This document is a Task Assignment Notification Change Order Form for DEP Contract No. HW552, issued by the Florida Department of Environmental Protection. The contract involves Professional Service Industries, Inc. as the contractor, with Mr. Chris Cummins serving as the contractor representative and Mr. David S. Meyers as the DEP Contract Manager. The work is being performed at the Collier-Hogan Study site (Site ID 714-1) located in Florida.

Change Order No. 1 authorizes the removal and replacement of an old and corroded 4-inch upper gate valve on the Collier Hogan deep well, with photodocumentation and a brief writeup of the field visit. The original task amount was $46,887.27, and this change order increases the total by $2,659.20 for equipment repair activities, resulting in a revised task amount of $49,546.47. The deliverables include tank rental invoices and weight tickets for purge water disposal totaling $46,887.27, and photodocumentation with field log and brief writeup of the visit totaling $2,659.20. All deliverables and final completion are due by June 28, 2019. The cost increase reflects labor for research and equipment ordering, travel, and gate valve repair services procured from John Ellsworth Co. at $185.70, with associated overhead and completion fees applied according to the contract's cost-plus-fixed-fee structure.

View the file

Other files

File Type Posted
CN-370000-HW555-A1.pdf PDF
CN-370000-HW555-A3.pdf PDF
CN-370000-HW555-A4.pdf PDF
CN-370000-HW555-A7.pdf PDF
CN-370000-HW555-C23BCO1.pdf PDF
CN-370000-HW555-DC007I.pdf PDF
CN-370000-HW555-DC007K.pdf PDF
CN-370000-HW555-DC013I.pdf PDF
CN-370000-HW555-DC015J.pdf PDF
CN-370000-HW555-DC017M.pdf PDF
CN-370000-HW555-DC017R.pdf PDF
CN-370000-HW555-DC017S.pdf PDF
CN-370000-HW555-DC01ACO1.pdf PDF
CN-370000-HW555-DC01ACO2.pdf PDF
CN-370000-HW555-DC01ACO9.pdf PDF
CN-370000-HW555-DC01E.pdf PDF
CN-370000-HW555-DC01K.pdf PDF
CN-370000-HW555-DC020F.pdf PDF
CN-370000-HW555-DC021H.pdf PDF
CN-370000-HW555-DC023G.pdf PDF
CN-370000-HW555-DC023K.pdf PDF
CN-370000-HW555-DC024o.pdf PDF
CN-370000-HW555-DC02BCO3.pdf PDF
CN-370000-HW555-DC02F.pdf PDF
CN-370000-HW555-DC02FCO1.pdf PDF
CN-370000-HW555-DC02GCO1.pdf PDF
CN-370000-HW555-DC031M.pdf PDF
CN-370000-HW555-DC033F.pdf PDF
CN-370000-HW555-DC034J.pdf PDF
CN-370000-HW555-DC035E.pdf PDF
CN-370000-HW555-DC045A.pdf PDF
CN-370000-HW555-DC046C.pdf PDF
CN-370000-HW555-DC04A.pdf PDF
CN-370000-HW555-DC04B.pdf PDF
CN-370000-HW555-DC04DCO1.pdf PDF
CN-370000-HW555-DC04E.pdf PDF
CN-370000-HW555-DC04FCO1.pdf PDF
CN-370000-HW555-DC04H.pdf PDF
CN-370000-HW555-DC050A.pdf PDF
CN-370000-HW555-DC052A.pdf PDF
CN-370000-HW555-DC053A.pdf PDF
CN-370000-HW555-DC05B.pdf PDF
CN-370000-HW555-DC065B.pdf PDF
CN-370000-HW555-DC065C.pdf PDF
CN-370000-HW555-DC066B.pdf PDF
CN-370000-HW555-DC069B.pdf PDF
CN-370000-HW555-DC06C.pdf PDF
CN-370000-HW555-DC06D.pdf PDF
CN-370000-HW555-DC06E.pdf PDF
CN-370000-HW555-DC06F.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, Florida 32399-2400

Rick Scott Governor

Carlos Lopez-Cantera

Lt. Governor

Noah Valenstein Secretary

Memorandum

TO: Site #714-1 Collier Hogan Site File FROM: David Meyers, Contract Manager SUBJECT: Negotiation Summary, HW552, SIS-011S1 DATE: September 28, 2018

Intertek-PSI will remove old and corroded 4 " upper gate valve and replace valve on Collier Hogan deep well. Photodocument and provide brief writeup of field visit. This work will increase Task Amount.

Intertek-PSIs’ cost and labor for these activities have been reviewed and are appropriate. The level-of-effort and cost increase of $2,659.20 is reasonable for the scope of services.

FDEP COST ESTIMATEContractor: Professional Service Industries, Inc.

Date: 6/5/2018

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 6 5.9 $62.50 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $50.25 Senior Engineer 0 0 0 0 0 0 0 0 0 0 $48.08 Senior Geologist 37 13 8 8 8 0 0 0 0 0 $45.20 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $50.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0 0 0 0 0 0 0 0 0 $31.73 Project Engineer 0 0 0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 0 0 0 0 0 0 0 0 0 0 $26.93 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0 0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0 0 0 0 0 0 0 0 0 $0.00 Professional Land Surveyor 0 0 0 0 0 0 0 0 0 0 $0.00 Chemist 0 0 0 0 0 0 0 0 0 0

$24.50 GIS Specialist, DG 0 0 0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $24.04 Staff Geologist 0 0 0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 0 0 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 0 0 0 0 0 0 0 0 0 0 $21.16 Staff Scientist, EL 0 0 0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0 0 0 0 0 0 0 0 0 $18.75 Administrative Assistant 26 8 6 6 6 0 0 0 0 0 $15.50 Secretary 0 0 0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0 0 0 0 0 0 0 0 0 $12.00 Laborer 0 0 0 0 0 0 0 0 0 0

Total Hours 69 6 21 14 14 14 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $2,549.77 $283.31 $775.04 $497.14 $497.14 $497.14 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $4,359.09 $484.35 $1,325.01 $849.91 $849.91 $849.91 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $6,908.86 $767.66 $2,100.05 $1,347.05 $1,347.05 $1,347.05 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $127.50 $14.17 $38.75 $24.86 $24.86 $24.86 $0.00 $0.00 $0.00 $0.00 $0.00

1 of 21 0552-246666-CO-1 FDEP Site 714-1]

Task #: SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Frac Tank $18,600.00 $4,500.00 $4,500.00 $4,500.00 $5,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Purge Water Transport $16,000.00 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Porta Potty $1,000.00 250.00$ 250.00$ 250.00$ 250.00$ $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $35,600.00 $8,750.00 $8,750.00 $8,750.00 $9,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $3,560.00 $875.00 $875.00 $875.00 $935.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $39,160.00 $9,625.00 $9,625.00 $9,625.00 $10,285.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $46,196.36 $781.83 $11,763.80 $10,996.91 $10,996.91 $11,656.91 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $690.91 $76.77 $210.01 $134.71 $134.71 $134.71 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $46,887.27 $858.60 $11,973.81 $11,131.62 $11,131.62 $11,791.62 $0.00 $0.00 $0.00 $0.00 $0.00

2 of 21 0552-246666-CO-1 FDEP Site 714-1]

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty

DATE: 6/5/2018

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist Arrange for equipment delivery, pick-up, develop cost estimate 5 Submit deliverable 2 Monthly processing, 2 hours per month (6 hours per quarter) 6

Administrative Assistant Document set-up 2 Monthly processing, 2 hours per month 6

TOTAL LABOR 21

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

TOTAL EQUIPMENT $0.00

VEHICLE TYPE RATE UNIT USEAGE

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

1 $4,500.00 $4,500.00 quarterly rental

SWS Environmental Services 1 $4,000.00 4,000.00$

RonsJons porta potty rental 1 $250.00 250.00$

TOTAL $8,750.00

Baker Corporation 21,000 gallon Frac tank purge water transport to POTW

Page 7 0552-246666-CO-1 FDEP Site 714-1

Task #: TA SIS-011 S SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 2 1.7 $62.50 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $50.25 Senior Engineer 0 0 0 0 0 0 0 0 0 0 $48.08 Senior Geologist 0 0 0 0 0 0 0 0 0 0 $45.20 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $50.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0 0 0 0 0 0 0 0 0 $31.73 Project Engineer 0 0 0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 0 0 0 0 0 0 0 0 0 0 $26.93 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0 0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0 0 0 0 0 0 0 0 0 $0.00 Professional Land Surveyor 0 0 0 0 0 0 0 0 0 0 $0.00 Chemist 0 0 0 0 0 0 0 0 0 0

$24.50 GIS Specialist, DG 0 0 0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $24.04 Staff Geologist 0 0 0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 16 16 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 0 0 0 0 0 0 0 0 0 0 $20.57 Staff Scientist, AH 13 13 0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0 0 0 0 0 0 0 0 0 $18.75 Administrative Assistant 0 0 0 0 0 0 0 0 0 0 $15.50 Secretary 0 0 0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0 0 0 0 0 0 0 0 0 $12.00 Laborer 0 0 0 0 0 0 0 0 0 0

Total Hours 31 2 29 0 0 0 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $746.52 $82.95 $663.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $1,276.25 $141.81 $1,134.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $2,022.77 $224.76 $1,798.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $37.33 $4.15 $33.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

8 of 21 0552-246666-CO-1 FDEP Site 714-1]

Task #: TA SIS-011 S SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) John Ellsworth Co. $185.70 $185.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $185.70 $185.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $18.57 $18.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $204.27 $204.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Frac Tank $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Purge Water Transport $0.00 -$ -$ -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00 Porta Potty $0.00 -$ -$ -$ -$ $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $63.05 $63.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $95.55 $95.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $2,456.92 $228.91 $2,228.01 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $202.28 $22.48 $179.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $2,659.20 $251.39 $2,407.81 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

9 of 21 0552-246666-CO-1 FDEP Site 714-1]

SUBTASK 2: Tank Rental, Purge Water, Porta-Potty

DATE: 6/5/2018

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist Arrange for equipment delivery, pick-up, develop cost estimate 0 Submit deliverable 0 Monthly processing, 2 hours per month (6 hours per quarter) 0

Administrative Assistant Document set-up 0 Monthly processing, 2 hours per month 0

Additional time for equipment repair

Staff Scientist, R Hanson Research and Order additional equipment 3 roundtrip travel 8 repair gate valve 5

Staff Scientist, A Hall roundtrip travel 8 repair gate valve 5

TOTAL LABOR 29

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction supplies $63.05 day 1 $63.05 Expendables $32.50 day 1 $32.50

TOTAL EQUIPMENT $95.55

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

EQUIPMENT PROCUREMENT

Gate valve repair existinggate valve 1 185.70$ $185.70 John Ellsworth Co.

TOTAL $185.70

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

0 $4,500.00 $0.00 quarterly rental

SWS Environmental Services 0 $4,000.00 -$

RonsJons porta potty rental 0 $250.00 -$

TOTAL $0.00

Baker Corporation 21,000 gallon Frac tank

Page 14 0552-246666-CO-1 FDEP Site 714-1

Task #: TA SIS-011 S-CO-1 SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

Professional Service Industries, Inc.

$48.08 Project Manager 8 7.6 $62.50 Principal Consultant 0 0 0 0 0 0 0 0 0 0 $50.25 Senior Engineer 0 0 0 0 0 0 0 0 0 0 $48.08 Senior Geologist 37 13 8 8 8 0 0 0 0 0 $45.20 Senior Scientist 0 0 0 0 0 0 0 0 0 0 $34.62 Certified Industrial Hygientist 0 0 0 0 0 0 0 0 0 0 $50.00 Certified Hazardous Materials Manager 0 0 0 0 0 0 0 0 0 0 $50.00 Florida Licensed Asbestos Consultant 0 0 0 0 0 0 0 0 0 0 $48.08 Project Manager 0 0 0 0 0 0 0 0 0 0 $31.73 Project Engineer 0 0 0 0 0 0 0 0 0 0 $32.94 Project Geologist, CC 0 0 0 0 0 0 0 0 0 0 $26.93 Project Scientist, SB 0 0 0 0 0 0 0 0 0 0 $29.81 QA Officer 0 0 0 0 0 0 0 0 0 0 $32.21 Remediation Coordinator 0 0 0 0 0 0 0 0 0 0 $0.00 Professional Land Surveyor 0 0 0 0 0 0 0 0 0 0 $0.00 Chemist 0 0 0 0 0 0 0 0 0 0

$24.50 GIS Specialist, DG 0 0 0 0 0 0 0 0 0 0 $25.00 Staff Engineer 0 0 0 0 0 0 0 0 0 0 $24.04 Staff Geologist 0 0 0 0 0 0 0 0 0 0 $24.76 Staff Scientist, RH 16 16 0 0 0 0 0 0 0 0 $24.04 Staff Scientist, RF 0 0 0 0 0 0 0 0 0 0 $20.57 Staff Scientist, AH 13 13 0 0 0 0 0 0 0 0 $18.30 Environmental Technician 0 0 0 0 0 0 0 0 0 0 $18.75 Administrative Assistant 26 8 6 6 6 0 0 0 0 0 $15.50 Secretary 0 0 0 0 0 0 0 0 0 0 $15.00 Senior Laborer 0 0 0 0 0 0 0 0 0 0 $12.00 Laborer 0 0 0 0 0 0 0 0 0 0

Total Hours 100 8 50 14 14 14 0 0 0 0 0

Professional Service Industries, Inc.

Direct Labor $3,296.28 $366.25 $1,438.61 $497.14 $497.14 $497.14 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 170.96% $5,635.32 $626.14 $2,459.45 $849.91 $849.91 $849.91 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Labor $8,931.60 $992.39 $3,898.06 $1,347.05 $1,347.05 $1,347.05 $0.00 $0.00 $0.00 $0.00 $0.00

Other Direct Costs $164.82 $18.31 $71.93 $24.86 $24.86 $24.86 $0.00 $0.00 $0.00 $0.00 $0.00

15 of 21 0552-246666-CO-1 FDEP Site 714-1]

Task #: TA SIS-011 S-CO-1 SUBTASK 1: Project Management SUBTASK 6:

Site: Collier Hogan, 714-1 SUBTASK 2: Tank Rental, Purge Water, Porta-Potty SUBTASK 7:

Activity/Phase: Support Services SUBTASK 3: Tank Rental, Purge Water, Porta-Potty SUBTASK 8:

Project Manager: Nana Westmark SUBTASK 4: Tank Rental, Purge Water, Porta-Potty SUBTASK 9:

SUBTASK 5: Tank Rental, Purge Water, Porta-Potty SUBTASK 10:

Totals 1 2 3 4 5 6 7 8 9 10 Travel

Vehicle Rental $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $97.00 $97.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) John Ellsworth Co. $185.70 $185.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $185.70 $185.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $18.57 $18.57 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $204.27 $204.27 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Frac Tank $18,600.00 $4,500.00 $4,500.00 $4,500.00 $5,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 Purge Water Transport $16,000.00 4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ $0.00 $0.00 $0.00 $0.00 $0.00 Porta Potty $1,000.00 250.00$ 250.00$ 250.00$ 250.00$ $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Subcontractor Subtotal $35,600.00 $8,750.00 $8,750.00 $8,750.00 $9,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $3,560.00 $875.00 $875.00 $875.00 $935.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $39,160.00 $9,625.00 $9,625.00 $9,625.00 $10,285.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $32.50 $32.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $63.05 $63.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $95.55 $95.55 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $48,653.24 $1,010.70 $13,991.81 $10,996.91 $10,996.91 $11,656.91 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $893.18 $99.24 $389.81 $134.71 $134.71 $134.71 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $49,546.42 $1,109.94 $14,381.62 $11,131.62 $11,131.62 $11,791.62 $0.00 $0.00 $0.00 $0.00 $0.00

16 of 21 0552-246666-CO-1 FDEP Site 714-1]

SUBTASK 2: Tank Rental, Purge Water, Porta-Potty

DATE: 6/5/2018

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Field Activities

Senior Geologist Arrange for equipment delivery, pick-up, develop cost estimate 5 Submit deliverable 2 Monthly processing, 2 hours per month (6 hours per quarter) 6

Administrative Assistant Document set-up 2 Monthly processing, 2 hours per month 6

Additional time for equipment repair

Staff Scientist, R Hanson Research and Order additional equipment 3 roundtrip travel 8 repair gate valve 5

Staff Scientist, A Hall roundtrip travel 8 repair gate valve 5

TOTAL LABOR 50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Construction supplies $63.05 day 1 $63.05 Expendables $32.50 day 1 $32.50

TOTAL EQUIPMENT $95.55

VEHICLE TYPE RATE UNIT USEAGE

Equipment Van / Truck $97.00 day 1 $97.00

TOTAL VEHICLE $97.00

PER DIEM STAFF RATE UNIT USEAGE

TOTAL PER DIEM $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC IDW

TOTAL LAB $0.00

EQUIPMENT PROCUREMENT

Gate valve repair existinggate valve 1 185.7 $185.70 John Ellsworth Co.

TOTAL $185.70

SUBCONTRACTOR COSTS

NAME PURPOSE UNIT COST

1 $4,500.00 $4,500.00 quarterly rental

SWS Environmental Services 1 $4,000.00 4,000.00$

RonsJons porta potty rental 1 $250.00 250.00$

TOTAL $8,750.00

Baker Corporation 21,000 gallon Frac tank

Page 21 0552-246666-CO-1 FDEP Site 714-1