CMS Back on Campus Phase II 75 Percent CD Architectural Report 2 24 2022.pdf
PDF 16 MB Posted
- Attached to
- CMS Back on Campus Phase II Federal contract opportunity
- Solicitation number
- 47PD0221R0072
About this file
This file describes a federal solicitation for construction services. The Centers for Medicare and Medicaid Services is seeking to renovate approximately 40,000 square feet of space across four areas at its campus in Woodlawn, Maryland, including renovations to level 2 of the Central Building, the lower level of the South Building, the lower level of the Central Building, and the main lobby of the Central Building. The scope of work involves consolidating growing office and workstation vacancies and providing upgrades. The applicable NAICS code is 236220 for Commercial and Institutional Building Construction and the small business size standard is $39.5 million. The order of magnitude for the contemplated acquisition is between $10 million and $15 million. Evaluation factors will include project management plan and approach, prior experience on relevant projects, past performance on relevant projects, and price. A bid guarantee and performance/payment bonds will be required. The point of contact is a GSA contracting officer.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CMS BACK TO CAMPUS
PHASE 2: 75% CONSTRUCTION DOCUMENTS
ARCHITECTURAL REPORT
FEBRUARY 24 ,2022
back of cover
PREPARED FOR:
General Service Administration (GSA) Philadelphia, PA
Centers for Medicare and Medicaid Services (CMS) Woodlawn, MD
PREPARED BY:
Architect Krueck + Sexton Architects Chicago, IL
MEP+Telecom
WSP USA
New York City, NY
Life Safety Jensen Hughes Chicago, IL
Structural Thornton Tomasetti Chicago, IL + Washington DC
Cost Toscano Clements Taylor (TCT) New York City, NY
C2 Main entry BOS + TAB G
ARCHITECTURAL REPORT
Table of Contents
I. Introduction
II. Sustainability
III. Code Analysis
IV. Central Level 2 (C2) Office Renovation - Area 1
i. Scope Description
ii. Sequencing
iii. Operations and Maintenance Goals
iv. Vision and Goals
v. Program Requirements
vi. Renderings and Finishes
V. South Lower Level (SLL) Office Renovation - Area 2
i. Scope Description
ii. Sequencing
iii. Operations and Maintenance Goals
iv. Vision and Goals
v. Program Requirements
vi. Renderings and Finishes
VI. Central Lower Level (CLL) Office Space Renovation - Area 3
i. Scope Description
ii. Sequencing
iii. Operations and Maintenance Goals
iv. Vision and Goals
v. Program Requirements
vi. Renderings and Finishes
VII. Central Level 1 (C1) Main Lobby Renovation - Area 4
i. Scope Description
ii. Sequencing
iii. Operations and Maintenance Goals
iv. Vision and Goals
v. Renderings
C E N T R A L L E V E L 2 ( C 2 )
O H C & C C S Q R E N OVAT I O N - A R EA 1
S O U T H LOW E R L E V E L ( S L L )
C M S O S F LO R E N OVAT I O N - A R EA 2
C E N T R A L L E V E L 1 ( C 1 )
M A I N LO B BY R E N OVAT I O N - A R EA 4
C E N T R A L LOW E R L E V E L ( C L L )
U N I O N S PAC E R E N OVAT I O N - A R EA 3
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 1
ARCHITECTURAL
I. INTRODUCTION
The Centers for Medicare and Medicaid Services (CMS) has an on-going Back on Campus initiative in support of the HHS Reduce the Footprint mandate. The goal of the Back on Campus initiative is to close out leased spaces to allow for all CMS staff to work collaboratively on the main campus in Woodlawn, Maryland. Beyond the additional collaboration possibilities, the consolidation also allows for a significant reduction in long-term cost related to leases and operating cost. In support of the Back on Campus initiative a Master Plan was developed for the Woodlawn headquarters. This document was completed in May of 2018. The Master Plan assessed overall campus capacity to support the consolidation. New space standards were studied that allowed for an optimization of the existing office area on campus. The following project entails the first phase of the Back on Campus initiative.
Scope of Work The project consists of four areas on the CMS HQ Campus. Those areas are referenced as Area 1 through Area 4 in the SOW. Areas 1 through 3 function as office spaces and will be renovated to be in concert with the CMS Phase 1 Project office spaces. Renovations will include floor, wall and ceiling finishes, lighting, MEP, fire protection, telecom, and AV systems. Area 1 and Area 2 include the renovation of public restrooms. In addition, Area 1 and Area 3 include the renovation of corridors as an alternate scope of work. Area 4 is the Main Lobby, located in the Central Building on Level 1. Work in Area 4 will be based around a concept developed through a lobby study by MGA. New conceptual development is not required for Area 4. Work will consist of casework, floor patching, electrical, telecom and tss relocations.
Areas of Work Area 1 - Central Building Level 2 (C2) OHC & CCSQ, Rest. Renovation - 22,269SF Area 2 - South Building Lower Level (SLL) CMS OSFLO Renovation - 14,403SF Area 3 - Central Building Lower Level (CLL) Union Space Renovation - 2,108SF Area 4 - Central Building Level 1 (C1) Main Lobby Renovation - 3,138SF
Overall Vision and Goals
• Improve the health and wellness of building occupants
• Modernize office spaces
• Improve main building entry security screening and overall first impression experience
• Modernize and improve the image, experience and process within the badging area
• Modernize and upgrade existing public restrooms and common corridors
• Rearrangement of suite’s tenant layout, position and relocation of various groups to meet adjacencies and security requirements
• Access to daylight
• Improve wayfinding
• Supportive of multiple work modes
• Implement the design principles (such as new stardard modules)
PG. 2
Post-Covid Reality
• Physical distancing + boundaries - provide a less dense environment.
• Visitor protocols - provide transitional spaces (lobbies).
• Sense of Culture - a place that creates sense of community where people can feel a renewed sense of belonging, resilience and purpose. Foster meaningful interactions and signal that change and adaptation are part of the culture and something to be embraced.
• Holistic Comfort - ability to work in a range of postures, change settings and to move throughout the day.
Greater control over the level of privacy and the flexibility to move their work.
• Flexibility - better experience in which the user can easily shift between group and solo work in both physical and digital environment.Embrace multi-use spaces that can support diverse types of activities.
CMS Culture The driving goal of CMS in this project is to support a workforce that is mission driven, flexible for reorganization, works collaboratively at all levels and is increasing telework and desk share programs Post-Covid reality.
The architectural scope of this project completes a series of workplace renovations which allow employees from nearby leased office buildings to move back on campus into a modern workplace and improve the existing workplaces with modernization. The projects will advance the overall goals of the masterplan and provide a significant area to test the new workplace layout and improved amenities, including the modernization of the Campus Lobby.
Per the MGA masterplan, CMS is collaborative across all levels of the agency, because of the many relationships with groups and divisions that work together.
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 3
MEPFP Scope of Work
HVAC:
Design Criteria: The heating, ventilation and air conditioning systems shall comply with the requirements of the P100 all other governing agencies. The HVAC System will be designed to provide superior environmental conditions associated with office buildings.
ELECTRICAL:
The majority of the open office, closed offices, and conference rooms on this level will be demolished and replaced with new program largely matching the profile of the existing. All electrical panel boards are intended to be reused to serve the newly renovated program on this Emergency power is intended to be re-fed from existing panels
LIGHTING:
Areas 1, 2 and 3: New light fixtures in these areas to be added for each of the following spaces, quantities to be determined upon development of reflected ceiling plans.
New light fixtures in this area to be determined upon development of reflected ceiling plans. Lighting shall have various zones of control.
Separate zones to be considered are: Lobby Desk; Lobby Walls; Circulation space; Security screening areas;
Lobby waiting areas. A programmable lighting scene controller shall be provided as well as automatic daylighting controls and time clock control.
FIRE ALARM:
New fire alarm devices(smoke detectors, speakers, strobes will be provided throughout the area of work per new layout and will be connected back to existing terminal cabinets.
PLUMBING:
Restrooms at SLL and C2. Plumbing fixtures in the core bathrooms will be removed and replaced in their existing locations with new.
Wet Pantry. Cold water will be supplied by a connection from the existing core toilet space.New pantry sink, all pantry appliances, and a new ceiling mounted 10-gallon water heater with leak detection.New sanitary and vent lines from the new pantry sink and drinking fountains will tie into the existing stacks in the core bathrooms.
Sanitary piping shall be run at the ceiling of the floor below at a minimum pitch of 1/8” per foot. An alternate price shall be provided for an ejector pump for the pantry sink in the event the sanitary routing is not achievable at the ceiling of the floor below.
FIRE PROTECTION:
The existing sprinkler heads, branch piping, and portions of sprinkler main in the area of work will be relocated as needed. Installation of new sprinkler heads, branch piping, and portions of sprinkler main will be installed to accommodate new architectural design. All existing heads in areas not in contract shall remain as-is.
Refer to Mechanical, Electrical, Lighting, Plumbing, Fire Protection, Life Safety, Telecommunication, Security and Audio Visual Report narrative for in detail description of the scope of work.
PG. 4
II. SUSTAINABILITY
Benchmarking
The scope depth of this renovation does not lend the project the opportunity to meet or exceed GSA’ s listed targets as defined in P100 Section 1.7. However, the GSA does provide guidance for the project type: Space Reconfiguration and Renovation Projects. Given that CMS Back to Campus falls under this category this project will follow the guidance and meet the following criteria. The LEED-based criteria is in bold followed by additional previously discussed project goals that will support both the GSA guidance and LEED for Commercial Interiors standards.
MECHANICAL EQUIPMENT
- No basebuilding HVAC system modifications in this scope. The assumption is that the basebuilding systems are in compliance;
- As an alternate to b.o.d. at all open office to provide separate control zone and controls capable of sensing space conditions and modulating system in response to space demand, for each solar exposure and interior space.
o No basebuilding HVAC system (e.g. motor) modifications in this scope. The assumption is that the basebuilding systems are in compliance.
o Increase thermal comfort in designated zones o Provide occupants control via diffusers o Provide energy star appliances for all newly installed equipment (by others)
ELECTRIC LIGHTING
- Ensure a lighting power density reduction below ASHRAE 90.1-2010 by at least 20%:
o Daylight responsive lighting at the perimeter o Provide task lighting at works stations to introduce occupant control o As an alternate to b.o.d. at all spaces to provide the option of circadian rythm to mimic outdoor conditions o Provide occupancy sensor lighting controls for min. 75% of connected lighting load:
o Introduce vacancy sensors in conference rooms, offices and other fully enclosed spaces o Introduce vacancy sensors in open office areas that will dim light fixtures when unoccupied
DAYLIGHT
Provide daylight responsive controls (switch or dim) in all regularly occupied daylit spaces within 15 feet of windows, for min. 25% of connected lighting load.
o Maintain foot-candle levels at 30-50 on work surfaces o High reflectance of ceilings, walls, and furniture to bounce light deeper into space o Higher level of Tvis for north facing windows o Investigate interior light shelves to drive light deeper into space o Use cubicle partition height no greater than 4’6”
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 5
WELLNESS
• Focus should be on creating thermally and visually comfortable environmental for occupants.
• Introduce sound control via acoustic ceiling tiles, carpet and/or hanging partitions. Carpet to reduce between 12dB and 30 dB and, as an alternate to provide at transitional or move social areas, luxury vinyl tile with sound choice backing to reduce up to 16 dB
• Minimize infiltration through walls and newly replaced fenestration.
THERMAL COMFORT
Meet ASHRAE 55-2010, Thermal Comfort Conditions for Human Occupancy - owner to confirm if the following is desirable - provide thermal comfort controls for 50% of individual occupants and all group, multi-occupant spaces. Thermal comfort controls allow occupants to adjust at least one of: air temp, radiant temp, air speed, humidity.
o Provide controllability to the occupant via the diffusers o Goal is to eliminate personal conditioning devices, e.g. space heaters
MATERIALS
Provide space for the collection and storage of paper, cardboard, glass, plastic, and metals AND batteries, and electronic waste.
o Reduce, reuse, recycle, compost, or recover solid waste streams (with the exception of hazardous and medical waste), thereby resulting in no waste disposal to landfills or incinerators. Pertains to operation of the building and excludes Construction & Demolition waste.
o Promote better indoor air quality through proper choices of materials via transparency of ingredients, e.g. EPDs, Declare Labels, etc.
o Source low emitting materials for at a minimum paints and coatings, flooring, and ceilings.
o Identify specific chemicals of concern and eliminate through the design of this renovation such as Chemical Flame Retardants o Specify removal of Chemical Flame Retardants from cushions in furniture, wall base, carpets, and non-blackout shades (textiles).
o Identify materials with low embodied carbon and investigate implementing them in the design, e.g.
flooring, etc.
PG. 6
III. CODE ANALYSIS
Applicable Codes & Standards The following adopted codes and associated standards are applicable to the Project:
• P100 Facilities Standards for the Public Buildings Service, July 2018 Edition (P100)
• International Building Code, 2018 edition (IBC)
• International Fire Code, 2018 edition (IFC)
• NFPA 13, Standard for the Installation of Sprinkler Systems, 2019 edition
• NFPA 70, National Electrical Code, 2020 edition
• NFPA 72, National Fire Alarm and Signaling Code, 2019 edition
• NFPA 101, Life Safety Code, 2018 edition (LSC)
• Architectural Barriers Act Accessibility Standard (ABAAS)
Additionally, per P100 section 1.4.5 National Standards, other national standards such as ASHRAE, NFPA, SMACNA, NRCA, IEEE, ASME should be utilized.
The application of those codes are per P100 section 1.2.1 Repairs, Renovations, Modernizations and Alterrations: All new work is required to meet the applicable national codes and standards adopted by GSA. The requirements of the P100 apply to repairs, renovations, modernizations, and alterations to the extent the work is identified in the approved and funded project prospectus. All items within the designer’s scope of work must be designed in accordance with the P100.
Waivers At this time no code related waivers are being requested for the project. CMS and the GSA project manager have requested that the project be documented in Imperial Units. Per that directive the project will need to be granted a P100 waiver from the GSA Metric Order.
Original Building Code
• BOCA National Building Code 1990 Edition
• NFPA 101 1991 for Life Safety
• UBC 1990 for Seismic
• SBC for Wind Load
• BOCA/National Electric Code
The Central Building was built to Type 1B construction with certain types of 2A modifications.
The South Building was built to Type 2A construction and with the primary function being Group B.
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 7
Occupant Load/Exit Capacity SLL, CLL and C1 are directly adjacent to grade and are not dependent upon stair capacity. Egress capacity at C2 has been calculated to be 300 persons based on stairs.
We have verified that the doors within the link are 90 minutes rated bi-swing which seems to indicate that they could be utilized but there are specific requirements in 2018 NFPA 101 for bridges and horizontal exits. Particularly, the walls of C2 must be 2-hour rated for 10 feet vertically and horizontally from the bridge. (NFPA 101 7.2.4.3.1 and 7.2.4.4.1) The existing partitions and link doors will not be modified.
As we currently stand the occupancy calculation as follows:
C2 (AREA 1)
SLL (AREA 2)
CLL (AREA 3)
C1 (AREA 4)
MEP, FP, and FA Requirements Refer to Mechanical, Electrical, Plumbing, Fire Protection and Telecommunications Report for code related information in regards to those disciplines.
FEC
FECAED
UP
P
14 15 17
18 19 20 21
P
Q
R
S
T
U
V
CPT - 100'
EXIT 1-A
17021
TD
5'
TRAVEL DISTANCE
COMMON PATH OF TRAVEL DISTANCE
DEAD END CORRIDOR DISTANCE
SMOKE PARTITION
BUSINESS OCCUPANCY
STORAGE OCCUPANCY
ASSEMBLY OCCUPANCY
EXIT #
USE CAP
2 HOUR FIRE BARRIER
0 1' 2' 1 1/2"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
CITY/ST./ZIP
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
www.ks.partners 312 787 0056 221 West Erie Street Chicago, IL 60654
Architect
SHEET SIZE:
DATE DRAWN:
34 X 44
Issue No. Date Issue
KRUECK SEXTON PARTNERS
/4
/2
3:
:3
PM
LS200
LOWER LEVEL LIFE SAFETY FLOOR PLAN
CMS BACK TO CAMPUS PHASE 2
FINAL CONCEPT
SEPTEMBER 03, 2021
Author
Checker
7500 SECURITY BOULEVARD
WOODLAWN, MD 21244
CMS HEADQUARTERS FACILITY
UNITED STATES GENERAL
SERVICE ADMINISTRATION
GSA REGION 3 MID-ATLANTIC
WSP
ARCHITECH CONSULTING, INC
224.345.3450
212.465.5000
MEP, FIRE PROTECTION + TELECOM:
SPECIFICATION WRITER
ONE PENN PLAZA, 2ND FLOOR
NEW YORK, NEW YORK 10119
111 EAST BUSSE AVENUE, SUITE 301
MOUNT PROSPECT, IL 60056
08/18/21
09/03/2021 FINAL CONCEPT
47PD0219F0014
WSP
SE
NS
ITI
VE
B
UT
U
NC
LA
SS
IFI
ED
(S
BU
) P
RO
PE
RT
Y
OF
TH
E
UN
ITE
D
ST
AT
ES
G
OV
ER
NM
EN
T F
OR
O
FF
IC
E
US
E
ON
LY
. D o no t r em ov e t hi s n ot ice
. P ro pe rly d es tro y o r r etu rn do cu me nt s w he n n o lo ng er ne ed ed
GENERAL COMMENTS
1. OCCUPANCY CALCULATIONS ARE FOR RENOVATED
AREA ONLY.
2. THERE IS NOT A CHANGE OF OCCUPANCY FUNCTION
THEREFORE NO PROJECTED CHANGE IN OCCUPANCY
NUMBERS OR EXITING REQUIRMENTS.
3. ALL RATED WALLS ARE EXISTING UNLESS NOTED
OTHERWISE. WHERE WORK AT RATED WALLS IS
REQUIRED MAINTAIN EXISTING FIRE RATING.
4. HORIZONTAL SLIDING DOORS FOLLOW REQUIREMENTS
FROM NFPA 101 SECTION 7.2.1.4.1(4).
EXIT EXIT EXIT EXIT
EXIT
P PP
P P P
TD - 178'
TD - 143'
EXIT 1
140125
EXIT 2
160132
EXIT 1A
34033
EXIT 2A
34033
EXIT 3A
17033
LCF
C2-18-18
497 SF
HS
C2-18-16H
72 SF
WS
C2-18-16WS
83 SF
WS
C2-18-16WS
82 SF
POD
C2-18-16P
67 SF
HUDDLE
C2-18-25
151 SF
HUDDLE
C2-17-25
143 SF
BOOTH
C2-18-16B
42 SF
OPEN OFFICE
C2-18-16
1040 SF
OPEN OFFICE/
COLLAB/STORAGE
C2-18-16CS
24 SF
OPEN COLLAB
C2-17-17
288 SF
FOCUS ROOM
C2-17-05
57 SF
FOCUS ROOM
C2-17-04
43 SF OPEN COLLAB
C2-16-25
142 SF
MCF
C2-16-28
230 SF
WS
C2-15-07WS
163 SF
OPEN OFFICE
C2-15-07
2244 SF
PANTRY
C2-16-23
150 SF
OFFICE
C2-16-13
116 SF
OFFICE
C2-16-03
113 SF
OFFICE
C2-15-23
116 SF
OFFICE
C2-14-23
112 SF
OFFICE
C2-14-13
116 SF
OFFICE
C2-14-03
129 SF
HS
C2-15-07H
142 SF
WS
C2-15-07WS
163 SF
WS
C2-15-07WS
163 SF
HS
C2-15-07H
144 SF
HS
C2-15-07H
72 SF
HS
C2-15-07H
72 SF
OFFICE
C2-19-03
115 SF
OFFICE
C2-18-23
115 SF
MCF
C2-18-03
235 SF OPEN COLLAB
C2-17-23
75 SF
OFFICE
C2-15-21
125 SF
OFFICE
C2-15-20
125 SF
MCF
C2-12-01
224 SF
WS
C2-14-11WS
242 SF
POD
C2-13-00
166 SF
HUDDLE
C2-13-20
162 SF
OPEN COLLAB
C2-13-11
222 SF
OPEN COLLAB
C2-13-13
255 SF
OFFICE
C2-12-23
133 SF
OFFICE
C2-11-03
116 SF
OFFICE
C2-11-13
116 SF
OFFICE
C2-11-23
112 SF
OFFICE
C2-12-03
116 SF
PANTRY
C2-13-03
116 SF
OFFICE
C2-10-23
111 SF
OPEN COLLAB
C2-10-17
108 SF
SCF
C2-09-23
150 SF
SCF
C2-09-03
159 SF
WS
C2-09-26WS
163 SF
FOCUS ROOM
C2-09-28A
53 SF
FOCUS ROOM
C2-09-28
48 SF
FOCUS ROOM
C2-09-27
52 SF
MCF
C2-11-08
230 SF
WS
C2-12-26WS
163 SF
WS
C2-12-26WS
163 SF
WS
C2-12-26WS
163 SF
WS
C2-12-26WS
163 SF
HUDDLE
C2-10-25
143 SF
POD
C2-12-25
196 SF
HS
C2-12-26H
144 SF
HS
C2-12-26H
142 SF
POD
C2-09-25
187 SF
WS
C2-09-26WS
163 SF
OPEN COLLAB
C2-10-17
509 SF
OPEN OFFICE/
COLLAB/STORAGE
C2-12-26CS
37 SF
OPEN OFFICE/
COLLAB/STORAGE
C2-12-26CS
37 SF
OPEN COLLAB
C2-10-17
509 SF
OPEN OFFICE/
COLLAB/STORAGE
C2-09-26CS
37 SF
WC FEMALE
C2-10-21
267 SF
WC MALE
C2-10-11
253 SF
VESTIBULE
C2-10-11A
42 SF
VESTIBULE
C2-10-21A
42 SF
CORRIDOR
C2-16-22
2564 SF
OPEN COLLAB
C2-14-12
225 SF
CORRIDOR
C2-16-22
2564 SF
EXISTING
COPIER
ROOM
EXISTING
ELECTRICAL
ROOM
EXISTING ADP
SATELLITE ROOM
EXISTING
TELEPHONE
ROOM
EXISTING
MECHANICAL
ROOM
EXISTING
ELECTRICAL
ROOM
EXISTING
ELEVATOR
EXISTING
ELEVATOR
CPT - 50'
TRAVEL DISTANCE
COMMON PATH OF TRAVEL DISTANCE
DEAD END CORRIDOR DISTANCE
SMOKE PARTITION
BUSINESS OCCUPANCY
STORAGE OCCUPANCY
ASSEMBLY OCCUPANCY
EXIT #
USE CAP
2 HOUR FIRE BARRIER
0 1' 2' 1 1/2"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
CITY/ST./ZIP
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
www.ks.partners 312 787 0056 221 West Erie Street Chicago, IL 60654
Architect
SHEET SIZE:
DATE DRAWN:
34 X 44
Issue No. Date Issue
KRUECK SEXTON PARTNERS
/4
/2
3:
:4
PM
LS202
LEVEL 2 LIFE SAFETY FLOOR PLAN
CMS BACK TO CAMPUS PHASE 2
FINAL CONCEPT
SEPTEMBER 03, 2021
Author
Checker
7500 SECURITY BOULEVARD
WOODLAWN, MD 21244
CMS HEADQUARTERS FACILITY
UNITED STATES GENERAL
SERVICE ADMINISTRATION
GSA REGION 3 MID-ATLANTIC
WSP
ARCHITECH CONSULTING, INC
224.345.3450
212.465.5000
MEP, FIRE PROTECTION + TELECOM:
SPECIFICATION WRITER
ONE PENN PLAZA, 2ND FLOOR
NEW YORK, NEW YORK 10119
111 EAST BUSSE AVENUE, SUITE 301
MOUNT PROSPECT, IL 60056
08/18/21
09/03/2021 FINAL CONCEPT
47PD0219F0014
WSP
SE
NS
ITI
VE
B
UT
U
NC
LA
SS
IFI
ED
(S
BU
) P
RO
PE
RT
Y
OF
TH
E
UN
ITE
D
ST
AT
ES
G
OV
ER
NM
EN
T F
OR
O
FF
IC
E
US
E
ON
LY
. D o no t r em ov e t hi s n ot ice
. P ro pe rly d es tro y o r r etu rn do cu me nt s w he n n o lo ng er ne ed ed
GENERAL COMMENTS
1. OCCUPANCY CALCULATIONS ARE FOR RENOVATED
AREA ONLY.
2. THERE IS NOT A CHANGE OF OCCUPANCY
FUNCTION THEREFORE NO PROJECTED CHANGE IN
OCCUPANCY NUMBERS OR EXITING REQUIRMENTS.
3. ALL RATED WALLS ARE EXISTING UNLESS NOTED
OTHERWISE. WHERE WORK AT RATED WALLS IS
REQUIRED MAINTAIN EXISTING FIRE RATING.
P P P
P P
CP
T
-7 1'
EXIT 1A
34053
EXIT 2A
17040
EXIT 3A
17040
TD - 240'
SCF
SLL-13-28
141.76 SF
SCF
SLL-13-27
125.79 SF
WS
SLL-12-14
243.83 SF
OPEN COLLAB
SLL-13-25
264.93 SF
LCF
SLL-13-13
386.63 SF
OFFICE
SLL-12-25
144.11 SF
HUDDLE
SLL-12-23
137.44 SF
WAITING
SLL-12-03
122.62 SF
OPEN COLLAB
SLL-12-01
109.00 SF
PANTRY
SLL-12-10
140.94 SF
DWG REV MAT
LIBRARY
SLL-15-10
115.60 SF
OFFICE
SLL-15-11
115.60 SF
BADGING OFFICE
SLL-11-24
827.91 SF
STORAGE
SLL-10-27
39.82 SF
STORAGE
SLL-10-26
71.27 SF
WAITING
SLL-10-23
435.99 SF
STORAGE
SLL-16-24
205.33 SF
OFFICE
SLL-16-14
115.44 SF
OFFICE
SLL-16-04
115.57 SF
OFFICE
SLL-15-24
112.39 SF
SCF
SLL-15-13
145.26 SF
HUDDLE
SLL-12-21
144.68 SF
SCF
SLL-13-11
187.80 SF
OPEN OFFICE
SLL-14-22
3470.04 SF
OFFICE
SLL-15-07
115.45 SF
OFFICE
SLL-15-17
115.44 SF
OFFICE
SLL-15-27
115.44 SF
OFFICE
SLL-16-07
115.44 SF
OFFICE
SLL-16-17
115.44 SF
MCF
SLL-16-26
265.66 SF
WC MALE
SLL-10-01
236.33 SF
WC FEMALE
SLL-09-21
264.85 SF
JAN
SLL-09-20
38.51 SF
CORRIDOR
SLL-10-22
1304.00 SF
COPY
SLL-16-02
134.16 SF
CUSTOMER SERVICE
SLL-16-25
115.06 SF
SCF
SLL-16-05
172.01 SF
OPEN COLLAB
SLL-15-25
316.83 SF
WALL RATING IS
NEW
CONSTRUCTION
WALL RATING IS
NEW
CONSTRUCTION
EXIT 1
340269
EXIT 2
400300
TRAVEL DISTANCE
COMMON PATH OF TRAVEL DISTANCE
DEAD END CORRIDOR DISTANCE
SMOKE PARTITION
BUSINESS OCCUPANCY
STORAGE OCCUPANCY
ASSEMBLY OCCUPANCY
EXIT #
USE CAP
2 HOUR FIRE BARRIER
0 1' 2' 1 1/2"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
CITY/ST./ZIP
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
www.ks.partners 312 787 0056 221 West Erie Street Chicago, IL 60654
Architect
SHEET SIZE:
DATE DRAWN:
34 X 44
Issue No. Date Issue
KRUECK SEXTON PARTNERS
/4
/2
3:
:4
PM
LS203
SLL LIFE SAFETY FLOOR PLAN
CMS BACK TO CAMPUS PHASE 2
FINAL CONCEPT
SEPTEMBER 03, 2021
Author
Checker
7500 SECURITY BOULEVARD
WOODLAWN, MD 21244
CMS HEADQUARTERS FACILITY
UNITED STATES GENERAL
SERVICE ADMINISTRATION
GSA REGION 3 MID-ATLANTIC
WSP
ARCHITECH CONSULTING, INC
224.345.3450
212.465.5000
MEP, FIRE PROTECTION + TELECOM:
SPECIFICATION WRITER
ONE PENN PLAZA, 2ND FLOOR
NEW YORK, NEW YORK 10119
111 EAST BUSSE AVENUE, SUITE 301
MOUNT PROSPECT, IL 60056
08/18/21
09/03/2021 FINAL CONCEPT
47PD0219F0014
WSP
SE
NS
ITI
VE
B
UT
U
NC
LA
SS
IFI
ED
(S
BU
) P
RO
PE
RT
Y
OF
TH
E
UN
ITE
D
ST
AT
ES
G
OV
ER
NM
EN
T F
OR
O
FF
IC
E
US
E
ON
LY
. D o no t r em ov e t hi s n ot ice
. P ro pe rly d es tro y o r r etu rn do cu me nt s w he n n o lo ng er ne ed ed
GENERAL COMMENTS
1. OCCUPANCY CALCULATIONS ARE FOR RENOVATED
AREA ONLY.
2. THERE IS NOT A CHANGE OF OCCUPANCY
FUNCTION THEREFORE NO PROJECTED CHANGE IN
OCCUPANCY NUMBERS OR EXITING REQUIRMENTS.
THE EXITING SCHEME HAS NOT CHANGE TO THE
EXTERIOR.
3. ALL RATED WALLS ARE EXISTING UNLESS NOTED
OTHERWISE. WHERE WORK AT RATED WALLS IS
REQUIRED MAINTAIN EXISTING FIRE RATING.
EXIT 1
EXIT 1-A EXIT 2-A EXIT 3-A
EXIT 2
LOBBY
C1-20-15
3782 SF
LOBBY
C1-20-15
3782 SF
TRAVEL DISTANCE
COMMON PATH OF TRAVEL DISTANCE
DEAD END CORRIDOR DISTANCE
SMOKE PARTITION
BUSINESS OCCUPANCY
STORAGE OCCUPANCY
ASSEMBLY OCCUPANCY
EXIT #
USE CAP
2 HOUR FIRE BARRIER
0 1' 2' 1 1/2"=1'-0"
True North
Plan North
SHEET NOTES
GENERAL NOTES
LEGEND
CHECKED BY
DRAWN BY
FLOOR NUMBER
DRAWING TITLE
SHEET
NUMBER
SUBMISSION DATE
SUBMISSION STAGE
GSA PM
GSA PROJECT NO.
PROJECT
DESCRIPTION
PROJECT TITLE
BULDING NAME
CITY/ST./ZIP
ADDRESS
BUILDING NUMBER
PRIME CONTR. NO.
PRIME ORDER NO.
CONST. CONTR.
A/E
SUB A/E
CONST. CONTR. NO.
SH
EE
T I
DE
NT
IFI
CA
TIO
N
DISCIPLINE
PR
OJ
EC
T I
DE
NT
IFI
CA
TIO
N
BU
ILD
IN
G
BIM FILE NAME
CO
NT
RA
CT
OR
S
RE
VI
SI
ON
B
LO
CK
GR
AP
HI
C
SC
AL
E
KE
Y
PL
AN
ST
AM
P
OR
S
EA
L
DE
SI
GN
ER
ID
EN
TIF
IC
AT
IO
N
OW
NE
R
ID
EN
TIF
IC
AT
IO
N
SHEET OF SHEETS
www.ks.partners 312 787 0056 221 West Erie Street Chicago, IL 60654
Architect
SHEET SIZE:
DATE DRAWN:
34 X 44
Issue No. Date Issue
KRUECK SEXTON PARTNERS
/4
/2
3:
:4
PM
LS201
LEVEL 1 LIFE SAFETY FLOOR PLAN
CMS BACK TO CAMPUS PHASE 2
FINAL CONCEPT
SEPTEMBER 03, 2021
Author
Checker
7500 SECURITY BOULEVARD
WOODLAWN, MD 21244
CMS HEADQUARTERS FACILITY
UNITED STATES GENERAL
SERVICE ADMINISTRATION
GSA REGION 3 MID-ATLANTIC
WSP
ARCHITECH CONSULTING, INC
224.345.3450
212.465.5000
MEP, FIRE PROTECTION + TELECOM:
SPECIFICATION WRITER
ONE PENN PLAZA, 2ND FLOOR
NEW YORK, NEW YORK 10119
111 EAST BUSSE AVENUE, SUITE 301
MOUNT PROSPECT, IL 60056
08/18/21
09/03/2021 FINAL CONCEPT
47PD0219F0014
WSP
SE
NS
ITI
VE
B
UT
U
NC
LA
SS
IFI
ED
(S
BU
) P
RO
PE
RT
Y
OF
TH
E
UN
ITE
D
ST
AT
ES
G
OV
ER
NM
EN
T F
OR
O
FF
IC
E
US
E
ON
LY
. D o no t r em ov e t hi s n ot ice
. P ro pe rly d es tro y o r r etu rn do cu me nt s w he n n o lo ng er ne ed ed
THE EXISTING BUILDING HAS AN EGRESS
CAPACITY OF 420 OCCUPANTS THROUGH THE
LOBBY TO THE EXTERIOR.
THE NEW EXTERIOR DOORS ARE THE SAME
WIDTH AND HAVE AN EGRESS CAPACITY OF 420
OCCUPANTS.
THE ACCESS DOORS LEADING TO THE NEW
EXTERIOR DOORS HAVE AN EGRESS CAPACITY
OF 555 OCCUPANTS.
THE ADDED ACCCESS DOORS DO NOT DETRACT
FROM THE EXISTING BUILDING EGRESS
CAPACITY. THERE IS NOT A CHANGE OF
OCCUPANCY NUMBERS OR EXITING
REQUIREMENTS FOR THIS AREA.
GENERAL COMMENTS
1. THERE IS NOT A CHANGE OF OCCUPANCY
FUNCTION THEREFORE NO PROJECTED CHANGE IN
OCCUPANCY NUMBERS OR EXITING REQUIRMENTS
FOR THIS SPACE.
2. ALL RATED WALLS ARE EXISTING UNLESS NOTED
OTHERWISE. WHERE WORK AT RATED WALLS IS
REQUIRED MAINTAIN EXISTING FIRE RATING.
EXIT 1
EXIT 1-A EXIT 3-A
EXIT 2
LOBBY
C1-20-15
LOBBY
C1-20-15
THE EXISTING BUILDING HAS AN EGRESS
CAPACITY OF 420 OCCUPANTS THROUGH THE
LOBBY TO THE EXTERIOR.
THE NEW EXTERIOR DOORS ARE THE SAME
WIDTH AND HAVE AN EGRESS CAPACITY OF 420
OCCUPANTS.
THE ACCESS OPENINGS LEADING TO THE NEW
EXTERIOR DOORS HAVE AN EGRESS CAPACITY
OF 960 OCCUPANTS.
THE ADDED ACCESS OPENINGS DO NOT
DETRACT FROM THE EXISTING BUILDING EGRESS
CAPACITY. THERE IS NOT A CHANGE OF
OCCUPANCY NUMBERS OR EXITING
REQUIREMENTS FOR THIS AREA.
PG. 8
CENTRAL LEVEL 2 (C2)
OHC & CC SQ
RENOVATION - AREA 1
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 9
IV. CENTRAL LEVEL 2 OHC & CCSQ RENOVATION
i. SCOPE DESCRIPTION
Renovation of approximately 22,300SF on the second level of the Central building. Renovations include office space, common areas, and multi-stall restrooms. Existing ceilings, walls, and floor finishes will be demolished.
New work includes:
• Interior GWB and glass partitions
• Specialty wall finishes
• Floor finishes
• Ceiling systems
• Mechanical distribution
• LED tunable color lighting
• Motorized roller shades on daylight sensing system
• Electrical
• Plumbing
• Sprinkler head relocation
• Fire alarm devices
• Telecom
• AV
• White noise system
Note: This report serves as an addition to the final concept drawings. Those drawings have been produced to a 35% level of completion. Most scope is covered within the documents but they are not complete or fully coordinated. The project will include AV equipment, signage, a white noise system in the open office areas, and fire alarm devices which are yet to be documented. Plumbing work includes the replacement of drinking fountains, restroom fixtures and lavatories, and new sinks.
ii. SEQUENCING Sequencing of construction for this space will be defined and discussed with owner and provided in a future issuance.
iii. OPERATIONS + MAINTENANCE GOALS The CMS campus has robust systems and is well maintained. No new mechanical, electrical, or telecom spaces are required to support the renovation. All distribution can be from existing service spaces. The proposed design maintains the existing 9’-0” ceiling height at enclosed spaces, but proposes 9’-6” ceiling height at open offices.
There is a generous plenum space as well as a 1’ high raised floor. Acoustics within existing office spaces suffer a bit from the above and below access. The proposed design calls for all new partitions to be built to deck above the ceiling but not below the raised floor.
PG. 10
NE OHC
NW OHCW OHC
Corridors
CCSQ
To North Building
C2 Restrooms
C2
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 11
IV. CENTRAL LEVEL 2 OHC & CCSQ RENOVATION (cont.)
iv. VISION AND GOALS
The following goals have been targeted by the GSA, CMS, and design team.
• Improved way-finding
• Improve access to daylight (brighter, happier space)
• Modernized spaces
• Flexibility in planning modules
• Space supportive of multiple work modes
• Project to serve as a model for future renovations
• Supportive of tenants
Opportunity: Extend Building Links Way-finding within the existing offices is a major challenge for staff and visitors. The building footprints are on the larger side, around 60,000sf, and corridors tend to be walled off from adjacent work areas. The overall effects are long unbroken corridors, with little indication of one’s arrival at their destination.
The perimeter wall has recesses that coincide with the building link and passenger elevator locations. Through material finishes, colors, and lighting we can connect these three elements creating anchors in the plan.
The anchors would serve as a primary way-finding component, connecting a person’s arrival to office space, daylight, and the building perimeter. Additionally, the anchors would serve to break down the 370’ long building into more human scaled dimensions, providing much needed moments of contrast; critical to one’s ability to establish their bearings within their environment. The anchors have been programmed with collaborative spaces and will be finished out with a contrasting set of finishes.
Opportunity: Day Lighting + Electric Lighting New space planning strategies have been developed by CMS to optimize their space utilization and space flexibility. Additionally, the new strategies also work to maximize all staff’s access to daylight. Offices and workstations have been pulled away from the windows such that daylight is allowed to enter the depth of the building footprint. The project proposes the addition of mechanical roller shades at exterior windows, controlled with a daylight sensing system. In combination with these strategies the newly renovated office areas will utilize tunable LED fixtures such that the electric lighting can be responsive to the day light condition.
PG. 12
STANDARD REFERENCE MODULES
WORKSTATION
6’ x 6’ (36 sqft)
HOTEL STATION
6’ x 6’ (36 sqft)
STANDARD OFFICE
10’ x 12’ (120 sqft) 1 desk, 3 seats
FOCUS
10’ x 6’ (60 sqft) 2 Focus = 1 Standard Office
HUDDLE
10’ x 12’ (120 sqft) 1 table, 4 seats
LARGE CONFERENCE
22.5’ x 29’ (653 sqft) 1 table, 13 - 25 seats
MEDIUM CONFERENCE
15’ x 22’ (330 sqft) 2-5 tables, 10 seats
SMALL CONFERENCE
15’ x 15’ (225 sqft) 1 table, 6 - 8 seats
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 13
v. PROGRAM REQUIREMENTS
Standard Planning Modules:
Executive Office - 12’x15’ Standard Office - 10’x12’ Huddle Rooms - 10’x12’ Workstation - 6’x6’ Hotelling Area - 6’x6’ Focus Rooms - 6’x10’ Small Conference - 15’x15’ Medium Conference - 15’x22’ Large Conference - 22.5’x29’
Additional Program:
Conference Rooms Focus Rooms Pods Print and Copy Areas Open Collaboration Pantry Restroom Remodel
OHC - BOS:
Managers | 1 Standard Office Non-Managers | 4 Workstations
Total 6’ x 6’ modules - 4
OHC - TAB G:
Managers | 7 Standard Offices Non-Managers | 16 Workstations Contractors | 14 Hotels
Total 6’ x 6’ modules - 30
OHC - ESG:
Managers | 2 Standard Offices Non-Managers | 6 Workstations
Total 6’ x 6’ modules - 6
OHC - HC SSG:
Managers | 3 Standard Offices Non-Managers | 9 Workstations Contractors | 6 Hotels
Total 6’ x 6’ modules - 15
CCSQ:
Managers | 3 Standard Offices Non-Managers | 15 Workstations Contractors | 6 Hotels
Total 6’ x 6’ modules - 21
PG. 14
OHC - BOS
OHC - TAB G
OHC - ESG
OHC - HC SSG
CCSQ
OHC - BOS
OHC - TAB G
OHC - ESG
OHC - HC SSG
CCSQ
0 5 10 20 ft
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 15
KEY PLAN
UP
UP
P
P PP
PPP
FE
C
FE
C
FEC
FEC
FEC
FE
C
FE
C
C2 FLOOR PLAN
0’ 20’5’ 40’
PT
PT
PT
OC
OC OC
OC
OC
Open Office 50 + 26(HS)
Private Office 16
Open Amenities 2
Meeting Room 11
Focus Room 5
Systems/ Storage
Collaboration
Collaboration Pod 4
Pantry 2
TRUE NORTH
PLAN NORTH
PG. 16
vi. RENDERINGS AND FINISHES
CEILING
WALL
FLOOR
certainteed symphony f
ACP-1
direct/indirect rectangular pendant L-4 direct/indirect linear pendant L-6 grazing interface hn820 -limestone
CPT-1
interface hn820 - slate
CPT-2
accent paint
PT-3
autex cube
- savoye
AWP-1
turf - 47 lime
AWP-2
GLAZING
gradient vynil film b.o.d. 3m fasara
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 17
C2 Private Office BOS + TAB G
C2 Avenue BOS + TAB G
PG. 18
219 TechLine 877 276-7876 armstrongceilings.com/commercial
ALTITUDES® Torsion Spring Custom Concealed Ceiling System smooth texture
Altitudes® Torsion Spring In White
TYPICAL APPLICATIONS
• Transportation
• Office
• Lobby areas
• Auditoriums
KEY SELECTION ATTRIBUTES
• Easily installs with standard Prelude®
15/16" suspension system
• Monolithic look with sag-resistant, large size panels
• Sizes up to 48" x 96" with or without upturns
• Shaped/curved panels available*
• Excellent acoustical performance –
NRC (0.85)
• Wide variety of color options available
• Smooth, clean, durable finish
• Downward accessible with tool
• Energy-saving high light-reflective finish (White)
• Non-directional visual
* Two opposite sides of panel must be straight
A ceiling system with a monolithic look from sag-resistant, large custom-size panels.
White
(WH)
DETAILS
armstrongceilings.com/capabilities See more photos at:
armstrongceilings.com/photogallery to do more plus...
capabilities
Made-to-order Sherwin-Williams®
Colors Available
COLOR SELECTION
Painted: Choose colors from Sherwin-Williams® Duration® or Harmony® flat interior paint families. When ordering, use Sherwin-Williams 4-digit color code (SW _ _ _ _)
CUSTOM FINISHES Due to printing limitations, shade may vary from actual product.
CEILING
WALL
FLOOR GLAZING
decoustics ceilencio syst. fiberglass ceiling
ACP-2
rulon endure linear 900
LMC-1
grazing interface hn820 -limestone
CPT-1
gradient vynil film b.o.d. 3m fasara accent paint
PT-3
turf - 38 matte gray
AWP-3
autex cube
- savoye
AWP-1
turf - 42 orange
AWP-4
turf - 25 light blue
AWP-5
turf static wall pattern f7
- 42 orange
AHP
interface hn820 - slate
CPT-2
gypsum board
GWB
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 19
C2 CCSQ Entry
C2 Link Entry
PG. 20
PR
P
P PP
PPP
UP
UP
AF
P
TV 58
FE
C
FE
C
FEC
FEC
FEC
FE
C
FE
C
OPEN OFFICE
C2-15-137
OPEN OFFICE
C2-15-137
HUDDLE
C2-18-169
HUDDLE
C2-17-170
FOCUS ROOM
C2-17-167
FOCUS ROOM
C2-17-161
OFFICE
C2-19-149 MCF
C2-18-148
PANTRY
C2-16-153
OFFICE
C2-16-150
OFFICE
C2-16-148
OFFICE
C2-15-152
OFFICE
C2-14-153
OFFICE
C2-14-151
OFFICE
C2-14-149
OPEN
COLLAB
C2-17-186
CORRIDOR
C2-13-37
WC MALE
C2-10-11
WC FEMALE
C2-10-21
VESTIBULE
C2-10-11A
VESTIBULE
C2-10-21A
SCF
C2-09-148
SCF
C2-09-151 OFFICE
C2-10-152
OFFICE
C2-11-148
OFFICE
C2-11-150
OFFICE
C2-11-153
OFFICE
C2-12-149
OFFICE
C2-12-151 PANTRY
C2-13-142
OPEN
COLLAB
C2-13-145
OPEN
COLLAB
C2-10-186
MCF
C2-10-189
LCF
C2-17-189
MCF
C2-17-184
FOCUS ROOM
C2-09-206
FOCUS ROOM
C2-09-194
FOCUS ROOM
C2-09-200
POD
C2-10-154
HUDDLE
C2-10-158
POD
C2-12-159
POD
C2-13-100
HUDDLE
C2-13-103MCF
C2-12-102
OFFICE
C2-15-103
OFFICE
C2-15-115
OPEN
COLLAB
C2-14-126
OPEN OFFICE
C2-14-100
CORRIDOR
C2-13-37
OPEN
COLLAB
C2-13-120
POD
C2-15-155
OPEN
COLLAB
C2-17-146
OPEN
COLLAB
C2-17-143
OPEN OFFICE
C2-10-153
OPEN OFFICE
C2-10-153
OPEN
COLLAB
C2-16-164
OPEN OFFICE
C2-17-138
OPEN OFFICE
C2-09-153
VESTIBULE
C2-10-144
OPEN
COLLAB
C2-10-142
Room C2-13-12
Room C2-13-14
Room C2-13-15
Room C2-13-16
Room C2-13-17
Room C2-13-18
TELECOM
C2-10-01
OFFICE
C2-18-153
VESTIBULE
C2-17-144
VESTIBULE
C2-15-150 turf - 47 lime
AWP-7
UPDATE
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 21
PT-3
AWP-1
AWP-2
AWP-3
AWP-4
AWP-5
AHP
accent paint
PT-3
autex cube
- savoye
AWP-1
turf - 47 lime
AWP-2
turf - 38 matte gray
AWP-3
turf - 42 orange
AWP-4
turf - 25 light blue
AWP-5
turf static wall pattern f7 - 42 orange
AHP
PG. 22
SOUTH LOWER LEVEL (SLL)
CMS OSFLO RENOVATION -
AREA 2
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 23
V. SOUTH LOWER LEVEL CMS OSFLO RENOVATION
Renovation of approximately 14,400SF on the lower level of the South building. Renovations include office space, common areas, and multi-stall restrooms. Existing ceilings, walls, and floor finishes will be demolished.
New work includes:
• Interior GWB and glass partitions
• Specialty wall finishes
• Floor finishes
• Ceiling systems
• Mechanical distribution
• LED tunable color lighting
• Motorized roller shades on daylight sensing system
• Electrical
• Plumbing
• Sprinkler head relocation
• Fire alarm devices
• Telecom
• AV
• White noise system
Note: This report serves as an addition to the final concept drawings. Those drawings have been produced to a 35% level of completion. Most scope is covered within the documents but they are not complete or fully coordinated. The project will include AV equipment, signage, a white noise system in the open office areas, and fire alarm devices which are yet to be documented. Plumbing work includes the replacement of drinking fountains, restroom fixtures and lavatories, and new sinks.
ii. SEQUENCING Sequencing of construction for this space will be defined and discussed with owner and provided in a future issuance.
iii. OPERATIONS + MAINTENANCE GOALS The CMS campus has robust systems and is well maintained. No new mechanical, electrical, or telecom spaces are required to support the renovation. All distribution can be from existing service spaces. The proposed design maintains the existing 9’-0” ceiling height at enclosed spaces, but proposes 9’-6” ceiling height at open offices.
There is a generous plenum space as well as a 1’ high raised floor. Acoustics within existing office spaces suffer a bit from the above and below access. The proposed design calls for all new partitions to be built to deck above the ceiling but not below the raised floor.
PG. 24
Roll-Up Door
SLL
To Central
Building
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 25
(cont.)
iv. VISION AND GOALS
The following goals have been targeted by the GSA, CMS, and design team.
• Improved way-finding
• Improve access to daylight (brighter, happier space)
• Modernized spaces
• Flexibility in planning modules
• Space supportive of multiple work modes
• Project to serve as a model for future renovations
• Supportive of tenants
Opportunity: Extend Building Links Way-finding within the existing offices is a major challenge for staff and visitors. The building footprints are on the larger side, around 60,000sf, and corridors tend to be walled off from adjacent work areas. The overall effects are long unbroken corridors, with little indication of one’s arrival at their destination.
The perimeter wall has recesses that coincide with the building link and passenger elevator locations. Through material finishes, colors, and lighting we can connect these three elements creating anchors in the plan.
The anchors would serve as a primary way-finding component, connecting a person’s arrival to office space, daylight, and the building perimeter. Additionally, the anchors would serve to break down the 370’ long building into more human scaled dimensions, providing much needed moments of contrast; critical to one’s ability to establish their bearings within their environment. The anchors have been programmed with collaborative spaces and will be finished out with a contrasting set of finishes.
Opportunity: Day Lighting + Electric Lighting New space planning strategies have been developed by CMS to optimize their space utilization and space flexibility. Additionally, the new strategies also work to maximize all staff’s access to daylight. Offices and workstations have been pulled away from the windows such that daylight is allowed to enter the depth of the building footprint. The project proposes the addition of mechanical roller shades at exterior windows, controlled with a daylight sensing system. In combination with these strategies the newly renovated office areas will utilize tunable LED fixtures such that the electric lighting can be responsive to the day light condition.
PG. 26
6’ x 6’ (36 sqft)
HOTEL STATION
6’ x 6’ (36 sqft)
STANDARD OFFICE
10’ x 12’ (120 sqft) 1 desk, 3 seats
FOCUS
10’ x 6’ (60 sqft) 2 Focus = 1 Standard Office
HUDDLE
10’ x 12’ (120 sqft) 1 table, 4 seats
LARGE CONFERENCE
22.5’ x 29’ (653 sqft) 1 table, 13 - 25 seats
MEDIUM CONFERENCE
15’ x 22’ (330 sqft) 2-5 tables, 10 seats
SMALL CONFERENCE
15’ x 15’ (225 sqft) 1 table, 6 - 8 seats
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 27
v. PROGRAM REQUIREMENTS
Standard Planning Modules:
Executive Office - 12’x15’ Standard Office - 10’x12’ Huddle Rooms - 10’x12’ Workstation - 6’x6’ Hotelling Area - 6’x6’ Focus Rooms - 6’x10’ Small Conference - 15’x15’ Medium Conference - 15’x22’ Large Conference - 22.5’x29’
Additional Program:
Conference Rooms Print and Copy Areas Open Collaboration Waiting Rooms Pantry Customer Service Drawing Review / Material Library Storage Restroom Remodel
OSFLO - Secure Badging Area:
Managers | 4 Standard Offices Non-Managers | 18 Workstations
Total 6’ x 6’ modules - 9 Total 6’ x 8’ modules - 9
OSFLO - Non-Secure Area:
Managers | 9 Standard Offices Non-Managers | 25 Workstations
Total 6’ x 6’ modules - 25
PG. 28
OSFLO
OSFLO BADGING
0 5 10 20 ft
OSFLO
OSFLO Badging
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 29
KEY PLAN
P P P P
FEC
FEC FEC
FEC
FEC
TRUE NORTH
PLAN NORTH
SLL FLOOR PLAN
0’ 20’5’ 40’
PT Pantry 1
Open Office 34 + 9(CS)
Private Office 12
Open Amenities 3
Meeting Room 9
Systems/ Storage
Collaboration
Waiting Room 2
PT
UPDATE
PG. 30
V. SOUTH LOWER LEVEL CMS OSFLO RENOVATION (cont.)
CEILING WALL
FLOOR
turf - 39 lavender
AWP-7
interface hn820 -limestone
CPT-1
interface hn820 - slate
CPT-2
certainteed symphony f
ACP-1
GLAZING
gradient vynil film b.o.d. 3m fasara
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 31
SLL OSFLO Open Office
PG. 32
vi. RENDERINGS AND FINISHES
219 TechLine 877 276-7876 armstrongceilings.com/commercial
ALTITUDES® Torsion Spring Custom Concealed Ceiling System smooth texture
Altitudes® Torsion Spring In White
TYPICAL APPLICATIONS
• Transportation
• Office
• Lobby areas
• Auditoriums
KEY SELECTION ATTRIBUTES
• Easily installs with standard Prelude®
15/16" suspension system
• Monolithic look with sag-resistant, large size panels
• Sizes up to 48" x 96" with or without upturns
• Shaped/curved panels available*
• Excellent acoustical performance –
NRC (0.85)
• Wide variety of color options available
• Smooth, clean, durable finish
• Downward accessible with tool
• Energy-saving high light-reflective finish (White)
• Non-directional visual
* Two opposite sides of panel must be straight
A ceiling system with a monolithic look from sag-resistant, large custom-size panels.
White
(WH)
DETAILS
armstrongceilings.com/capabilities See more photos at:
armstrongceilings.com/photogallery to do more plus...
capabilities
Made-to-order Sherwin-Williams®
Colors Available
COLOR SELECTION
Painted: Choose colors from Sherwin-Williams® Duration® or Harmony® flat interior paint families. When ordering, use Sherwin-Williams 4-digit color code (SW _ _ _ _)
CUSTOM FINISHES Due to printing limitations, shade may vary from actual product.
CEILING
WALL
FLOOR
decoustics ceilencio syst. fiberglass ceiling
ACP-2
rulon endure linear 900
LMC-1
grazing interface hn820 -limestone
CPT-1
autex cube
- savoye
AWP-1
interface hn820 - slate
CPT-2
turf - 39 lavender
AWP-7
gypsum board
GWB
GLAZING
gradient vynil film b.o.d. 3m fasara
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 33
SLL OSFLO Entry Near Secure Area
SLL OSFLO Open Collab at End of Main Entry Corridor
PG. 34
vi. RENDERINGS AND FINISHES
CEILING
WALL
rulon endure linear 900
LMC-1
certainteed symphony f
ACP-1
FLOOR
interface hn820 -limestone
CPT-1
autex cube
- savoye
AWP-1
interface hn820 - slate
CPT-2
turf - 39 lavender
AWP-7
gypsum board
GWB
GLAZING
gradient vynil film b.o.d. 3m fasara
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 35
SLL OSFLO Open Collab Near Secure Area
SLL OSFLO Open Collab Non-Secure Area
PG. 36
P
PP
P
P P P
FEC
FEC FEC
FEC
FEC
SCF
SL-13-199
SCF
SL-13-181
OPEN
COLLAB
SL-13-165
OPEN
COLLAB
SL-13-141
OPEN
COLLAB
SL-13-141
SCF
SL-13-121
LCF
SL-13-139
OFFICE
SL-12-169
HUDDLE
SL-12-133
HUDDLE
SL-12-122
OFFICE
SL-12-198
OFFICE
SL-12-180
OFFICE
SL-12-162 WAITING
SL-12-138
OPEN
COLLAB
SL-12-119
PANTRY
SL-12-102
DWG REV
MAT LIBRARY
SL-15-115
OFFICE
SL-15-127
COPY
SL-16-02
WAITING
SL-11-156
STORAGE
SL-10-176
VESTIBULE
SL-09-21A JAN
SL-09-20
WC MALE
SL-10-01
WC FEMALE
SL-09-21
CUSTOMER
SERVICE
SL-16-153
MCF
SL-16-177
SCF
SL-16-157
OPEN
COLLAB
SL-15-170
OFFICE
SL-15-152
OFFICE
SL-16-149
OFFICE
SL-16-151
OFFICE
SL-16-187
OFFICE
SL-16-185
OFFICE
SL-15-188
OFFICE
SL-15-186
OFFICE
SL-15-184SCF
SL-15-138
CORRIDOR
SL17
CORRIDOR
SL17
BADGING
OFFICE
SL-11-153
OPEN OFFICE
SL-12-154
OPEN OFFICE
SL-12-124
OPEN OFFICE
SL-12-124
V. SOUTH LOWER LEVEL CMS OSFLO RENOVATION
(cont.)
vi. RENDERINGS AND FINISHES
UPDATE
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 37
AWP-1
AWP-6
AWP-7
autex cube
- savoye
AWP-1
turf - 29 dark blue
AWP-6
turf - 39 lavender
AWP-7
PG. 38
CENTRAL LOWER LEVEL (CLL)
OFFICE SPACE RENOVATION -
AREA 3
CLL OFFICE UNASSIGNED
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 39
VI. CENTRAL LOWER LEVEL OFFICE SPACE RENOVATION
Renovation of approximately 2,100SF on the lower level of the Central building. Renovations include office space and common areas. Existing ceilings, walls, and floor finishes will be demolished. New work includes:
• Interior GWB and glass partitions
• Specialty wall finishes
• Floor finishes
• Ceiling systems
• Mechanical distribution
• LED tunable color lighting
• Electrical
• Plumbing
• Sprinkler head relocation
• Fire alarm devices
• Telecom
• AV
• White noise system
Note: This report serves as an addition to the final concept drawings. Those drawings have been produced to a 35% level of completion. Most scope is covered within the documents but they are not complete or fully coordinated. The project will include AV equipment, signage, a white noise system in the open office areas, and fire alarm devices which are yet to be documented. Plumbing work included.
ii. SEQUENCING This space is currently unassigned, therefore, the sequencing is not expected to be a sequence of events during construction.
iii. OPERATIONS + MAINTENANCE GOALS The CMS campus has robust systems and is well maintained. No new mechanical, electrical, or telecom spaces are required to support the renovation. All distribution can be from existing service spaces. The proposed design maintains the existing 9’-0” ceiling height at enclosed spaces, but proposes 9’-6” ceiling height at open offices.
There is a generous plenum space as well as a 1’ high raised floor. Acoustics within existing office spaces suffer a bit from the above and below access. The proposed design calls for all new partitions to be built to deck above the ceiling but not below the raised floor.
PG. 40
iv. VISION AND GOALS
The following goals have been targeted by the GSA, CMS, and design team.
• Improved way-finding
• Modernized spaces
• Implement new layout per new standard modules
• Flexibility in planning modules
• Embrace multi-use spaces for diverse type of activities (open collaboration)
• Provide adequate adjacency between cubicles, offices, and conference rooms
• Provide an open office environment to a naturally considered enclosed space
• Circadian rythm to mimic exterior environment
• Supportive of tenants
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 41
6’ x 6’ (36 sqft)
HOTEL STATION
6’ x 6’ (36 sqft)
STANDARD OFFICE
10’ x 12’ (120 sqft) 1 desk, 3 seats
FOCUS
10’ x 6’ (60 sqft) 2 Focus = 1 Standard Office
HUDDLE
10’ x 12’ (120 sqft) 1 table, 4 seats
LARGE CONFERENCE
22.5’ x 29’ (653 sqft) 1 table, 13 - 25 seats
MEDIUM CONFERENCE
15’ x 22’ (330 sqft) 2-5 tables, 10 seats
SMALL CONFERENCE
15’ x 15’ (225 sqft) 1 table, 6 - 8 seats
PG. 42
v. PROGRAM REQUIREMENTS
Standard Planning Modules:
Executive Office - 12’x15’ Standard Office - 10’x12’ Huddle Rooms - 10’x12’ Workstation - 6’x6’ Hotelling Area - 6’x6’ Focus Rooms - 6’x10’ Small Conference - 15’x15’ Medium Conference - 15’x22’ Large Conference - 22.5’x29’
Additional Program:
Conference Rooms Print and Copy Areas Open Office/ Collab/Storage Pantry Reception Storage
CLL Office Unassigned:
Managers | 3 Standard Offices Non-Managers | 7 Workstations
Total 6’ x 6’ modules - 7
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 43
P FE
C
14 15 17
S
T
U
CLL FLOOR PLAN
0’ 20’5’ 40’
PT
PT
Open Office 7
Private Office 3
Open Amenities 1
Meeting Room 2
Systems/ Storage
Pantry 1
TRUE NORTH
PLAN NORTH
AWP-1
autex cube
- savoye
AWP-1
PG. 44
vi. RENDERINGS AND FINISHES
CEILING WALL
certainteed symphony f
ACP-1
GLAZING
gradient vynil film b.o.d. 3m fasara
FLOOR
interface hn820 -limestone
CPT-1
interface hn820 - slate
CPT-2
autex cube
- savoye
AWP-1
CMS Back to Campus Phase 2 75% CONSTRUCTION DOCUMENTS PG. 45
CLL View from Huddle + Pantry to Open Office
PG. 46
CENTRAL LEVEL 1 (C1)
MAIN LOBBY RENOVATION -
AREA 4
CMS Back to Campus Phase 2 75% CONSTRUCTION…