This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW556, executed on May 17, 2021. The contract is between FDEP and Cardno, Inc., with Eric Meyers serving as the contractor representative and Walsta Jean-Baptiste as the FDEP Contract Manager. The task assignment pertains to operation and maintenance services at the Star Cleaners Depot facility (ERIC_4613), located at 7181 Crane Avenue, Jacksonville, Duval County, Florida.
Task Assignment DC029E authorizes Cardno to conduct six months of operation and maintenance activities for a soil vapor extraction (SVE) system and groundwater monitoring from July through December 2021, with a total task assignment value of $17,731.64. The contract utilizes a fixed price payment structure of $15,631.64 combined with a cost plus fixed fee arrangement for utilities not to exceed $2,100.00 in actual costs plus a $240 handling fee. The scope includes three subtasks: Project Management (calculated at 12.5% of direct labor costs totaling $1,410.08), O&M activities including system inspections, sample collection, and laboratory analysis ($13,981.56), and utilities for electricity and telemetry ($2,340.00). The final deliverable is a Semi-Annual Remedial Action Status Report due February 28, 2022, with a total period of performance through May 31, 2022. No retainage applies to this task assignment. Labor costs total $11,345.74 covering 135 hours of work across project engineering, staff geology, and technical support positions.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC029E
Cardno, Inc.
Eric Meyers
850-245-8705Walsta Jean-Baptiste
ERIC_4613
Star Cleaners Depot
7181 Crane Avenue, Jacksonville, Duval County
Operation and Maintenance
This Task Assignment authorizes Cardno to conduct 6 months of operation and maintenance in accordance with the Cardno scope of work, cost estimate, bid documentation, and schedule.
The payment of utilities is the only part of this Task Assignment that is Cost Plus Fixed Fee.
Semi-Annual Remedial Action Status Report
02/28/2022
05/31/2022
$ 15,631.64 $ 0.00 $ 2,100.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.05.17 16:34:49 -04'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.05.17 16:34:55 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.05.18 10:19:57 -04'00'
Eric Meyers Digitally signed by Eric Meyers Date: 2021.05.18 11:13:48 -04'00'
$ 17,731.64
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Semi-Annual Remedial Action Status Report - Subtasks 1 and 2 02/28/2022
FDEP approval of Semi-Annual Remedial Action Status Report - Subtasks 1 and 2 $ 15,391.64
FDEP receipt of utility invoices for 6 months; Utilities (Cost Plus Fixed Fee) = not to exceed $2,100; Utilities Handling Fee = $240 - Subtask 3 $ 2,340.00
$ 17,731.64
HW556
DC029E
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: Star Cleaners; Operation and Maintenance; DC029E DATE: May 17, 2021
This Task Assignment authorizes Cardno to conduct 6 months of operation and maintenance in accordance with the Cardno scope of work, cost estimate, bid documentation, and schedule.
Subtask 1: Project Management Project management is automatically calculated at 12.5% of the direct labor cost.
Subtask 2: O&M (July - December 2021) The subtask covers 6 months of O&M from July to December 2021.
Subtask 3: O&M (July - December 2021) This subtask is for utilities. By Cardno’s estimate, the utilities will not exceed $2,100 from July to December 2021. The total for handling fees related to this O&M period is $240. The handling fees were calculated based on monthly billing for electric and telemetry.
The cost related to this Task Assignment is $17,731.64 with 135 hours.
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date:
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 O&M (6 Months) SubTask 7 ctivity/Phase: SubTask 3 Utilities (6 Months) SubTask 8 ect Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
CARDNO, Inc.
$43.32 Project Manager (EM) 11 10.8 $43.32 Project Engineer (EM) 23 23 0 0 0 0 0 0 0 0 $27.02 Staff Geologist (AS) 95 95 0 0 0 0 0 0 0 0 $29.63 CADD Technician (DJD) 6 6 0 0 0 0 0 0 0 0
Total Hours 135 11 124 0 0 0 0 0 0 0 0
CARDNO, Inc.
Direct Labor $4,208.67 $467.63 $3,741.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 169.58% $7,137.07 $793.01 $6,344.06 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (CARDNO) $11,345.74 $1,260.64 $10,085.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $11,345.74 $1,260.64 $10,085.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $210.43 $23.38 $187.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $420.00 $420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $420.00 $420.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
5/12/2021
FDEP: W. Jean-Baptiste / Cardno: E. M
O&M (6 months)
Star Cleaners Depot (ERIC_4613)
HW556 DC029E
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date:
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 O&M (6 Months) SubTask 7 ctivity/Phase: SubTask 3 Utilities (6 Months) SubTask 8 ect Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
5/12/2021
FDEP: W. Jean-Baptiste / Cardno: E. M
O&M (6 months)
Star Cleaners Depot (ERIC_4613)
HW556 DC029E
Subcontracto(Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontracto(Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $2,100.00 $0.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Handling Fee $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,340.00 $0.00 $2,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,340.00 $0.00 $2,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,200.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $252.00 $252.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,452.00 $1,452.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $227.50 $227.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $601.40 $601.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $828.90 $828.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $16,597.07 $1,284.02 $12,973.05 $2,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,134.57 $126.06 $1,008.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $17,731.64 $1,410.08 $13,981.56 $2,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE : Star Cleaners Depot (ERIC_4613)
FDEP NO: ERIC_4613
SUBTASK: O&M (6 Months)
DATE: 5/12/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Engineer EM 16 System Operation Review and optimization recs (1 Hr per Inspection) 7
Staff Geologist AS 35
CADD Technician DJD CAD Figure Development 6
TOTAL LABOR 124
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $420.00 Week 1 $420.00
TOTAL VEHICLE $420.00
SUBCONTRACTOR
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
Groundwater
VOHs-8260 (Condensate) $66.00 0 0 $0.00
Air VOHs- TO-15 (7 day, Month 1, Month 3, Month 6) $200.00 6 $1,200.00
Shipping small (0 to 25lbs); No Ice $63.00 4 $252.00
Shipping small (0 to 25lbs)+Ice $68.00 0 $0.00
TOTAL LAB $1,452.00
FIELD EXPENSE ITEM RATE UNIT USEAGE TOTALS
Field Equipment Construction/O&M Supplies $252.20 Week 1 $252.20
Photoionization Meter (Mini Rae 3000) $87.30 Day 4 $349.20
Expendables $32.50 Day 7 $227.50
Sub-Total $828.90
TOTAL EQUIPMENT $828.90
Data tables, ADAPT/GIS, and Figures
Semiannual RASSR: Report Writing, Lab QA/QC, Conclusions, and Recommendations, certification
Mobilization - Tallahassee to Jacksonville (2.5 hours each way) - 7 mob
7 SVE O&M Inspections, Field Measurements, and Sample Collection (7 day, 30 day, 3 month, 6 month) and Warehouse Mob/Demob
SITE : Star Cleaners Depot (ERIC_4613)
FDEP NO: ERIC_4613
SUBTASK: Utilities (6 Months)
DATE: 5/12/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TOTAL LABOR 0
TRAVEL TYPE RATE UNIT USEAGE Miles Free
TOTAL VEHICLE $0.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Utilities Electric ($300/month); Telemetry ($50/month) $350.00 Month 6 $2,100.00
Utilities Handling Fee $20 per month per utility (Electric and Telemetry) $40.00 Month 6 $240.00
TOTAL SUBS $2,340.00
LABORATORY
TOTAL LAB $0.00
FIELD EXPENSE ITEM RATE UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Cardno
2420 Lakeshore Drive Suite 100 Tallahassee
FL 32312 USA
Phone +1.850.385.8232
Fax 850.385.8233 www.cardno.com
May 12, 2021
Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection Waste Site Cleanup Section Drycleaning Solvent Cleanup Program 2600 Blairstone Road, MS 4520 Tallahassee, FL 32399
RE: Task Assignment Request for Six (6) Months Operations and Maintenance
Star Cleaners Depot
7181 Crane Avenue, Jacksonville, Duval County, Florida
FDEP Facility ID: ERIC_4613
Task Assignment: HW556-DC029E
Dear Walsta:
Cardno Inc. (Cardno) is pleased to submit this Task Assignment Request for soil vapor extraction (SVE) system operations and maintenance (O&M) and groundwater monitoring activities at the above referenced site. This O&M proposal is based on the assumption the Interim Source Removal and SVE startup will occur in July 2021 and continue for six (6) months until December 2021. A time extension may be requested to adjust the deliverable schedule accordingly based upon the actual SVE system O&M start date.
During each monthly site inspection routine O&M will be conducted and include the following:
• Check system operation during each visit;
• Check/change oil in pump(s), if required;
• Check the water level in the moisture separator; if necessary, accumulated water in the moisture separator will be drained, treated by carbon adsorption and discharged to the pavement. If the groundwater entrainment rate is significant, the wellhead vacuum levels will be reduced. One sample of accumulated water will be collected for laboratory analysis of volatile organic compounds (VOCs) by United States Environmental Protection Agency (USEPA) Method 8260 for generator knowledge (by a work change directive, if required);
• Collect gauge readings from the manifold and remedial equipment during each visit to verify system performance;
• Collection of vapor samples from each vapor extraction well, the influent, and the effluent for field screening using an organic vapor analyzer (OVA) (Table 1);
• Collection of depth to water (DTW) measurements from monitor wells MW-1, MW-2, MW-3, and MW-4 (Table 1); and, Florida Department of Environmental Protection - Waste Site Cleanup Section Star Cleaners Depot (ERIC 4613) Task Assignment Request DC029E – Six (6) Months Operations and Maintenance Cost Proposal
• Collect vacuum or pressure readings from the vapor extraction wells/air injection points and vacuum distribution monitoring points (Table 1) and optimize SVE system according to monitoring results.
The SVE system O & M activities include the following subtasks:
Task 1: Project Management
Costs associated with this subtask are based on 12.5% of the direct labor costs of the remaining subtasks.
Task 2: O&M (6 Months)
This subtask is for O&M activities for six (6) months of O&M. As part of the six (6) months of O&M, the site will be visited at the end of week 1 and monthly for six (6) months. In addition to the routine O&M tasks, the following activities will be conducted:
• Week 1 and Month 1 – Collection of vapor samples from the influent and effluent for laboratory analysis of volatile organic halocarbons (VOHs) by USEPA Method TO-15 (Table 1);
• Month 3 and Month 6 – Collection of a vapor sample for the influent for laboratory analysis of
VOHs by USEPA Method TO-15 (Table 1);
• If condensate is recovered, collection of one sample for VOHs by USEPA Method 8260 will be conducted for generator knowledge following issuance of a change order or Work Change
Directive.
A Semi-Annual Remedial Action Status Summary (RASS) report will be submitted summarizing the remedial status, tabulation of current and historic field measured parameters and laboratory analytical results, groundwater elevation isopleth map (if applicable), treatment system radius of influence maps (if applicable), summary of site visits and sampling events, conclusions and recommendations, and
Professional Engineering certification.
Additionally, updated Geographical Information System (GIS) Data Table updates and associated laboratory electronic data deliverables will be submitted.
Subtask 3: Utilities (6 Months)
The estimated costs of utilities is approximately $300.00 per month for electricity and $50.00 per month for telemetry. Electrical consumption is based on a similar system located at Phenix Supply Company
(ERIC_4764).
A utility bill handling fee of $20.00 per month for per utility is included.
Actual utility costs incurred during the six (6) months O&M time period will be billed to FDEP. Unused estimated utility costs will be returned, or increased utility costs, will be addressed by a change order request.
Florida Department of Environmental Protection - Waste Site Cleanup Section Star Cleaners Depot (ERIC 4613) Task Assignment Request DC029E – Six (6) Months Operations and Maintenance Cost Proposal
Schedule
The proposed deliverables and deliverable dates are summarized below and are based on the assumption that startup of the SVE system is completed by July 1, 2021:
Subtasks 1 and 3: O&M (6 Months) and Semi-Annual RASS
Report
Deliverable: Semi-Annual RASS Report including field documentation, laboratory analytical data, IDW manifest, updated GIS data tables and ADaPT files (submitted electronically)
Deliverable Due Date: February 28, 2022
Subtask 4: Utilities (six (6) months)
Deliverable: FDEP receipt of utilities summary and utility bills
(submitted electronically)
Deliverable Due Date: March 30, 2022
Period of Performance: May 30, 2022
If you have questions regarding this cost proposal, please call me at 850-629-2702 or by email
(eric.meyers@cardno.com).
Sincerely, Eric V. Meyers
Project Engineer
For Cardno
Enc: Table
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Table
Facility Name: Star Cleaners Depot Facility ID#: ERIC_4613
Well ID
Screened Interval
(ft bls)
Depth to Water
Measurements
During Remedial
Action Visits
MW-1 4.76-14.76 X
MW-2 4.79-14.79 X
MW-3 25-35 X
MW-4 10-20 X
MW-7 10-20
MW-8 10-20
MW-10 10-20
MW-15 10-20
Well ID Startup Week 1 Month 1 Quarterly
Semi-Annual /
Annual As Needed
VE-1/M-2
2 VOHs (TO-15) and OVA OVA OVA OVA OVA
VOHs (TO-15) and
OVA
VE-2/M-4
2 VOHs (TO-15) and OVA OVA OVA OVA OVA
VOHs (TO-15) and
OVA
Influent VOHs (TO-15) and OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA
Effluent 1 VOHs (TO-15) and OVA
VOHs (TO-15) and
OVA
VOHs (TO-15) and
OVA OVA OVA -
M-1
M-3
M-5
Condensate
Notes:
2. Sampling of individual VEW wells will not be conducted on VEWs no longer being used for vapor extraction.
Key:
ft bls = feet below land surface
VOHs (8260) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method 8260
VOHs (TO-15) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method TO-15
OVA = Organic Vapor Analyzer equipped with Photoionization Detector (PID)
- = No analysis
1 Sample for Generator Knowledge for VOHs (8260) - If condensate is recovered
1. Effluent sampling assumed to be terminated after 30-days; however, sampling requirements are dependent on emissions rate determined from influent/effluent concentrations.
TABLE 1: PROPOSED MONITORING SCHEDULE
Soil Vapor Extraction System
Vacuum/Pressure Distribution Monitoring Point
Air Injection Point and/or Vacuum/Pressure Distribution Monitoring Point
Air Injection Point and/or Vacuum/Pressure Distribution Monitoring Point
Groundwater
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Phenix Supply DC005i Proposal 05122021.pdf |
| 43822670 |
| IDW combined |
| 957820310 |
| 541165790 |
| 619781330 |
| Copy of Phenix OM DC005i Costs (003).pdf |
| Cost Estimate |
| Sub 2 |
| Sub 3 |
| Star DC029E Costs 05122021.pdf |
| Table 1 Sampling Plan |
| 23546080 |
| 554095490 |
| Star DC029E O&M Costs 05122021.pdf |
| Cost Estimate |
| Sub 2 |