 10-20 VOHs (8260) VOHs (8260) X
MW-7 10-20 VOHs (8260) VOHs (8260)
MW-8 10-20 VOHs (8260) VOHs (8260)
MW-10 10-20 VOHs (8260) VOHs (8260)
MW-15 10-20 VOHs (8260) VOHs (8260)
Well ID Startup Week 1 Month 1 Quarterly
Semi-Annual /
Annual As Needed
VE-1/M-2
2 VOHs (TO-15) and OVA OVA OVA OVA OVA
VOHs (TO-15) and
OVA
VE-2/M-4
2 VOHs (TO-15) and OVA OVA OVA OVA OVA
VOHs (TO-15) and
OVA
Influent VOHs (TO-15) and OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
Effluent 1 VOHs (TO-15) and OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA OVA OVA -
M-1
M-3
M-5
Condensate
Notes:
2. Sampling of individual VEW wells will not be conducted on VEWs no longer being used for vapor extraction.
Key:
ft bls = feet below land surface
VOHs (8260) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method 8260
VOHs (TO-15) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method TO-15
OVA = Organic Vapor Analyzer equipped with Photoionization Detector (PID)
- = No analysis
TABLE 8: PROPOSED MONITORING SCHEDULE
Groundwater
Soil Vapor Extraction System
1 Sample for Generator Knowledge for VOHs (8260) - If condensate is recovered
Vacuum/Pressure Distribution Monitoring Point
Air Injection Point and/or Vacuum/Pressure Distribution Monitoring Point
Air Injection Point and/or Vacuum/Pressure Distribution Monitoring Point
1. Effluent sampling assumed to be terminated after 30-days; however, sampling requirements are dependent on emissions rate determined from influent/effluent concentrations.
Appendix A Subcontractor Costs
Facility Name: Star Cleaners Depot Facility ID#: ERIC_4613
Equipment with
Experience
NDN
Companies Petrotech SE
ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
TOTAL TOTAL TOTAL
Mobilization and all other costs not otherwise specified below.
Lump Sum 1 $ 4,200.00 $ 17,300.00 $ 12,000.00
2 Well Head Construction and Well Vaults Lump Sum 1 $ 1,500.00 $ 1,400.00 $ 728.00
3 Earthwork (trenching and backfilling) Lump Sum 1 $ 14,250.00 $ 5,220.00 $ 9,491.00
4 Piping and Appurtenances Lump Sum 1 $ 1,850.00 $ 1,100.00 $ 1,983.00
5 Surface Restoration Lump Sum 1 $ 3,500.00 $ 1,585.00 $ 2,130.00
6 SVE System Compound Lump Sum 1 $ 6,000.00 $ 1,000.00 $ 1,975.00
Enclosed Skid Mounted SVE System
(Equipment Only) Lump Sum --- $ - $ - $ -
Skid Mounted Enclosure Lump Sum 1 $ 9,500.00 $ 10,500.00 $ 17,020.00 Control Panel (including telemetry
[wireless]) Lump Sum 1 $ 8,750.00 $ 4,700.00 $ 12,627.00
SVE Pump – Ametek Regenerative EN656
3hp Lump Sum 1 $ 6,840.00 $ 8,000.00 $ 5,865.00
Air Injection Pump - Ametek Regenerative
EN404 1 hp Lump Sum 1 $ 3,660.00 $ 6,000.00 $ 2,530.00
Condensate Transfer Pump – Myers DT05
1/2 hp Lump Sum 1 $ 1,850.00 $ 900.00 $ 1,357.00
Moisture Separator Lump Sum 1 $ 1,850.00 $ 1,700.00 $ 2,300.00 Vapor Phase Carbon – Carbtrol G-2 (170 pounds) Lump Sum 1 $ 1,200.00 $ 1,180.00 $ 805.00
Enclosed Skid Mounted SVE System
(Assembly) Lump Sum 1 $ 21,000.00 $ 17,520.00 $ 10,774.00
9 Utility Hookup (Electric and Wireless) Lump Sum 1 $ 8,500.00 $ 3,000.00 $ 10,000.00
10 Waste Management and Disposal $ 95.00 $ 600.00 $ 1,690.00
$ 94,545.00 $ 81,705.00 $ 93,275.00 8 8 6
Total
See Quote for Method
Field Days
Table 1: Subcontractor Evaluation for Interim Source Removal Plan
Implementation
EXHIBIT 2
Bid Form for
Remedial System Construction at the Star Cleaners Depot (ERIC_4613)
7181 Crane Avenue
Jacksonville, Duval County, Florida
ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
UNIT PRICE TOTAL
1 Mobilization and all other costs not otherwise specified below. Lump Sum 1
2 Well Head Construction and Well Vaults Lump Sum 1
3 Earthwork (trenching and backfilling) Lump Sum 1
4 Piping and Appurtenances Lump Sum 1
5 Surface Restoration Lump Sum 1
6 SVE System Compound Lump Sum 1
7 Enclosed Skid Mounted SVE System (Equipment Only) Lump Sum Listed as individual components
Skid Mounted Enclosure Lump Sum 1
Control Panel (including telemetry [wireless]) Lump Sum 1
SVE Pump – Ametek Regenerative EN656 3hp Lump Sum 1
Air Injection Pump - Ametek Regenerative EN404 1 hp Lump Sum 1
DC029D
4200 4200
1500 1500
14250 14250
1850 1850
3500 3500
6000 6000
EXHIBIT 2 - Bid Form for Remedial System Construction
Star Cleaners Depot (ERIC_4613)
ITEM DESCRIPTION UNIT
ESTIMATED
QUANTITY
UNIT PRICE TOTAL
Condensate Transfer Pump – Myers DT05 1/2 hp Lump Sum 1
Moisture Separator Lump Sum 1
Vapor Phase Carbon – Carbtrol G-2 (170 pounds) Lump Sum 1
8 Enclosed Skid Mounted SVE System (Assembly) Lump Sum 1
9 Utility Hookup (Electric and Wireless) Lump Sum 1
10 Waste Management and Disposal Ton
TOTAL FIELDWORK DURATION REQUIRED DAYS.
TOTAL NOT TO EXCEED BID PRICE
(use words) (figures)
Corporate Entity: ____________________________________________________
Authorized Agent: ___________________________________________________
Costs Valid for: _______________________________________(days)
1850 1850
1850 1850
1200 1200
21000 21000
8500 8500
Equipment with Experience, LLC
Thomas Twitmyer
Ninety-four thousand four hundred and fifty dollars 94,450.00
EXHIBIT 2
Bid Form
Remedial System Construction at the
Star Cleaners Depot (ERIC_4613)
ITEM DESCRIPTION UNIT ESTIMATED
QUANTITY UNIT PRICE TOTAL
1 Mobilization and all other costs not otherwise specified below. Lump Sum 1 $12,000.00 $12,000.00
2 Well Head Construction and Well Vaults Lump Sum 1 $728.00 $728.00
3 Earthwork (trenching and backfilling) Lump Sum 1 $9,491.00 $9,491.00
4 Piping and Appurtenances Lump Sum 1 $1,983.00 $1,983.00
5 Surface Restoration Lump Sum 1 $2,130.00 $2,130.00
6 SVE System Compound Lump Sum 1 $1,975.00 $1,975.00
7 Enclosed Skid Mounted SVE System (Equipment Only) Lump Sum Listed as individual components
Skid Mounted Enclosure Lump Sum 1 $17,020.00 $17,020.00
Control Panel (including telemetry [wireless]) Lump Sum 1 $12,627.00 $12,627.00
SVE Pump – Ametek Regenerative EN656 3hp Lump Sum 1 $5,865.00 $5,865.00
Air Injection Pump - Ametek Regenerative EN404 1 hp Lump Sum 1 $2,530.00 $2,530.00
EXHIBIT 2 - Bid Form for Remedial System Construction
ITEM DESCRIPTION UNIT ESTIMATED
QUANTITY UNIT PRICE TOTAL
Condensate Transfer Pump – Myers DT05 1/2 hp Lump Sum 1 $1,357.00 $1,357.00
Moisture Separator Lump Sum 1 $2,300.00 $2,300.00
Vapor Phase Carbon – Carbtrol G-2 (170 pounds) Lump Sum 1 $805.00 $805.00
8 Enclosed Skid Mounted SVE System (Assembly) Lump Sum 1 $10,774.00 $10,774.00
9 Utility Hookup (Electric and Wireless) Lump Sum 1 $10,000.00 $10,000.00
10 Waste Management and Disposal Ton 10 $169.00 $1,690.00
TOTAL FIELDWORK DURATION REQUIRED 6 DAYS.
TOTAL NOT TO EXCEED BID PRICE
Ninety Three Thousand Two hundred and seventy Five Dollars ( $93,275.00 ) (use words) (figures)
Corporate Entity: Petrotech SE, Inc.
Authorized Agent: Michael Bishop, CGC, PSSC, LEED AP
Costs Valid for: 90 (days)
EXHIBIT 1
Scope of Work
Remedial System Construction at the
Star Cleaners Depot (ERIC_4613)
Cardno, Inc. (Cardno), under contract (Contract HW556) with Florida Department of
Environmental Protection (FDEP), herein referred to as the Client, is seeking Subcontractor(s) to perform remedial system construction at the above-referenced site. These services include, well installation, well head and vault construction, sub-surface piping, trenching and backfilling, surface restoration, delivering a new skid mounted soil vapor extraction (SVE) system onsite, assembly of the SVE system, utility installation (electric and wireless), non-hazardous waste soil management and disposal, and SVE system treatment startup.
The scope of work will be costed based on 10-hour working days Monday through Friday.
Weekends may be worked if agreed upon by Cardno project manager, property owner or the property representative, and the selected subcontractor.
The subcontractor shall obtain necessary permits and furnish the equipment and material for construction of the remedial system, transportation and assembly of the trailer mounted system, waste management, disposal, and SVE system treatment startup. If overburden from the system trenches during construction cannot be used as backfill, then manifests indicating proper transportation and disposal will be required for final payment.
Exhibit 2 is to be completed by the subcontractor to indicate the proposed costs to complete this
Scope of Work.
Interim Source Removal Design
The Interim Source Removal Plan prepared for the Client is available at:
https://prodenv.dep.state.fl.us/DepNexus/public/electronic-documents/ERIC_4613/facility!search
NOTE: If discrepancies between this scope of work and the Interim Source Removal Plan are identified, the details in the Interim Source Removal Plan will supersede the details of this scope of work, unless changes are approved by Cardno .
Site Access
The Client has obtained permission to enter the site from the property owner. Construction activities and facility access will be determined with a meeting with the property owner/property representative, facility operator, prior to commencement of construction activities.
Health and Safety
Subcontractor and their subcontractors, if applicable, shall work under the Subcontractor Health and Safety Plan (HASP). The HASP shall be in accordance with Occupational Safety and Health
Administration (OSHA) requirements specified in Title 29, Code of Federal Regulations.
https://prodenv.dep.state.fl.us/DepNexus/public/electronic-documents/ERIC_4613/facility!search
EXHIBIT 1 Scope of Work for Remedial System Construction
Requirements
Trenchwork activities (including electrical and plumbing) will be performed in accordance with the OSHA requirements, the Florida Trench Safety Act (Section 553.60-553.64, Florida Statutes), the Underground Facility Damage Prevention and Safety Act (556.101-556.111, Florida Statutes), and Federal and State regulations (including Chapter 489 and Chapter 553, Florida Statues).
Electrical and plumbing work, underground utility construction and excavation, and SVE system installation will be performed in accordance with Chapters 489 & 553, Florida Statutes and local requirements.
The SVE equipment shall be Underwriters Laboratory certified. Electrical hookup, wiring, connections, grounding, etc. shall meet appropriate requirements of the National Electrical Code.
Subsurface Features
The selected subcontractor is responsible to obtain underground utility searches (including U-Dig and ground penetrating radar, where appropriate) in accordance with the law. Subsurface work shall be conducted in a manner as to protect subsurface utilities and features. A ground penetrating radar (GPR) survey has previously conducted at the property and can be provided upon request. Providing the GPR does not alleviate the subcontractor of liability for performing the GPR search or damage to underground structures or utilities.
Bid Sheet/Price Schedule Item Descriptions
The following are referenced to the item number on the preceding Subcontractor Rate Sheet and are intended to further define the corresponding cost items identified therein.
1. Mobilization, Site Preparation, and Demobilization (including all other costs not otherwise specified below)
This item is for the time and efforts of the Subcontractor in obtaining and transporting any of the equipment and supplies required for this project to and from the site required for installation and construction of the SVE system. This item includes charges incidental to equipment set-up and removal as well as the furnishing of personnel, machinery, tools, and all other equipment necessary to perform and complete the work properly. Site cleanup
(demobilization) and site restoration including repair of damage caused by installation or use of temporary facilities.
This item should not include the actual cost of purchased or rented equipment and supplies.
Equipment and supplies furnished under this item will remain the property of the
Subcontractor(s) and will be maintained, cared for, and disposed of by the Subcontractor(s).
The following costs are also included in this item:
Permitting and Utility Clearance
Permitting costs (application, fees, processing, well installation/completion, etc.);
Conduct underground utility clearances;
Schedule mandatory meetings and inspections with all the corresponding authorities;
Site Preparation
Provision of worker safety and sanitary facilities and enclosures as required by
OSHA;
Coordination of activities;
Place caution tape, traffic plates, traffic cones, and traffic signs where needed; and, Clear all work areas/
SVE Treatment System Startup
Coordinate the SVE treatment system startup activities with Cardno’s project manager. The Cardno project manager must receive notification of startup activities no less than 48 hours in advance
Provide SVE treatment system startup and run the SVE treatment system continuously for a minimum of 6 hours.
Startup shall be performed in accordance with the United States Army Corps of
Engineers publication EM 1110-1-4001 titled “Engineering and Design: Soil Vapor
Extraction and Bioventing.”
Items, installed by the Subcontractor(s),that do not meet the specifications or requirements must be satisfactorily resolved with concurrence of Cardno. Items deemed unacceptable by the Cardno project manager must be repaired or replaced prior to Cardno’s approval of work and acceptance of the SVE treatment system.
This item will be paid at the lump sum contract price.
2. Well Head Construction and Well Vaults
This item shall include labor and materials associated with the the construction of vapor extraction well heads and conversion of MAGS wells.
A total of four (4) well heads will be constructed as shown on the construction drawings
(Exhibit 3) at VE-1/M-2, VE-2/M-4, M-3, and M-5.
The remaining well head M-1 will be converted into a vacuum distribution monitoring point.
The subcontractor shall remove the temporary grout patch, and install an 8-inch FDOT H20 rated manhole set within a 2 foot by 2 foot concrete pad. Interior wells may have a smaller footprint on both pad and manhole to minimize impact to the facility. The subcontractor shall convert each of these well heads by installing a well plug fitted with a vacuum/sample port.
This item will be paid at a lump sum costs.
3. Earthwork (trenching and backfilling).
This item shall include labor and materials associated with trenching and backfilling.
Conduct trenching and backfilling activities as shown on the construction drawings. Saw cut asphalt and/or concrete prior to trenching. Provide protection (such as trench road plates) over and around excavated areas until backfill and surface restoration activities are complete.
Any field changes that deviate from the construction drawings shall be noted and submitted by the Subcontractor to the Cardno project manager.
Material removed from trenches shall be replaced in the trench following piping installation.
Installation of material shall be placed and compacted in 4 inch to 6 inch lifts. Subcontractor shall compact material to no less than 95% density of the modified Proctor. Subcontractor shall Proctor and field density test to determine the degree of compaction. It is the responsibility of the Subcontractor to have available an independent testing agency to complete the tests. Whenever test results indicate compaction densities are less than specified, the Contractor shall secure the specified compaction. The testing agency, so employed by the Subcontractor, shall submit a copy of testing reports directly to Cardno.
Subcontractor shall stop placement of backfill 6-inch below land surface bls at exterior trenching for surface restoration as described in Item 5.
Overburden generated during trenching that is not used as backfill will be disposed of as indicated in Item 10.
This item will be paid at lump sum price.
4. Piping and Appurtenances.
This item shall include labor and materials associated with both above grade and below grade surface piping installation. Vapor extraction well piping and controls, from the vapor extraction wells to the SVE treatment system, as shown on the construction drawings.
Additionally, this item includes the labor and materials associated with the SVE and air injection manifold (including flow meters and gauges) as shown in the construction drawings.
Above grade piping shall be 2-inch diameter schedule 80 PVC. Above grade piping and accessories shall affixed to walls by brackets set apart no greater than 6 feet. Piping shall be affixed at an above head height, at such a height as field determined. Additionally, Subcontractor shall be equipped to cut an opening through wall(s) to allow for piping. Any such drilling shall be sealed upon installation of the piping with a fire retardant insulation.
The walls at the property are known to be cinderblock.
Below grade piping shall be 2-inch diameter schedule 40 PVC.
Piping and manifold shall be pressure/vacuum tested during construction and slightly sloped toward the VEW to minimize water entrainment.
This item will be paid at a lump sum costs.
5. Surface Restoration.
This item shall include labor and materials associated with surface restoration. Conduct surface restoration activities as shown on the construction drawings.
Surface restoration on the interior of the building shall be no less than 3,000 pounds per square inch (psi) concrete with fiber mesh dyed to match the interior.
Surface restoration on the interior of the building shall be no less than 6-inches of no less than
3,000 psi concrete with fiber mesh dyed black to match asphalt conditions.
Well pads shall be no less than 6-inches thick and no less than 3,000 psi fiber mesh concrete.
This item will be paid at the lump sum contract price.
6. SVE System Compound
Subcontractor shall construct a compound for the manifold and SVE system as indicated in the construction drawings (Exhibit 3). The rear alleyway in which the manifold and system is located is approximately 10 feet wide. Access to the rear exits of the building cannot be blocked as there are active businesses in the rear.
This item will be paid at the lump sum contract price.
7. Enclosed Skid Mounted SVE System (equipment only).
This item shall include labor and materials associated with purchase and delivery of an enclosed skid mounted SVE system. Equipment purchased shall meet specifications as shown on the construction drawings (Exhibit 3) The SVE equipment shall be Underwriters
Laboratory certified.
This item will be paid at the lump sum contract prices for individual components.
8. Enclosed Skid Mounted SVE System (Assembly).
This item shall include labor and materials associated with assembly of a skid mounted SVE system. Assembly of the skid mounted SVE system shall meet specifications as shown on the construction drawings. The SVE equipment shall be Underwriters Laboratory certified.
This item will be paid at the lump sum contract price.
9. Utility Hook-up (Electric and Wireless).
This item shall include labor, equipment, and materials associated with electric and wireless utilities connections. This item includes installation of a utility drop, wiring, electrical box, inspections, and installation of utilities from the electrical drop to the SVE treatment system.
Coordinate utility connects with local utility owners/suppliers.
Utility accounts will be setup by Cardno.
This item will be paid at the lump sum contract price.
10. Waste Management and Disposal.
This item shall include labor and materials associated with waste management and disposal, if warranted.
Subcontractor shall:
Properly containerize mixed debris and soils excavated during trench work activities.
Properly manage and dispose of asphalt and concrete cuttings in an appropriate facility
(C and D landfill). Provide Cardno with manifests or bills of lading and final disposal certificates. Subcontractor shall provide Cardno with a list of any subcontractors, transporters and disposal facility(ies) utilized to dispose of the waste.
Properly manage and dispose of non-hazardous over burden cuttings in an appropriate facility. Provide Cardno with manifests or bills of lading and final disposal certificates.
Subcontractor shall provide Cardno with a list of any subcontractors, transporters and disposal facility(ies) utilized to dispose of the waste.
This item will be paid at the contract price per ton.
END SCOPE OF WORK.
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Star Cleaners Construction CEF 10192020.pdf |
| Cost Estimate-Original |
| sub 2-Original |
| sub 3-Original |