CN-370000-HW556-DC026E.pdf
PDF 736 KB Posted
- Contract number
- HW556
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form under Florida Department of Environmental Protection (FDEP) Contract No. HW556, issued to Cardno, Inc. for operations and maintenance services at the Plaza Dry Cleaners & Laundry facility located at 934 Patricia Ave, Dunedin, Pinellas County, Florida (FDEP Facility ID: ERIC_5294). The task assignment was executed on December 20, 2021, with Walsta Jean-Baptiste serving as the FDEP Contract Manager and Joe Marsh as the Cardno representative.
The task assignment authorizes Cardno to conduct three months of soil vapor extraction (SVE) system operations and maintenance, including groundwater monitoring activities, from January through March 2022. The contract includes three subtasks: Project Management ($516.35), Operations and Maintenance for three months ($6,351.88), and Utilities covering electricity costs ($3,885.00), for a total task assignment value of $10,753.23 with 54 hours of labor. Pricing is structured as fixed price for O&M activities ($7,153.23) and cost-plus fixed fee for utilities ($3,600.00 in estimated electricity costs plus a $285.00 handling fee). The final deliverable—a quarterly O&M submittal including field documentation, laboratory reports, and tables—is due April 29, 2022, with the period of performance concluding June 1, 2022. Utilities costs are reimbursable on an actual basis, with provisions for adjustment if actual costs exceed or fall below estimates through change order requests.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW556
D000 NADC026E
Cardno, Inc.
Joe Marsh
850-245-8705Walsta Jean-Baptiste
ERIC_5294
Plaza Dry Cleaners & Laundry
934 Patricia Ave, Dunedin, Pinellas County
Operation and Maintenance
This Task Assignment authorizes Cardno to conduct operation and maintenance in accordance with the Cardno scope of work, cost estimate, and schedule received on December 16, 2021.
The payment of utilities is the only part of this Task Assignment that is Cost Plus Fixed Fee
Quarterly O&M submittal including field documentation, laboratory reports and tables
04/29/2022
06/01/2022
$ 7,153.23 $ 0.00 $ 3,600.00 $ 0.00
$ 0.00
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.12.20 11:32:21 -05'00'
Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2021.12.20 11:32:27 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.12.20 16:49:13 -05'00'
Digitally signed by Gregory A Schultz Date: 2021.12.21 08:52:12 -05'00'
$ 10,753.23
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Quarterly O&M submittal including field documentation, laboratory reports and tables and Project Management - Subtasks 1 and 2 04/29/2022
FDEP approval of quarterly O&M submittal including field documentation, laboratory reports and tables and Project Management - Subtasks 1 and 2; $ 6,868.23
FDEP receipt of utility invoices for 3 months (January through March 2022); Utilities (Cost Plus Fixed Fee) = not to exceed $3,600; Utilities Handling Fee = $285 - Subtask 3
$ 3,885.00
$ 10,753.23
HW556
DC026E
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton
Secretary
Memorandum
TO: HW556 Contract File
FROM: Walsta Jean-Baptiste, Contract Manager
SUBJECT: Plaza Dry Cleaners & Laundry; Operation and Maintenance; DC026E
ERIC_5294
DATE: December 16, 2021
This Task Assignment authorizes Cardno to conduct operation and maintenance in accordance with the Cardno scope of work, cost estimate, and schedule received on December 16, 2021.
This Task Assignment also includes 3 months of operation and maintenance including utilities to allow system startup and operation during the contract transition.
The changes to the proposed costs include reduction of the level of effort from six months to three months.
The final cost associated with this Task Assignment is $10,753.23 with 54 hours.
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Cardno
380 Park Place Boulevard Suite 300 Clearwater
FL 33759 USA
Phone +1.727.531.3505 www.cardno.com
December 16, 2021
Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection Waste Site Cleanup Section Drycleaning Solvent Cleanup Program 2600 Blairstone Road, MS 4520 Tallahassee, FL 32399
RE: Task Assignment Request for Three (3) Months O&M Plaza Dry Cleaners & Laundry 934 Patricia Ave., Dunedin, Pinellas County, Florida FDEP Facility ID: ERIC_5294 Task Assignment: HW556-DC026E
Dear Walsta:
Cardno Inc. (Cardno) is pleased to submit this Task Assignment Request for soil vapor extraction (SVE) system operations and maintenance (O&M) and groundwater monitoring activities at the above referenced site. This O&M proposal is based on the assumption the SVE startup will occur in January 2022 (based on delayed power install and pending delivery of carbon). After startup one quarter of O&M through March 2022 will be completed.
During each monthly site inspection routine O&M will be conducted and include the following:
Check system operation during each visit;
Check/change oil in pump(s), if required;
Check the water level in the moisture separator; if necessary, accumulated water in the moisture separator will be drained, treated by carbon adsorption and discharged to the pavement. If the groundwater entrainment rate is significant, the wellhead vacuum levels will be reduced. One sample of accumulated water will be collected for laboratory analysis of volatile organic compounds (VOCs) by United States Environmental Protection Agency (USEPA) Method 8260 for generator knowledge (by a work change directive, if required);
Collect gauge readings from the manifold and remedial equipment during each visit to verify system performance;
Collection of vapor samples from each vapor extraction well, the influent, and the effluent for field screening using an organic vapor analyzer (OVA) (Table 1);
Collection of depth to water (DTW) measurements from monitoring wells MW-3, MW-4, and MW-Unk (Table 1); and, Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection - Waste Site Cleanup Section Plaza Dry Cleaners and Laundry (ERIC_5294) Task Assignment Request DC026E – Three (3) Months O&M Cost Proposal Page 2 of 3 December 16, 2021
Collect vacuum or pressure readings from the vapor extraction wells/air injection points and vacuum distribution monitoring points and optimize SVE system according to monitoring results.
The SVE system O & M activities include the following subtasks:
Task 1: Project Management
Costs associated with this subtask are based on 12.5% of the direct labor costs of the remaining subtasks.
Task 2: O&M (3 Months)
This subtask is for O&M activities for startup and three (3) months of O&M. The site will be visited at the end of week 1 and monthly for six (3) months. In addition to the routine O&M tasks, the following activities will be conducted:
• Week 1 and Month 1 – Collection of vapor samples from the influent and effluent for laboratory analysis of volatile organic halocarbons (VOHs) by USEPA Method TO-15 (Table 1);
• Month 3 – Collection of a vapor sample for the influent for laboratory analysis of VOHs by USEPA Method TO-15 (Table 1);
• If condensate is recovered, collection of one sample for VOHs by USEPA Method 8260 will be conducted for generator knowledge following issuance of a change order or Work Change Directive.
A quarterly O&M deliverable will be submitted including field documentation, tables, and laboratory reports.
Subtask 3: Utilities (3 Months)
The estimated costs of utilities is approximately $1,200.00 per month for electricity. Electrical consumption is based on the electrical costs the SVE system incurred at McSherry’s Dry Cleaner, Inc.
(ERIC_4787).
A utility account setup up fee of $225 and utility bill handling fee of $20.00 per month for per electricity are included.
Actual utility costs incurred during the three (3) months O&M time period will be billed to FDEP.
Unused estimated utility costs will be returned, or increased utility costs, will be addressed by a change order request.
Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection - Waste Site Cleanup Section Plaza Dry Cleaners and Laundry (ERIC_5294) Task Assignment Request DC026E – three (3) Months O&M Cost Proposal December 16, 2021
Schedule
The proposed deliverables and deliverable dates are summarized below and are based on the assumption that startup of the SVE system is completed no later than January 14, 2021:
Subtasks 1 and 3: O&M (3 Months)
Deliverable: Quarterly O&M submittal including field documentation, laboratory reports, and tables
Deliverable Due Date: April 29, 2022
Subtask 4: Utilities (three (3) months)
Deliverable: FDEP receipt of utilities summary and utility bills (submitted electronically)
Deliverable Due Date: May 11, 2022
Period of Performance: June 1, 2022
If you have questions regarding this cost proposal, please call me at 727-431-1589 or by email (joe.marsh@cardno.com).
Sincerely, Joe L. Marsh Senior Project Manager For Cardno
Enc: Table
Australia • Belgium • Canada • Colombia • Ecuador • Germany • Indonesia • Kenya • Myanmar • New Zealand • Nigeria • Papua New Guinea • Peru • Philippines • Singapore • Timor-Leste • United Kingdom • United States • Operations in over 100 countries
Table
Facility Name: Plaza Dry Cleaners & Laundry Facility ID#: ERIC_5294
Well ID Screened Interval
(ft bls) Baseline Annual
Natural Attenuation Monitoring
O&M Depth to Water
Measurements
MW-2 60-70 VOHs (8260) VOHs (8260) VOHs (8260) X
MW-3 15-30 VOHs (8260) VOHs (8260) VOHs (8260) -
MW-4 15-30 VOHs (8260) VOHs (8260) VOHs (8260) -
MW-6 90-100 VOHs (8260) VOHs (8260) VOHs (8260) X
MW-9 60-70 VOHs (8260) TBD TBD -
MW-10 60-70 VOHs (8260) TBD TBD -
MW-11 60-70 VOHs (8260) TBD TBD -
MW-Unk Total Depth ~30 VOHs (8260) VOHs (8260) VOHs (8260) X
Exfiltration Gallery Total Depth ~30 VOHs (8260) - - -
Well ID Startup Week 1 Month 1 Quarter 1 Semi-Annual Quarterly Annual
VE001
VOHs (TO-15)
PID
PID PID PID PID PID PID
VE002
VOHs (TO-15)
PID
PID PID PID PID PID PID
VE003
VOHs (TO-15)
PID
PID PID PID PID PID PID
VE004
VOHs (TO-15)
PID
PID PID PID PID PID PID
Influent VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
Effluent1 VOHs (TO-15)
PID
VOHs (TO-15)
PID
VOHs (TO-15)
PID
Condensate
Monitoring Well Well Depth
(ft bls) Screen Interval (ft bls) Depth to Water (ft bls) Date Measurement
Collected
MW-3 30 15-30 25.37 10/31/2019
MW-4 30 15-30 24.75 10/31/2019
MW-Unk Total Depth ~30 Unknown 25.34 10/31/2019
Notes:
1. Effluent sampling assumed to be terminated after 30-days; however, dependent on emissions rate determined from influent/effluent concentrations.
2. Sampling of individual VEW wells will not be conducted on VEWs no longer being used for vapor extraction.
Key:
ft bls = feet below land surface
VOHs (8260) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method 8260
VOHs (TO-15) = Volatile Organic Halocarbons by United States Environmental Protection Agency Method TO-15
- = No analysis
PID = Photoionization Detector
Groundwater
Soil Vapor Extraction System
1 Sample for Generator Knowledge for VOHs (8260) - If condensate is recovered.
Routine Depth to Water Monitoring During Operations and Maintenance Site Inspections
TABLE 1: PROPOSED MONITORING SCHEDULE
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date:
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 O&M (3 Months) SubTask 7 ctivity/Phase: SubTask 3 Utilities (3 Months) SubTask 8 ect Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
CARDNO, Inc.
$43.04 Project Manager (JM) 4 4.0 $59.51 Senior Engineer (GS) 2 2 0 0 0 0 0 0 0 0 $43.04 Project Engineer (JM) 12 12 0 0 0 0 0 0 0 0 $21.60 Staff Geologist (VU) 34 34 0 0 0 0 0 0 0 0 $29.63 CADD Technician (DJD) 0 0 0 0 0 0 0 0 0 0
Total Hours 54 4 50 0 0 0 0 0 0 0 0
CARDNO, Inc.
Direct Labor $1,541.14 $171.24 $1,369.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 169.58% $2,613.47 $290.39 $2,323.08 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sub-Total Labor (CARDNO) $4,154.61 $461.63 $3,692.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Labor $4,154.61 $461.63 $3,692.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $77.06 $8.56 $68.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $388.00 $388.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
12/16/2021
Joe Marsh
O&M (3 months)
Plaza Dry Cleaners & Laundry (ERIC_5
HW556 DC026E
REV: 05/2015 CEF: CARDNO HSW Page 1
FDEP COST ESTI MATEContractor: CARDNO, Inc. / HSW Eng., Inc
Date:
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 O&M (3 Months) SubTask 7 ctivity/Phase: SubTask 3 Utilities (3 Months) SubTask 8 ect Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10
12/16/2021
Joe Marsh
O&M (3 months)
Plaza Dry Cleaners & Laundry (ERIC_5
HW556 DC026E
Subcontracto(Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontracto(Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $3,600.00 $0.00 $3,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Handling Fee $285.00 $0.00 $285.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $3,885.00 $0.00 $3,885.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $3,885.00 $0.00 $3,885.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,000.00 $1,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $189.00 $189.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,189.00 $1,189.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $130.00 $130.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $514.10 $514.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $644.10 $644.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $10,337.77 $470.19 $5,982.58 $3,885.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $415.46 $46.16 $369.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $10,753.23 $516.35 $6,351.88 $3,885.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 05/2015 CEF: CARDNO HSW Page 2
SITE : Plaza Dry Cleaners & Laundry (ERIC_5294)
FDEP NO: ERIC_4613
SUBTASK: O&M (3 Months)
DATE: 12/16/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Engineer JM 5 Documentation of O&M Preparation 7
Project Engineer GS System Operation Review 2
Staff Geologist VU 3
CADD Technician DJD CAD Figure Development 0
TOTAL LABOR 48
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 Day 4 $388.00
TOTAL VEHICLE $388.00
SUBCONTRACTOR
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
Groundwater
VOHs-8260 (Condensate) $66.00 0 0 $0.00
Air VOHs- TO-15 (7 day, Month 1, Month 3, Month 6) $200.00 5 $1,000.00
Shipping small (0 to 25lbs); No Ice $63.00 3 $189.00
Shipping small (0 to 25lbs)+Ice $68.00 0 $0.00
TOTAL LAB $1,189.00
FIELD EXPENSE ITEM RATE UNIT USEAGE TOTALS
Field Equipment Construction/O&M Supplies $252.20 Week 1 $252.20
Photoionization Meter (Mini Rae 3000) $87.30 Day 3 $261.90
Expendables $32.50 Day 4 $130.00
Sub-Total $644.10
TOTAL EQUIPMENT $644.10
ADAPT/GIS update
Field Correspondence
Mobilization - Clearwater to Dunedin (0.25 hours each way) - 4 mob
4 SVE O&M Inspections, Field Measurements, and Sample Collection (7 day, 30 day, 3 month) and Warehouse Mob/Demob
SITE : Plaza Dry Cleaners & Laundry (ERIC_5294)
FDEP NO: ERIC_4613
SUBTASK: Utilities (3 Months)
DATE: 12/16/2021
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Utilities Electric ($300/month) $1,200.00 Month 3 $3,600.00
Utilities Handling Fee $20 per month per utility (Electric) $20.00 Month 3 $60.00
Utility Account Setup Fee $225.00 each 1 $225.00
TOTAL SUBS $3,885.00
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Plaza DC026E O&M Costs 12162021.pdf |
| Cost Estimate |
| Sub 2 |
| Sub 3 |
| Plaza DC026E O&M Costs 12162021.pdf |
| Cost Estimate |
| Sub 2 |
| Sub 3 |
File details come from the government source that posted it. Updated .