This document is a Task Assignment Notification Form issued by the Florida Department of Environmental Protection (FDEP) under DEP Contract No. HW555 for GHD Services, Inc. The task assignment (DC024o) involves groundwater monitoring services at the 60 Minute Cleaners - Cleveland site located at 13300 S Cleveland Avenue in Fort Myers, Lee County, Florida. The contractor is represented by Brian Moore, with FDEP Contract Manager Billy Hessman overseeing the engagement. The site identifier is ERIC_4845, and this work constitutes the Monitoring phase of the broader contract.

GHD Services, Inc. will conduct groundwater monitoring and prepare a comprehensive Groundwater Monitoring Report in accordance with a February 2021 scope of work and cost proposal. The work encompasses two subtasks: Project Management (calculated at 12.5% of direct labor) and Groundwater Monitoring, which includes depth-to-water measurements at 18 wells and groundwater sampling at 7 wells analyzed for Volatile Organic Compounds (VOCs) via EPA Method 8260. The total task assignment value is $4,497.04, structured as a fixed price contract with no retainage. The final deliverable—the Groundwater Monitoring Report—is due August 4, 2021, with the complete task assignment execution concluding October 15, 2021. Invoice submission is permitted upon completion of groundwater sampling activities and FDEP approval of the monitoring report.

View the file

Other files

File Type Posted
CN-370000-HW555-CO2.pdf PDF
CN-370000-HW555-DC002L.pdf PDF
CN-370000-HW555-DC004G.pdf PDF
CN-370000-HW555-DC010H.pdf PDF
CN-370000-HW555-DC010J.pdf PDF
CN-370000-HW555-DC010M.pdf PDF
CN-370000-HW555-DC013J.pdf PDF
CN-370000-HW555-DC014I.pdf PDF
CN-370000-HW555-DC015B.pdf PDF
CN-370000-HW555-DC019A.pdf PDF
CN-370000-HW555-DC01ACO3.pdf PDF
CN-370000-HW555-DC020M.pdf PDF
CN-370000-HW555-DC027H.pdf PDF
CN-370000-HW555-DC02BCO1.pdf PDF
CN-370000-HW555-DC02BCO2.pdf PDF
CN-370000-HW555-DC02HCO3.pdf PDF
CN-370000-HW555-DC02HCO5.pdf PDF
CN-370000-HW555-DC02ICO2.pdf PDF
CN-370000-HW555-DC02N.pdf PDF
CN-370000-HW555-DC031H.pdf PDF
CN-370000-HW555-DC034E.pdf PDF
CN-370000-HW555-DC034I.pdf PDF
CN-370000-HW555-DC035D.pdf PDF
CN-370000-HW555-DC035K.pdf PDF
CN-370000-HW555-DC039C.pdf PDF
CN-370000-HW555-DC039F.pdf PDF
CN-370000-HW555-DC03E.pdf PDF
CN-370000-HW555-DC03F.pdf PDF
CN-370000-HW555-DC03G.pdf PDF
CN-370000-HW555-DC040H.pdf PDF
CN-370000-HW555-DC041B.pdf PDF
CN-370000-HW555-DC043C.pdf PDF
CN-370000-HW555-DC045G.pdf PDF
CN-370000-HW555-DC049G.pdf PDF
CN-370000-HW555-DC049H.pdf PDF
CN-370000-HW555-DC051A.pdf PDF
CN-370000-HW555-DC052G.pdf PDF
CN-370000-HW555-DC063E.pdf PDF
CN-370000-HW555-DC07D.pdf PDF
CN-370000-HW555-DC09HCO6.pdf PDF
CN-370000-HW555-DC09K.pdf PDF
CN-370000-HW555-DC09M.pdf PDF
CN-370000-HW555-DC10FCO2.pdf PDF
CN-370000-HW555-DC10I.pdf PDF
CN-370000-HW555-DC11DCO1.pdf PDF
CN-370000-HW555-DC11DCO2.pdf PDF
CN-370000-HW555-DC11E.pdf PDF
CN-370000-HW555-DC11F.pdf PDF
CN-370000-HW555-DC12B.pdf PDF
CN-370000-HW555-DC12BCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC024o

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_4845

60 Minute Cleaners - Cleveland

13300 S Cleveland Ave., Fort Myers, Lee

Monitoring

GHD Services, Inc. will conduct groundwater monitoring in accordance with the February 2021 scope of work and cost proposal.

Groundwater Monitoring Report

08/04/2021

10/15/2021

$ 4,497.04 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 12:32:13 -05'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 12:32:23 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.02.17 13:12:21 -05'00'

Brian Moore Digitally signed by Brian Moore Date: 2021.02.17 14:47:44 -05'00'

$ 4,497.04

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/04/2021

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. $ 4,497.04

$ 4,497.04

HW555

DC024o

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File

FROM: Billy Hessman, Contract Manager

DATE: February 17, 2021

SUBJECT: Task Assignment DC024o

Negotiation Summary 60 Minute Cleaners - Cleveland

ERIC_4845

Monitoring

This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 7 wells. Samples will be analyzed for VOCs by EPA Method 8260. Based on past sampling events, IDW disposal is not anticipated. If IDW disposal is required a WCD will be submitted to the Department for the change in scope. Upon receipt of the groundwater analytical data, GHD will generate a Groundwater Monitoring Report detailing the field activities, procedures, and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.

Documentation of the costs is included in the attached revised CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is August 4, 2021, and the completion date for the task assignment is October 15, 2021.

Final cost total for Task Assignment DC024o is $4,497.04.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/15/21

Task #: DC024o SubTask 1 Project Management SubTask 6

Site: 60 Minute Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 1.92 1.918 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.00 Professional Engineer/Geologist JH 11.50 11.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.29 Project Engineer/Scientist AW 14.00 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.73 Staff Engineer/Scientist VH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 4.50 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 35.92 1.918 34.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,203.59 $133.73 $1,069.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,360.05 $151.11 $1,208.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $337.00 $37.44 $299.56 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $306.91 $34.10 $272.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,207.55 $356.38 $2,851.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $60.18 $6.69 $53.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/15/21

Task #: DC024o SubTask 1 Project Management SubTask 6

Site: 60 Minute Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $462.00 $462.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $497.00 $497.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $282.05 $282.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $314.55 $314.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $4,176.28 $363.07 $3,813.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $320.76 $35.64 $285.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,497.04 $398.71 $4,098.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : 60 Minute Cleaners - Cleveland

PROJECT NUMBER: 090147

FDEP NO: ERIC_4845

SUBTASK: Groundwater Monitoring

DATE: 3/21/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer BM Conclusions/Recommendations 1

Professional Engineer JH Specify laboratory data deliverable/Sample Kit 1 Professional Engineer JH Field sampling SOW/coordinate site access 1 Professional Engineer JH QA/QC field and laboratory data 1 Professional Engineer JH Project Background 1 Professional Engineer JH Groundwater Sampling Methods 1 Professional Engineer JH Groundwater flow evaluation (shallow and deep) 2 Professional Engineer JH Water Quality Parameter Summary 1 Professional Engineer JH Groundwater Analtycial Results (shallow and deep) 1 Professional Engineer JH QA/QC Laboratory Data 1.5 Professional Engineer JH Conclusions/Recommendations 1

11.5

Project Engineer/Scientist AW Mob/Demob (1 day) 0.5 Project Engineer/Scientist AW Water Levels (18 wells) 3 Project Engineer/Scientist AW Groundwater Sampling (7 wells) 10.5

Drafting Technician MJ Update water level maps (shallow/deep) 2 Drafting Technician MJ Update groundwater analytical maps (shallow/deep) 1

Staff Assistants SS Date Entry (18 water levels/3 gw samples) 0.75 Staff Assistants SS Prepare summary tables 0.75 Staff Assistants SS Publish report/generate pdf 1.5 Staff Assistants SS ADAPT/GIS update 1.5

4.5

TOTAL LABOR 34

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 7 $462.00 Sample Shipping Small Cooler (2 day) $35.00 1 $35.00

TOTAL LAB $497.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

Groundwater Sampling Kit $208.55 day 1 $208.55 Poly Tubing (HDPE) $0.25 ft 238 $59.50 Silicon Tubing $2.00 ft 7 $14.00

Sub-Total $282.05

TOTAL EQUIPMENT $314.55

Copy of TA_024o.xlsx\sub 2 Page 3 2/15/20212:04 PM

COST PROPOSAL FOR TASK DC024o < 60 Minute Cleaners – Cleveland 369502158>

Groundwater Monitoring

1. INTRODUCTION:

GHD previously completed operation of a Soil Vapor Extractions (SVE) system at the 60 Minute Cleaners (Cleveland) site located in Fort Myers, Lee County. Following completion of SVE operations, periodic groundwater monitoring is conducted in order to evaluate groundwater concentration trends. In accordance with GHD recommendations in the previous monitoring report (dated July 2020) and DEP comments/approval dated August 17, 2020, continued annual monitoring is recommended in June 2021.

Task DC024o includes groundwater monitoring at the 60 Minute Cleaners – Cleveland site.

Subtask 1: Project Management Subtask 1 includes all activities associated with conducting groundwater monitoring and reporting at the 60 Minute Cleaners – Cleveland site.

Subtask 2: Groundwater Monitoring Annual groundwater monitoring will be conducted in June 2021. Initially, GHD personnel will gather depth to water measurements at all site monitor and recovery wells and wells associated with the nearby Dolphin Cleaners site (18 total). Depth to water measurements will be gathered from all available wells.

Upon completion of depth to groundwater measurement, groundwater sampling will be conducted at seven (7) wells including MW005, MW009D, MW012, MW012D, MW013D, MW014, and RW002. Groundwater analysis will include Volatile Organic Halocarbons (VOHs) by EPA Method 8260. Groundwater sampling will be conducted in general accordance with FDEP SOPs.

Following receipt of analytical data, a groundwater monitoring summary report will be prepared. The report will include a summary of groundwater field and analytical data. The report will also include recommendations for additional sampling and/or other site activities.

Deliverables:

Deliverable Deliverable Due Date

Groundwater Monitoring Report 8/4/21

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

113 days Mon 3/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

48 days Mon 5/31/21

Wed 8/4/21

4 Field Work Preparatio2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Feb 14, '21 Feb 21, '21 Feb 28, '21 Mar 7, '21 Mar 14, '21 M

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC024o at the 60 Minute Cleaners facility located in Fort Myers, Lee County

Project: TA_024o Date: Mon 2/15/21

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

113 days Mon 3/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

48 days Mon 5/31/21

Wed 8/4/21

4 Field Work Preparatio2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Mar 21, '21 Mar 28, '21 Apr 4, '21 Apr 11, '21 Apr 18, '21 A

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC024o at the 60 Minute Cleaners facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

113 days Mon 3/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

48 days Mon 5/31/21

Wed 8/4/21

4 Field Work Preparatio2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Apr 25, '21 May 2, '21 May 9, '21 May 16, '21 May 23, '21 M

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC024o at the 60 Minute Cleaners facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

113 days Mon 3/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

48 days Mon 5/31/21

Wed 8/4/21

4 Field Work Preparatio2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21

Jeremy Hess

Andrew Wyatt

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S May 30, '21 Jun 6, '21 Jun 13, '21 Jun 20, '21 Jun 27, '21 J

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC024o at the 60 Minute Cleaners facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

113 days Mon 3/1/21 Wed 8/4/21

3 Subtask 2:

Groundwater Monitoring

48 days Mon 5/31/21

Wed 8/4/21

4 Field Work Preparatio2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Samplin1 day Tue 6/15/21 Tue 6/15/21

6 Groundwater Monitoring Report

6 wks Thu 6/24/21 Wed 8/4/21 Brian

S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Jul 4, '21 Jul 11, '21 Jul 18, '21 Jul 25, '21 Aug 1, '21 A

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC024o at the 60 Minute Cleaners facility located in Fort Myers, Lee County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
Copy of TA_024o.pdf
Cost Estimate
sub 2

File details come from the government source that posted it. Updated .