This is a Task Assignment Notification Form (DC017R) issued by the Florida Department of Environmental Protection (FDEP) for Operation and Maintenance (O&M) services at the McNatt's Cleaners site located at 5227 Ehrlich Road, Tampa, Hillsborough County. The contract is awarded to GHD Services, Inc., with Brian Moore serving as the contractor representative and Billy Hessman as the FDEP Contract Manager. The task assignment is executed under FDEP Contract No. HW555 and is part of the state's environmental remediation program.
GHD Services, Inc. will conduct six months of O&M for an existing Soil Vapor Extraction (SVE) system from November 2020 through April 2021, with quarterly site visits to verify system operation, record operational data, and conduct groundwater sampling. The task is divided into three subtasks: Subtask 1 covers project management ($486.54), Subtask 2 addresses semi-annual O&M activities ($8,392.79), and Subtask 3 covers utility reimbursement for electricity at $1,980.00 plus a $120.00 handling fee ($2,100.00 total). The total task assignment value is $10,979.33, structured as fixed price ($8,999.33) and cost-plus fixed fee ($1,980.00 cost reimbursement). The primary deliverables are a Semi-Annual Remedial Action Status Report due May 3, 2021, and paid utility invoices due June 4, 2021. The task assignment execution period extends through August 27, 2021, with no retainage applied.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC017R
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_4752
McNatt's Cleaners
5227 Ehrlich Rd, Tampa, Hillsborough County
Operation and Maintenance (O&M)
GHD Services, Inc. (GHD) will conduct 6 months O&M of the Soil Vapor Extraction (SVE) system in accordance with the September 2020 GHD scope of work and cost proposal.
The payment of utility invoices associated with O&M activities under this Task Assignment is the only portion of this Task Assignment which is Cost Plus
Paid Utility Invoices
06/04/2021
08/27/2021
$ 8,999.33 $ 0.00 $ 1,980.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2020.09.17 13:16:53 -04'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2020.09.17 13:17:00 -04'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2020.09.17 14:34:08 -04'00'
Brian Moore Digitally signed by Brian Moore Date: 2020.09.18 10:19:45 -04'00'
$ 10,979.33
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Semi-Annual Remedial Action Status Report 05/03/2021
Paid Utility Invoices 06/04/2021
Upon completion of six months O&M activities and FDEP approval of the Semi-Annual Remedial Action Status Report: Subtasks 1 & 2 $ 8,879.33
Paid Utility Invoices Utilities (Cost Plus Fixed Fee): not to exceed $1,980.00 Handling Fee: $120.00: Subtask 3
$ 2,100.00
$ 10,979.33
HW555
DC017R
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
To: Operation and Maintenance / Monitoring, Fiscal File McNatt’s Cleaners
ERIC_4752
Tampa, Hillsborough County
From: Billy Hessman, Project Manager
Date: September 17, 2020
Subject: Negotiation Summary
HW555 DC017R
Operation and Maintenance (O&M)
GHD Services, Inc. (GHD) will conduct 6 months O&M of the existing Soil Vapor Extraction (SVE) system. Due to elevated methane levels, continuous operation of the existing SVE system is required. Clarifications to the subtasks are as follows:
Subtask 1: Project Management An automatic calculation based upon total direct labor hours determines the labor hours within this subtask.
Subtasks 2: O&M GHD personnel will conduct quarterly site visits to perform routine SVE system O&M activities to verify system operation, record operational data including meter and gauge readings, and adjust flow and vacuum/pressure settings to maximize methane mitigation. GHD personnel will conduct OVA readings and vapor influent sampling quarterly. In addition, quarterly and annual groundwater sampling for VOCs, UIC parameters, and dissolved gases will be conducted. Upon completion of 6 months of O&M, a Semi-Annual Remedial Action Status Report will be generated and submitted to the Department. Report will include recommendations for future site rehabilitation.
Subtask 3: Utilities Estimated utility costs for six months of SVE system operation are $1,980.00 for electricity. Costs for utility bill handling are $120.00 ($20.00 per month).
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is June 4, 2021, and the completion date for the task assignment is August 27, 2021.
The final cost total for Task Assignment DC017R is $10,979.33.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 09/17/20
Task #: DC017R SubTask 1 Project Management SubTask 6
Site: McNatts Cleaners SubTask 2 Semi-annul O&M (November 2020 through April 2021) SubTask 7
Activity/Phase: O&M SubTask 3 Utilities (November 2020 through April 2021) SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 2.34 2.341 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 0.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$42.29 Professional Engineer/Geologist JH 14.50 14.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.01 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.04 Staff Engineer/Scientist MT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.88 Project Manager/Engineer NS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.91 Staff Engineer/Scientist SL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$22.76 Senior Technician WM 22.00 22.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.27 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician SM 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Staff Assistant ET 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 47.34 2.341 45.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,468.70 $163.19 $1,305.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,659.63 $184.40 $1,475.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $411.23 $45.69 $365.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $374.52 $41.61 $332.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,914.08 $434.89 $3,479.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $73.44 $8.16 $65.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 09/17/20
Task #: DC017R SubTask 1 Project Management SubTask 6
Site: McNatts Cleaners SubTask 2 Semi-annul O&M (November 2020 through April 2021) SubTask 7
Activity/Phase: O&M SubTask 3 Utilities (November 2020 through April 2021) SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $1,980.00 $0.00 $1,980.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $1,980.00 $0.00 $1,980.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $120.00 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,100.00 $0.00 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,978.00 $2,978.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $397.00 $397.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,375.00 $3,375.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $866.40 $866.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $931.40 $931.40 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $10,587.92 $443.05 $8,044.87 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $391.41 $43.49 $347.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $10,979.33 $486.54 $8,392.79 $2,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : McNatts Cleaners
PROJECT NUMBER: 090113
FDEP NO: ERIC_4752
SUBTASK: Semi-annul O&M (November 2020 through April 2021)
DATE: 3/21/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer BM Conclusions/Recommendations 0.5 0.5
Professional Engineer JH Specify laboratory data deliverable/Sample Kit (2 events) 1 Professional Engineer JH Field sampling SOW/coordinate site access (2 events) 1 Professional Engineer JH QA/QC field and laboratory data 1 Professional Engineer JH Project Background 1 Professional Engineer JH Groundwater Sampling Methods 1.5 Professional Engineer JH Water Quality Parameter Summary (2 quarters) 1 Professional Engineer JH Groundwater Analtycial Results (VOCs) 1 Professional Engineer JH Groundwater Analytical Results (UIC/performance - 2 quarters) 2 Professional Engineer JH Summarize SVE O&M 2 Professional Engineer JH QA/QC Laboratory Data 2 Professional Engineer JH Conclusions/Recommendations 1
14.5
Senior Technician WM Mob/Demob (2 days) 1 Senior Technician WM Monthly O&M (2 quarters) 6 Senior Technician WM Groundwater Sampling (4 wells - December 2020)) 6 Senior Technician WM Groundwater Sampling (6 wells - March 2021) 9
Drafting Technician SM Prepare VOC plume figures with updated concentration data 2
Staff Assistant ET Data Entry (10 monitor wells, 2 O&M samples) 2 Staff Assistants ET Update summary tables (2 quarters) 2 Staff Assistant ET Document Preparation/Publishing 2
TOTAL LABOR 45
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 2 $194.00
TOTAL VEHICLE $194.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
TO15 $200.00 2 $400.00
VOCs EPA Method 8260 $66.00 5 $330.00
TOC EPA 9060 $26.00 2 $52.00
TDS EPA 160.1 $11.50 6 $69.00
TRPH FL-PRO $84.00 6 $504.00
sodium EPA 6010 $11.50 6 $69.00 ammonia SM4500 $21.00 6 $126.00 chloride EPA 352.2 $14.00 2 $28.00 nitrate EPA 353.2 $20.00 6 $120.00 dissolved gases (methane, ethane, ethene) $160.00 8 $1,280.00 Sample Shipping Large Cooler (1 day) $104.00 2 $208.00 sample shipping (Next Day) $63.00 3 $189.00
TOTAL LAB $3,375.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 2 $65.00 Sub-Total $65.00
Groundwater Sampling Kit $208.55 day 2 $417.10 Poly Tubing (HDPE) $0.25 ft 250 $62.50 Silicon Tubing $2.00 ft 10 $20.00 Air Sampling Pump $25.25 Day 2 $50.50 Anemometer $17.50 Day 2 $35.00 Vacuum Gauges $19.40 Day 2 $38.80 Tedlar Air Bags (optimization and O&M) $14.55 Day 2 $29.10 PID/FID $106.70 Day 2 $213.40
Sub-Total $866.40
TOTAL EQUIPMENT $931.40
TA_017R.xlsx\sub 2 Page 3 9/17/202012:43 PM
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 3
SITE : McNatts Cleaners
PROJECT NUMBER: 090113 (600-1924)
FDEP NO: ERIC_4752
SUBTASK: Utilities (November 2020 through April 2021)
DATE: 9/17/2020
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
TRAVEL TYPE RATE UNIT USEAGE Miles Free
TOTAL VEHICLE $0.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TECO Electricity $330.00 month 6 $1,980.00 Handling Fee $20.00 month 6 $120.00
TOTAL SUBS $2,100.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Sub-Total $0.00
Sub-Total $0.00
TOTAL EQUIPMENT $0.00
TA_017R.xlsx\sub 3 Page 4 9/17/202012:43 PM
COST PROPOSAL FOR TASK DC017R
McNatt’s Cleaners, 299502136
SVE System operations & maintenance (12 months) November 2020 through April 2021
1. INTRODUCTION:
A Remedial Action Plan (RAP) was submitted in February 2004 for the McNatt’s Cleaners facility located in Tampa, Florida. The RAP was subsequently approved along with Task 12B that included the installation of an SVE system at the subject site. The remedial system construction is complete and the system is currently in operation. During the 2016 reporting period, a RAP Modification was implemented, which included the addition of one lateral SVE well to the existing system and completion of remedial injections. The system is currently being operated as a precaution associated methane generation from the recent biostimulation activities.
Task DC017R includes six additional months [November 2020 through April 2021] of operations and maintenance of the existing SVE system. Site visits will occur quarterly during this period of operation and include SVE system verification and groundwater sampling.
Groundwater monitoring and reporting will be conducted as part of the recent RAP Modification implementation.
Subtask 1: Project Management Includes all tasks associated with project management for 12 months of O&M of the existing SVE system.
Subtask 2: Semi-Annual O&M (November 2020 through April 2021) As part of subtask 2, quarterly site visits will be conducted to verify system operation and record operational data including vacuum, flows, and water levels. In addition, during quarterly site visits, operation flow patterns in the subsurface will be adjusted to maximize mass recovery. OVA readings and vapor influent sampling will be conducted quarterly.
During the quarterly O&M site visits, groundwater sampling will be conducted. Groundwater sampling will be conducted quarterly as summarized below:
VOCs (TO-15) Influent Soil Vapor Q1 and Q2 VOCs (GW) MW025, 40, 43, 51, 52 Q2 TOC MW051 Q1 and Q2 TDS MW040, 42, 51 Q1 and Q2 TRPH MW040, 42, 51 Q1 and Q2 Sodium MW040, 42, 51 Q1 and Q2 Ammonia MW040, 42, 51 Q1 and Q2 Chloride MW051 and 52 Q1 Nitrate MW040, 42, 51 Q1 and Q2 Dissolved Gases MW051, 52, blank, dup Q1 and Q2
Groundwater sampling will be conducted in accordance with FDEP Standard Operating Procedures and samples will be analyzed at a Florida-certified laboratory. At the end of April 2020, GHD will prepare a semi-annual Remedial Action Status Report (RASR). The RASR will include a summary of the annual SVE operations, flow and vacuum data, vapor analytical data, and operation performance. The RASR will also include a summary of groundwater sampling methods and analytical results. The RASR will provide recommendations for additional remediation or testing.
Subtask 3: Utilities (November 2020 through April 2021) Subtask 3 includes utility reimbursement charges ($330/month) for electrical service for 6 months.
Deliverables:
Deliverable Deliverable Due Date
Semi-Annual Remedial Action Status Report 5/3/21
Paid Utilities ($1,320) and handling fee of $120 (mid-October 2020 through mid April 2021) 6/4/21
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T '20 Sep 20, '20 Sep 27, '20 Oct 4, '20 Oct 11, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Project: TA_017R Date: Thu 9/17/20
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F 0 Oct 18, '20 Oct 25, '20 Nov 1, '20 Nov 8, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S Nov 15, '20 Nov 22, '20 Nov 29, '20 Dec 6, '20
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
Jeremy Hess
William McKinney
S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S Dec 13, '20 Dec 20, '20 Dec 27, '20 Jan 3, '21 J
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Jan 10, '21 Jan 17, '21 Jan 24, '21 Jan 31, '21 Feb
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T eb 7, '21 Feb 14, '21 Feb 21, '21 Feb 28, '21 Mar 7
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21
Jeremy Hess
William McKinney
T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 7, '21 Mar 14, '21 Mar 21, '21 Mar 28, '21 Apr 4, '2
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Thu 9/17/20 Wed 9/30/20
2 Task 1: Project Management 132 days Fri 10/30/20 Mon 5/3/21
3 Task 2: Semi‐Annual O&M 110 days Tue 12/1/20 Mon 5/3/21
4 Field Work Preparation 2 wks Tue 12/1/20 Mon 12/14/20
5 Quarterly GW Sampling/O&1 day Wed 12/16/20 Wed 12/16/20
6 Field Work Preparation 2 wks Wed 3/3/21 Tue 3/16/21
7 Semi‐Annual GW Sampling/O&M
1 day Thu 3/18/21 Thu 3/18/21
8 Remedial Action Status Rep5 wks Tue 3/30/21 Mon 5/3/21 Bria
W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T 21 Apr 11, '21 Apr 18, '21 Apr 25, '21 May 2, '21
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC017R at the McNatts Cleaners facility located in Tampa, Florida
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| TA_017R.pdf |
| Cost Estimate |
| sub 2 |
| sub 3 |