CN-370000-HW555-DC02BCO2.pdf
PDF 1 MB Posted
- Contract number
- HW555
- Issued by
- Florida
About this file
This is a Task Assignment Notification Change Order Form for Florida Department of Environmental Protection Contract HW555, managed by HSA Engineers & Scientists. The change order (Change Order No. 2) involves contractor HSA Engineers & Scientists, with contractor representative Brian Moore, P.E., and DEP contract manager Anastasia Davis. The assignment pertains to work conducted at the Dolphin Fabricare facility (Site ID 369502257). The task involves conducting an annual groundwater monitoring event in March 2012 and performing monthly operation and maintenance activities from October 2011 through September 2012 on a soil vapor extraction system at the referenced site.
The change order addresses costs associated with repairing the SVE blower and installing a Buck Boost Transformer under Subtask 3, with payment of utility invoices representing the only portion of this task constituting Cost Plus Fixed Fee. The revised task assignment total is $23,460.69, comprising $17,460.69 in fixed price work and $6,000.00 in cost reimbursement plus fixed fee ($3,000.00 cost plus $0.00 fixed fee). Key deliverables include semi-annual summary recommendations, an annual Remedial Performance Report, and paid utility receipts for specified periods (October 2011 through March 2012 and April through September 2012). The final deliverable due date is November 15, 2012. Invoicing requirements include tasks related to FDEP approval of reports and utility invoices, with total invoiced amounts of $23,460.69 across five separate task requirements.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .