CN-370000-HW554-DC01F.pdf
PDF 1 MB Posted
- Contract number
- HW554
- Issued by
- Florida
About this file
This is a Task Assignment Notification Form for Department of Environmental Protection (DEP) Contract No. HW554, issued to CB&I Environmental & Infrastructure under Task Assignment DC001F. The contract involves the State of Florida's Department of Environmental Protection and CB&I Environmental & Infrastructure, with Edward Vehling serving as the contractor representative and Walsta Jean-Baptiste as the DEP contract manager. The task assignment pertains to onsite meetings and site visits in Florida's Southwest District, specifically at the Lakeland Tannery Site and Walker's Plaza in Plant City.
The scope of work requires CB&I to perform site visits and submit a photographic log as the primary deliverable, due on December 19, 2014, with task completion by January 30, 2015. The task assignment is structured as a fixed-price contract with a total value of $1,508.12, comprised entirely of direct costs with no retainage. The cost estimate includes direct labor of $472.77, fringe benefits at 35 percent, overhead at 60 percent, general and administrative costs at 26.1 percent, other direct costs of $23.64, travel expenses of $68.00 (vehicle rental), and a completion fee of $128.78. Invoice is triggered upon FDEP approval of CB&I's photographic log, with the entire contract amount invoiced at that single milestone.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FDEP COST ESTI MATE
Cost Estimate Page 1 of 2 DC001F est.xlsx
Contractor: CB&I Environmental & Infrastructure, Inc.
Date: 11/24/2014
Task #: HW-554-DC001F SubTask 1 Project Management
Site: Other - Onsite Meetings SubTask 2 2-Site Visits
Activity/Phase: Other - Onsite Meetings SubTask 3
Project Manager: Edward Vehling SubTask 4
SubTask 5
Totals 1 2 3 4 5 6 Labor Rate Category
$54.61 Client Program Manager 1 E. Vehling 1 1.0 $54.61 Client Program Manager 1 E. Vehling 0 0 0 0 0 0 $53.78 Engineer/Scientist 5 D. Rodgers 0 0 0 0 0 0 $35.62 Engineer/Scientist 4 R. Bates 0 0 0 0 0 0 $49.31 Engineer/Scientist 4 E. Kramer 0 0 0 0 0 0 $52.27 Engineer/Scientist 4 G. Roberts 8 8 0 0 0 0 $41.74 Engineer/Scientist 3 E. Johnson 0 0 0 0 0 0 $52.53 Engineer/Scientist 3 K. Brinson 0 0 0 0 0 0 $25.98 Engineer/Scientist 2 J. Ramsey 0 0 0 0 0 0 $22.61 Engineer/Scientist 2 N. Miller 0 0 0 0 0 0 $29.78 Engineer/Scientist 2 J. Pena 0 0 0 0 0 0 $26.33 Engineer/Scientist 2 A. Cinelli 0 0 0 0 0 0 $20.67 Engineer/Scientist 2 A. Driscoll 0 0 0 0 0 0 $23.72 Engineering Technician 4 M. Hubbard 0 0 0 0 0 0 $28.01 Engineering Technician 4 A. Escobar 0 0 0 0 0 0 $20.49 Engineering Technician 3 D. Suchinsky 0 0 0 0 0 0 $21.86 Engineering Technician 3 D. Young 0 0 0 0 0 0 $24.09 Engineering Technician 2 R. Grenville 0 0 0 0 0 0 $22.93 Engineering Technician 2 J. Washington 0 0 0 0 0 0 $25.05 Designer 1 S. Ferianc 0 0 0 0 0 0 $49.69 Geospatial Analyst 4 A. Belden 0 0 0 0 0 0 $30.83 Geospatial Analyst 3 H. Vollmer 0 0 0 0 0 0 $18.10 Tech Publications Specialist H. Vining 0 0 0 0 0 0
$0.00 0 0 0 0 0 0 $0.00 0 0 0 0 0 0 $0.00 0 0 0 0 0 0
Total Hours 9 1 8 0 0 0 0
Direct Labor $472.77 $54.61 $418.16 $0.00 $0.00 $0.00 $0.00
Fringe 35.00% $165.47 $19.11 $146.36 $0.00 $0.00 $0.00 $0.00 Overhead 60.00% $382.94 $44.23 $338.71 $0.00 $0.00 $0.00 $0.00 Gen & Admin 26.10% $266.52 $30.78 $235.74 $0.00 $0.00 $0.00 $0.00 Total Labor $1,287.70 $148.73 $1,138.97 $0.00 $0.00 $0.00 $0.00
Other Direct Costs $23.64 $2.73 $20.91 $0.00 $0.00 $0.00 $0.00 Travel
Vehicle Rental $68.00 $68.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $68.00 $68.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials/GenFuel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Rental Eq $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Tree Removal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Cap Repair $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $1,379.34 $151.46 $1,227.88 $0.00 $0.00 $0.00 $0.00 Completion Fee $128.78 $14.88 $113.90 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $1,508.12 $166.34 $1,341.78 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT / EXPENSE WORKSHEET
2-GW Sampling 2014 Page 2 of 2 DC001F est.xlsx]
SITE : Other - Onsite Meetings
SUBTASK:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
TITLE STAFF WORK DESCRIPTION HOURS
Client Program Manager 1 E. Vehling Engineer/Scientist 5 D. Rodgers Engineer/Scientist 4 R. Bates Engineer/Scientist 4 E. Kramer Engineer/Scientist 4 G. Roberts 8 Engineer/Scientist 3 E. Johnson Engineer/Scientist 3 K. Brinson Engineer/Scientist 2 J. Ramsey Engineer/Scientist 2 N. Miller Engineer/Scientist 2 J. Pena Engineer/Scientist 2 A. Cinelli Engineer/Scientist 2 A. Driscoll Engineering Technician 4 M. Hubbard Engineering Technician 4 A. Escobar Engineering Technician 3 D. Suchinsky Engineering Technician 3 D. Young Engineering Technician 2 R. Grenville Engineering Technician 2 J. Washington Designer 1 S. Ferianc Geospatial Analyst 4 A. Belden Geospatial Analyst 3 H. Vollmer Tech Publications Specialist H. Vining
TOTAL LABOR 8
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $32.50 Day 0 $0.00 Personnel Protection Level D $28.00 Units/Man/Day 0 $0.00 Monitoring Well Installation Kit $184.00 Day 0 $0.00 Shallow GW Sampling Kit $208.50 Day 0 $0.00 Generator (5 kw) $66.00 Day 0 $0.00 Global Positioning System $25.00 Day 0 $0.00 Total Survey Station $41.75 Day 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 0 $0.00
TOTAL EQUIPMENT $0.00
VEHICLE TYPE RATE UNIT USEAGE TOTALS
Automobile $68.00 Day 1 $68.00 Equiment Van $97.00 Day 0 $0.00 Truck $97.00 Day 0 $0.00
TOTAL VEHICL $68.00
PER DIEM STAFF RATE UNIT USEAGE TOTALS
Hotel $75.00 Day 0 $0.00 First Day (Depart before 6) $36.00 Day 0 $0.00 First Day (Depart before 1800) $18.00 Day 0 $0.00 Whole days $36.00 Day 0 $0.00 Return day $80.00 Day 0 $0.00
TOTAL PER DIEM $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QA/QC
$11.50 0 0 $0.00
EPA Method 8151 (PCP) $130.00 0 0 $0.00 EPA Method 8260 (VOCs - Full List) $135.00 0 0 $0.00 EPA Method 8270 (PAHs) $100.00 0 0 $0.00 FL-PRO (Total Petroleum Hydrocarbons) $84.00 0 0 $0.00 EPA Method 504 (EDB) $50.00 0 $0.00 EPA Method 6010 (Total Pb) $11.50 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00 Ice $5.00 0 $0.00
TOTAL LAB $0.00
SUBCONTRACTOR
NAME PURPOSE Rate Unit Usage TOTALS $0.00
TOTAL $0.00
TURN
AROUND
EPA Method 6010 Aqueous (As)
Attend Day of Site Meetings as Requested by FDEP
2-Site Visits November 24, 2014
Proposed Scope of Work CB&I Proposed Onsite Meeting Task Assignment DC001F Shaw Environmental, Inc.
11/24/14
Attached are the CEF and LOE for the onsite meetings you requested in Lakeland and Plant City, currently scheduled for Tuesday, December 2, 2014. The site visits will consist of the Lakeland Tannery Site and Walker’s Plaza in Plant City. The Lakeland site visit will be performed to address several issues raised by the property owner. The Walker Plaza site will be visited to address issues associated with the proposed site assessment activities.
A task completion date of January 31, 2015 is recommended. Please do not hesitate to call should you have any questions.
| DC001F est.pdf |
| Cost Estimate |
| 2-GW Sampling 2014 |
File details come from the government source that posted it. Updated .