About this file

This is a Task Assignment Notification Form for contract HW555 issued by the Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. The task assignment covers groundwater monitoring activities at the Tower Oaks Cleaners site located at 12119 Little Road, Hudson, Pasco County, Florida (DEP Site #ERIC_5229). The contract is managed by Kevin Kane at FDEP, with Brian Moore serving as the contractor representative. The task was executed between May 20, 2021, and November 5, 2021, under a Fixed Price contracting arrangement.

The scope of work comprises two subtasks: Project Management (calculated at 12.5% of direct labor) and Groundwater Monitoring. The groundwater monitoring work includes sampling from ten monitoring wells on-site, depth-to-water measurements, volatile organic halocarbon analysis via EPA Method 8260, and preparation of a Groundwater Monitoring Report due August 4, 2021. The total task assignment value is $5,167.05, invoiced in full upon completion of groundwater sampling activities and FDEP approval of the deliverable report. Cost components include $3,281.53 in direct labor (including overhead, general and administrative, and fringe), $61.57 in other direct costs, $97.00 in vehicle rental, $104.50 in subcontractor services for contaminated water disposal, $720.00 in laboratory analysis, and $574.30 in field equipment expenses.

View the file

Other files

File Type Posted
CN-370000-HW552-TDC007A.pdf PDF
CN-370000-HW555-A10.pdf PDF
CN-370000-HW555-A5.pdf PDF
CN-370000-HW555-CO1.pdf PDF
CN-370000-HW555-DC001A.pdf PDF
CN-370000-HW555-DC001H.pdf PDF
CN-370000-HW555-DC001I.pdf PDF
CN-370000-HW555-DC004F.pdf PDF
CN-370000-HW555-DC004K.pdf PDF
CN-370000-HW555-DC006H.pdf PDF
CN-370000-HW555-DC006L.pdf PDF
CN-370000-HW555-DC007F.pdf PDF
CN-370000-HW555-DC007H.pdf PDF
CN-370000-HW555-DC008E.pdf PDF
CN-370000-HW555-DC010D.pdf PDF
CN-370000-HW555-DC012H.pdf PDF
CN-370000-HW555-DC013H.pdf PDF
CN-370000-HW555-DC019G.pdf PDF
CN-370000-HW555-DC019L.pdf PDF
CN-370000-HW555-DC01ACO6.pdf PDF
CN-370000-HW555-DC01ACO8.pdf PDF
CN-370000-HW555-DC01J.pdf PDF
CN-370000-HW555-DC020J.pdf PDF
CN-370000-HW555-DC021i.pdf PDF
CN-370000-HW555-DC024I.pdf PDF
CN-370000-HW555-DC02C.pdf PDF
CN-370000-HW555-DC02D.pdf PDF
CN-370000-HW555-DC02E.pdf PDF
CN-370000-HW555-DC02HCO4.pdf PDF
CN-370000-HW555-DC02HCO6.pdf PDF
CN-370000-HW555-DC02I.pdf PDF
CN-370000-HW555-DC02K.pdf PDF
CN-370000-HW555-DC02M.pdf PDF
CN-370000-HW555-DC030K.pdf PDF
CN-370000-HW555-DC031K.pdf PDF
CN-370000-HW555-DC032G.pdf PDF
CN-370000-HW555-DC033G.pdf PDF
CN-370000-HW555-DC034O.pdf PDF
CN-370000-HW555-DC034Q.pdf PDF
CN-370000-HW555-DC035F.pdf PDF
CN-370000-HW555-DC035I.pdf PDF
CN-370000-HW555-DC035J.pdf PDF
CN-370000-HW555-DC038B.pdf PDF
CN-370000-HW555-DC039E.pdf PDF
CN-370000-HW555-DC03B.pdf PDF
CN-370000-HW555-DC03CCO1.pdf PDF
CN-370000-HW555-DC03D.pdf PDF
CN-370000-HW555-DC03J.pdf PDF
CN-370000-HW555-DC03J.pdf.crdownload CRDOWNLOAD file
CN-370000-HW555-DC040C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC065C

GHD Services, Inc.

Brian Moore

(850) 245-8971Kevin Kane

ERIC_5229

Tower Oaks Cleaners

12119 Little Rd., Hudson, Pasco County

Monitoring

GHD Services, Inc. will conduct groundwater sampling in accordance with the May 2021 scope of work and cost proposal. Groundwater Monitoring Report will be generated.

Groundwater Monitoring Report

08/04/2021

11/05/2021

$ 5,167.05 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.20 15:16:18 -04'00'

Kevin Kane Digitally signed by Kevin Kane Date: 2021.05.20 15:16:35 -04'00'

Aaron Cohen Digitally signed by Aaron Cohen Date: 2021.05.21 10:14:21 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2021.05.21 10:55:38 -04'00'

$ 5,167.05

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/04/2021

Upon completion of groundwater sampling activities and FDEP approval of Groundwater Monitoring Report $ 5,167.05

$ 5,167.05

HW555

DC065C

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File Tower Oaks Cleaners

ERIC_5229

Hudson, Pasco County, FL

FROM: Kevin Kane, Contract Manager

DATE: May 20, 2021

SUBJECT: Task Assignment Summary

HW555 DC065C

Monitoring

GHD Services, Inc. will conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at all monitoring wells on site (10 total).

Additionally, depth to water measurements will be taken from all monitor wells prior to sampling. All samples will be analyzed for the presence of VOHs by EPA Method 8260.

IDW disposal is expected for this site and has been accounted for under this subtask.

Following receipt of analytical results, a Groundwater Monitoring Report will be generated and submitted to the Department.

This work will be conducted in accordance with the scope of work included in the GHD proposal, received May 18, 2021.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 4, 2021, and the completion date for the Task Assignment is November 5, 2021.

The final cost total for Task Assignment DC065C is $5,167.05.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 05/20/21

Task #: DC065C SubTask 1 Project Management SubTask 6

Site: Tower Oaks Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 1.96 1.963 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.00 Professional Engineer/Geologist ES 12.50 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$21.14 Junior Technician BJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician PM 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 4.25 4.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 43.71 1.963 41.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,231.34 $136.82 $1,094.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,391.42 $154.61 $1,236.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $344.78 $38.31 $306.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $313.99 $34.89 $279.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,281.53 $364.63 $2,916.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $61.57 $6.84 $54.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 05/20/21

Task #: DC065C SubTask 1 Project Management SubTask 6

Site: Tower Oaks Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $95.00 $95.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $9.50 $9.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $104.50 $104.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $660.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $720.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $541.80 $541.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $574.30 $574.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,838.90 $371.47 $4,467.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $328.15 $36.46 $291.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $5,167.05 $407.93 $4,759.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Tower Oaks Cleaners

PROJECT NUMBER: 11207776

FDEP NO: ERIC_5229

SUBTASK: Groundwater Monitoring

DATE: 5/20/2021

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer BM Conclusions/Recommendations 1

Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Coordinate IDW Disposal 1 Professional Geologist ES Project Background 1 Professional Geologist ES Groundwater Sampling Methods 1 Professional Geologist ES Groundwater flow evaluation 1 Professional Geologist ES Water Quality Parameter Summary 1 Professional Geologist ES Groundwater Analtycial Results 2 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Conclusions/Recommendations 1

12.5

Junior Technician SA Mob/demob 2 Junior Technician SA Water Levels (all wells - 10 total) 1 Junior Technician SA Groundwater Sampling (5 wells) 7.5

10.5

Junior Technician WO Mob/demob 2 Junior Technician WO Water Levels (all wells - 10 total) 1 Junior Technician WO Groundwater Sampling (5 wells) 7.5

10.5

Drafting Technician PM Prepare GW Flow map 1 Drafting Technician PM Prepare VOC plume figures with updated concentration data 2

Staff Assistant SS Data Entry (10 wls, and 10 monitor wells) 1.25 Staff Assistant SS Document Preparation/Publishing 2 Staff Assistant SS Update GIS/ADAPT 1

4.25

TOTAL LABOR 41.75

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

Gulf Coast IDW Disposal $95 drum 1 $95.00

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 10 $660.00 Sample Shipping Large Cooler (2 day) $60.00 1 $60.00

TOTAL LAB $720.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

Groundwater Sampling Kit $208.55 day 2 $417.10 Poly Tubing (HDPE) $0.25 ft 186 $46.50 Silicon Tubing $2.00 ft 10 $20.00 55-gallon drum $58.20 drum 1 $58.20

Sub-Total $541.80

TOTAL EQUIPMENT $574.30

TA_065C\sub 2 Page 3 5/20/20212:27 PM

COST PROPOSAL FOR TASK DC065C

<Tower Oaks Cleaners/FDEP ERIC_5229>

< Groundwater Monitoring>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) submitted a Site Assessment Report (SAR) for the former Tower Oaks Cleaners site located in Hudson, Pasco County, in February 2021. The SAR detailed assessment results, which identified relatively low levels of chlorinated solvent in soil and soil gas. Minor groundwater impacts were identified immediately south of the former facility. The SAR recommended groundwater monitoring. The FDEP provided comments on March 30, 2021, which approved the SAR and recommendation for monitoring. Task DC065C includes groundwater sampling.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the groundwater monitoring activities at the former Tower Oaks Cleaners site.

Subtask 2: Groundwater Monitoring As recommended by FDEP, groundwater sampling will be conducted at all site monitor wells (10 total). Prior to sampling, depth to water measurements will be gathered at all site monitor wells. Following depth to water measurements, groundwater sampling will be conducted in accordance with FDEP SOPs. All of the groundwater samples (MW001 through MW010) will be submitted to a Florida-certified laboratory for volatile organic halocarbon analysis.

Upon receipt of analytical data, a Groundwater Monitoring Report (GMR) will be prepared.

The GMR will include a summary of field methodology, and laboratory analytical results. The GMR will also include conclusions and recommendations. The recommendations may include additional well installation and/or sampling.

Deliverables:

Deliverable Deliverable Due Date

Groundwater Monitoring Report 8/4/21

Gulf Coast Vacuum Truck Services 1744 Williams Ditch Rd

Cantonment, FL 32533 US

+1 8504500058 accounting@gcvts.net

Estimate

ADDRESS

GHD

ESTIMATE 1040

DATE 04/15/2021

DATE SERVICE DESCRIPTION QTY RATE AMOUNT

Drum Disposal Disposal of of 1 drum of contaminated water.

1 95.00 95.00

Island Cleaners - Sanibel TOTAL $95.00

Accepted By

Accepted Date

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

April 15, 2021

Re: Non-Hazardous Drum Disposal Quote – South and Central Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in south and central

Florida will be $100.00 per drum, total, for both transportation and disposal.

Pricing for the Florida Keys will be quoted separately on a case-by-case basis.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Tue 5/18/21 Mon 5/31/21

2 Subtask 1: Project Management

47 days Tue 6/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

47 days Tue 6/1/21 Wed 8/4/21

4 Field Work Preparatio2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

5/9 5/16 5/23

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC065C at the Tower Oaks Cleaners site located in Hudson, Pasco County

Project: TA_065C Date: Tue 5/18/21

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Tue 5/18/21 Mon 5/31/21

2 Subtask 1: Project Management

47 days Tue 6/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

47 days Tue 6/1/21 Wed 8/4/21

4 Field Work Preparatio2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

Ed Siersema

Skylar Albri

5/30 6/6 6/13 June

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC065C at the Tower Oaks Cleaners site located in Hudson, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Tue 5/18/21 Mon 5/31/21

2 Subtask 1: Project Management

47 days Tue 6/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

47 days Tue 6/1/21 Wed 8/4/21

4 Field Work Preparatio2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21 itton,William Ouchie

6/20 6/27 7/4 July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC065C at the Tower Oaks Cleaners site located in Hudson, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Tue 5/18/21 Mon 5/31/21

2 Subtask 1: Project Management

47 days Tue 6/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

47 days Tue 6/1/21 Wed 8/4/21

4 Field Work Preparatio2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

7/11 7/18 7/25

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC065C at the Tower Oaks Cleaners site located in Hudson, Pasco County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Tue 5/18/21 Mon 5/31/21

2 Subtask 1: Project Management

47 days Tue 6/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

47 days Tue 6/1/21 Wed 8/4/21

4 Field Work Preparatio2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21 Brian Moore,Ed Siersema,Peter McLean,Sheila Stoker

8/1 8/8 8/15 August

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC065C at the Tower Oaks Cleaners site located in Hudson, Pasco County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule

File details come from the government source that posted it. Updated .