CN-370000-HW556-DC01ACO5.pdf

PDF 3 MB Posted

Attached to
Master Agreement FL|HW556|86bbd2b3f214cef39efd393b3d5af1f9
Contract number
HW556
Issued by
Florida

About this file

This document is a Task Assignment Notification Change Order Form (TACO #5) for Florida Department of Environmental Protection (FDEP) contract HW556, administered under the Drycleaning Solvent Cleanup Program. The primary parties are FDEP's Waste Site Cleanup Section, the contractor Cardno, Inc. (with subcontractor HSW Engineering, Inc.), and the DEP Contract Manager Walsta Jean-Baptiste. The change order applies to multiple sites across Florida and addresses critical response activities related to Hurricane Eta preparedness.

Change Order #5 reconciles costs authorized by Work Change Directive (WCD) #6 for site preparation and hurricane preparedness plan implementation at four drycleaning facilities: Phenix Supply Cleaners, McSherry's Drycleaner, Inc., Former Merlin's Custom Cleaners, and Spring Fresh Dry Cleaning. The net increase in task amount is $1,325.94, representing actual costs incurred under WCD #6 that were estimated at $1,500.00 not-to-exceed. Costs consisted of labor and vehicle expenses for remediation system shutdown, investigative derived waste securing, and miscellaneous object removal. The task completion date was extended 199 days from December 9, 2020, to June 26, 2021, in accordance with HW556 Amendment 08. The total cumulative cost for Task Assignment DC001A with all change orders is $9,863.90. Work activities were completed on June 26, 2021, with deliverables including documentation of site preparation activities for Hurricanes Irma, Michael, Dorian, and Eta.

View the file

Other files

File Type Posted
CN-370000-HW556-A 9.pdf PDF
CN-370000-HW556-A10.pdf PDF
CN-370000-HW556-A5.pdf PDF
CN-370000-HW556-BF004F.pdf PDF
CN-370000-HW556-BF03ACO1.pdf PDF
CN-370000-HW556-BF03C.pdf PDF
CN-370000-HW556-BF04B.pdf PDF
CN-370000-HW556-BF04BCO3.pdf PDF
CN-370000-HW556-BF04CCO2.pdf PDF
CN-370000-HW556-BF04DCO2.pdf PDF
CN-370000-HW556-BF04DCO3.pdf PDF
CN-370000-HW556-BF04DCO4.pdf PDF
CN-370000-HW556-BF05A.pdf PDF
CN-370000-HW556-BF05B.pdf PDF
CN-370000-HW556-BF06BCO3.pdf PDF
CN-370000-HW556-BF06BCO4.pdf PDF
CN-370000-HW556-BF08B.pdf PDF
CN-370000-HW556-BF562E.pdf PDF
CN-370000-HW556-BF563A.pdf PDF
CN-370000-HW556-DC003F.pdf PDF
CN-370000-HW556-DC004E.pdf PDF
CN-370000-HW556-DC006C.pdf PDF
CN-370000-HW556-DC006E.pdf PDF
CN-370000-HW556-DC007E.pdf PDF
CN-370000-HW556-DC008A.pdf PDF
CN-370000-HW556-DC009C.pdf PDF
CN-370000-HW556-DC010E.pdf PDF
CN-370000-HW556-DC011A.pdf PDF
CN-370000-HW556-DC012A.pdf PDF
CN-370000-HW556-DC012C.pdf PDF
CN-370000-HW556-DC01ACO3.pdf PDF
CN-370000-HW556-DC01B.pdf PDF
CN-370000-HW556-DC01C.pdf PDF
CN-370000-HW556-DC01I.pdf PDF
CN-370000-HW556-DC027B.pdf PDF
CN-370000-HW556-DC027E.pdf PDF
CN-370000-HW556-DC027F.pdf PDF
CN-370000-HW556-DC028B.pdf PDF
CN-370000-HW556-DC029A.pdf PDF
CN-370000-HW556-DC029E.pdf PDF
CN-370000-HW556-DC02B.pdf PDF
CN-370000-HW556-DC02BCO1.pdf PDF
CN-370000-HW556-DC02E.pdf PDF
CN-370000-HW556-DC032A.pdf PDF
CN-370000-HW556-DC035A.pdf PDF
CN-370000-HW556-DC03A.pdf PDF
CN-370000-HW556-DC03B.pdf PDF
CN-370000-HW556-DC03C.pdf PDF
CN-370000-HW556-DC03CCO2.pdf PDF
CN-370000-HW556-DC03DCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

HW556

5DC001A

Cardno, Inc.

W. Bruce Moore

850-245-8705Walsta Jean-Baptiste Multiple Multiple

This Task Assignment Change Order reconciles costs for site preparation in advance of Hurricane Eta. Costs were authorized by work change directive WCD #6. This Change Order also extends the completion date.

Completed site activities 06/26/2021

$ 2,500.00 $ 0.00 $ 0.00 $ 0.00

$ 8,537.96 $ 0.00 $ 0.00 $ 0.00 $ 8,537.96

$ 1,325.94 $ 0.00 $ 0.00 $ 0.00 $ 1,325.94

$ 9,863.90

12/09/2020

12/09/2020

199 Days

06/26/2021

Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.12.04 11:09:40 -05'00'

Walsta Jean-Baptiste Digitally signed by Walsta Jean-Baptiste Date: 2020.12.04 11:09:46 -05'00'

Aaron Cohen Digitally signed by Aaron Cohen Date: 2020.12.04 11:48:21 -05'00'

Eric Meyers Digitally signed by Eric Meyers Date: 2020.12.04 12:25:08 -05'00'

$ 9,863.90 $ 0.00 $ 0.00 $ 0.00

$ 2,500.00

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Change Order #:

Deliverables Schedule:

Deliverable Deliverable Due Date

BWC TAFORM 01_18

HW556

DC001A

Completed site activities

Documentation of completion of irrigation well sampling at University Cleaners

Documentation of completion of IDW inspection in preparation for Hurricane Irma

Documentation of completion of site preparation for Hurricane Michael

Documentation of completion of site preparation for Hurricane Dorian

Documentation of completion of site preparation for Hurricane Eta

6/26/21

6/16/17

9/13/17

11/13/18

10/1/19

12/31/20

WCP TACO Form (02-2019)

Contract Number:

Task Ass gnment #:

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST $0.00

HW556

DC001A

Documentation of completion of site activities $ 2,500.00

Documentation of completion of irrigation well sampling at University Cleaners - Previously Invoiced

Documentation of completion of IDW inspection in preparation for Hurricane Irma - Previously Invoiced

Documentation of completion of site preparation for Hurricane Michael - Previously Invoiced

Documentation of completion of site preparation for Hurricane Dorian - Previously Invoiced

Documentation of completion of site preparation for Hurricane Eta $ 1,325.94

$ 3,587.79

$ 716.67

$ 488.97

$ 1,244.53

$ 9,863.90

WCP TACO Form (02-2019)

FFLORIDA DEPARTMENT OF

EEnvironmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette NNuñez

Lt. Governor

NNoah Valenstein Secretary

Memorandum TO: HW556 Contract File FROM: Walsta Jean-Baptiste, Contract Manager SUBJECT: DC001A-5; Critical Response DATE: December 4, 2020

This Task Assignment Change Order reconciles costs authorized by work change directive WCD#6. WCD#6 was authorized for up to $1,500 to secure sites in advance of Hurricane Eta.

The actual cost related for securing sites was $1,325.94.

This Change Order also extends the completion date to June 26, 2021 in accordance with HW556 Amendment 08.

The total cost related to Task Assignment DC001A is $9,863.90.

Cardno

2420 Lakeshore Drive Suite 100 Tallahassee

FL 32312 USA

Phone +1.850.385.8232 Fax 850.385.8233 www.cardno.com

December 3, 2020

Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection Waste Site Cleanup Section Drycleaning Solvent Cleanup Program 2600 Blairstone Road, MS 4520 Tallahassee, FL 32399-2400

Subject: Task Assignment Change Order Request (HW556-DC001A-5) for Work Change

Directive (WCD) #6 for Implementation of Hurricane Preparedness Plan for Hurricane Eta

Multiple Sites Multiple Addresses Multiple Facility ID Numbers

Dear Walsta:

Cardno Inc. (Cardno) is respectfully submitting this Task Assignment Change Order (TACO) Request to Task Assignment HW556-DC001A-4. A summary of the changes proposed is provided below:

Subtask 1

The costs associated with this subtask are calculated automatically at 12.5% of the change in the direct labor costs of the remaining subtasks.

Subtask 2: Hurricane Eta

The costs associated with this subtask are for the reconciliation of Work Change Directive (WCD) #6 for implementation of the Hurricane Preparedness Plan in association with Hurricane Eta. A copy of WCD#6 is provided in Attachment A.

On November 11, 2020, Cardno mobilized to the Phenix Supply Cleaners site (ERIC_4764). Additionally, HSW mobilized to McSherry’s Drycleaner, Inc. (ERIC_4787), Former Merlin’s Custom Cleaners (ERIC_5345), and Spring Fresh Dry Cleaning (ERIC_5382). At each site, the Hurricane Preparedness Plan was implemented, remediation systems shutdown, investigative derived waste secured, and miscellaneous objects removed/secured at the sites, where applicable.

A breakdown of the costs incurred under WCD#6 is as follows:

WCD #6

Item Description Estimated Cost Actual Cost

Labor and Vehicles Not to Exceed

$1,500.00 $1,325.94

Not to Exceed

$1,500.00 Total Cost $1,325.94

Ms. Walsta Jean-Baptiste Florida Department of Environmental Protection Critical Response Task Assignment Change Order for Hurricane Eta Task Assignment Change Order Request DC001A-5 December 3, 2020

Schedule to Complete

Based on the current deliverable schedule, Cardno requests the following adjustments:

Subtasks 1 and 2: Documentation of implementation of Hurricane Preparedness Plan for Hurricane Etna (submit electronically)

Deliverable Due Date: December 31, 2020

Period of Performance: June 30, 2021

If you have questions regarding this change order request, please contact me at (850) 629-2702 or by email (eric.meyers@cardno.com).

Sincerely, Eric Meyers Project Manager For Cardno Attachments

Sincerely, Eric Meyers

Attachment A: WCD#6

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

A R

D N

O , I nc

H S

W E ng

In c

D at e:

/3

/2

Ta sk

D C

1A

-5

S ub Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M ul tip le

Ta sk

H ur ric an e

E ta

C rit ic al R es po ns e

(W C

D #6

S ub Ta sk

A ct iv ity

/P ha se

M ul

Ta sk

S ub

Ta sk

P ro je ct

M an ag er

FD

E P

: W . J ea n-

B ap tis te

/ C ar dn o:

E . M ey er s S ub Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

La bo r

R at e C at eg or y

C A

R D

N O

, I nc

$4

2.

P P ro je ct

M an ag er

(E

M

0.

$2

0.

St af f E ng in ee r/G eo lo gi st (V

G

H S

W E ng in ee ri ng , I nc

$4 5.

P ro je ct M an ag

(N B

0.

$3 3.

St af f E ng in ee r/G eo lo gi st

(J A

B

To ta l H ou rs

C A

R D

N O

, I nc

D ire ct

L ab or

$9 4.

$1

0.

$8 3.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

O ve rh ea d

9.

$1

.5

$1

7.

$1

.8

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub -T ot al

L ab or (C

A R

D N

O

$2

.6

$2 8.

$2

.4

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H S

W E ng in ee ri ng , I nc

D ire ct L ab or

$2

.2

$2

5.

$2

.9

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

0.

$3

.2

$4

2.

$3

.3

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

G en

A dm in

0.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge 0.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub -T ot al

L ab or (H

S W

$6

.4

$6

8.

$5

.2

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or $8

.1

$9

6.

$7

.7

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

O th er D ire ct

C os ts $1

6.

$1 .7

$1

4.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $2

.0

$2

.0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

RE

V:

5/

CE

F:

C

AR

DN

O

HS

W

Pa ge

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

C

A R

D N

O , I nc

H S

W E ng

In c at e:

/3

/2

Ta sk

D C

1A

-5

Ta sk

P ro je ct

M an ag em en t

S ub

Ta sk

S ite

M ul

Ta sk

H ur ric an e

E ta

C rit ic al R es po ns e

(W C

D #6

S ub Ta sk

A ct iv ity

/P ha se

M ul

Ta sk

S ub

Ta sk

P ro je ct

M an ag er

FD

E P

: W . J ea n-

B ap tis te

/ C ar dn o:

E . M ey er s S ub Ta sk

S ub

Ta sk

S ub

Ta sk

S ub Ta sk

TTo ta ls

SS

ub co nt ra ct or

(E qu ip m en t P ro cu re m en t)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$ $0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or (S er vi ce s

P ro cu re m en t) ril lin g

(C on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

D ril lin g (N on -c on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

M ob ile L ab or at or y $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

H an dl in g Fe e $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l S ub co nt ra ct or

C os t $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

La bo ra to ry

A na ly tic al

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P so na l P ro te ct io n $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E xp en da bl es $6

5.

$6 5.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( D ril lin g re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( A na ly tic al re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

ID

W re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

O th er

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l F ie ld E xp en se s

$6 5.

$6

5.

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub to ta l $1

,2

.2

$9 8.

$1

,1

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$8 6.

$9

.6

$7 7.

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$1 ,3

.9

$1

.8

$1

,2

.1

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

RE

V:

5/

CE

F:

C

AR

DN

O

HS

W

Pa ge

SITE : Multiple

FDEP NO: Multiple

SUBTASK: Hurricane Eta - Critical Response (WCD#6)

DATE: 12/3/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Staff Geologist VU - Cardno Hurricane Preparation for Cardno sites (Phenix) 4

Staff Engineer JB - HSW Hurricane Preparation for HSW Sites (McSherry's, Merlin's Custom Cleaners, Spring Fre 6

TOTAL LABOR 10

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck - HSW $97.00 Day 2 $194.00

Truck - Cardno $97.00 day 1 $97.00

TOTAL VEHICLE $291.00

SUBCONTRACTOR

TOTAL SUBS $0.00

LABORATORY

TOTAL LAB $0.00

FIELD EXPEN ITEM RATE UNIT USEAGE TOTALS

Field Equipment Expendables $32.50 day 2 $65.00

Sub-Total $65.00

TOTAL EQUIPMENT $65.00

TO: Jennifer Farrell, Program Administrator, Staff, Waste Site Cleanup Section

FROM: William E. Burns, Jr., Environmental Administrator Waste Site Cleanup Section

DATE: December 3, 2020

SUBJECT: Temporary Delegation of Authority

I will be on annual leave on December 4, 2020, in my absence I designate Aaron Cohen as acting Administrator of the Waste Site Cleanup Section.

Aaron has been delegated authority to approve or sign on my behalf those documents requiring processing during this period.

Memorandum

Florida Department of Environmental Protection

DEP Delegation of Authority Memo Dec 2020.pdf
Florida Department of Environmental Protection
Memorandum

File details come from the government source that posted it. Updated .