Task Assignment Summary
This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW555, issued by the state of Florida. The document establishes Task Assignment DC069B between FDEP and GHD Services, Inc., a private environmental consulting contractor. The task involves groundwater monitoring and well installation activities at the Cameo Cleaners site located at 2810 Lakeland Highlands Road in Lakeland, Polk County, Florida. The contract manager is Billy Hessman, and the site identification number is ERIC_5363.
GHD Services, Inc. will conduct groundwater monitoring and well installation in accordance with the January 2021 scope of work and cost proposal. The scope includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring, which encompasses installation of one deep monitoring well to a depth of approximately 45 feet with 10 feet of screen, groundwater sampling from 19 existing and newly installed wells analyzed for volatile organic halocarbons via EPA Method 8260, and preparation of a Groundwater Monitoring Report. The task assignment is structured as a Fixed Price with a total not-to-exceed amount of $11,773.91, with zero retainage. The final deliverable, the Groundwater Monitoring Report, is due May 7, 2021, and the period of performance extends through July 30, 2021. Invoice payment is contingent upon completion of well installation and groundwater monitoring activities and FDEP approval of the Groundwater Monitoring Report, with the entire task assignment value of $11,773.91 invoiced upon satisfaction of these conditions.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 NADC069B
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_5363
Cameo Cleaners
2810 Lakeland Highlands Rd., Lakeland, Polk County
Monitoring
GHD Services, Inc. will conduct groundwater monitoring and well installation in accordance with the January 2021 scope of work and cost proposal.
Groundwater Monitoring Report
05/07/2021
07/30/2021
$ 11,773.91 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2021.01.12 08:34:18 -05'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2021.01.12 08:34:29 -05'00'
William Burns Digitally signed by William Burns Date: 2021.01.12 11:31:28 -05'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.01.12 14:33:39 -05'00'
$ 11,773.91
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 05/07/2021
Upon completion of well installation and groundwater monitoring activities and FDEP approval of the Groundwater Monitoring Report. $ 11,773.91
$ 11,773.91
HW555
DC069B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File Cameo Cleaners
ERIC_5363
Lakeland, Polk County
FROM: Billy Hessman, Contract Manager
DATE: January 11, 2021
SUBJECT: Task Assignment Summary
HW555 DC069B
Monitoring
GHD Services, Inc. will conduct groundwater monitoring and well installation. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring GHD will install one deep well in the vicinity of MW006/MW007 and conduct groundwater monitoring. Upon completion of field activities, a Groundwater Monitoring Report will be generated and submitted to the Department. The Report will include a recommendation for future site activities.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is May 7, 2021, and the completion date for the task assignment is July 30, 2021.
The final cost total for Task Assignment DC069B is $11,773.91.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/11/21
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 3.63 3.625 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$47.12 Professional Engineer/Geologist ES 21.25 21.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$22.76 Senior Technician WM 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 20.50 20.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.27 Staff Assistant SS 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 75.38 3.625 71.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,274.18 $252.69 $2,021.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $2,569.82 $285.54 $2,284.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $636.77 $70.75 $566.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $579.92 $64.44 $515.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,060.69 $673.42 $5,387.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $113.70 $12.63 $101.07 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 01/11/21
Task #: SubTask 1 Project Management SubTask 6
Site: SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: SubTask 3 SubTask 8
Project Manager: SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $291.00 $291.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $1,990.00 $1,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $2,090.00 $2,090.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $209.00 $209.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,299.00 $2,299.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,254.00 $1,254.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,314.00 $1,314.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,024.45 $1,024.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,089.45 $1,089.45 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $11,167.84 $686.05 $10,481.79 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $606.07 $67.34 $538.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $11,773.91 $753.39 $11,020.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Cameo Cleaners
PROJECT NUMBER: 11147374-02
FDEP NO: ERIC_5363
SUBTASK: Groundwater Monitoring
DATE: 1/11/2021
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Project Background 1 Professional Geologist ES Well Installation Methods/Discussion 0.75 Professional Geologist ES Groundwater Sampling Methods 1 Professional Geologist ES Groundwater flow evaluation (shallow, intermediate, deep) 2 Professional Geologist ES Water Quality Parameter Summary 1 Professional Geologist ES Groundwater Analtycial Results 2 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Conclusions/Recommendations 1 Professional Geologist ES Mob/demob 2 Professional Geologist ES Oversee Well Installation 6
21.25
Senior technician WM Mob/demob (2 days) 4 Senior technician WM Water Levels (all wells - 25 total) 4 Senior technician WM Groundwater Sampling (8 wells) 12
Junior Technician SA Mob/demob (2 days) 4 Junior Technician SA Groundwater Sampling (11 wells) 16.5
20.5
Drafting Technician MJ Prepare GW Flow maps (shallow, intermediate, deep) 3 Drafting Technician MJ Prepare VOC plume figures with updated concentration data 2
Staff Assistant SS Data Entry (25 wls, and 12 monitor wells) 1.5 Staff Assistant SS Prepare Summary Tables 1.5 Staff Assistant SS Document Preparation/Publishing 2
TOTAL LABOR 71.75
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 3 $291.00
TOTAL VEHICLE $291.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
Groundwater Protection Mobilization $500.00 each 1 $500.00 Groundwater Protection DPT Rig and Crew $1,050.00 each 1 $1,050.00 Groundwater Protection 1" PVC well Install $3.00 ft 45 $135.00 Groundwater Protection Prepack Screen $150.00 each 1 $150.00 Groundwater Protection Completion $100.00 each 1 $100.00 Groundwater Protection Drums $55.00 drum 1 $55.00 Groundwater Protection Permits $0.00 each 1 $0.00
Erwin IDW Water Drum $100.00 drum 1 $100.00
TOTAL SUBS $2,090.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $66.00 19 $1,254.00 Sample Shipping Large Cooler (2 days) $60.00 1 $60.00
TOTAL LAB $1,314.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 2 $65.00 Sub-Total $65.00
Groundwater Sampling Kit $208.55 day 4 $834.20 Poly Tubing (HDPE) $0.25 ft 609 $152.25 Silicon Tubing $2.00 ft 19 $38.00
Sub-Total $1,024.45
TOTAL EQUIPMENT $1,089.45
TA_069B.xlsx\sub 2 Page 3 1/11/20212:17 PM
COST PROPOSAL FOR TASK DC069B
<Cameo Cleaners/FDEP ERIC_4730>
< Groundwater Monitoring >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) completed initial Site Assessment activities and submitted a Site Assessment Report (SAR) for the Cameo Cleaners site located in Lakeland, Polk County, in March 2020. In accordance with FDEP comments, additional assessment was conducted and a Supplemental SAR was submitted in September 2020 that was approved. Task DC069B includes additional monitor well installation and groundwater sampling.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the groundwater monitoring activities at the Cameo Cleaners site.
Subtask 2: Additional Assessment As recommended by FDEP, subtask 2 includes well installation and groundwater sampling.
One additional deep well will be installed to a depth of 45 feet and will be constructed with 10 feet of well screen. The deep well will be installed near the location of MW006/MW007.
Following well installation, groundwater monitoring will be conducted. Prior to sampling, the new well will be surveyed relative to the existing wells. Prior to sampling, depth to water measurements will be gathered at all site wells. Groundwater sampling will be conducted in general accordance with FDEP SOPs. Groundwater sampling is proposed at monitoring wells
MW001, MW002, MW004, MW005, MW006, MW007, MW008, MW009, MW010, MW011,
MW012, MW014, MW017, MW018, MW021, MW023, MW024, MW025, and the newly installed well. All groundwater samples will be analyzed for the presence of volatile organic halocarbons (VOHs) by EPA Method 8260.
Upon receipt of analytical data, a Groundwater Monitoring Report (GWMR) will be prepared.
The GWMR will include a summary of field methodology and laboratory analytical results for soil and groundwater. The GMWR will also include conclusions and recommendations.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 5/7/21
Drilling
Mobilization $500.00 each 1 $500.00 $400.00 each 1 $400.00 $500.00 each 1 $500.00 Deep Well $1,575.00 each 1 $1,575.00 $1,500.00 each 1 $1,500.00 DPT Rig/Crew $1,050.00 day 1 $1,050.00 PVC Well Install $3.00 ft 45 $135.00 Prepack screens $150.00 each 1 $150.00 Completion $100.00 each 1 $100.00
Drums $55.00 drum 1 $55.00 $45.00 drum 2 $90.00 $50.00 drum 2 $100.00 Permits $50.00 each 0 $0.00 $50.00 total 1 $50.00 $50.00 total 1 $50.00
$1,990.00 $2,115.00 $2,150.00 soil IDW drum $100.00 drum 0 $0.00 $80.00 drum 0 $0.00 $100.00 drum 0 $0.00 GW IDW Drum $100.00 drum 1 $100.00 $60.00 drum 1 $60.00 $125.00 drum 1 $125.00 transportation $0.00 drum 2 $0.00 $30.00 drum 1 $30.00 $301.00 trip 1 $301.00
$20.00 drum 1 $20.00 $77.60 each 1 $77.60
Stop Fee $0.00 each 1 $0.00 $50.00 each 1 $50.00 each 1 $0.00
$100.00 $140.00 $523.60
Groundwater Protection JAEEPreferred
Erwin Remediation Clark Clean Harbors
Sonic Auger DPT Horizontal Directional Drilling
DATE: 12/16/2020
ESTIMATE #: 1220033
Project Description:
ID QTY Unit Rate TOTAL
1 1 ls 500.00$ 500.00$
2 0 night 200.00$ -$
3 1 1/2 day 1,050.00$ 1,050.00$
4 45 foot 3.00$ 135.00$
5 1 each 150.00$ 150.00$
6 1 each 75.00$ Included
7 1 each 100.00$ 100.00$
8 55 gallon drums (Soil) (As Needed) 0 each 55.00$ -$
9 55 gallon drums (Water) (As Needed) 1 each 55.00$ 55.00$
10 Permits: SWFLWMD (Not Applicable FDEP Work) -$
Completion: Subtotal 1,990.00$
Todd Hodgson
TOTAL 1,990.00$
Partner
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
Develop wells-- Drum all IDW
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew
"Actual quantities used and days on site will be invoiced"
1/2 Day
2' x 2' Concrete Pad w/8" Flush Completion
DESCRIPTION
Mobilization DPT
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
Utility Locates on Private Property is the responsibility of the client
Well Development (Up to 1/2 hour w/pump)
Borehole Clearance to 5’ bgs beyond 30 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
DPT Well Installation
1" PVC Well Installation
(2) 1" x 5' PVC .010 Slot Prepack Screen (10' total), 3" Expendable Point
(813) 257-0685
(1) 1" x 45' MW w/10' of prepacked screen-8" Flush Completion- No Soil Sampling
PROJECT
Cameo Cleaners 2810 Lakeland Highlands Road
Damages to utilities on private property during borehole clearance are the responsibility of the client
5904 Hampton Oaks Pkwy Suite F
CUSTOMER
GHD
Brian Moore
Tampa, Florida 33610 Lakeland, Florida
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
GHD BID FORM
Cameo Cleaners
2810 Lakeland Highlands Road, Lakeland, Polk County, Florida
ITEM 1 Mobilization Lump Sum Cost Per Mobilization: $
ITEM 2 Install one (1) exterior deep monitoring well. Develop well. Drum all wastes.
Lump Sum Cost per exterior Deep Well (est @ 45’) $ /Well
REQUIRED ADDITIONAL INFORMATION
Number of days required to complete well installation: _____________days
Cost to supply, fill, and stage drums at central area: ___________________ per drum
Number of drums required ___________________drums
Cost for well installation permits: each total
Bidder agrees that the proposed costs for the work specified in this bid package will be good for a period of 180 days from the bid opening.
Name of Bidder Authorizing Signature and Title
Address Date
.5
$45.00
$50.00
$400.00
$1,575.00
$2,115.00
Preferred Drilling Solutions, Inc. Kevin Bonacum, Estimator
8820 66th Street North, Pinellas Park, FL 33782 12/16/20
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
June 4, 2020
Re: Cameo Cleaners – Lakeland, FL
Mr. Moore:
The price for disposal of one (1) drum of non-hazardous soil and three (3) drums of non-hazardous groundwater located in Lakeland, FL will be $100.00 per drum, or $400.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
DISPOSAL
Profile/ Waste Code Waste Description Qty UOM Price Total
CNO NON HAZARDOUS SOLID 1 55 gallon drum $100.00 $100.00
CNOS NON HAZARDOUS SEMI-SOLIDS 3 55 gallon drum $125.00 $375.00
Total $475.00
TRANSPORTATION
Dispatch Location Qty Price UOM Total
Bartow, FL Hub 4 $30.00 container *$301.00
*Minimum charge $301.00 per trip.
A demurrage charge of $107.00 per hour will apply as follows:
Number of Containers
Allowable Loading Time
1 to 10 0.5 hour(s) 11 to 15 0.75 hour(s) 16 to 25 1 hour(s) 26 to 35 1.25 hour(s) 36 to 40 1.5 hour(s) 41 to 45 1.5 hour(s) 46 to 50 1.75 hour(s) 51 to 80 2 hour(s)
ESTIMATED E-MANIFEST FEE (quantity 3) $60.00
ESTIMATED RECOVERY FEE $77.60
QUOTE TOTAL ESTIMATE $913.60
GENERAL CONDITIONS
1.Except where superseded by an existing services agreement the following terms and conditions apply to this quoted business.
2.Prices firm for 30 days.
3.Terms: Net 90 Days 4.Interest will be charged at 1.5% per month or the maximum allowed by law for all past due amounts.
5.Local, state and federal fees/taxes applying to the generating location/receiving facilities are not included in disposal pricing and will be added to each invoice as applicable.
6.Materials subject to additional charges if they do not conform to the listed specifications.
June 4, 2020 Clean Harbors Quote #3503626
"People and Technology Creating a Safer, Cleaner Environment"
| TA_069Bcef.pdf |
| Cost Estimate |
| sub 2 |
| TA_0bidsum69B.pdf |
| Bids |
| TA_069B Bids.pdf |
| Groundwater Protection |
| Invoice |
| PDS (1) |
| JAEE |
| ER Quote - GHD - Drum - 06.04.2020 |
| Clark |
| June 2020 IDW drums |
File details come from the government source that posted it. Updated .