About this file

The document is a presentation for Colorado Mesa University's (CMU) Request for Qualifications (RFQ) for a Campus Energy Infrastructure project, involving the university's procurement team and potential consultant partners. The university is seeking developers, architects, and engineers to expand the existing campus heating and cooling geo-exchange system, integrate it into campus facilities, and construct additional interconnected facilities in the planned Formation District. The project will be implemented in phases, with work packages released through Integrated Project Delivery (IPD-DBLS-RFP) method. Key dates include a pre-submittal conference on July 14, 2023, RFQ submissions due by July 31, 2023 at 11:00 am, interviews on August 14, 2023, and anticipated contract approval on August 25, 2023.

The project aims to maximize energy efficiency and financial incentives, with a focus on utilizing tax credits from the Inflation Reduction Act of 2022. The scope includes initial design, construction budgeting, financial modeling, lifecycle planning, and tax credit analysis. Potential projects involve extending the geo-exchange central loop to multiple campus buildings, drilling new well fields, and connecting 17 existing buildings totaling 545,865 square feet to the central system. The university has allocated a Capital Construction Fund amount of $6,000,000 and plans to develop a five-story, 45,000 square foot mixed-use facility with retail on the first floor and housing on the upper floors. Future plans also include potential photovoltaic solar projects both on and off-site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CMU 2767

Colorado Mesa University Campus Energy

Infrastructure

July 14, 2023

Team Introduction

Kent Marsh: VP for Capital Planning, Sustainability, and Campus Operations

Jaime Cox, Capital Projects Manager

Suzanne Ellinwood: Director of Campus Procurement & Risk Management

Donovan Harwell: Purchasing Specialist/Buyer

Meeting Overview

Project Description

Scope of Work

Formation District Concept

CCCRN Energy Independence “Heat Beneath our Feet”

Evaluation Criteria

Submittal Requirements

Schedule of Activities

Please feel free to ask questions throughout the presentation. All questions that require additional clarifications beyond what is provided during today’s meeting shall be submitted in writing.

Project Description

The University intends to engage a consultant partner including:

Developers

Architects & Engineers

Provide design and development services for:

Expansion of existing campus heating & cooling geo-exchange system

Integration of the geo-exchange system into balance of CMU facilities

Construction of additional interconnected facilities in planned mixed-use zone “Formation District”

Scope of Work

Services include:

Initial design

Construction budgeting

Financial modeling

Lifecycle planning

Tax credit analysis

Project Phased approach Work packages released using Integrated Project Delivery

IPD-DBLS-RFP(s)

Formation District – Main Campus

Potential Projects

• Facilities Condition Assessment

• Energy Master Plan

• Extend Geo-Exchange Central Loop to Fine Arts Building

& Grand Mesa Hall

• Extend Geo-Exchange Central Loop to Moss Performing

Arts Center, Lowell Heiny Hall, & connect back into main loop at Wubben Science Building

• Extend Geo-Exchange Central Loop to New Theater, & connect back into main loop north of Bunting Hall

• Extend Central Loop to Walnut Ridge Apartments, Pinon Hall, Tolman Hall, Rait Hall, Albers Hall, CMU

Admissions & Student Housing Offices

• Drill new Geo-Exchange well field on west half of rugby pitch

• Drill new field east of CMU Center for Reflection

• Drill remainder of infield at CMU track complex

• Drill new field in parking lot CP6 (North of CMU

Outdoor Program)

• Drill Parking Lot RH28 and RHR28 (North of Wingate

Hall)

• Connect 17 existing buildings, 545,865 sf under roof, into the central Geo-Exchange loop (replace traditional

HVAC systems with ground source heat pump systems)

• New potential 45,000 sf, five story mixed-use housing facility – first floor retail with 4 floors of housing above in CMU Formation District zone

• Future PV solar projects, both on and off site

CCCRN Energy Independence “Heat Beneath our Feet”

CCCRN Energy Independence “Heat Beneath our Feet”

Evaluation Criteria

Project Team

Firm|Team Capabilities Specific expertise and experience with navigating outside funding opportunities

(direct grants, tax credits, etc.) like those contained in the Inflation Reduction Act of

2022.

Prior Experience|Performance Demonstrated financial guarantees for tax credits and energy savings

Provide example(s) of similar higher education campus development(s) including providing campus housing and facilities to generate ancillary revenues and support the University’s key objectives.

Provide example(s) of designing, financing, installing, and guaranteeing performance for renewable energy facilities.

Evaluation Criteria

Project Approach

Maximize and guarantee incentives and tax credit payments.

Improve energy efficiency through the use of an integrated design process, life cycle cost analysis, the use of an energy standard (current energy code) and the specification of energy efficient materials, systems, and equipment.

Explain integration into and consideration for CMU’s academic and fiscal calendars.

Show plan to maximize incentives and tax credits

Work Location

Submittal Requirements

Please respond to each item outlined in the Submittal Requirements section of the RFQ, when submitting your firm’s qualifications.

Submittals will be accepted electronically through BidNet.

Any questions related to the RFQ need to be submitted to:

Donovan Harwell, Purchasing Specialist/Buyer dlharwell@coloradomesa.edu

Schedule of Activities

July 5, 2023 Advertisement

July 14, 2023 1:30 pmPre-submittal Conference

July 17, 2023 11:00 amDate Written Inquiries Due

July 19, 2023 Date Response to Written Inquiries Issued

July 31, 2023 11:00 am RFQ Submittal Due

August 7, 2023 Interview List Released

August 14, 2023 Oral Interviews (as scheduled)

August 14-18, 2023Negotiation of Pro. Consulting Services Contract

August 25, 2023Contract Approval (projected)

August 28, 2023Anticipated A/E professional Services - Start

TBDAnticipated Construction Services – Start - Finish

Questions?