Task Assignment Notification Summary

This Task Assignment Notification Form is a state contract document issued by the Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for groundwater monitoring services at the 60 Minute Cleaners (College) site located in Fort Myers, Lee County, Florida. The contract is identified as DEP Contract No. HW555, Task Assignment No. DC003K, with Module No. D000 and Grant No. N/A. Billy Hessman serves as the FDEP Contract Manager, and Brian Moore represents GHD Services, Inc. as the contractor representative. The work is classified as a Monitoring phase activity at site ERIC_4831.

The task assignment specifies groundwater monitoring services to be conducted in accordance with a February 2021 scope of work and cost proposal. GHD Services will conduct groundwater sampling at 11 monitoring wells, collect water level measurements from all 19 site wells, and analyze samples for volatile organic compounds (VOCs) using EPA Method 8260. The contract includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring. The sole deliverable is a Groundwater Monitoring Report due by August 10, 2021, with task execution through October 8, 2021. The contract is structured as a fixed-price task assignment with a total task assignment value of $5,877.74, with no retainage, cost reimbursement, or cost plus fixed fee components. No option periods or renewal provisions are specified in the documentation. Payment is conditional upon completion of groundwater sampling activities and FDEP approval of the final Groundwater Monitoring Report.

View the file

Other files

File Type Posted
CN-370000-HW555-A1.pdf PDF
CN-370000-HW555-A3.pdf PDF
CN-370000-HW555-A4.pdf PDF
CN-370000-HW555-A7.pdf PDF
CN-370000-HW555-C23BCO1.pdf PDF
CN-370000-HW555-DC007I.pdf PDF
CN-370000-HW555-DC007K.pdf PDF
CN-370000-HW555-DC013I.pdf PDF
CN-370000-HW555-DC015J.pdf PDF
CN-370000-HW555-DC017M.pdf PDF
CN-370000-HW555-DC017R.pdf PDF
CN-370000-HW555-DC017S.pdf PDF
CN-370000-HW555-DC01ACO1.pdf PDF
CN-370000-HW555-DC01ACO2.pdf PDF
CN-370000-HW555-DC01ACO9.pdf PDF
CN-370000-HW555-DC01E.pdf PDF
CN-370000-HW555-DC01K.pdf PDF
CN-370000-HW555-DC020F.pdf PDF
CN-370000-HW555-DC021H.pdf PDF
CN-370000-HW555-DC023G.pdf PDF
CN-370000-HW555-DC023K.pdf PDF
CN-370000-HW555-DC024o.pdf PDF
CN-370000-HW555-DC02BCO3.pdf PDF
CN-370000-HW555-DC02F.pdf PDF
CN-370000-HW555-DC02FCO1.pdf PDF
CN-370000-HW555-DC02GCO1.pdf PDF
CN-370000-HW555-DC031M.pdf PDF
CN-370000-HW555-DC033F.pdf PDF
CN-370000-HW555-DC034J.pdf PDF
CN-370000-HW555-DC035E.pdf PDF
CN-370000-HW555-DC045A.pdf PDF
CN-370000-HW555-DC046C.pdf PDF
CN-370000-HW555-DC04A.pdf PDF
CN-370000-HW555-DC04B.pdf PDF
CN-370000-HW555-DC04DCO1.pdf PDF
CN-370000-HW555-DC04E.pdf PDF
CN-370000-HW555-DC04FCO1.pdf PDF
CN-370000-HW555-DC04H.pdf PDF
CN-370000-HW555-DC050A.pdf PDF
CN-370000-HW555-DC052A.pdf PDF
CN-370000-HW555-DC053A.pdf PDF
CN-370000-HW555-DC05B.pdf PDF
CN-370000-HW555-DC065B.pdf PDF
CN-370000-HW555-DC065C.pdf PDF
CN-370000-HW555-DC066B.pdf PDF
CN-370000-HW555-DC069B.pdf PDF
CN-370000-HW555-DC06C.pdf PDF
CN-370000-HW555-DC06D.pdf PDF
CN-370000-HW555-DC06E.pdf PDF
CN-370000-HW555-DC06F.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC003K

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_4831

60 Minute Cleaners (College)

7091 College Parkway #1, Fort Myers, Lee County

Monitoring

GHD Services, Inc. will conduct groundwater monitoring in accordance with the February 2021 scope of work and cost proposal.

Groundwater Monitoring Report

08/10/2021

10/08/2021

$ 5,877.74 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.18 08:43:43 -05'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.18 08:43:50 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.02.18 09:58:05 -05'00'

Brian Moore Digitally signed by Brian Moore Date: 2021.02.18 10:23:58 -05'00'

$ 5,877.74

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/10/2021

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. $ 5,877.74

$ 5,877.74

HW555

DC003K

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File

FROM: Billy Hessman, Contract Manager

DATE: February 17, 2021

SUBJECT: Task Assignment DC003K

Negotiation Summary 60 Minute Cleaners - College

ERIC_4831

Monitoring

This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 11 wells. Samples will be analyzed for VOCs by EPA Method 8260. GHD will collect water level measurements from all 19 site wells.

Based on past sampling events, IDW disposal is not anticipated. If IDW disposal is required a WCD will be submitted to the Department for the change in scope. Upon receipt of the groundwater analytical data, GHD will generate a Groundwater Monitoring Report detailing the field activities, procedures, and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal.

Final cost total for Task Assignment DC003K is $5,877.74.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/16/21

Task #: DC003K SubTask 1 Project Management SubTask 6

Site: 60 Minute College SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 2.31 2.309 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$38.05 Professional Engineer/Geologist JM 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.29 Project Engineer/Scientist AW 20.50 20.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 7.50 7.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 46.31 2.309 44.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,448.48 $160.94 $1,287.54 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,636.78 $181.86 $1,454.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $405.57 $45.06 $360.51 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $369.36 $41.04 $328.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,860.19 $428.90 $3,431.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $72.43 $8.05 $64.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/16/21

Task #: DC003K SubTask 1 Project Management SubTask 6

Site: 60 Minute College SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $194.00 $194.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $726.00 $726.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $60.00 $60.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $786.00 $786.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $65.00 $65.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $514.10 $514.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $579.10 $579.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $5,491.72 $436.95 $5,054.77 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $386.02 $42.89 $343.13 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $5,877.74 $479.84 $5,397.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : 60 Minute Cleaners (College)

PROJECT NUMBER: 090149

FDEP NO: ERIC_4831

SUBTASK: Groundwater Monitoring

DATE: 3/21/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer BM Conclusions/Recommendations 1

Professional Engineer JM Site Access/Prepare field scope of work 0.5 Professional Engineer JM Review field notes, verify sampling procedures 0.5 Professional Engineer JM Historical Summary 2 Professional Engineer JM Groundwater sampling methodology 1 Professional Engineer JM Groundwater field parameter evaluation 1 Professional Engineer JM Groundwater flow evaluation (shallow/deep) 1.5 Professional Engineer JM Groundwater analytical data evaluation (shallow/deep) 1.5 Professional Engineer JM QA/QC 1 Professional Engineer JM Conclusions/Recommendations 2

Project Engineer/Scientist AW Mob/demob (2 days) 1 Project Engineer/Scientist AW Water Levels (19 wells total)) 3 Project Engineer/Scientist AW Groundwater Sampling (11 wells) 16.5

20.5

Drafting Technician MJ Groundwater Elevation Figures (shallow/deep) 2 Drafting Technician MJ Groundwater Analytical Figures (shallow/deep) 2

Adminstrative Assistant SS Data Entry (19 WLs and 9 well samples) 2 Adminstrative Assistant SS Update tables (parameter, wl, analytical) 1.5 Adminstrative Assistant SS Publish Report/generate pdf 2 Adminstrative Assistant SS ADAPT/GIS update 2

7.5

TOTAL LABOR 44

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 2 $194.00

TOTAL VEHICLE $194.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 11 $726.00 Sample Shipping Large cooler (2 day) $60.00 1 $60.00

TOTAL LAB $786.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 2 $65.00 Sub-Total $65.00

Groundwater Sampling Kit $208.55 day 2 $417.10 Poly Tubing (HDPE) $0.25 ft 300 $75.00 Silicon Tubing $2.00 ft 11 $22.00

Sub-Total $514.10

TOTAL EQUIPMENT $579.10

TA_003K.xlsx\sub 2 Page 3 2/16/202110:39 AM

COST PROPOSAL FOR TASK DC003K

60 Minute Cleaners-College, ERIC_4831

Annual Groundwater Monitoring

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

Annual groundwater monitoring has been conducted at the 60 Minute College site following active remediation activities. The active remediation included the use of a recirculating bioremediation system, which was conducted by ARCADIS. During the past several years, GHD completed annual groundwater monitoring events. Based on the results of the 2020 groundwater monitoring event, additional annual monitoring was recommended in August 2020 and comments were provided by FDEP on August 3, 2020. GHD also recommended completing MAGS beneath the former drycleaner, which is currently a Mattress store.

Although attempts were made to gain access to complete MAGS, permission has not been granted by the property owner.

Subtask 1: Project Management Subtask 1 includes all activities associated with implementing annual groundwater sampling at the site.

Subtask 2: Annual Groundwater Sampling Annual groundwater monitoring is recommended at eleven (11) wells including monitoring wells MW004, MW005, MW007, MW013, MW018, MW019, MW020, MW021, MW022, and recovery wells RW001 and RW002. Prior to groundwater sampling, water levels will be gathered from all on-site monitoring wells (19 total). Groundwater sampling will be completed in general accordance with FDEP SOPs and all samples will be submitted for VOH analysis at a Florida Certified laboratory.

Following receipt of analytical data, a summary report will be prepared. The summary report will include a detail of field activities along with a summary of laboratory analytical data. The annual monitoring report will also include recommendations regarding additional monitoring.

Deliverables:

Deliverable Deliverable Due Date

Submittal of field notes, analytical data, and DEP approval of Groundwater Monitoring Report 8/10/21

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Tue 2/16/21 Mon 3/1/21

2 Subtask 1: Project Management

116 days Tue 3/2/21 Tue 8/10/21

3 Subtask 2:

Groundwater Monitoring

51 days Tue 6/1/21 Tue 8/10/21

4 Field Work Preparat 2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Sampl2 days Thu 6/17/21 Fri 6/18/21

6 Groundwater Monitoring Report

6 wks Wed 6/30/21

Tue 8/10/21

2/7 2/14 2/21 2/28 3/7 3/14 March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003K at the 60 Minute - College facility located in Fort Myers, Lee County

Project: TA_003K Date: Tue 2/16/21

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Tue 2/16/21 Mon 3/1/21

2 Subtask 1: Project Management

116 days Tue 3/2/21 Tue 8/10/21

3 Subtask 2:

Groundwater Monitoring

51 days Tue 6/1/21 Tue 8/10/21

4 Field Work Preparat 2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Sampl2 days Thu 6/17/21 Fri 6/18/21

6 Groundwater Monitoring Report

6 wks Wed 6/30/21

Tue 8/10/21

3/21 3/28 4/4 4/11 4/18 4/25 April M

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003K at the 60 Minute - College facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Tue 2/16/21 Mon 3/1/21

2 Subtask 1: Project Management

116 days Tue 3/2/21 Tue 8/10/21

3 Subtask 2:

Groundwater Monitoring

51 days Tue 6/1/21 Tue 8/10/21

4 Field Work Preparat 2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Sampl2 days Thu 6/17/21 Fri 6/18/21

6 Groundwater Monitoring Report

6 wks Wed 6/30/21

Tue 8/10/21

5/2 5/9 5/16 5/23 5/30 6/6 May June

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003K at the 60 Minute - College facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Tue 2/16/21 Mon 3/1/21

2 Subtask 1: Project Management

116 days Tue 3/2/21 Tue 8/10/21

3 Subtask 2:

Groundwater Monitoring

51 days Tue 6/1/21 Tue 8/10/21

4 Field Work Preparat 2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Sampl2 days Thu 6/17/21 Fri 6/18/21

6 Groundwater Monitoring Report

6 wks Wed 6/30/21

Tue 8/10/21

Jenna Martin

Andrew Wyatt

6/13 6/20 6/27 7/4 7/11 7/18 July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003K at the 60 Minute - College facility located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approva2 wks Tue 2/16/21 Mon 3/1/21

2 Subtask 1: Project Management

116 days Tue 3/2/21 Tue 8/10/21

3 Subtask 2:

Groundwater Monitoring

51 days Tue 6/1/21 Tue 8/10/21

4 Field Work Preparat 2 wks Tue 6/1/21 Mon 6/14/21

5 Groundwater Sampl2 days Thu 6/17/21 Fri 6/18/21

6 Groundwater Monitoring Report

6 wks Wed 6/30/21

Tue 8/10/21 Brian Moore,Jenna Martin,Melissa Jerom

7/25 8/1 8/8 8/15 8/22 8/29 August Septemb

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003K at the 60 Minute - College facility located in Fort Myers, Lee County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
TA_003K.pdf
Cost Estimate
sub 2

File details come from the government source that posted it. Updated .