Document Summary

This is a Task Assignment Change Order Form issued by the Florida Department of Environmental Protection (FDEP) for Contract CN217 with JGP Structural Group, Inc. The document authorizes Change Order No. 1 for Project No. 40743, the Assistant Keeper's House Repairs project at Gasparilla Island State Park. The contract is managed by FDEP's Bureau of Design and Construction, with Jeffrey G. Parzych as the consultant representative and Jack Brady serving as the FDEP Contract Manager.

The change order authorizes Subtask 4, which requires JGP Structural Group, Inc. to provide shoring design documents for the removal and replacement of perimeter beams and associated structural members at the Assistant Keeper's House. The deliverables consist of three formatted 24"x36" design sheets (Note Sheet, Plan Sheet, and Detail Sheet) signed and sealed by a licensed engineer, submitted in both PDF and AutoCAD formats. The fixed price cost for this subtask is $3,000.00, comprised of Principal Engineer hours ($640.00), Project Engineer hours ($1,520.00), and CADD Designer/Technician hours ($840.00), with no reimbursable costs. The net increase to the task amount is $3,000.00, bringing the total task amount including all previous change orders to $13,643.55. Payment will be made upon FDEP approval of the deliverables. The original task end date of December 1, 2020 remains unchanged.

View the file

Other files

File Type Posted
CN-370000-CN217-A1.pdf PDF
CN-370000-CN217-T10CO1.pdf PDF
CN-370000-CN217-T12.pdf PDF
CN-370000-CN217-T16CO4.pdf PDF
CN-370000-CN217-T18.pdf PDF
CN-370000-CN217-T18CO4.pdf PDF
CN-370000-CN217-T2.pdf PDF
CN-370000-CN217-T20.pdf PDF
CN-370000-CN217-T20CO1.pdf PDF
CN-370000-CN217-T21.pdf PDF
CN-370000-CN217-T21CO1.pdf PDF
CN-370000-CN217-T22CO1.pdf PDF
CN-370000-CN217-T34CO2.pdf PDF
CN-370000-CN217-T36.pdf PDF
CN-370000-CN217-T37.pdf PDF
CN-370000-CN217-T38.pdf PDF
CN-370000-CN217-T4.pdf PDF
CN-370000-CN217-T45.pdf PDF
CN-370000-CN217-T48.pdf PDF
CN-370000-CN217-T49CO1.pdf PDF
CN-370000-CN217-T51.pdf PDF
CN-370000-CN217-T54.pdf PDF
CN-370000-CN217-T57.pdf PDF
CN-370000-CN217-T61.pdf PDF
CN-370000-CN217-T67.pdf PDF
CN-370000-CN217-T68.pdf PDF
CN-370000-CN217-T75.pdf PDF
CN-370000-CN217-T78.pdf PDF
CN-370000-CN217-T7CO3.pdf PDF
CN-370000-CN217-T8.pdf PDF
CN-370000-CN217-T9.pdf PDF
CN-370000-CN217-TA25CO1.pdf PDF
CN-370000-CN217-TA27.pdf PDF
CN-370000-CN217-TA28.pdf PDF
CN-370000-CN210-TA7.pdf PDF
CN-370000-CN217-CMC1.pdf PDF
CN-370000-CN217-CMC4.pdf PDF
CN-370000-CN217-T15.pdf PDF
CN-370000-CN217-T18CO2.pdf PDF
CN-370000-CN217-T18CO3.pdf PDF
CN-370000-CN217-T18CO6.pdf PDF
CN-370000-CN217-T1CO2.pdf PDF
CN-370000-CN217-T29CO1.pdf PDF
CN-370000-CN217-T3.pdf PDF
CN-370000-CN217-T32.pdf PDF
CN-370000-CN217-T33.pdf PDF
CN-370000-CN217-T34CO3.pdf PDF
CN-370000-CN217-T34CO4.pdf PDF
CN-370000-CN217-T35.pdf PDF
CN-370000-CN217-T39CO1.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gasparilla Island State Park

Repair/Renovate Assistant Keeper's House

Shoring Design Documents

CN217, TA #13 CO1

Subtask 4: Shoring Design and documents

Description: JGP Structural Group, Inc. will provide the following:

• The Shoring Design Documents (Shoring Plans) shall be formatted to the BOC 24"x36" standard and include the standard BOC border. Each individual sheet shall be clearly labeled and dated.

• This design will be utilized to allow removal and replacement of the perimeter beams and associated members. Portions of the roof system, due to the original design, will require temporary shoring.

• The work will be performed with the degree of skill and the standard of care common to the profession. No warranty is expressed or implied by this agreement.

• Engineering design, analysis and code verification of elements outside of the scope of work described above is not included.

• It is assumed the existing foundation supports and building are structurally sound and adequate to support the elevated deck loads.

• It is assumed the soil conditions are adequate to support the loads imposed by the shoring posts.

• The Shoring Design Documents shall be submitted to the BOC project manager via electronic file transfer in PDF and AutoCad format.

• Additional shoring and or modification of the shoring original concepts could become necessary.

Due to these possibilities additional services may be required.

Deliverable: Shoring Design Documents will be provided to BDC for review. These documents will be provided to the contractor based on their schedule.

• JGP will provide Final Design Documents - It is anticipated that (3) 24x36 drawing sheets will be necessary (Note Sht, Plan Sht, Detail Sht), signed & sealed

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Firm Name Position Classification Hourly Rate Hours TotalFixed Price Cost

JGP Structural Group, Inc. Principal Engineer $160.00 4 $640.00 Project Engineer $95.00 16 $1,520.00 CADD Des/Tech $60.00 14 $840.00

Reimbursable Cost:

I ��i:bursable Total Cost

Total for Subtask 4: $3,000.00

Proiect Schedule:

A;ctiVity

Subtask 4: Shoring Plans

Summarv of Fees:

Subtask

Subtask 4: Shoring Plans

Total Fixed Price Cost:

Overall Total Cost:

Duration (CalendarOays)

Based on Contractor's Schedule

Subtask Fixed Price Cost f Subtask Reimbursable

$3,000.00 I - $3,000.00

$3,000.00

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.