Document Summary

This is a Task Assignment Notification Change Order Form (TACO #2) issued by the Florida Department of Environmental Protection (FDEP) under statewide contract HW554 with APTIM Environmental & Infrastructure, Inc. The contract pertains to environmental remediation services at the Best Care Cleaners site (ERIC_4474) in Miami-Dade County. The change order reconciles Work Change Directive (WCD) #1 and modifies the task assignment to address unforeseen circumstances during the groundwater monitoring event.

The task assignment includes three primary subtasks: Annual Groundwater Sampling, SVE Vapor Testing, and resolution of WCD #1 concerning a stolen 55-gallon drum of purge water. WCD #1 authorized site visits to Miami-Dade Police Department to file a police report documenting the theft, estimated at $1,500 but ultimately resolved for $982.19. The original task amount was $13,524.03; Change Order #1 reduced costs by $110.00 to $13,414.03; Change Order #2 increases the amount by $982.19 to a final fixed price of $14,396.22. The task completion date was extended 45 days from January 1, 2021 to February 15, 2021 to allow for police report acquisition, FDEP approval, and invoicing. All costs are fixed-price under the contract, with deliverables including a Biennial Groundwater Monitoring Report with Soil Vapor Data and a Police Report for the stolen drum.

View the file

Other files

File Type Posted
CN-370000-HW554-DC002M.pdf PDF
CN-370000-HW554-DC003H.pdf PDF
CN-370000-HW554-DC004E.pdf PDF
CN-370000-HW554-DC011E.pdf PDF
CN-370000-HW554-DC012F.pdf PDF
CN-370000-HW554-DC017B.pdf PDF
CN-370000-HW554-DC01ACO3.pdf PDF
CN-370000-HW554-DC01E.pdf PDF
CN-370000-HW554-DC01J.pdf PDF
CN-370000-HW554-DC02B.pdf PDF
CN-370000-HW554-DC02BCO6.pdf PDF
CN-370000-HW554-DC02C.pdf PDF
CN-370000-HW554-DC02E.pdf PDF
CN-370000-HW554-DC02ECO1.pdf PDF
CN-370000-HW554-DC02ECO2.pdf PDF
CN-370000-HW554-DC02G.pdf PDF
CN-370000-HW554-DC02GCO1.pdf PDF
CN-370000-HW554-DC02I.pdf PDF
CN-370000-HW554-DC02N.pdf PDF
CN-370000-HW554-DC03B.pdf PDF
CN-370000-HW554-DC03C.pdf PDF
CN-370000-HW554-DC03ECO1.pdf PDF
CN-370000-HW554-DC03F.pdf PDF
CN-370000-HW554-DC03GCO1.pdf PDF
CN-370000-HW554-DC05CCO5.pdf PDF
CN-370000-HW554-DC05D.pdf PDF
CN-370000-HW554-DC05G.pdf PDF
CN-370000-HW554-DC05GCO1.pdf PDF
CN-370000-HW554-DC06D.pdf PDF
CN-370000-HW554-DC07GCO1.pdf PDF
CN-370000-HW554-DC08BCO1.pdf PDF
CN-370000-HW554-DC08BCO4.pdf PDF
CN-370000-HW554-DC08D.pdf PDF
CN-370000-HW554-DC08ECO1.pdf PDF
CN-370000-HW554-DC08ICO1.pdf PDF
CN-370000-HW554-DC08KCO1.pdf PDF
CN-370000-HW554-DC08KCO2.pdf PDF
CN-370000-HW554-DC08LCO1.pdf PDF
CN-370000-HW554-DC09CCO1.pdf PDF
CN-370000-HW554-DC10ACO1.pdf PDF
CN-370000-HW554-DC10FCO2.pdf PDF
CN-370000-HW554-DC10JCO1.pdf PDF
CN-370000-HW554-DC11ACO3.pdf PDF
CN-370000-HW554-DC11BCO1.pdf PDF
CN-370000-HW554-DC11CCO2.pdf PDF
CN-370000-HW554-DC11DCO1.pdf PDF
CN-370000-HW554-DC11GCO1.pdf PDF
CN-370000-HW554-DC12ECO1.pdf PDF
CN-370000-HW554-DC12H.pdf PDF
CN-370000-HW554-DC12JCO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

HW554

2DC005H

APTIM

Eric Kramer, P.E.

850.245.8941Miranda McClure (acting) Best Care Cleaners

ERIC_4474

This Change Order is for reconciling Work Change Directive (WCD) #1 to meet on site with the Miami PD to file a missing report for a stolen IDW drum.

Police Report for Stolen Drum 01/15/2021

$ 13,524.03 $ 0.00 $ 0.00 $ 0.00

$ 13,414.03 $ 0.00 $ 0.00 $ 0.00 $ 13,414.03

$ 982.19 $ 0.00 $ 0.00 $ 0.00 $ 982.19

$ 14,396.22

11/27/2020

01/01/2021

45 days

02/15/2021

Miranda McClure Digitally signed by Miranda McClure Date: 2020.12.30 11:32:38 -05'00'

Miranda McClure Digitally signed by Miranda McClure Date: 2020.12.30 11:32:50 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.12.30 14:53:02 -05'00'

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2020.12.30 15:42:15 -05'00'

$ 14,396.22 $ 0.00 $ 0.00 $ 0.00

$ 13,524.03

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

HW554

DC005H

$ 14,396.22

Biennial Groundwater Monitoring Report with Soil Vapor Data and DEP EDDs - ST 2

& 3--APPROVED

Police report for stolen drum--st 4

DEP approval of Biennial Groundwater Monitoring Report with Soil Vapor Data and DEP EDDs; and Police Report for stolen drum- ST 1-4

09/25/2020

01/15/2021

$ 14,396.22

Site Name: Site ID #:

Contract #: Contractor:

• Reason for Work Change Directive :

• Description of Work Change Directive :

• Attachments (if applicable, list documents supporting change):

• Costs (if negotiated unit costs, provide information below):

WCP WCD 07-2018

Authorized Contractor Signature:

Authorized FDEP Signature:

WORK CHANGE DIRECTIVE FORM

FDEP Supervisor Approval:

(if applicable)

Additional work is not authorized without prior FDEP approval as indicated by an approved Work Change Directive Form or Task Assignment Change Order Form. It is the Contractor's responsibility to ensure that additional costs associated with this WCD are resolved by a Task Assignment Change Order (TACO) prior to the completion date of the original Task Assignment or subsequent TACOs completed prior to the execution date of this WCD. Failure to do so will result in a loss of reimbursement for work associated with this WCD.

Task Assignment #: Work Change Directive #:

Maximum Estimated Increase in Task Amount:

Best Care Cleaners ERIC_4474

HW554 Aptim Environmental & Infrastructure LLC

DC005H WCD #1

During the annual groundwater sampling event purge water was stored in a 55-gallon drum until off site disposal was completed. However, the drum was stolen from the site before disposal pickup was completed. FDEP required APTIM obtain a police report documenting the incident. Miami-Dade police require APTIM to meet officer on site to complete report.

APTIM will coordinate with the Miami-Dade police to meet on site and complete a report documenting the incident. APTIM will submit the police report once a copy becomes available.

Labor costs $1,250, transportation $100, and other costs $150.

$ 1,500.00

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2020.12.02 10:06:19 -05'00'

Miranda McClure Digitally signed by Miranda McClure Date: 2020.12.02 15:36:20 -05'00'

William E.

Burns, Jr.

Digitally signed by William E.

Burns, Jr.

Date: 2020.12.02 15:37:08 -05'00'

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

A

P

TI

M E nv iro nm en ta l &

In fra st ru ct ur e, In c D at e:

/2 /2

Ta sk

H W

4-

D C

5H

W C

D #1

S ub

Ta sk

P ro je ct M an ag em en t S ite

B es t C ar e C le ne rs , E

R

IC

_4

S ub Ta sk

2- W

C D

A ct iv ity

/P ha se

R em ed ia l S ub Ta sk

P ro je ct

M an ag er

E ric K ra m er S ub Ta sk

S ub

Ta sk

TTo ta ls

La bo r

R at e C at eg or y

$6 1.

CC

lie nt

P ro gr am

M an ag er

E . K ra m er

0.

$6 1.

E ng in ee r/S ci en tis t 5

E . K ra m er

$5

9.

E ng in ee r/S ci en tis t 5 G

. R ob er ts

$4 1.

E ng in ee r/S ci en tis t 3

A . B la ck fo rd

$3 2.

E ng in ee r/S ci en tis t 2

K . H ow ar d

$2

5.

E ng in ee r/S ci en tis t 1 K

. M cD on al d

$2

5.

E ng in ee rin g

Te ch ni ci an

J.

B el l

$3 1.

D es ig ne r 2

S . F er ia nc

$2

4.

Te ch

P ub lic at io ns

S pe ci al i s H

. V in in g

$0 .0

T To ta l H ou rs

D ire ct L ab or

$2

.8

$3

1.

$2

.7

$0 .0

$0

.0

$0 .0

$0

.0

Fr in ge

9.

$3

.9

$3

7.

$2

.9

$0 .0

$0

.0

$0 .0

$0

.0

O ve rh ea d

.9 0%

$5 8.

$6

.5

$5 1.

$0

.0

$0 .0

$0

.0

$0 .0

G en

A dm in

.6 0%

$9 1.

$1

0.

$8 1.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l L ab or

$7

.4

$8 4.

$6

.7

$0

.0

$0 .0

$0

.0

$0 .0

O th er D ire ct

C os ts $1

3.

$1 .5

$1

2.

$0 .0

$0

.0

$0 .0

$0

.0

Tr av el V eh ic le R en ta l $9

7.

$9 7.

$0

.0

$0 .0

$0

.0

$0 .0

M ile ag e C os ts

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

A ir

Fa re

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P er d ie m

H ot el $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l T ra ve l $9

7.

$9 7.

$0

.0

$0 .0

$0

.0

$0 .0

(E qu ip m en t P ro cu re m en

t) S ub co nt ra ct or

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or S ub to ta l

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

P ro cu re m en t F ee

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

(S er vi ce s P ro cu re m en t)

S ub co nt ra ct or D ril lin g (C on ve nt io na l)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

D ril lin g

(N on

-c on ve nt io na

l) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

M ob ile

L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

C os t E st im at e Pa ge o f 2

W C

D

C

EF

.x ls x

FFLORIDA DEPARTMENT OFF

EEnvironmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DDeSantis Governor

Jeanette NNuñez Lt. Governor

Noah Valenstein Secretary

Memorandum TO: DSCP Site File FROM: Miranda McClure, Project Manager SUBJECT: Negotiation Summary, HW554, TA DC005H, Change Order #

DATE: , 2020

APTIM perform a groundwater monitoring event (5 wells), obtain soil vapor samples from 5 former SVE wells and submit a Groundwater Monitoring Report w/Soil Vapor Data. This change order is for

Subtask :

Summary:

The revised TA is for the fixed price of $1 , . , respectively.

DC005H

FD

EP

C

OS

T

ES

TI

MA

TE

C on tra ct or

A

P

TI

M E nv iro nm en ta l &

In fra st ru ct ur e, In c D at e:

/2 /2

Ta sk

H W

4-

D C

5H

W C

D #1

S ub

Ta sk

P ro je ct M an ag em en t S ite

B es t C ar e C le ne rs , E

R

IC

_4

S ub Ta sk

2- W

C D

A ct iv ity

/P ha se

R em ed ia l S ub Ta sk

P ro je ct

M an ag er

E ric K ra m er S ub Ta sk

S ub

Ta sk

TTo ta ls

S ur ve yi ng

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

ID

W

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

U til iti es

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

S ub co nt ra ct or s

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

W el l M at er ia ls $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S ub co nt ra ct or

S ub to ta l $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

H an dl in g

Fe e

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l S ub co nt ra ct or C os t

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

La bo ra to ry A na ly tic al

C os ts $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

Fa st T ur na ro un d C ha rg es $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

S am pl e S hi pp in g

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

To ta l L ab or at or y

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

Fi el d E xp en se s

P er so na l P ro te ct io n

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E xp en da bl es

$3 2.

$3

2.

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

D ril lin g re la te d)

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

E qu ip m en t (

A na ly tic al re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t (

ID

W re la te

d) $0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

E qu ip m en t ( O th er

$0

.0

$0 .0

$0

.0

$0 .0

$0

.0

$0 .0

To ta l F ie ld

E xp en se s $3

2.

$3 2.

$0

.0

$0 .0

$0

.0

$0 .0

S ub to ta l $9

.9

$8

6.

$8

.6

$0 .0

$0

.0

$0 .0

$0

.0

C om pl et io n

Fe e

$7 6.

$8

.4

$6 7.

$0

.0

$0 .0

$0

.0

$0 .0

To ta l E st im at ed C os t

$9

.1

$9 4.

$8

.4

$0

.0

$0 .0

$0

.0

$0 .0

C os t E st im at e Pa ge o f 2

W C

D

C

EF

.x ls x

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, Inc.

Date: 12/21/2020

Task #: HW554-DC005H TACO #2 SubTask 1 Project Management

Site: Best Care Cleaners SubTask 2 2-Annual Groundwater Sampling

Activity/Phase: Biennial Sampling SubTask 3 3-SVE Vapor Testing

Project Manager: Eric Kramer SubTask 4 4-WCD#1

SubTask 5

TTotals 1 2 3 4 5 6 Labor Rate Category

$61.78 CClient Program Manager 1 E. Kramer 6 6.4 $61.78 Engineer/Scientist 5 E. Kramer 6 2 2 2 0 0 $59.42 Engineer/Scientist 5 G. Roberts 21 17 4 0 0 0 $25.29 Engineer/Scientist 1 K. McDonald 23 0 23 0 0 0 $25.03 Engineering Technician 2 J. Bell 18 13 0 5 0 0 $19.41 Engineering Technician 1 D. Mconnaughey 20 0 20 0 0 0 $31.07 Designer 2 S. Ferianc 2 2 0 0 0 0 $24.55 Tech Publications Specialist 3 H. Vining 3 3 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 0 0

Total Hours 99 6 37 49 7 0 0

Direct Labor $3,571.54 $396.84 $1,594.88 $1,331.11 $248.71 $0.00 $0.00

Fringe 119.00% $4,250.13 $472.24 $1,897.91 $1,584.02 $295.96 $0.00 $0.00 Overhead 20.90% $746.45 $82.94 $333.33 $278.20 $51.98 $0.00 $0.00 Gen & Admin 32.60% $1,164.32 $129.37 $519.93 $433.94 $81.08 $0.00 $0.00

Total Labor $9,732.44 $1,081.39 $4,346.05 $3,627.27 $677.73 $0.00 $0.00

Other Direct Costs $178.58 $19.84 $79.74 $66.56 $12.44 $0.00 $0.00 Travel

Vehicle Rental $388.00 $97.00 $194.00 $97.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $420.00 $0.00 $420.00 $0.00 $0.00 $0.00 Total Travel $808.00 $97.00 $614.00 $97.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bob's Barricades $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,396.00 $396.00 $1,000.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $0.00 $104.00 $0.00 $0.00 $0.00 Total Laboratory $1,500.00 $396.00 $1,104.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $130.00 $32.50 $65.00 $32.50 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,073.95 $266.75 $807.20 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,203.95 $299.25 $872.20 $32.50 $0.00 $0.00

Subtotal $13,422.97 $1,101.23 $5,218.04 $6,284.03 $819.67 $0.00 $0.00 Completion Fee $973.25 $108.14 $434.61 $362.73 $67.77 $0.00 $0.00

Total Estimated Cost $14,396.22 $1,209.37 $5,652.65 $6,646.76 $887.44 $0.00 $0.00

Total Page 1 of 7 DC005H TACO #2.xlsx

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : Best Care Cleaners

SUBTASK:

DATE: December 21, 2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts Engineer/Scientist 1 K. McDonald Engineering Technician 2 J. Bell 5 Engineering Technician 1 D. Mconnaughey Designer 2 S. Ferianc Tech Publications Specialist 3 H. Vining

TOTAL LABOR 7

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 0 $0.00 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 0 $0.00

TOTAL EQUIPMENT: $32.50

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $70.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 0 0 $0.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Misc. Supplies Home Depot/Lowes/Equivilent $50.00 Lump 0 $0.00 Erwin Remediation IDW Transporation and Disposal $100.00 Drum 0 $0.00

TOTAL SUB: $0.00

Site visit to report Drum Theft to Miami-Dade Police Department, Including travel to site (5 hrs)

4-WCD#1

Continued Followup with Police Department to obtain Theft Report and Submit Deliverable (1 hr.), Preparation of WCD and TACO (1 hr)

4-Total Page 2 of 7 DC005H TACO #2.xlsx

FDEP COST ESTI MATE

Date: 12/21/2020

Task #: HW554-DC005H TACO #2 SubTask 1 Project Management

Site: Best Care Cleaners SubTask 2 2-Annual Groundwater Sampling

Activity/Phase: Biennial Sampling SubTask 3 3-SVE Vapor Testing

Project Manager: Eric Kramer SubTask 4 4-WCD#1

SubTask 5

TTotals 1 2 3 4 5 6 Labor Rate Category

$61.78 CClient Program Manager 1 E. Kramer 1 0.5 $61.78 Engineer/Scientist 5 E. Kramer 2 0 0 2 0 0 $59.42 Engineer/Scientist 5 G. Roberts 0 0 0 0 0 0 $25.29 Engineer/Scientist 1 K. McDonald 0 0 0 0 0 0 $25.03 Engineering Technician 2 J. Bell 5 0 0 5 0 0 $19.41 Engineering Technician 1 D. Mconnaughey 0 0 0 0 0 0 $31.07 Designer 2 S. Ferianc 0 0 0 0 0 0 $24.55 Tech Publications Specialist 3 H. Vining 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 0 0

TTotal Hours 8 1 0 0 7 0 0

Direct Labor $279.80 $31.09 $0.00 $0.00 $248.71 $0.00 $0.00

Fringe 119.00% $332.96 $37.00 $0.00 $0.00 $295.96 $0.00 $0.00 Overhead 20.90% $58.48 $6.50 $0.00 $0.00 $51.98 $0.00 $0.00 Gen & Admin 32.60% $91.22 $10.14 $0.00 $0.00 $81.08 $0.00 $0.00

Total Labor $762.46 $84.73 $0.00 $0.00 $677.73 $0.00 $0.00

Other Direct Costs $13.99 $1.55 $0.00 $0.00 $12.44 $0.00 $0.00 Travel

Vehicle Rental $97.00 $0.00 $0.00 $97.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $0.00 $0.00 $97.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bob's Barricades $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $0.00 $0.00 $32.50 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $32.50 $0.00 $0.00 $32.50 $0.00 $0.00

Subtotal $905.95 $86.28 $0.00 $0.00 $819.67 $0.00 $0.00 Completion Fee $76.24 $8.47 $0.00 $0.00 $67.77 $0.00 $0.00

Total Estimated Cost $982.19 $94.75 $0.00 $0.00 $887.44 $0.00 $0.00

Delta Page 3 of 7 DC005H TACO #2.xlsx

SUBTASK:

DATE: December 21, 2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts Engineer/Scientist 1 K. McDonald

Engineering Technician 2 J. Bell

Engineering Technician 1 D. Mconnaughey Designer 2 S. Ferianc Tech Publications Specialist 3 H. Vining

TOTAL LABOR 7

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 0 $0.00 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 0 $0.00

TOTAL EQUIPMENT: $32.50

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $70.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 0 0 $0.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Misc. Supplies Home Depot/Lowes/Equivilent $50.00 Lump 0 $0.00 Erwin Remediation IDW Transporation and Disposal $100.00 Drum 0 $0.00

TOTAL SUB: $0.00

Site visit to report Drum Theft to Miami-Dade Police Department, Including travel to site (5 hrs)

4-WCD#1

Continued Followup with Police Department to obtain Theft Report and Submit Deliverable (1 hr.), Preparation of WCD and TACO (1 hr)

4-Delta Page 4 of 7 DC005H TACO #2.xlsx

FDEP COST ESTI MATE

Date: 11/3/2020

Task #: HW554-DC005H TACO #1 SubTask 1 Project Management

Site: Best Care Cleaners SubTask 2 2-Annual Groundwater Sampling

Activity/Phase: Biennial Sampling SubTask 3 3-SVE Vapor Testing

Project Manager: Eric Kramer SubTask 4 4-WCD#1

SubTask 5

TTotals 1 2 3 4 5 6 Labor Rate Category

$61.78 CClient Program Manager 1E. Kramer 6 5.9 $61.78 Engineer/Scientist 5 E. Kramer 4 2 2 0 0 0 $59.42 Engineer/Scientist 5 G. Roberts 21 17 4 0 0 0 $25.29 Engineer/Scientist 1 K. McDonald 23 0 23 0 0 0 $25.03 Engineering Technician 2 J. Bell 13 13 0 0 0 0 $19.41 Engineering Technician 1 D. Mconnaugh 20 0 20 0 0 0 $31.07 Designer 2 S. Ferianc 2 2 0 0 0 0 $24.55 Tech Publications SpecialisH. Vining 3 3 0 0 0 0

0 0 0 0 0 0 TTotal Hours 92 6 37 49 0 0 0

Direct Labor $3,291.74 $365.75 $1,594.88 $1,331.11 $0.00 $0.00 $0.00

Fringe 119.00% $3,917.17 $435.24 $1,897.91 $1,584.02 $0.00 $0.00 $0.00 Overhead 20.90% $687.97 $76.44 $333.33 $278.20 $0.00 $0.00 $0.00 Gen & Admin 32.60% $1,073.10 $119.23 $519.93 $433.94 $0.00 $0.00 $0.00

Total Labor $8,969.98 $996.66 $4,346.05 $3,627.27 $0.00 $0.00 $0.00

Other Direct Costs $164.59 $18.29 $79.74 $66.56 $0.00 $0.00 $0.00

Travel Vehicle Rental $291.00 $97.00 $194.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $420.00 $0.00 $420.00 $0.00 $0.00 $0.00 Total Travel $711.00 $97.00 $614.00 $0.00 $0.00 $0.00 (Equipment Procurement)

Subcontractor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 (Services Procurement)

Subcontractor Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,396.00 $396.00 $1,000.00 $0.00 $0.00 $0.00

Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $104.00 $0.00 $104.00 $0.00 $0.00 $0.00 Total Laboratory $1,500.00 $396.00 $1,104.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Expendables $97.50 $32.50 $65.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,073.95 $266.75 $807.20 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,171.45 $299.25 $872.20 $0.00 $0.00 $0.00

$12,517.02 $1,014.95 $5,218.04 $6,284.03 $0.00 $0.00 $0.00 Subtotal $897.01 $99.67 $434.61 $362.73 $0.00 $0.00 $0.00 Completion Fee

Total Estimated Cost $13,414.03 $1,114.62 $5,652.65 $6,646.76 $0.00 $0.00 $0.00

Cost Estimate Page 5 of 7 DC005H TACO #2.xlsx

SUBTASK:

DATE: November 03, 2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 1 K. McDonald

Engineering Technician 2 J. Bell

Engineering Technician 1 D. Mconnaughey Designer 2 S. Ferianc 2 Tech Publications Specialist 3 H. Vining 3

TOTAL LABOR 37

EQUIPMENT ITEM RATE UNIT USAGE

Expendables $32.50 Day 1 $32.50 Shallow GW Sampling Kit $208.55 day 1 $208.55 Deep Groundwater Sampling Kit $349.20 Day 0 $0.00 Water Level Indicator $19.40 Day 0 $0.00 Well Cap, 2" $10.20 each 0 $0.00 Well Locks $3.40 each 0 $0.00 HDPE Tubing $0.25 foot 0 $0.00 55-gallon Drum $58.20 each 1 $58.20

TOTAL EQUIPMENT: $299.25

VEHICLE TYPE RATE UNIT USAGE

Automobile $68.00 Day 0 $0.00 Van or Truck $97.00 Day 1 $97.00

TOTAL VEHICLE: $97.00

PER DIEM STAFF RATE UNIT USAGE

Hotel $70.00 Day 0 $0.00 Day One leave before 06:00 AM $36.00 Day 0 $0.00 Day One Leave Between 6:00 - Noon $30.00 Day 0 $0.00 Day One leave before 6:00 PM $19.00 Day 0 $0.00 Day $36.00 Day 0 $0.00 Return Day $80.00 Day 0 $0.00

TOTAL PER DIEM: $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method 8260 (Halos Only) $66.00 5 1 $396.00 EPA Method 8260 (Volatiles) $135.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 0 $0.00

TOTAL LAB: $396.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USAGE TOTALS

Misc. Supplies Home Depot/Lowes/Equivilent $50.00 Lump 0 $0.00 Erwin Remediation IDW Transporation and Disposal $100.00 Drum 0 $0.00

TOTAL SUB: $0.00

Report Document Production Proposed Monitoring Wells MW006, MW008, MW009, MW014 and MW015.

Drafting GW Flow and Analytical Results Maps

Travel Preparation and Mobilization (1 hr), Round trip travel to site (2 hrs). Collect Depth to Groundwater Measurements from all wells (2 hrs). Sample four monitoring wells MW006, MW008, MW009, MW014 and MW015 (5 hrs). Purgewater Handling (1 hr), Prepare chain of custody preparation, sample packaging (1 hr), sample delivery (1 hr).

2-Annual Groundwater Sampling

Technical Review of Annual Report, Update Recommendations (2 hrs)

Preparation of GW Flow Maps and GW Analytical Results Maps (2 hrs). Update of GW Elevation, Analytical Summary Tables (2 hrs), Letter Report Text and Preparation of Recommendations and conclusions (9 hrs). Preparation of IDW manifest and profile (1 hr), CD/Database Tables Update and Upload, ADaPT Laboratory Data Check (2 hrs). Preparation of Deliverable for Invoicing (1 hr).

2-GW Sampling Page 6 of 7 DC005H TACO #2.xlsx

SUBTASK:

DATE: November 03, 2020

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 2 Engineer/Scientist 5 G. Roberts 4

Engineer/Scientist 1 K. McDonald

Engineering Technician 2 J. Bell

Engineering Technician 1 D. Mconnaughey

Designer 2 S. Ferianc Tech Publications Specialist 3 H. Vining

TOTAL LABOR 49

EQUIPMENT ITEM RATE UNIT USEAGE

Expendables $32.50 Day 2 $65.00 Soil Sampling Kit (concrete) $208.55 Day 0 $0.00 Soil Vapor Sampling Kit $213.40 Day 2 $426.80 Air Flow Meter $17.50 Day 2 $35.00 Regenerative Blower $92.15 Day 2 $184.30 Portable Generator (5 KW) $66.00 Day 2 $132.00 Encore Sampler $8.75 Each 0 $0.00 Tedlar Bags $14.55 bag 2 $29.10 55 Gallon Drums $58.20 each 0 $0.00

TOTAL EQUIPMENT: $872.20

VEHICLE TYPE RATE UNIT USEAGE

Automobile $68.00 Day 0 $0.00 Truck $97.00 Day 2 $194.00 Truck $420.00 Week 0 $0.00

TOTAL VEHICLE: $194.00

PER DIEM STAFF RATE UNIT USEAGE

Hotel $100.00 Day 2 $200.00 Day One leave before 12:00 (Noon) $30.00 Day 2 $60.00 Whole days $36.00 Day 0 $0.00 Return Day $80.00 Day 2 $160.00

TOTAL PER DIEM: $420.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

EPA Method TO-15 (VOC Soil Vapor) $200.00 5 0 $1,000.00 EPA Method 8260 (VOHs) Soil $66.00 0 0 $0.00 Sample Shipping (Small cooler) $63.00 0 $0.00 Sample Shipping (large cooler) $104.00 1 $104.00

TOTAL LAB: $1,104.00

SUBCONTRACTOR COSTS

NAME PURPOSE Rate UNIT USEAGE TOTALS HomeDepot/Lowes Concrete $5.86 Bag 0 $0.00 Drilling Supplies/Atlantic MAGS Well Supplies (Casing, Screen, Sand) $334.05 LS 0 $0.00

TOTAL SUB: $0.00

Mobilization and Travel round trip (8 hrs), Locate, Open and adapt wells for connection to system (2 hrs), Perform Active Gas Tests at 5 locations, Collect 5 Vapor Samples, Site Restoration (8 hrs), Chain of custody preparation, Sample Packaging, Sample Drop-off for Delivery (2 hrs). Upload data and Calculate ROI, Preparation of Active Gas Results Maps, Data Tables (3 hrs).

3-SVE Vapor Testing

Review Active Gas Sample Results, Preparation of Recommentations for Report (2 hrs) Incorporation of Active Gas Sampling data and Text, Tables and Maps into Groundwater Report (4 hrs)

Note: Air Analysis by TO-15, Soil Analysis by EPA Method 8260 (VOCs)

Mobilization and Travel round trip (8 hrs), Locate, Open and adapt wells for connection to system (2 hrs), Perform Active Gas Tests at 5 locations, Collect 5 Vapor Samples, Site Restoration (8 hrs), Chain of custody preparation, Sample Packaging, Drop-off for Delivery (2 hrs).

3-SVE Vapor Testing Page 7 of 7 DC005H TACO #2.xlsx

DEP CONTRACT NO.

Task Assignment #: Change Order No.:

Contractor Name:

Contractor Representative:

DEP Contract Manager: Phone #:

Site Name:

Site ID / Facility ID::

Description of Change [use additional pages if necessary]:

The Deliverable and Invoice Schedule is attached.

Final Deliverable:

TASK ASSIGNMENT TYPE AND NOT TO EXCEED AMOUNTS:

Cost Reimbursement Fixed Fee

Original Task Amount

Task Amount Prior to this Change Order Net Increase/decrease in task amount Task amount with all change orders $0.00 $0.00 $0.00 $0.00

Original Task Completion Date:

Completion Date Prior to this Change:

Net Increase/Decrease in Task Period:

Completion Date with all Change Orders:

DEP Task Manager:

DEP Contract Manager:

Contractual Authority:

Contractor Representative:

CC: Procurement Section (MS 93) Section Representative ________

FIXED PRICE

TASK ASSIGNMENT NOTIFICATION CHANGE ORDER FORM

ITEM

$0.00

$0.00

DEP will review the deliverables to verify that they meet the specifications of this contract and task description. DEP’s Contract Manager shall notify the Contractor of any deficiencies in the deliverable(s) and shall give the Contractor reasonable opportunity to correct noted deficiencies and provide a revised deliverable(s).

Final Deliverable Due Date:

$0.00

$0.00

CHANGE IN TASK TIME

FEE SCHEDULE

COST PLUS FIXED FEE

TOTAL

WCP TAFORM 01_18

HW554

1DC005H

APTIM

Eric Kramer, P.E.

850.245.8941Miranda McClure (acting) Best Care Cleaners

ERIC_4474

This Change Order is for the reduction of costs associated with Transport & Disposal of the IDW drum. The drum was stolen from the site. The police report has been added as a final deliverable.

Police Report for stolen drum 11/30/2020

$ 13,524.03 $ 0.00 $ 0.00 $ 0.00

$ 13,524.03 $ 0.00 $ 0.00 $ 0.00 $ 13,524.03

($ 110.00) $ 0.00 $ 0.00 $ 0.00 ($ 110.00)

$ 13,414.03

11/27/2020

11/27/2020

5 weeks

01/01/2021

Miranda McClure Digitally signed by Miranda McClure Date: 2020.11.25 11:17:35 -05'00'

Miranda McClure Digitally signed by Miranda McClure Date: 2020.11.25 11:17:49 -05'00'

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2020.11.25 15:40:12 -05'00'

Kramer, Eric K Digitally signed by Kramer, Eric K Date: 2020.11.25 15:46:58 -05'00'

$ 13,414.03 $ 0.00 $ 0.00 $ 0.00

$ 13,524.03

Proposed Scope of Work Best Care Cleaners (Brickell Bay Cleaners) Groundwater and Vapor Sampling Task Assignment DC005H TACO #2 ERIC_4474 (Former FAC ID No. 139601743) APTIM Environmental & Infrastructure, Inc., 12/21/20

The Scope of Work forDC005H Task Assignment Change Order (TACO) #2 was prepared to resolve WCD #1 and reconcile the Task Assignment.

Subtask 2 – Annual Groundwater Sampling: No changes required.

Subtask 3 – SVE Vapor Testing: No changes required.

Subtask 4 – WCD #1:

Work Change Directive (WCD) #1 was approved to allow for a technician to travel to the site, as requested by the City of Miami Police Department to file a report for the missing IDW drum, which was taken from the site prior to pickup. WCD was approved for $1,500 and is being resolved for a total of $982.19.

The current Task Assignment Completion date is January 1, 2021. To allow for TACO processing, obtaining a copy of the Miami Police Department Report for deliverable and approval and invoicing of the TA, please allow for a 45-day extension to February 15, 2021 for final task completion.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, Inc.

and Florida Department of Environmental Protection No. HW554. APTIM will begin the proposed scope of work upon written authorization.

Please call should you have any questions.