This is a Task Assignment Notification Form for Florida Department of Environmental Protection (FDEP) Contract No. HW555, Task Assignment DC031M, issued on October 7, 2020. The contract involves GHD Services, Inc. as the contractor, with Brian Moore serving as the contractor representative and Billy Hessman as the FDEP Contract Manager. The work location is the Magic Cleaners site at 2738 N. Hiawassee Road, Orlando, Orange County, Florida (DEP Site #ERIC_4986). The task falls under the monitoring phase of the contract.

GHD Services, Inc. will conduct groundwater monitoring at ten monitor wells (MW004, MW005, MW006, MW009, MW012, MW013, MW014, MW020, MW021, and MW022) in accordance with the October 2020 scope of work and cost proposal. The work includes project management calculated at 12.5 percent of direct labor, groundwater sampling with depth-to-water measurements from all available site monitor wells, analysis of samples for volatile organic compounds using EPA Method 8260, and preparation of a Groundwater Monitoring Report. The final deliverable, the Groundwater Monitoring Report, is due December 23, 2020, with a period of performance extending through March 26, 2021. The total task assignment value is $5,796.21 on a fixed price basis, with no retainage. Invoice payment of the full $5,796.21 is due upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report.

View the file

Other files

File Type Posted
CN-370000-HW552-TDC007A.pdf PDF
CN-370000-HW555-A10.pdf PDF
CN-370000-HW555-A5.pdf PDF
CN-370000-HW555-CO1.pdf PDF
CN-370000-HW555-DC001A.pdf PDF
CN-370000-HW555-DC001H.pdf PDF
CN-370000-HW555-DC001I.pdf PDF
CN-370000-HW555-DC004F.pdf PDF
CN-370000-HW555-DC004K.pdf PDF
CN-370000-HW555-DC006H.pdf PDF
CN-370000-HW555-DC006L.pdf PDF
CN-370000-HW555-DC007F.pdf PDF
CN-370000-HW555-DC007H.pdf PDF
CN-370000-HW555-DC008E.pdf PDF
CN-370000-HW555-DC010D.pdf PDF
CN-370000-HW555-DC012H.pdf PDF
CN-370000-HW555-DC013H.pdf PDF
CN-370000-HW555-DC019G.pdf PDF
CN-370000-HW555-DC019L.pdf PDF
CN-370000-HW555-DC01ACO6.pdf PDF
CN-370000-HW555-DC01ACO8.pdf PDF
CN-370000-HW555-DC01J.pdf PDF
CN-370000-HW555-DC020J.pdf PDF
CN-370000-HW555-DC021i.pdf PDF
CN-370000-HW555-DC024I.pdf PDF
CN-370000-HW555-DC02C.pdf PDF
CN-370000-HW555-DC02D.pdf PDF
CN-370000-HW555-DC02E.pdf PDF
CN-370000-HW555-DC02HCO4.pdf PDF
CN-370000-HW555-DC02HCO6.pdf PDF
CN-370000-HW555-DC02I.pdf PDF
CN-370000-HW555-DC02K.pdf PDF
CN-370000-HW555-DC02M.pdf PDF
CN-370000-HW555-DC030K.pdf PDF
CN-370000-HW555-DC031K.pdf PDF
CN-370000-HW555-DC032G.pdf PDF
CN-370000-HW555-DC033G.pdf PDF
CN-370000-HW555-DC034O.pdf PDF
CN-370000-HW555-DC034Q.pdf PDF
CN-370000-HW555-DC035F.pdf PDF
CN-370000-HW555-DC035I.pdf PDF
CN-370000-HW555-DC035J.pdf PDF
CN-370000-HW555-DC038B.pdf PDF
CN-370000-HW555-DC039E.pdf PDF
CN-370000-HW555-DC03B.pdf PDF
CN-370000-HW555-DC03CCO1.pdf PDF
CN-370000-HW555-DC03D.pdf PDF
CN-370000-HW555-DC03J.pdf PDF
CN-370000-HW555-DC03J.pdf.crdownload CRDOWNLOAD file
CN-370000-HW555-DC040C.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC031M

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_4986

Magic Cleaners

2738 N. Hiawassee Rd., Orlando, Orange

Monitoring

GHD Services, Inc. will conduct groundwater monitoring in accordance with the October 2020 scope of work and cost proposal. Groundwater Monitoring Report will be generated.

Groundwater Monitoring Report

12/23/2020

03/26/2021

$ 5,796.21 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2020.10.07 10:02:12 -04'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2020.10.07 10:02:21 -04'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.10.07 10:38:58 -04'00'

Brian Moore Digitally signed by Brian Moore Date: 2020.10.08 08:40:01 -04'00'

$ 5,796.21

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 12/23/2020

Upon completion of groundwater sampling activities and FDEP approval of Groundwater Monitoring Report $ 5,796.21

$ 5,796.21

HW555

DC031M

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

To: Monitoring, Fiscal File Magic Cleaners

ERIC_4986

Orlando, Orange County

From: Billy Hessman, Contract manager

Date: October 7, 2020

Subject: Task Assignment Summary

HW555 DC031M

Monitoring

GHD Services, Inc. will conduct groundwater monitoring. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Sampling GHD will conduct groundwater sampling at 10 monitor wells (MW004, MW005, MW006, MW009, MW012, MW013, MW014, MW020, MW021, and MW022). Sampling will be conducted in accordance with FDEP SOPs and all samples will be analyzed for the presence of VOCs by EPA Method 8260. Depth to water measurements will be gathered from all available site monitor wells. Following completion of field sampling, a Groundwater Monitoring Report will be prepared and submitted to the Department electronically.

This work will be conducted in accordance with the scope of work included in the GHD proposal, received October 7, 2020.

The final cost total for Task Assignment DC031M is $5,796.21.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/07/20

Task #: DC031M SubTask 1 Project Management SubTask 6

Site: Magic Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.36 2.360 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$47.12 Professional Engineer/Geologist ES 12.50 12.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$22.76 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 13.50 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 13.50 13.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 4.75 4.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 51.61 2.360 49.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,480.66 $164.52 $1,316.14 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,673.15 $185.91 $1,487.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $414.59 $46.07 $368.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $377.57 $41.95 $335.62 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,945.97 $438.45 $3,507.52 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $74.04 $8.23 $65.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 10/07/20

Task #: DC031M SubTask 1 Project Management SubTask 6

Site: Magic Cleaners SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $660.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $720.00 $720.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $532.10 $532.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $564.60 $564.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,401.61 $446.68 $4,954.93 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $394.60 $43.85 $350.75 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $5,796.21 $490.53 $5,305.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Former Magic Cleaners

PROJECT NUMBER: 090161

FDEP NO: ERIC_4986

SUBTASK: Groundwater Monitoring

DATE: 3/21/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer BM Conclusions/Recommendations for monitoring report 1

Professional Geologist ES Specify laboratory data deliverable/Sample Kit 1 Professional Geologist ES Field sampling SOW/coordinate site access 1 Professional Geologist ES QA/QC field and laboratory data 1 Professional Geologist ES Project Background 1 Professional Geologist ES Groundwater Sampling Methods 1 Professional Geologist ES Groundwater flow evaluation (shallow, intermediate) 2 Professional Geologist ES Water Quality Parameter Summary 1 Professional Geologist ES Groundwater Analtycial Results 2 Professional Geologist ES QA/QC Laboratory Data 1.5 Professional Geologist ES Conclusions/Recommendations 1

12.5

Junior Technician SA Mob/demob 4 Junior Technician SA Water Levels (all wells - 25 total) 2 Junior Technician SA Groundwater Sampling (5 wells) 7.5

13.5

Junior Technician WO Mob/demob 4 Junior Technician WO Water Levels (all wells - 25 total) 2 Junior Technician WO Groundwater Sampling (5 wells) 7.5

13.5

Drafting Technician MJ Prepare GW Flow maps (shallow, intermediate) 2 Drafting Technician MJ Prepare VOC plume figures with updated concentration data 2

Staff Assistant ET Data Entry (25 wls, and 10 monitor wells) 1.25 Staff Assistant ET Update summary tables 1 Staff Assistant ET Document Preparation/Publishing 1.5 Staff Assistant ET Update GIS/ADAPT 1

4.75

TOTAL LABOR 49.25

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 10 $660.00 Sample Shipping Large Cooler (2 day) $60.00 1 $60.00

TOTAL LAB $720.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

Groundwater Sampling Kit $208.55 day 2 $417.10 Poly Tubing (HDPE) $0.25 ft 380 $95.00 Silicon Tubing $2.00 ft 10 $20.00

Sub-Total $532.10

TOTAL EQUIPMENT $564.60

TA_031M (002).xlsx\sub 2 Page 1 10/7/20209:50 AM

COST PROPOSAL FOR TASK DC031M

<Magic Cleaners/FDEP #489501045>

<Groundwater Sampling>

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD completed operations of a Soil Vapor Extraction (SVE) system and groundwater assessment at the former Magic Cleaners site located in Orlando, Orange County. Although the final soil vapor results and initial groundwater data suggested that the site may have been remediated to acceptable levels, groundwater concentration increases were noted at 2 monitoring wells (MW004 and MW005) in June 2016. Following initial detection and confirmation sampling, supplemental assessment activities were conducted. Most recently, GHD completed additional assessment and additional groundwater monitoring. Based on the most recent results (April 2020) additional semi-annual groundwater monitoring was recommended. This subtask includes semi-annual groundwater sampling per GHD’s recommendations and Department approval.

Subtask 1 Subtask 1 includes all activities associated with Project Management of the proposed groundwater monitoring.

Subtask 2 Subtask 2 includes groundwater sampling at site monitor wells MW004, MW004, MW005, MW006, MW009, MW012, MW013, MW014, MW020, MW021, and MW022. Prior to groundwater sampling, depth to water measurement will be gathered from all site wells. Groundwater sampling will be conducted in general accordance with FDEP SOPs. Groundwater samples will be submitted for fixed laboratory analysis by EPA Method 8260 for the presence of VOHs.

Upon receipt of analytical data from the laboratory, a summary report will be prepared. The summary report will include a detail of field sampling methods, field screening results, and laboratory data. The summary will also include recommendations based on the results.

Deliverables:

Deliverable Deliverable Due Date

Groundwater Monitoring Report 12/24/20

ID Task Mode

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

M T W T F S S M T W T 20 Oct 11, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Project: TA_031M Date: Tue 10/6/20

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

F S S M T W T F S S M Oct 18, '20 Oct 25, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

T W T F S S M T W T F Nov 1, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20 edwin siersema skylar albritton,william ouchie

S S M T W T F S S M T Nov 8, '20 Nov 15, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

W T F S S M T W T F S Nov 22, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

S M T W T F S S M T W Nov 29, '20 Dec 6, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20

T F S S M T W T F S S Dec 13, '20 Dec 20, Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Name Duration Start Finish

1 LOE Approval 2 wks Tue 10/6/20 Mon 10/19/20

2 Subtask 1: Project Management

49 days Mon 10/19/20 Thu 12/24/20

3 Subtask 2: Groundwater Monitoring

49 days Mon 10/19/20 Thu 12/24/20

4 Field Work Preparation 3 wks Mon 10/19/20 Fri 11/6/20

5 Groundwater Sampling 1 day Mon 11/9/20 Mon 11/9/20

6 Groundwater Monitoring Report

5 wks Fri 11/20/20 Thu 12/24/20 Brian Moore,edwin siersema,Melissa Je

M T W T F S S M T W T , '20 Dec 27, '20

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC031M at the Magic Cleaners facility located in Orlando, Orange County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
TA_031M (002).pdf
Cost Estimate
sub 2
TA_0milf31M (002).pdf
sub 2

File details come from the government source that posted it. Updated .