CN-370000-HW556-DC027E.pdf
PDF 660 KB Posted
- Contract number
- HW556
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for DEP Contract No. HW556, issued by the Florida Department of Environmental Protection (FDEP) to Cardno, Inc./HSW Engineering, Inc. The task assignment was executed on January 8, 2021, and authorizes operation and maintenance activities at the Peterson Cleaners site located at 850 N Broadway Avenue, Bartow, Polk County, Florida (Site ID: ERIC_5380). The contractor representative is Eric Meyers, and the FDEP Contract Manager is Walsta Jean-Baptiste. This indefinite delivery vehicle task assignment falls under the state's hazardous waste cleanup contract structure.
The task assignment authorizes HSW to conduct six months of soil vapor extraction system operation and maintenance in accordance with the Interim Source Removal Plan approved by FDEP on June 9, 2020. The work encompasses four subtasks: project management, quarterly O&M documentation (deliverable due May 20, 2021), semi-annual remedial action status reporting (deliverable due August 26, 2021), and utility costs covering seven months from January through July 2021. The total task assignment value is $22,552.94, comprised of a fixed price of $18,352.94, a cost reimbursement component of $4,200.00 for utilities, and a fixed fee of $0.00, with no retainage. The contract involves 116 total labor hours and includes direct labor costs, overhead at 170 percent, laboratory analytical services, field equipment and expendables, vehicle rental for site visits, and utility handling fees of $140.00.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC027E
Cardno, Inc.
Eric Meyers
850-245-8705Walsta Jean-Baptiste
ERIC_5380
Peterson Cleaners
850 N Broadway Avenue, Bartow, Polk County
Operation and Maintenance
This Task Assignment authorizes HSW to conduct six months of operation and maintenance in accordance with the HSW scope of work, schedule, and cost estimate received on January 5, 2021.
The payment of utilities is the only part of this Task Assignment that is Cost Plus Fixed Fee.
Semi-Annual Remedial Action Status Report
08/26/2021
11/30/2021
$ 18,352.94 $ 0.00 $ 4,200.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.01.08 11:23:57 -05'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.01.08 11:24:04 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.01.08 12:37:19 -05'00'
Eric Meyers Digitally signed by Eric Meyers Date: 2021.01.08 15:02:02 -05'00'
$ 22,552.94
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Quarterly O&M submittal including field documentation, laboratory reports and tables (submitted electronically) - Subtask 2 05/20/2021
Semi-Annual Remedial Action Status Report (submitted electronically) - Subtask 3 08/26/2021
FDEP approval of quarterly O&M submittal including field documentation, laboratory reports and tables (submitted electronically) - Subtask 2; AND FDEP approval of Semi-Annual Remedial Action Status Report (submitted electronically) - Subtask 3
$ 18,212.94
FDEP receipt of utility invoices for 7 months (January to July 2021); Utilities (Cost Plus Fixed Fee) = not to exceed $4,200; Utilities Handling Fee = $140 - Subtask 4 $ 4,340.00
$ 22,552.94
HW556
DC027E
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
Memorandum
TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: Peterson Cleaners; Operation and Maintenance; DC027E DATE: January 8, 2021
This Task Assignment authorizes HSW to conduct six months of operation and maintenance in accordance with the HSW scope of work, schedule, and cost estimate received on January 5, 2021.
This Task Assignment also includes 7 months of utilities from January through July 2021. The utilities also include startup and month 1.
The final cost associated with this Task Assignment is $22,552.94 with 116 hours.
(813) 968-7722 ■ 15711 Mapledale Blvd., Suite B ■ Tampa, FL 33624 ■ www.hsweng.com Engineering and Scientific solutions within your reach…
P:\1CB6 Cardno\1CB6022XX Peterson Cleaners\1CB602203 Peterson Cleaners - SVE\01 Proposals\TA Request_O&M 01-2021.docx
January 5, 2021
Sent via Electronic Mail
Ms. Walsta Jean-Baptiste, P.G.
Florida Department of Environmental Protection Hazardous Waste Cleanup Section 2600 Blair Stone Road, MS 4520 Tallahassee, FL 32399-2400
Re: Task Assignment Request – SVE Operation & Maintenance (Six Months) Peterson Cleaners 850 N. Broadway Avenue, Bartow, FL
ERIC_5380
Dear Walsta:
HSW Engineering, Inc. (HSW) is pleased to submit this Task Assignment request for Soil Vapor Extraction System Operation and Maintenance (SVE O&M) activities at the former Peterson Cleaners site (Site) in accordance with the Interim Source Removal Plan (ISR Plan, February 2020 and revised June 2020), approved by FDEP in a memorandum dated June 9, 2020. The following presents a proposed schedule and associated cost estimate for implementation of the activities described above.
Subtask 1: Project Management;
Subtask 2: SVE O&M Quarter One; submittal of Quarterly O&M Documentation.
Deliverable Date: May 20, 2021
Subtask 3: SVE O&M Quarter Two; Submittal of Semiannual Remedial Action Status Report, including updated tables, figures and laboratory data.
Deliverable Date: August 26, 2021
Sincerely, HSW ENGINEERING, INC.
Nicholas Barnes, P.E.
Senior Engineer
Attachments: Subcontractor Quotes
Level of Effort/Cost Estimate Forms (native file attached)
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date: TBD
Task #: TBD SubTask 1 Project Management SubTask 6
Site: Peterson Cleaners SubTask 2 O&M - 1 Quarter SubTask 7
Activity/Phase: O&M SubTask 3 O&M - 2 Quarter , Semi-Annual Status Report SubTask 8
Project Manager: Steven Folsom SubTask 4 Utilities (quarterly) SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
HSW Engineering, Inc.
$66.35 Project Manager SDF 8 8.3
Principal 0 0 0 0 0 0 0 0 0 0 $66.35 Project Manager SDF 12 4 8 0 0 0 0 0 0 0
Senior Geologist 0 0 0 0 0 0 0 0 0 0 Senior Engineer 0 0 0 0 0 0 0 0 0 0 Project Geologist 0 0 0 0 0 0 0 0 0 0
$45.20 Senior Engineer NSB 32 10 22 0 0 0 0 0 0 0 Project Scientist 0 0 0 0 0 0 0 0 0 0 Staff Engineer/Geologist 0 0 0 0 0 0 0 0 0 0
$33.66 Staff Engineer JAB 60 30 30 0 0 0 0 0 0 0 Field Technician 0 0 0 0 0 0 0 0 0 0
$45.68 Senior Scientist CLW 0 0 0 0 0 0 0 0 0 0 $39.67 CADD Technician BLA 4 0 4 0 0 0 0 0 0 0 $15.00 Project Assistant BNK 0 0 0 0 0 0 0 0 0 0
$0.00 CADD Technician 0 0 0 0 0 0 0 0 0 0 $0.00 Surveyor (PLS) 0 0 0 0 0 0 0 0 0 0 $0.00 Survey Party chief 0 0 0 0 0 0 0 0 0 0 $0.00 Survey Crew 0 0 0 0 0 0 0 0 0 0 $0.00 Subsurface Utility Location (SUE) Tech 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 116 8 44 64 0 0 0 0 0 0 0
HSW Engineering, Inc.
Direct Labor $4,973.49 $552.61 $1,727.20 $2,693.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 170.00% $8,454.94 $939.44 $2,936.24 $4,579.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (HSW) $13,428.43 $1,492.05 $4,663.44 $7,272.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $13,428.43 $1,492.05 $4,663.44 $7,272.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $248.67 $27.63 $86.36 $134.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $582.00 $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $582.00 $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date: TBD
Task #: TBD SubTask 1 Project Management SubTask 6
Site: Peterson Cleaners SubTask 2 O&M - 1 Quarter SubTask 7
Activity/Phase: O&M SubTask 3 O&M - 2 Quarter , Semi-Annual Status Report SubTask 8
Project Manager: Steven Folsom SubTask 4 Utilities (quarterly) SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $4,200.00 $0.00 $0.00 $4,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $4,200.00 $0.00 $0.00 $4,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $140.00 $0.00 $0.00 $140.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $4,340.00 $0.00 $0.00 $4,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,000.00 $800.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $252.00 $189.00 $63.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,252.00 $989.00 $263.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $195.00 $97.50 $97.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,164.00 $873.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,359.00 $970.50 $388.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $21,210.10 $1,519.68 $7,000.30 $8,350.12 $4,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,342.84 $149.21 $466.34 $727.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $22,552.94 $1,668.89 $7,466.64 $9,077.41 $4,340.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE : Peterson Cleaners
FDEP NO: ERIC_5380
SUBTASK: O&M - 1 Quarter
DATE: 1/8/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager SDF System Operation Review 4
Senior Engieer NSB Field Correspondence 4 Documentation of O&M Preparation 6
Staff Engineer JAB Mobilization/Demobilization - Month 1, Month 2, Month 3 6 System O&M, Field Measurements, Sample Collection 24
TOTAL LABOR 44
TRAVEL
TYPE RATE UNIT USEAGE Miles Free Truck $97.00 day 3 $291.00
TOTAL VEHICLE $291.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
TO-15 $200.00 4 $800.00
Sample Shipment/Preparation Small (0 to 25 lbs), Overnight $63.00 3 $189.00
TOTAL LAB $989.00
FIELD EXPENSES
ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Construction/O&M/Pilot Test Kit $291.00 day 3 $873.00 Construction/O&M Supplies $63.05 day 0 $0.00
Sub-Total $873.00
Expendables $32.50 day 3 $97.50
Sub-Total $97.50
Total Equipment $970.50
SUBTASK: O&M - 2 Quarter
DATE: 1/8/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager SDF System Operation Review 2 Senior Review 6
Senior Engineer NSB Field Correspondence 4 Semi-Annual Status Report 18
CAD Technician BLA Figures 4
Staff Engineer JAB Mobilization/Demobilization - Month 4, Month 5, Month 6 6 System O&M, Field Measurements, Sample Collection 24
TOTAL LABOR 64
TRAVEL
TYPE RATE UNIT USEAGE Miles Free Truck $97.00 day 3 $291.00
TOTAL VEHICLE $291.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
$0.00
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
TO-15 $200.00 1 $200.00
Sample Shipment/Preparation Small (0 to 25 lbs), Overnight $63.00 1 $63.00
TOTAL LAB $263.00
FIELD EXPENSES
ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Construction/O&M/Pilot Test Kit $291.00 day 1 $291.00 Construction/O&M Supplies $63.05 day 3 $189.15
Sub-Total $480.15
Expendables $32.50 day 3 $97.50
Sub-Total $97.50
Total Equipment $577.65
SUBTASK: O&M - Utilities
DATE: 1/8/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
FIELD EXPENSES
ITEM RATE UNIT USEAGE TOTALS
O&M Quarter 1 Utilities January to April 2021
Utility Charges (Electric) $600.00 month 4 $2,400.00 Utility Handling Fee $20.00 month 4 $80.00
Sub-Total $2,480.00 O&M Quarter 2 Utilities May to July 2021
Utility Charges (Electric) $600.00 month 3 $1,800.00 Utility Handling Fee $20.00 month 3 $60.00
Sub-Total $1,860.00
Total Equipment $4,340.00
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| 2021_01 SVE OM.pdf |
| Cost Estimate |
| sub 2 |
| sub 3 |
| sub 4 |
File details come from the government source that posted it. Updated .