CN-370000-HW555-DC013I.pdf
PDF 678 KB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
Task Assignment Notification Summary
This is a Task Assignment Notification Form (WCP TAFORM 01_18) issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW555. The task assignment, designated DC013i, is awarded to GHD Services, Inc., with Brian Moore serving as the contractor representative and Billy Hessman as the DEP Contract Manager. The work is being performed at the Sta-Brite Cleaners facility located at 1155 Washington Boulevard North in Sarasota, Sarasota County, Florida (FDEP Site No. ERIC_5445).
The task involves groundwater monitoring activities conducted in accordance with GHD's March 2020 scope of work and cost proposal. The scope consists of two subtasks: Subtask 1 encompasses project management calculated at 12.5 percent of direct labor costs, and Subtask 2 includes groundwater monitoring at five locations with samples analyzed for volatile organic compounds (VOCs) and total organic carbon (TOC). The final deliverable is a Groundwater Monitoring Report due on November 26, 2020, with the overall task completion date of February 26, 2021. The fixed price task assignment is valued at $3,718.35 with zero retainage. Invoice payment is due upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. No cost reimbursement, fee schedule adjustments, or additional fixed fees are authorized under this task assignment.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 NADC013i
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_5445
Sta-Brite Cleaners
1155 Washington Blvd N, Sarasota, Sarasota County
Monitoring
GHD Services, Inc. will conduct groundwater sampling in accordance with the March 2020 scope of work and cost proposal. Groundwater Monitoring Report will be generated.
Groundwater Monitoring Report
11/26/2020
02/26/2021
$ 3,718.35 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.27 21:04:13 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.03.27 21:04:52 -04'00'
Digitally signed by Jennifer Farrell Date: 2020.03.30 09:58:18 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2020.04.06 13:36:12 -04'00'
$ 3,718.35
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 11/26/2020
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report $ 3,718.35
$ 3,718.35
HW555
DC013i
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File Sta-Brite Cleaners
ERIC_5445
Sarasota, Sarasota County
FROM: Billy Hessman, Contract Manager
DATE: March 27, 2020
SUBJECT: Task Assignment Summary HW555 DC013i Monitoring
This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 5 locations. Samples will be analyzed for VOCs and TOC. Based on previous sampling events, the need for IDW disposal is not anticipated. If IDW disposal is required, a WCD will be submitted to the Department for the change in scope. Following completion of field sampling, a Groundwater Monitoring Report will be prepared and submitted to FDEP.
This work will be conducted in line with the scope of work included in the GHD proposal, received March 27, 2020.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is November 26, 2020 and the completion date for the Task Assignment is February 26, 2021.
The final cost total for Task Assignment DC013i is $3,718.35
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 03/27/20
SubTask 1 Project Management SubTask 6
SubTask 2 Groundwater Monitoring SubTask 7
SubTask 3 SubTask 8
Task #: DC013i
Site: Sta-Brite Cleaners
Activity/Phase: Monitoring
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 1.42 1.421 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$47.12 Professional Engineer/Geologist ES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 9.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$22.76 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 3.75 3.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 29.67 1.421 28.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $891.34 $99.04 $792.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,007.22 $111.92 $895.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $249.57 $27.73 $221.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $227.30 $25.26 $202.04 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $2,375.43 $263.95 $2,111.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $44.57 $4.95 $39.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 03/27/20
SubTask 1 Project Management SubTask 6
SubTask 2 Groundwater Monitoring SubTask 7
SubTask 3 SubTask 8
Task #: DC013i
Site: Sta-Brite Cleaners
Activity/Phase: Monitoring
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $630.00 $630.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $690.00 $690.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $241.30 $241.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $273.80 $273.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,480.80 $268.90 $3,211.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $237.55 $26.40 $211.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $3,718.35 $295.30 $3,423.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Sta-brite Cleaners
PROJECT NUMBER: 090115
FDEP NO: 589600764 ERIC_5445
SUBTASK: Groundwater Monitoring
DATE: 3/27/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer BM Conclusions/Recommendation 1
Professional Geologist GE Order sample kit/prepare field scope of work 1 Professional Geologist GE Contact property owner 0.5 Professional Geologist GE Verify COC/field notes following sampling 0.5 Professional Geologist GE Summarize previous assessment and remediation 1 Professional Geologist GE Groundwater Sampling Scope of Work and analysis 1 Professional Geologist GE Groundwater field sampling parameters 1 Professional Geologist GE Groundwater flow (one map) 1 Professional Geologist GE Groundwater analytical summary 1 Professional Geologist GE QA/QC 1 Professional Geologist GE Conculstion/Recommendations 1
Junior Technician SA Mob/Demob 3 Junior Technician SA Water Levels (all wells - 11 total) 1 Junior Technician SA Groundwater Sampling (5 wells) 7.5
11.5
CADD Design SM Prepare groundwater flow figure 1.5 CADD Design SM Prepare groundwater analytical figure 1.5
Staff Assistant ET Data Entry (11 water levels/5 monitor wells) 0.75 Staff Assistant ET Summary tables (gw elevation, quality, analytical) 1 Staff Assistant ET Publish report / generate pdf 2
3.75
TOTAL LABOR 28.25
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOCs EPA Method 8021 $100.00 5 $500.00
TOC $26.00 5 $130.00
Sample Shipping Large Cooler - two day $60.00 1 $60.00
TOTAL LAB $690.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment Expendables $32.50 Day 1 $32.50
Sub-Total $32.50
Groundwater Sampling Kit $208.55 Day 1 $208.55 Poly Tubing/HDPE $0.25 ft 90 $22.50 Silicon Tubing 3/16 x 3/8 $2.05 ft 5 $10.25
Sub-Total $241.30
TOTAL EQUIPMENT $273.80
TA_013J.xlsx\sub 2 Page 1 3/27/20208:45 PM
COST PROPOSAL FOR TASK DC013i Stabrite Cleaners, 589600764
Groundwater Monitoring
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
A dual-phase remedial system was operated at the subject site in order to remediate chlorinated solvent impacts present beneath the subject facility within soil and groundwater.
Based on the presence of residual PCE and PCE breakdown products in the former source area, GHD recommended the completion of pilot study activities that were implemented and included both bioremediation and bioaugmentation.
GHD implemented additional biostimulation using EOS as recommended in the approved RAP Modification and conducted baseline sampling at three wells including MW003, MW004, and MW005. Five groundwater monitoring events followed the implementation of the biostimulation injections and indicated a decrease in the presence of PCE and PCE breakdown products. GHD recommended and FDEP approved continued Groundwater Monitoring at the site.
Subtask 1: Project Management Includes all activities associated with groundwater sampling and report preparation.
Subtask 2: Groundwater Monitoring Task assignment DC013J includes groundwater sampling at one (1) monitor well (MW005) and four (4) existing MPE wells DW001, DW002, DW003, and DW004. Groundwater analysis will include volatile organic halocarbons and Total Organic Carbon (TOC). All sampling will be in accordance with the approved RAP Modification and FDEP SOPs. Although monitoring well MW009 was recommended for sampling in Bill Linn’s comments dated August 7, 2015, the well was not located during the previous sampling events. Further, the area of the monitor well is covered with new asphalt. All groundwater sampling will be conducted in accordance with FDEP SOPs and groundwater depth to water measurements will be gathered prior to sampling at all available wells.
Following groundwater sampling and receipt of analytical data, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
Groundwater Monitoring Report 11/26/20
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Mar 29, '20 Apr 5, '20 Apr 12, '20 Apr 19, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Project: TA_013J Date: Fri 3/27/20
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Apr 26, '20 May 3, '20 May 10, '20 May 17, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W May 24, '20 May 31, '20 Jun 7, '20 Jun 14, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Jun 21, '20 Jun 28, '20 Jul 5, '20 Jul 12, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Jul 19, '20 Jul 26, '20 Aug 2, '20 Aug 9, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Aug 16, '20 Aug 23, '20 Aug 30, '20 Sep 6, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
Gabrielle En
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Sep 13, '20 Sep 20, '20 Sep 27, '20 Oct 4, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20 nos
Skylar Albritton
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Oct 11, '20 Oct 18, '20 Oct 25, '20 Nov 1, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approva3 wks Fri 3/27/20 Thu 4/16/20
2 Subtask 1: Project Management
160 days Fri 4/17/20 Thu 11/26/20
3 Subtask 2:
Groundwater Monitoring
54 days Mon 9/14/20
Thu 11/26/20
4 Field Work Preparat 3 wks Mon 9/14/20Fri 10/2/20
5 Groundwater Sampl1 day Wed 10/7/20Wed 10/7/20
6 Groundwater Monitoring Report
6 wks Fri 10/16/20 Thu 11/26/20
Brian Moore,G
T F S S M T W T F S S M T W T F S S M T W T F S S M T W Nov 8, '20 Nov 15, '20 Nov 22, '20 Nov 29, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC013J at the Sta-Brite Cleaners facility located in Sarasota, Sarasota County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| TA_013J.pdf |
| Cost Estimate |
| sub 2 |
| fubar.pdf |
| sub 2 |
File details come from the government source that posted it. Updated .