This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under contract HW555. The task assignment was executed on March 31, 2020, between FDEP and GHD Services, Inc., with Billy Hessman serving as the DEP Contract Manager and Brian Moore as the Contractor Representative. The work site is located at Jan's Quality Cleaners, 1115 Highway 17 South, Bartow, Polk County, Florida (DEP Site #ERIC_5367).
The scope of work involves the decommissioning of a soil vapor extraction (SVE) system at the facility. The project is organized into two subtasks: Subtask 1 encompasses project management calculated at 12.5 percent of direct labor costs, while Subtask 2 covers SVE system decommissioning, including equipment disconnection and relocation to Nu-Touch Cleaners in Rockledge, Florida, abandonment of three SVE wells through grouting, and disposal of carbon filter contents by a licensed waste hauler. The final deliverable, a System Decommissioning Summary including field notes, photographs, and waste manifests, is due May 8, 2020, with task completion scheduled for July 31, 2020. The total task assignment value is $4,941.55 on a fixed price basis with zero retainage. The contract is structured as a fixed price engagement with no cost reimbursement or additional fees beyond the stated amount.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 NADC045G
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_5367
Jan's Quality Cleaners
1115 Highway 17 South, Bartow, Polk County
Other
GHD Services, Inc. will conduct system decommissioning of the soil vapor extraction system.
System Decommissioning Summary
05/08/2020
07/31/2020
$ 4,941.55 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 14:16:30 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 14:16:36 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.03.31 15:18:50 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2020.03.31 16:31:16 -04'00'
$ 4,941.55
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
System Decommissioning Summary 05/08/2020
Upon completion of system decommissioning and FDEP approval of the System Decommissioning Summary $ 4,941.55
$ 4,941.55
HW555
DC045G
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
To: HW555 Contract File Jan’s Quality Cleaners
ERIC_5367
Bartow, Polk County
From: Billy Hessman, Contract Manager
Date: March 31, 2020
Subject: Negotiation Summary
HW555 DC045G
Other
GHD will conduct system decommissioning of the SVE system. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: SVE System Decommissioning Subtask 2 includes costs for GHD to decommission and transfer the SVE system to Nu- Touch Cleaners (ERIC_4023). In addition, all SVE wells will be properly abandoned and the contents of the carbon filter will be disposed by a licensed waste hauler. Upon completion of decommissioning activities, a System Decommissioning Summary will be submitted to document field activities.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is May 8, 2020, and the completion date for the Task Assignment is July 31, 2020.
The Final cost total for DC045G is $4,941.55.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 03/31/20
Task #: DC045G SubTask 1 Project Management SubTask 6
Site: Jan's Quality Cleaners SubTask 2 SVE Decommissioning SubTask 7
Activity/Phase: Decommissioning SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.31 2.314 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$47.12 Professional Engineer/Geologist ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$28.85 Senior Technician MM 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.00 Junior Technician DC 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 53.31 2.314 51.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,452.07 $161.34 $1,290.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,640.83 $182.31 $1,458.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $406.58 $45.18 $361.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $370.28 $41.14 $329.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,869.76 $429.97 $3,439.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $72.61 $8.07 $64.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 03/31/20
Task #: DC045G SubTask 1 Project Management SubTask 6
Site: Jan's Quality Cleaners SubTask 2 SVE Decommissioning SubTask 7
Activity/Phase: Decommissioning SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $114.00 $114.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $149.00 $149.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $126.70 $126.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $159.20 $159.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,554.57 $438.04 $4,116.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $386.98 $43.00 $343.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,941.55 $481.04 $4,460.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Jan's Quality Cleaners
PROJECT NUMBER: 11124287
FDEP NO: ERIC_5367
SUBTASK: SVE Decommissioning
DATE: 3/31/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer BM Specify laboratory data deliverable/Sample Kit 1 Sr. Professional Engineer BM Field sampling SOW/coordinate site access 1 Sr. Professional Engineer BM Conclusions/Recommendations 1
Senior Technician MM Mob/demob (2 days) 3 Senior Technician MM Remove SVE Piping 6 Senior Technician MM Abandon SVE Wells (1 hr each) 3 Senior Technician MM Site Restoration 4
Junior Technician JM Mob/demob (2 days) 3 Junior Technician JM Remove SVE Piping 6 Junior Technician JM Disconnect and Load Equipment 3 Junior Technician JM Site Restoration 4
Junior Technician DC Mob/demob (2 days) 3 Junior Technician DC Remove SVE Piping 6 Junior Technician DC Disconnect and Load Equipment 3 Junior Technician DC Relocate Equipment to Nu-Touch 4
TOTAL LABOR 51
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Erwin Remediation Carbon Drum Disposal $100 each 1 $100.00
TOTAL SUBS $100.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
TCLP VOCs Extraction $48.00 1 $48.00 TCLP VOCs 8260 $66.00 1 $66.00
Sample Shipping Small Cooler (2 day) $35.00 1 $35.00
TOTAL LAB $149.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 1 $32.50 Sub-Total $32.50
O&M O&M Supplies $63.05 day 1 $63.05 Dump Trailer (waste materials) $50.00 day 1 $50.00 Portland Cement Grout $4.55 bag 3 $13.65
Sub-Total $126.70
TOTAL EQUIPMENT $159.20
TA_045G.xlsx\sub 2 Page 3 3/31/20201:41 PM
COST PROPOSAL FOR TASK DC045G
< Jan’s Quality Dry Cleaners, ERIC_5367>
SVE System Decommissioning
1. INTRODUCTION:
GHD recently completed one year of SVE system operations and shutdown testing was conducted. Based on the results of the O&M and testing, system shutdown and deactivation was recommended. Task DC045G includes decommissioning of the SVE system.
Subtask 1 Project Management Sub Task 1 includes all tasks associated with managing the SVE decommissioning of the SVE system at the Jan’s Quality Cleaners.
Subtask 2 SVE System Decommissioning GHD personnel will mobilize to the site and disconnect the existing equipment. The equipment will be relocated to Nu-Touch Cleaners in Rockledge, Florida. All of the SVE piping will be removed from the facility and the 3 SVE wells will be abandoned by filling each with grout from bottom to top. The SVE wells will be cut below land surface and the surfaces will be restored. Any penetrations associated with the SVE piping will also be repaired/restored.
During SVE decommissioning, the contents of the carbon filter will be transferred to a FDOT-approved drum for characterization and off-site disposal by a licensed waste hauler. Upon completion of the SVE decommissioning, field notes, photographs, and waste manifests will be provided to the Department.
Deliverables:
Deliverable Deliverable Due Date
Field Notes, Photographs, Waste Manifests, and subcontractor receipts 5/8/20
IDW
Carbon Drum Disposa $100.00 each 1 $100.00 $80.00 each 1 $80.00 $95.00 each 1 $95.00 Transportation $0.00 each 1 $0.00 $30.00 each 1 $30.00 $0.00 each 1 $0.00 Stop Fee $0.00 each 1 $0.00 $50.00 each 1 $50.00 $150.00 each 1 $150.00
$100.00 $160.00 $245.00
Erwin Clean ManagementClark
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 26, 2020
Re: Jan’s Quality Cleaners - Bartow, FL
Mr. Moore:
The price for disposal of one (1) drum of non-hazardous activated carbon located in Bartow, FL will be $100.00 per drum total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: Jan"s Quality Cleaners - Bartow Date: Tuesday, March 31, 2020 9:16:01 AM Attachments: image002.png image003.png image004.png image005.png
Just saw this. Sorry for the delayed response- $95.00 per drum $150.00 stop
Thanks, Ask me about our Coronavirus (COVID-19) Decontamination and Disposal Services that are avaliable now.
Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian Moore [mailto:Brian.Moore@ghd.com] Sent: Thursday, March 26, 2020 2:52 PM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: Jan's Quality Cleaners - Bartow
Jamie, Can you provide a quote for disposal of 1 drum of activated carbon. Assume low level of solvents (non-haz).
Thank you
Brian Moore, PE mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
M T W T F
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Project: TA_045G Date: Tue 3/31/20
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
S S M T W Apr 5, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
T F S S M Apr 12, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
T W T F S
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
Brian Moore
Max Macedo
S M T W T Apr 19, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20 o,Jose Muniz,Dalvise Curry
F S S M T Apr 26, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20 Brian Moore
W T F S S May 3, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
M T W T F
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20
2 Subtask 1: Project Management
19 days Tue 4/14/20 Fri 5/8/20
3 Subtask 2: SVE Decommissioning
14 days Tue 4/14/20 Fri 5/1/20
4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20
5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20
6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20
S S M T W May 10, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County
| TA_045G.pdf |
| Cost Estimate |
| sub 2 |
| Bids - TA_045G.pdf |
| ER Quote - GHD - Drum - 03.26.2020 |
| SKMBT_C45220032614040 |
| RE_ Jan's Quality Cleaners - Bartow |
| Copy of TA_045G.pdf |
| Bids |
File details come from the government source that posted it. Updated .