CN-370000-HW555-DC02O.pdf
PDF 617 KB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form (DC002o) issued by the Florida Department of Environmental Protection (FDEP) under Contract HW555 with GHD Services, Inc. The task assignment covers groundwater monitoring services at the Dolphin Fabricare Inc. site located at 7101-55 Cypress Lake Drive, Fort Myers, Lee County, Florida. The site is identified as ERIC_4847 and is currently in the monitoring phase of environmental remediation. Billy Hessman serves as the FDEP Contract Manager, with Brian Moore as the Contractor Representative from GHD Services, Inc.
The task assignment is structured as a fixed-price contract valued at $4,231.51 with no retainage fees. The scope of work includes two subtasks: Project Management (calculated at 12.5 percent of direct labor) and Groundwater Monitoring. The groundwater monitoring subtask requires sampling at five monitoring wells (MW001, MW006, MW007, MW015, and MW016) with analysis for Volatile Organic Halocarbons using EPA Method 8260. The deliverable is a Groundwater Monitoring Report due on August 3, 2021, with performance execution through October 8, 2021. Invoice payment is contingent upon completion of groundwater sampling activities and FDEP approval of the report. The cost estimate itemizes labor costs of $3,118.36, laboratory services of $365.00, field expenses of $280.80, travel costs of $97.00, and a completion fee of $311.84, totaling $4,231.51.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEP CONTRACT NO.
Task Assignment #: Module #: Grant #:
Contractor Name:
Contractor Representative:
DEP Contract Manager: Phone #:
DEP Site #:
Site Name:
Address(Street, City, County):
Phase:
Task Description [use additional pages if necessary]:
The Deliverable and Invoice Schedule is attached.
Final Deliverables:
Final Deliverable Due Date:
TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:
FIXED FEE
RETAINAGE:
TOTAL TASK ASSIGNMENT VALUE: $0.00
DEP Task Manager:
DEP Contract Manager:
Contractual Authority:
Contractor Representative:
CC: Procurement Section (MS 93) Section Representative ________
TASK ASSIGNMENT NOTIFICATION FORM
COST PLUS FIXED FEE
COST REIMBURSEMENT
FIXED PRICE FEE SCHEDULE
Period of Performance:
Execution of Task Assignment through:
DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).
WCP TAFORM 01_18
HW555
D000 N/ADC002o
GHD Services, Inc.
Brian Moore
850-245-8972Billy Hessman
ERIC_4847
Dolphin Fabricare Inc.
7101-55 Cypress Lake Drive, Fort Myers, Lee County
Monitoring
GHD Services, Inc. will conduct groundwater monitoring in accordance with the February 2021 scope of work and cost proposal.
Groundwater Monitoring Report
08/03/2021
10/08/2021
$ 4,231.51 $ 0.00 $ 0.00 $ 0.00
$ 0.00
Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 09:41:33 -05'00'
Billy Hessman Digitally signed by Billy Hessman Date: 2021.02.17 09:41:44 -05'00'
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2021.02.17 10:42:14 -05'00'
Brian Moore Digitally signed by Brian Moore Date: 2021.02.17 11:23:22 -05'00'
$ 4,231.51
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 01-2018
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report 08/03/2021
Upon completion of groundwater sampling activities and FDEP approval of the Groundwater Monitoring Report. $ 4,231.51
$ 4,231.51
HW555
DC002o
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Noah Valenstein Secretary
TO: HW555 Contract File
FROM: Billy Hessman, Contract Manager
DATE: February 15, 2021
SUBJECT: Task Assignment DC002o
Negotiation Summary Dolphin Fabricare
ERIC_4847
Monitoring
This Task Assignment is for GHD to conduct groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 12.5 percent of the direct labor.
Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at 5 monitoring wells. Samples will be analyzed for VOCs by EPA Method 8260.Based on past sampling events, IDW disposal is not anticipated. If IDW disposal is required a WCD will be submitted to the Department for the change in scope. Upon receipt of the groundwater analytical data, GHD will generate a Groundwater Monitoring Report detailing the field activities, procedures, and analytical results. The report will also include recommendations regarding the next step toward site rehabilitation.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal.
Final cost total for Task Assignment DC002o is $4,231.51.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/15/21
Task #: DC002o SubTask 1 Project Management SubTask 6
Site: Dolphin Fabricare SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$69.71 Project Manager BM 1.87 1.865 $0.00 President/V.P 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$69.71 Sr. Professional Engineer BM 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$44.21 Professional Engineer/Geologist JH 11.00 11.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $42.64 Professional Engineer/Geologist GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.00 Professional Engineer/Geologist KC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.72 Staff Engineer/Scientist BG 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.91 Project Manager/Engineer SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.29 Staff Engineer/Scientist AW 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Field Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$28.85 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.18 Junior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $17.51 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.82 Drafting Technician MJ 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Senior Assistant/Accounting 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.14 Staff Assistant SS 6.50 6.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Computer Specialist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 34.37 1.865 32.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,170.12 $130.01 $1,040.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 113.00% $1,322.23 $146.91 $1,175.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 28.00% $327.63 $36.40 $291.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 25.50% $298.38 $33.15 $265.23 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,118.36 $346.47 $2,771.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $58.51 $6.50 $52.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Travel
REV: 02/03 CEF GHD Services Inc. Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/15/21
Task #: DC002o SubTask 1 Project Management SubTask 6
Site: Dolphin Fabricare SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, P.E. SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $330.00 $330.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $35.00 $35.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $365.00 $365.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $248.30 $248.30 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $280.80 $280.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $3,919.67 $352.97 $3,566.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $311.84 $34.65 $277.19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,231.51 $387.62 $3,843.89 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF GHD Services Inc. Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET Sub 2
SITE : Dolphin Fabricare
PROJECT NUMBER: 090128
FDEP NO: ERIC_4847
SUBTASK: Groundwater Monitoring
DATE: 3/21/2017
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr. Professional Engineer BM Conclusions/Recommendations 1
Professional Engineer JH Site Access/Prepare field scope of work 0.5 Professional Engineer JH Review field notes, verify sampling procedures 0.5 Professional Engineer JH Historical Summary 2 Professional Engineer JH Groundwater sampling methodology 1 Professional Engineer JH Groundwater field parameter evaluation 1 Professional Engineer JH Groundwater flow evaluation (shallow/deep) 1.5 Professional Engineer JH Groundwater analytical data evaluation (shallow/deep) 1.5 Professional Engineer JH QA/QC 1 Professional Engineer JH Conclusions/Recommendations 2
Project Engineer/Scientist AW Mob/demob (1 day - split with 60 minute) 0.5 Project Engineer/Scientist AW Water Levels (23 wells total)) 2 Project Engineer/Scientist AW Groundwater Sampling (5 wells) 7.5
Drafting Technician MJ Groundwater Elevation Figures (shallow/deep) 2 Drafting Technician MJ Groundwater Analytical Figures (shallow/deep) 2
Adminstrative Assistant SS Dat Entry (23 WLs and 5 well samples) 1 Adminstrative Assistant SS Update tables (parameter, wl, analytical) 1.5 Adminstrative Assistant SS Publish Report/generate pdf 2 Adminstrative Assistant SS ADAPT/GIS update 2
6.5
TOTAL LABOR 32.5
TRAVEL TYPE RATE UNIT USEAGE Miles Free
Truck $97.00 day 1 $97.00
TOTAL VEHICLE $97.00
SUBCONTRACTOR
Equipment Procurement
NAME PURPOSE COST UNIT USEAGE
Services Procurement
NAME PURPOSE COST UNIT USEAGE
TOTAL SUBS $0.00
LABORATORY
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA 8260 $66.00 5 $330.00 Sample Shipping Small Cooler (2 day) $35.00 1 $35.00
TOTAL LAB $365.00
FIELD EXPENSES ITEM RATE UNIT USEAGE TOTALS
Field Equipment
Expendables $32.50 Day 1 $32.50 Sub-Total $32.50
Groundwater Sampling Kit $208.55 day 1 $208.55 Poly Tubing (HDPE) $0.25 ft 119 $29.75 Silicon Tubing $2.00 ft 5 $10.00
Sub-Total $248.30
TOTAL EQUIPMENT $280.80
Copy of TA_002o.xlsx\sub 2 Page 3 2/15/20219:29 AM
COST PROPOSAL FOR TASK DC002o < Dolphin Fabricare – ERIC_4847>
<Groundwater Monitoring>
1. INTRODUCTION:
Following assessment, remedial design, and remedial construction, GHD assumed SVE system operations in 2009. The remedial system was operational for nearly 6 years and operated until late 2015. After discussions with the Department regarding the ongoing drycleaning operations (using PCE), confirmation soil and soil vapor sampling was conducted and the SVE system was shutdown. Following system shutdown, periodic groundwater sampling was recommended. Task DC002o includes annual groundwater monitoring in accordance with GHD recommendations from August 2020 and Department comments/approval (August 17, 2020).
Subtask 1: Project Management Subtask 1 includes all activities associated with completion of groundwater sampling and preparation of a Groundwater Monitoring Report.
Subtask 2: Groundwater Sampling (June 2021) In order to evaluate groundwater quality in the vicinity of the subject site, groundwater sampling is recommended in late June 2021. In accordance with recommendations in the last Groundwater Monitoring Report (August 2020) and Department comments, sampling is recommended at 5 wells.
In June 2021, groundwater sampling will be conducted at five (5) wells including MW001, MW006, MW007, MW015, and MW016. Prior to sampling, depth-to-water measurements will be gathered from all available wells (23 total). Groundwater samples will be analyzed for the presence of Volatile Organic Halocarbons (VOHs) using EPA Method 8260.
Following receipt of analytical data, a groundwater monitoring report will be prepared. The report will include a description of field sampling methodology and analytical results.
Groundwater elevation and analytical figures will be prepared. The report will also include recommendations regarding the next step toward rehabilitation.
Deliverables:
Deliverable Deliverable Due Date
Field notes and data submittal and DEP approval of the groundwater monitoring report 8/3/21
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21
2 Subtask 1: Project Management
112 days Mon 3/1/21 Tue 8/3/21
3 Subtask 2: Groundwater Monitoring
47 days Mon 5/31/21
Tue 8/3/21
4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21
5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21
6 Groundwater Monitoring Report
6 wks Wed 6/23/21
Tue 8/3/21
2/7 2/14 2/21 2/28 3/7 3/14 March
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County
Project: TA_002o Date: Mon 2/15/21
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21
2 Subtask 1: Project Management
112 days Mon 3/1/21 Tue 8/3/21
3 Subtask 2: Groundwater Monitoring
47 days Mon 5/31/21
Tue 8/3/21
4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21
5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21
6 Groundwater Monitoring Report
6 wks Wed 6/23/21
Tue 8/3/21
3/21 3/28 4/4 4/11 4/18 4/25 April M
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21
2 Subtask 1: Project Management
112 days Mon 3/1/21 Tue 8/3/21
3 Subtask 2: Groundwater Monitoring
47 days Mon 5/31/21
Tue 8/3/21
4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21
5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21
6 Groundwater Monitoring Report
6 wks Wed 6/23/21
Tue 8/3/21
5/2 5/9 5/16 5/23 5/30 6/6 May June
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21
2 Subtask 1: Project Management
112 days Mon 3/1/21 Tue 8/3/21
3 Subtask 2: Groundwater Monitoring
47 days Mon 5/31/21
Tue 8/3/21
4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21
5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21
6 Groundwater Monitoring Report
6 wks Wed 6/23/21
Tue 8/3/21
Jeremy Hess
Andrew Wyatt
6/13 6/20 6/27 7/4 7/11 7/18 July
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Mon 2/15/21Fri 2/26/21
2 Subtask 1: Project Management
112 days Mon 3/1/21 Tue 8/3/21
3 Subtask 2: Groundwater Monitoring
47 days Mon 5/31/21
Tue 8/3/21
4 Field Work Preparation 2 wks Mon 5/31/21Fri 6/11/21
5 Groundwater Sampling 1 day Mon 6/14/21Mon 6/14/21
6 Groundwater Monitoring Report
6 wks Wed 6/23/21
Tue 8/3/21 Brian Moore,Jeremy Hess,Melissa Jerome,Sheila S
7/25 8/1 8/8 8/15 8/22 8/29 August Septemb
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC002o at the Dolphin Fabricare site located in Fort Myers, Lee County
| Task Assignment Notification |
| BWC Task Assignment Form (Rev 02_17).pdf |
| Task Assignment Notification |
| BWC Task Assignment Form - Page 2 (Rev 08_10) - Rev 1.pdf |
| Deliverable & Invoice Schedule |
| Copy of TA_002o.pdf |
| Cost Estimate |
| sub 2 |
File details come from the government source that posted it. Updated .