This is a Task Assignment Notification Form (DC002o) issued by the Florida Department of Environmental Protection (FDEP) under Contract HW555 with GHD Services, Inc. The task assignment covers groundwater monitoring services at the Dolphin Fabricare Inc. site located at 7101-55 Cypress Lake Drive, Fort Myers, Lee County, Florida. The site is identified as ERIC_4847 and is currently in the monitoring phase of environmental remediation. Billy Hessman serves as the FDEP Contract Manager, with Brian Moore as the Contractor Representative from GHD Services, Inc.

The task assignment is structured as a fixed-price contract valued at $4,231.51 with no retainage fees. The scope of work includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring. The groundwater monitoring subtask requires sampling at five monitoring wells (MW001, MW006, MW007, MW015, and MW016) with analysis for Volatile Organic Halocarbons using EPA Method 8260. The deliverable is a Groundwater Monitoring Report due on August 3, 2021, with performance execution through October 8, 2021. Invoice payment is contingent upon completion of groundwater sampling activities and FDEP approval of the report. The cost estimate itemizes labor costs of $3,118.36, laboratory services of $365.00, field expenses of $280.80, travel costs of $97.00, and a completion fee of $311.84, totaling $4,231.51.

View the file

Other files

File Type Posted
CN-370000-HW555-A1.pdf PDF
CN-370000-HW555-A3.pdf PDF
CN-370000-HW555-A4.pdf PDF
CN-370000-HW555-A7.pdf PDF
CN-370000-HW555-C23BCO1.pdf PDF
CN-370000-HW555-DC007I.pdf PDF
CN-370000-HW555-DC007K.pdf PDF
CN-370000-HW555-DC013I.pdf PDF
CN-370000-HW555-DC015J.pdf PDF
CN-370000-HW555-DC017M.pdf PDF
CN-370000-HW555-DC017R.pdf PDF
CN-370000-HW555-DC017S.pdf PDF
CN-370000-HW555-DC01ACO1.pdf PDF
CN-370000-HW555-DC01ACO2.pdf PDF
CN-370000-HW555-DC01ACO9.pdf PDF
CN-370000-HW555-DC01E.pdf PDF
CN-370000-HW555-DC01K.pdf PDF
CN-370000-HW555-DC020F.pdf PDF
CN-370000-HW555-DC021H.pdf PDF
CN-370000-HW555-DC023G.pdf PDF
CN-370000-HW555-DC023K.pdf PDF
CN-370000-HW555-DC024o.pdf PDF
CN-370000-HW555-DC02BCO3.pdf PDF
CN-370000-HW555-DC02F.pdf PDF
CN-370000-HW555-DC02FCO1.pdf PDF
CN-370000-HW555-DC02GCO1.pdf PDF
CN-370000-HW555-DC031M.pdf PDF
CN-370000-HW555-DC033F.pdf PDF
CN-370000-HW555-DC034J.pdf PDF
CN-370000-HW555-DC035E.pdf PDF
CN-370000-HW555-DC045A.pdf PDF
CN-370000-HW555-DC046C.pdf PDF
CN-370000-HW555-DC04A.pdf PDF
CN-370000-HW555-DC04B.pdf PDF
CN-370000-HW555-DC04DCO1.pdf PDF
CN-370000-HW555-DC04E.pdf PDF
CN-370000-HW555-DC04FCO1.pdf PDF
CN-370000-HW555-DC04H.pdf PDF
CN-370000-HW555-DC050A.pdf PDF
CN-370000-HW555-DC052A.pdf PDF
CN-370000-HW555-DC053A.pdf PDF
CN-370000-HW555-DC05B.pdf PDF
CN-370000-HW555-DC065B.pdf PDF
CN-370000-HW555-DC065C.pdf PDF
CN-370000-HW555-DC066B.pdf PDF
CN-370000-HW555-DC069B.pdf PDF
CN-370000-HW555-DC06C.pdf PDF
CN-370000-HW555-DC06D.pdf PDF
CN-370000-HW555-DC06E.pdf PDF
CN-370000-HW555-DC06F.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Module #: Grant #:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

DEP Site #:

Site Name:

Address(Street, City, County):

Phase:

Task Description [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverables:

Final Deliverable Due Date:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

FIXED FEE

RETAINAGE:

TOTAL TASK ASSIGNMENT VALUE: $0.00

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

TASK ASSIGNMENT NOTIFICATION FORM

COST PLUS FIXED FEE

COST REIMBURSEMENT

FIXED PRICE FEE SCHEDULE

Period of Performance:

Execution of Task Assignment through:

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

WCP TAFORM 01_18

HW555

D000 N/ADC002o

GHD Services, Inc.

Brian Moore

850-245-8972Billy Hessman

ERIC_4847

Dolphin Fabricare Inc.

7101-55 Cypress Lake Drive, Fort Myers, Lee County

Monitoring

GHD Services, Inc. will conduct groundwater monitoring in accordance with the February 2021 scope of work and cost proposal.

Groundwater Monitoring Report

08/03/2021

10/08/2021

$ 4,231.51 $ 0.00 $ 0.00 $ 0.00

$ 0.00

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 09:41:33 -05'00'

Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 09:41:44 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2021.02.17 10:42:14 -05'00'

Brian Moore Digitally signed by Brian Moore Date: 2021.02.17 11:23:22 -05'00'

$ 4,231.51

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 01-2018

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Groundwater Monitoring Report 08/03/2021

Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. $ 4,231.51

$ 4,231.51

HW555

DC002o

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Noah Valenstein Secretary

TO: HW555 Contract File

FROM: Billy Hessman, Contract Manager

DATE: February 15, 2021

SUBJECT: Task Assignment DC002o

Negotiation Summary Dolphin Fabricare

ERIC_4847

Monitoring

This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.

Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 5 monitoring wells. Samples will be analyzed for VOCs by EPA Method 8260.Based on past sampling events, IDW disposal is not anticipated. If IDW disposal is required a WCD will be submitted to the Department for the change in scope. Upon receipt of the groundwater analytical data, GHD will generate a Groundwater Monitoring Report detailing the field activities, procedures, and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal.

Final cost total for Task Assignment DC002o is $4,231.51.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/15/21

Task #: DC002o SubTask 1 Project Management SubTask 6

Site: Dolphin Fabricare SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$69.71 Project Manager BM 1.87 1.865 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$44.21 Professional Engineer/Geologist JH 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.29 Staff Engineer/Scientist AW 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 6.50 6.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 34.37 1.865 32.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $1,170.12 $130.01 $1,040.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 113.00% $1,322.23 $146.91 $1,175.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $327.63 $36.40 $291.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $298.38 $33.15 $265.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,118.36 $346.47 $2,771.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $58.51 $6.50 $52.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel

REV: 02/03 CEF GHD Services Inc. Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/15/21

Task #: DC002o SubTask 1 Project Management SubTask 6

Site: Dolphin Fabricare SubTask 2 Groundwater Monitoring SubTask 7

Activity/Phase: Monitoring SubTask 3 SubTask 8

Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $330.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $365.00 $365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $248.30 $248.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $280.80 $280.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $3,919.67 $352.97 $3,566.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $311.84 $34.65 $277.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $4,231.51 $387.62 $3,843.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF GHD Services Inc. Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2

SITE : Dolphin Fabricare

PROJECT NUMBER: 090128

FDEP NO: ERIC_4847

SUBTASK: Groundwater Monitoring

DATE: 3/21/2017

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer BM Conclusions/Recommendations 1

Professional Engineer JH Site Access/Prepare field scope of work 0.5 Professional Engineer JH Review field notes, verify sampling procedures 0.5 Professional Engineer JH Historical Summary 2 Professional Engineer JH Groundwater sampling methodology 1 Professional Engineer JH Groundwater field parameter evaluation 1 Professional Engineer JH Groundwater flow evaluation (shallow/deep) 1.5 Professional Engineer JH Groundwater analytical data evaluation (shallow/deep) 1.5 Professional Engineer JH QA/QC 1 Professional Engineer JH Conclusions/Recommendations 2

Project Engineer/Scientist AW Mob/demob (1 day - split with 60 minute) 0.5 Project Engineer/Scientist AW Water Levels (23 wells total)) 2 Project Engineer/Scientist AW Groundwater Sampling (5 wells) 7.5

Drafting Technician MJ Groundwater Elevation Figures (shallow/deep) 2 Drafting Technician MJ Groundwater Analytical Figures (shallow/deep) 2

Adminstrative Assistant SS Dat Entry (23 WLs and 5 well samples) 1 Adminstrative Assistant SS Update tables (parameter, wl, analytical) 1.5 Adminstrative Assistant SS Publish Report/generate pdf 2 Adminstrative Assistant SS ADAPT/GIS update 2

6.5

TOTAL LABOR 32.5

TRAVEL TYPE RATE UNIT USEAGE Miles Free

Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

SUBCONTRACTOR

Equipment Procurement

NAME PURPOSE COST UNIT USEAGE

Services Procurement

NAME PURPOSE COST UNIT USEAGE

TOTAL SUBS $0.00

LABORATORY

PARAMETER RATE # SAMPLES #QAQC

VOHs EPA 8260 $66.00 5 $330.00 Sample Shipping Small Cooler (2 day) $35.00 1 $35.00

TOTAL LAB $365.00

FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS

Field Equipment

Expendables $32.50 Day 1 $32.50 Sub-Total $32.50

Groundwater Sampling Kit $208.55 day 1 $208.55 Poly Tubing (HDPE) $0.25 ft 119 $29.75 Silicon Tubing $2.00 ft 5 $10.00

Sub-Total $248.30

TOTAL EQUIPMENT $280.80

Copy of TA_002o.xlsx\sub 2 Page 3 2/15/20219:29 AM

COST PROPOSAL FOR TASK DC002o < Dolphin Fabricare – ERIC_4847>

<Groundwater Monitoring>

1. INTRODUCTION:

Following assessment, remedial design, and remedial construction, GHD assumed SVE system operations in 2009. The remedial system was operational for nearly 6 years and operated until late 2015. After discussions with the Department regarding the ongoing drycleaning operations (using PCE), confirmation soil and soil vapor sampling was conducted and the SVE system was shutdown. Following system shutdown, periodic groundwater sampling was recommended. Task DC002o includes annual groundwater monitoring in accordance with GHD recommendations from August 2020 and Department comments/approval (August 17, 2020).

Subtask 1: Project Management Subtask 1 includes all activities associated with completion of groundwater sampling and preparation of a Groundwater Monitoring Report.

Subtask 2: Groundwater Sampling (June 2021) In order to evaluate groundwater quality in the vicinity of the subject site, groundwater sampling is recommended in late June 2021. In accordance with recommendations in the last Groundwater Monitoring Report (August 2020) and Department comments, sampling is recommended at 5 wells.

In June 2021, groundwater sampling will be conducted at five (5) wells including MW001, MW006, MW007, MW015, and MW016. Prior to sampling, depth-to-water measurements will be gathered from all available wells (23 total). Groundwater samples will be analyzed for the presence of Volatile Organic Halocarbons (VOHs) using EPA Method 8260.

Following receipt of analytical data, a groundwater monitoring report will be prepared. The report will include a description of field sampling methodology and analytical results.

Groundwater elevation and analytical figures will be prepared. The report will also include recommendations regarding the next step toward rehabilitation.

Deliverables:

Deliverable Deliverable Due Date

Field notes and data submittal and DEP approval of the groundwater monitoring report 8/3/21

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

112 days Mon 3/1/21 Tue 8/3/21

3 Subtask 2: Groundwater Monitoring

47 days Mon 5/31/21

Tue 8/3/21

4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21

6 Groundwater Monitoring Report

6 wks Wed 6/23/21

Tue 8/3/21

2/7 2/14 2/21 2/28 3/7 3/14 March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County

Project: TA_002o Date: Mon 2/15/21

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

112 days Mon 3/1/21 Tue 8/3/21

3 Subtask 2: Groundwater Monitoring

47 days Mon 5/31/21

Tue 8/3/21

4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21

6 Groundwater Monitoring Report

6 wks Wed 6/23/21

Tue 8/3/21

3/21 3/28 4/4 4/11 4/18 4/25 April M

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

112 days Mon 3/1/21 Tue 8/3/21

3 Subtask 2: Groundwater Monitoring

47 days Mon 5/31/21

Tue 8/3/21

4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21

6 Groundwater Monitoring Report

6 wks Wed 6/23/21

Tue 8/3/21

5/2 5/9 5/16 5/23 5/30 6/6 May June

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

112 days Mon 3/1/21 Tue 8/3/21

3 Subtask 2: Groundwater Monitoring

47 days Mon 5/31/21

Tue 8/3/21

4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21

6 Groundwater Monitoring Report

6 wks Wed 6/23/21

Tue 8/3/21

Jeremy Hess

Andrew Wyatt

6/13 6/20 6/27 7/4 7/11 7/18 July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21

2 Subtask 1: Project Management

112 days Mon 3/1/21 Tue 8/3/21

3 Subtask 2: Groundwater Monitoring

47 days Mon 5/31/21

Tue 8/3/21

4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21

5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21

6 Groundwater Monitoring Report

6 wks Wed 6/23/21

Tue 8/3/21 Brian Moore,Jeremy Hess,Melissa Jerome,Sheila S

7/25 8/1 8/8 8/15 8/22 8/29 August Septemb

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County

Task Assignment Notification
BWC Task Assignment Form (Rev 02_17).pdf
Task Assignment Notification
BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf
Deliverable & Invoice Schedule
Copy of TA_002o.pdf
Cost Estimate
sub 2