This document is a Task Assignment Notification Form for the Florida Department of Environmental Protection (FDEP) under contract HW555. The task assignment was executed on March 31, 2020, between FDEP and GHD Services, Inc., with Billy Hessman serving as the DEP Contract Manager and Brian Moore as the Contractor Representative. The work site is located at Jan's Quality Cleaners, 1115 Highway 17 South, Bartow, Polk County, Florida (DEP Site #ERIC_5367).

The scope of work involves the decommissioning of a soil vapor extraction (SVE) system at the facility. The project is organized into two subtasks: Subtask 1 encompasses project management calculated at 12.5 percent of direct labor costs, while Subtask 2 covers SVE system decommissioning, including equipment disconnection and relocation to Nu-Touch Cleaners in Rockledge, Florida, abandonment of three SVE wells through grouting, and disposal of carbon filter contents by a licensed waste hauler. The final deliverable, a System Decommissioning Summary including field notes, photographs, and waste manifests, is due May 8, 2020, with task completion scheduled for July 31, 2020. The total task assignment value is $4,941.55 on a fixed price basis with zero retainage. The contract is structured as a fixed price engagement with no cost reimbursement or additional fees beyond the stated amount.

View the file

Other files

File Type Posted
CN-370000-HW555-A1.pdf PDF
CN-370000-HW555-A3.pdf PDF
CN-370000-HW555-A4.pdf PDF
CN-370000-HW555-A7.pdf PDF
CN-370000-HW555-C23BCO1.pdf PDF
CN-370000-HW555-DC007I.pdf PDF
CN-370000-HW555-DC007K.pdf PDF
CN-370000-HW555-DC013I.pdf PDF
CN-370000-HW555-DC015J.pdf PDF
CN-370000-HW555-DC017M.pdf PDF
CN-370000-HW555-DC017R.pdf PDF
CN-370000-HW555-DC017S.pdf PDF
CN-370000-HW555-DC01ACO1.pdf PDF
CN-370000-HW555-DC01ACO2.pdf PDF
CN-370000-HW555-DC01ACO9.pdf PDF
CN-370000-HW555-DC01E.pdf PDF
CN-370000-HW555-DC01K.pdf PDF
CN-370000-HW555-DC020F.pdf PDF
CN-370000-HW555-DC021H.pdf PDF
CN-370000-HW555-DC023G.pdf PDF
CN-370000-HW555-DC023K.pdf PDF
CN-370000-HW555-DC024o.pdf PDF
CN-370000-HW555-DC02BCO3.pdf PDF
CN-370000-HW555-DC02F.pdf PDF
CN-370000-HW555-DC02FCO1.pdf PDF
CN-370000-HW555-DC02GCO1.pdf PDF
CN-370000-HW555-DC031M.pdf PDF
CN-370000-HW555-DC033F.pdf PDF
CN-370000-HW555-DC034J.pdf PDF
CN-370000-HW555-DC035E.pdf PDF
CN-370000-HW555-DC045A.pdf PDF
CN-370000-HW555-DC046C.pdf PDF
CN-370000-HW555-DC04A.pdf PDF
CN-370000-HW555-DC04B.pdf PDF
CN-370000-HW555-DC04DCO1.pdf PDF
CN-370000-HW555-DC04E.pdf PDF
CN-370000-HW555-DC04FCO1.pdf PDF
CN-370000-HW555-DC04H.pdf PDF
CN-370000-HW555-DC050A.pdf PDF
CN-370000-HW555-DC052A.pdf PDF
CN-370000-HW555-DC053A.pdf PDF
CN-370000-HW555-DC05B.pdf PDF
CN-370000-HW555-DC065B.pdf PDF
CN-370000-HW555-DC065C.pdf PDF
CN-370000-HW555-DC066B.pdf PDF
CN-370000-HW555-DC069B.pdf PDF
CN-370000-HW555-DC06C.pdf PDF
CN-370000-HW555-DC06D.pdf PDF
CN-370000-HW555-DC06E.pdf PDF
CN-370000-HW555-DC06F.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 NADC045G

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_5367

Jan's Quality Cleaners

1115 Highway 17 South, Bartow, Polk County

Other

GHD Services, Inc. will conduct system decommissioning of the soil vapor extraction system.

System Decommissioning Summary

05/08/2020

07/31/2020

$ 4,941.55 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 14:16:30 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.31 14:16:36 -04'00'

Digitally signed by Jennifer Farrell Date: 2020.03.31 15:18:50 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2020.03.31 16:31:16 -04'00'

$ 4,941.55

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

System Decommissioning Summary 05/08/2020

Upon completion of system decommissioning and FDEP approval of the System Decommissioning Summary $ 4,941.55

$ 4,941.55

HW555

DC045G

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Noah Valenstein Secretary

To: HW555 Contract File Jan’s Quality Cleaners

ERIC_5367

Bartow, Polk County

From: Billy Hessman, Contract Manager

Date: March 31, 2020

Subject: Negotiation Summary

HW555 DC045G

Other

GHD will conduct system decommissioning of the SVE system. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: SVE System Decommissioning Subtask 2 includes costs for GHD to decommission and transfer the SVE system to Nu- Touch Cleaners (ERIC_4023). In addition, all SVE wells will be properly abandoned and the contents of the carbon filter will be disposed by a licensed waste hauler. Upon completion of decommissioning activities, a System Decommissioning Summary will be submitted to document field activities.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is May 8, 2020, and the completion date for the Task Assignment is July 31, 2020.

The Final cost total for DC045G is $4,941.55.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 03/31/20

Task #: DC045G SubTask 1 Project Management SubTask 6

Site: Jan's Quality Cleaners SubTask 2 SVE Decommissioning SubTask 7

Activity/Phase: Decommissioning SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.31 2.314 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$47.12 Professional Engineer/Geologist ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$28.85 Senior Technician MM 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.00 Junior Technician DC 16.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 53.31 2.314 51.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,452.07 $161.34 $1,290.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,640.83 $182.31 $1,458.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $406.58 $45.18 $361.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $370.28 $41.14 $329.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,869.76 $429.97 $3,439.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $72.61 $8.07 $64.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 03/31/20

Task #: DC045G SubTask 1 Project Management SubTask 6

Site: Jan's Quality Cleaners SubTask 2 SVE Decommissioning SubTask 7

Activity/Phase: Decommissioning SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $114.00 $114.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $149.00 $149.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $126.70 $126.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $159.20 $159.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,554.57 $438.04 $4,116.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $386.98 $43.00 $343.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,941.55 $481.04 $4,460.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Jan's Quality Cleaners

PROJECT NUMBER: 11124287

FDEP NO: ERIC_5367

SUBTASK: SVE Decommissioning

DATE: 3/31/2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer BM Specify laboratory data deliverable/Sample Kit 1 Sr. Professional Engineer BM Field sampling SOW/coordinate site access 1 Sr. Professional Engineer BM Conclusions/Recommendations 1

Senior Technician MM Mob/demob (2 days) 3 Senior Technician MM Remove SVE Piping 6 Senior Technician MM Abandon SVE Wells (1 hr each) 3 Senior Technician MM Site Restoration 4

Junior Technician JM Mob/demob (2 days) 3 Junior Technician JM Remove SVE Piping 6 Junior Technician JM Disconnect and Load Equipment 3 Junior Technician JM Site Restoration 4

Junior Technician DC Mob/demob (2 days) 3 Junior Technician DC Remove SVE Piping 6 Junior Technician DC Disconnect and Load Equipment 3 Junior Technician DC Relocate Equipment to Nu-Touch 4

TOTAL LABOR 51

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 2 $194.00

TOTAL VEHICLE $194.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

Erwin Remediation Carbon Drum Disposal $100 each 1 $100.00

TOTAL SUBS $100.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

TCLP VOCs Extraction $48.00 1 $48.00 TCLP VOCs 8260 $66.00 1 $66.00

Sample Shipping Small Cooler (2 day) $35.00 1 $35.00

TOTAL LAB $149.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

O&M O&M Supplies $63.05 day 1 $63.05 Dump Trailer (waste materials) $50.00 day 1 $50.00 Portland Cement Grout $4.55 bag 3 $13.65

Sub-Total $126.70

TOTAL EQUIPMENT $159.20

TA_045G.xlsx\sub 2 Page 3 3/31/20201:41 PM

COST PROPOSAL FOR TASK DC045G

< Jan’s Quality Dry Cleaners, ERIC_5367>

SVE System Decommissioning

1. INTRODUCTION:

GHD recently completed one year of SVE system operations and shutdown testing was conducted. Based on the results of the O&M and testing, system shutdown and deactivation was recommended. Task DC045G includes decommissioning of the SVE system.

Subtask 1 Project Management Sub Task 1 includes all tasks associated with managing the SVE decommissioning of the SVE system at the Jan’s Quality Cleaners.

Subtask 2 SVE System Decommissioning GHD personnel will mobilize to the site and disconnect the existing equipment. The equipment will be relocated to Nu-Touch Cleaners in Rockledge, Florida. All of the SVE piping will be removed from the facility and the 3 SVE wells will be abandoned by filling each with grout from bottom to top. The SVE wells will be cut below land surface and the surfaces will be restored. Any penetrations associated with the SVE piping will also be repaired/restored.

During SVE decommissioning, the contents of the carbon filter will be transferred to a FDOT-approved drum for characterization and off-site disposal by a licensed waste hauler. Upon completion of the SVE decommissioning, field notes, photographs, and waste manifests will be provided to the Department.

Deliverables:

Deliverable Deliverable Due Date

Field Notes, Photographs, Waste Manifests, and subcontractor receipts 5/8/20

IDW

Carbon Drum Disposa $100.00 each 1 $100.00 $80.00 each 1 $80.00 $95.00 each 1 $95.00 Transportation $0.00 each 1 $0.00 $30.00 each 1 $30.00 $0.00 each 1 $0.00 Stop Fee $0.00 each 1 $0.00 $50.00 each 1 $50.00 $150.00 each 1 $150.00

$100.00 $160.00 $245.00

Erwin Clean ManagementClark

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

March 26, 2020

Re: Jan’s Quality Cleaners - Bartow, FL

Mr. Moore:

The price for disposal of one (1) drum of non-hazardous activated carbon located in Bartow, FL will be $100.00 per drum total, for both transportation and disposal.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Jamie Infinger To: Brian Moore Subject: RE: Jan"s Quality Cleaners - Bartow Date: Tuesday, March 31, 2020 9:16:01 AM Attachments: image002.png image003.png image004.png image005.png

Just saw this. Sorry for the delayed response- $95.00 per drum $150.00 stop

Thanks, Ask me about our Coronavirus (COVID-19) Decontamination and Disposal Services that are avaliable now.

Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.

P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com

From: Brian Moore [mailto:Brian.Moore@ghd.com] Sent: Thursday, March 26, 2020 2:52 PM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: Jan's Quality Cleaners - Bartow

Jamie, Can you provide a quote for disposal of 1 drum of activated carbon. Assume low level of solvents (non-haz).

Thank you

Brian Moore, PE mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

M T W T F

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Project: TA_045G Date: Tue 3/31/20

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

S S M T W Apr 5, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

T F S S M Apr 12, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

T W T F S

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

Brian Moore

Max Macedo

S M T W T Apr 19, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20 o,Jose Muniz,Dalvise Curry

F S S M T Apr 26, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20 Brian Moore

W T F S S May 3, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

M T W T F

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 3/31/20 Mon 4/13/20

2 Subtask 1: Project Management

19 days Tue 4/14/20 Fri 5/8/20

3 Subtask 2: SVE Decommissioning

14 days Tue 4/14/20 Fri 5/1/20

4 Field Work Preparation1 wk Tue 4/14/20 Mon 4/20/20

5 SVE Decommissioning 2 days Tue 4/21/20 Wed 4/22/20

6 Field Notes and Photo 1 wk Mon 4/27/20Fri 5/1/20

S S M T W May 10, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC045G at the Jan's Quality Cleaners site located in Bartow, Pasco County

TA_045G.pdf
Cost Estimate
sub 2
Bids - TA_045G.pdf
ER Quote - GHD - Drum - 03.26.2020
SKMBT_C45220032614040
RE_ Jan's Quality Cleaners - Bartow
Copy of TA_045G.pdf
Bids

File details come from the government source that posted it. Updated .