This is a Task Assignment Notification Form (WCP TAFORM 04-2017) for Florida Department of Environmental Protection (DEP) Contract No. HW556. The contract involves the Department of Environmental Protection as the contracting agency and Cardno as the contractor, with Roger Register serving as the Contractor Representative and Carrie L. Kruchell, P.G., as the DEP Contract Manager. The work is being performed at the Boynton Beach Town Square Project located at 100 E. Boynton Beach Blvd., and the contract is associated with the Statewide Remediation Program (SRPPM module, SRP13 grant).

The task assignment requires Cardno to conduct an Additional Site Assessment for soil and groundwater analysis at the project site. Specific work includes confirmatory groundwater sampling at monitoring well MW-1, soil boring installation and sample collection from three suspect buried debris piles using a GeoProbe, and discreet confirmatory groundwater samples from downgradient positions. Soil samples will be field-screened using an Organic Vapor Analyzer (OVA) prior to confirmatory laboratory analysis. The final deliverable is a Supplemental Site Assessment Report including tables, figures, conclusions, and recommendations. The contract is structured as a fixed-price assignment with a total value of $18,577.47, comprised of $13,427.80 for field notes, chain of custody documentation, and photos (due 12/30/2017) and $5,149.67 for the final Supplemental Site Assessment Report (due 02/15/2018), with an overall period of performance through 03/31/2018.

View the file

Other files

File Type Posted
CN-370000-HW556-A 9.pdf PDF
CN-370000-HW556-A10.pdf PDF
CN-370000-HW556-A5.pdf PDF
CN-370000-HW556-BF004F.pdf PDF
CN-370000-HW556-BF03ACO1.pdf PDF
CN-370000-HW556-BF03C.pdf PDF
CN-370000-HW556-BF04B.pdf PDF
CN-370000-HW556-BF04BCO3.pdf PDF
CN-370000-HW556-BF04CCO2.pdf PDF
CN-370000-HW556-BF04DCO2.pdf PDF
CN-370000-HW556-BF04DCO3.pdf PDF
CN-370000-HW556-BF04DCO4.pdf PDF
CN-370000-HW556-BF05A.pdf PDF
CN-370000-HW556-BF05B.pdf PDF
CN-370000-HW556-BF06BCO3.pdf PDF
CN-370000-HW556-BF06BCO4.pdf PDF
CN-370000-HW556-BF562E.pdf PDF
CN-370000-HW556-BF563A.pdf PDF
CN-370000-HW556-DC003F.pdf PDF
CN-370000-HW556-DC004E.pdf PDF
CN-370000-HW556-DC006C.pdf PDF
CN-370000-HW556-DC006E.pdf PDF
CN-370000-HW556-DC007E.pdf PDF
CN-370000-HW556-DC008A.pdf PDF
CN-370000-HW556-DC009C.pdf PDF
CN-370000-HW556-DC010E.pdf PDF
CN-370000-HW556-DC011A.pdf PDF
CN-370000-HW556-DC012A.pdf PDF
CN-370000-HW556-DC012C.pdf PDF
CN-370000-HW556-DC01ACO3.pdf PDF
CN-370000-HW556-DC01B.pdf PDF
CN-370000-HW556-DC01C.pdf PDF
CN-370000-HW556-DC01I.pdf PDF
CN-370000-HW556-DC027B.pdf PDF
CN-370000-HW556-DC027E.pdf PDF
CN-370000-HW556-DC027F.pdf PDF
CN-370000-HW556-DC028B.pdf PDF
CN-370000-HW556-DC029A.pdf PDF
CN-370000-HW556-DC029E.pdf PDF
CN-370000-HW556-DC02B.pdf PDF
CN-370000-HW556-DC02BCO1.pdf PDF
CN-370000-HW556-DC02E.pdf PDF
CN-370000-HW556-DC032A.pdf PDF
CN-370000-HW556-DC035A.pdf PDF
CN-370000-HW556-DC03A.pdf PDF
CN-370000-HW556-DC03B.pdf PDF
CN-370000-HW556-DC03C.pdf PDF
CN-370000-HW556-DC03CCO2.pdf PDF
CN-370000-HW556-DC03DCO1.pdf PDF
CN-370000-HW556-DC05A.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WCP TAFORM 04-2017

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS93)

Section Representative _____

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

COST PLUS FIXED FEE

TASK ASSIGNMENT NOTIFICATION FORM

HW556

BF008B SRPPM SRP13

Cardno

Roger Register Phone #: 850-556-1369

Carrie L. Kruchell, P.G. 850.245.8765

ERIC_5550

Boynton Beach Town Square Project

100 E. Boynton Beach Blvd.

Additional Site Assessment (Soil & GW)

Per Cardno's (revised) 10-31-17 Supplemental Site Assessment Work Plan and Cost Proposal/Level of Effort, confirmatory GW sampling at MW-1 will proceed, followed by SB installation & soil sample collection from (3) suspect buried debris piles via a GeoProbe; one in-situ, discreet confirmatory GW sample (GW-1 through GW-3) will be collected from the SB installed at the downgradient position at each anomalous area. Soils will be field-screened by an OVA prior to soil sample collection for confirmatory analysis. An SSAR, will be provided as the final deliverable and will include tables, figures and conclusions and recommendations.

Supplemental Site Assessment Report

02/15/2018

03/31/2018

$ 18,577.47

$ 18,577.47

Carrie Kruchell Digitally signed by Carrie Kruchell Date: 2017.11.01 16:12:02 -04'00'

Carrie Kruchell Digitally signed by Carrie Kruchell Date: 2017.11.01 16:12:11 -04'00'

Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2017.11.02 09:34:52 -04'00'

Roger Register Digitally signed by Roger Register DN: cn=Roger Register, o=Cardno, ou=Brownfields Practice Leader, email=Roger.Register@cardno.com, c=US Date: 2017.11.02 14:49:35 -04'00'

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW556

BF008B

Field notes, COC, photos (subtask 2) 12/30/2017

Final Supplemental Site Assessment Report (subtask 3) 02/15/2018

Field notes, COC, photos (subtask 2) $ 13,427.80

Final Supplemental Site Assessment Report (subtask 3) $ 5,149.67

$ 18,577.47

Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
CEF LOE Spreadsheet Boynton Beach v3.pdf
Cost Estimate
Formula Sheet
Subtask 2
Subtask 3

File details come from the government source that posted it. Updated .