About this file

This is a Request for Qualifications and Price Proposal issued by Pickens County Government in Georgia for Construction Management at Risk Services for the Roper Park Improvements Project. The project comprises two components: an Aquatic Facility Component involving construction of a new 21,385 square foot aquatic facility, and a Major Park Improvements Component including four new baseball fields, renovation of five existing baseball fields, renovation of three soccer fields, a new maintenance shop, two new concession buildings, and landscape and irrigation system installation. Each component will include both a Preconstruction Phase and a Construction Phase. The mandatory Pre-Proposal Conference and Site Inspection is scheduled for August 26, 2026 at 1:00 PM at the Pickens County Administration Building located at 1266 East Church Street, Jasper, Georgia 30143. Sealed proposals must be received by Miranda McDowell, Finance Director, at the same address no later than 4:30 p.m. on September 11, 2026. The Construction Manager will be responsible for project planning, estimating, value engineering, arranging and awarding trade contracts, managing construction, and implementing a one-year warranty period with warranty inspections.

The selection process will follow a five-step evaluation methodology including preliminary evaluation to produce a shortlist, interviews by a Recommendations Committee, committee evaluations, recommendations to the Board of Commissioners, and final selection by the Board. Evaluation criteria include qualitative factors such as professional staff capability, project approach, experience on similar projects, past performance, and references, as well as the quantitative factor of proposed fees and costs. The award will not be based solely on lowest fees but will also consider quality, references, and other subjective criteria at the discretion of the evaluators. Design documents are available by requesting the preliminary bid set of construction plans from pmillard@DCCM.com. Pickens County reserves the right to issue addenda and clarifications through its official procurement website at www.pickenscountyga.gov, which serves as the sole official source for all RFQ/P information, and proposing firms are responsible for monitoring the website and acknowledging receipt of all addenda in their proposals.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Notice - Request for Qualifications and Price Proposal

Date Issued: August 10, 2026 RFQ/P Title: Construction Management at Risk Services for the Roper Park Improvements Project

RFP #2026-6122-001

To all potential Proposing Firms:

This email and the attached Request for Qualifications and Price Proposal (“RFQ/P”) concerns the following project being commissioned by the Pickens County Government (“Pickens County”) under the direction of the Board of Commissioners of Pickens County, Georgia (“BOC”) and its Chairman:

Construction Management at Risk Services for the Roper Park Improvements Project

Pickens County is seeking proposals from qualified Proposing Firms for the performance of construction management at risk services (“CMAR Services”) for the Roper Park Improvements Project (“Project”), which will be comprised of two (2) components:

1. Aquatic Facility Component - - The construction of a new aquatic facility

2. Major Park Improvements Component - - The construction of major non-aquatic park improvements

Each component will be comprised of a Preconstruction Phase and a Construction Phase.

The successful Proposing Firm will serve as Construction Manager (“CM”) for the Project and, as such, will perform CMAR Services during the Project. In this regard, the CM will work with Pickens County and the Project Architect in a prescribed manner on:

1. Project planning

2. Project estimating

3. Value engineering

4. Arranging proposal packages

5. Awarding individual trade contracts and soliciting prior proposals related thereto

6. Managing construction until full occupancy is achieved

7. Implementing a one (1) year warranty and one (1) year warranty inspections

Sealed proposals from Proposing Firms concerning the Project will be received by Miranda McDowell, Finance Director of Pickens County, located at 1266 East Church Street Jasper, Georgia 30143, until 4:30 p.m., legal prevailing time, on September 11, 2026.

Thereafter, in a designated room and place, at a future time to be determined, the names of the Proposing Firms will be publicly read. No further information will be read, discussed or provided until the evaluation of all submitted proposals has been completed in the process described in this letter and the

RFQ/P.

No extension of the proposal period will be made other than by a formal written addendum made to the RFQ/P by Pickens County.

Proposal submittal documents may be obtained by:

1. Going to Pickens County's website at www.pickenscountyga.gov; then selecting "I Want To..."

from the top navigation menu; then, under "Find," selecting "Bid Openings"; then selecting the "SPLOST" category; and then selecting "Construction Management at Risk Services – New Aquatic Center and Improvements at Roper Park."

2. Contacting the Finance Department at 1266 East Church Street Jasper, Georgia 30143, or via landline phone 706-253-8809 to obtain the information at no charge.

Pickens County reserves the right to revise, clarify, interpret, or amend this RFQ/P at any time by written addendum. Any addendum issued shall become a part of the RFQ/P and shall be posted on Pickens County's official procurement website. This website is the sole official source for this RFQ/P, all addenda, responses to questions, and any other procurement-related communications. It shall be the sole responsibility of each interested Proposing Firm to monitor the website and obtain all addenda and other procurement-related information. Proposing Firms shall acknowledge receipt of all addenda in their proposals. Failure to acknowledge receipt of an addendum may result in a proposal being deemed non-responsive. No oral statement, interpretation, clarification, or representation made by any County official, employee, consultant, or representative shall be binding unless confirmed through a written addendum issued by Pickens County.

Proposals for the Project will be evaluated, and the presumptive selection of a successful Proposing Firm will be pursuant to the following five-step process.

1. The first step will constitute the preliminary evaluation of proposal submissions that will produce a shortlist of qualified Proposing Firms.

2. The second step will constitute interviews of shortlisted Proposing Firms by a Recommendations Committee.

3. The third step will constitute evaluations of the shortlisted firms by the Recommendations Committee.

4. The fourth step will constitute the making of recommendations by the Recommendations Committee to the BOC by the BOC’s consideration toward a selection.

5. The fifth step will constitute the selection by the BOC of the successful Proposing Firm to serve as CM on the Project.

All evaluations, recommendations and the BOC’s selection will be based on:

1. Qualitative factors including, but not limited to, the ability of the professional staff, approach to project, experience on similar projects, performance on past projects and references for the same CMAR Services provided to other clients in similar situations.

2. The quantitative factor of fees and costs.

Any recommendation by the Recommendations Committee and/or the ultimate award of a contract by the BOC will not be solely based on low proposed fees and costs, but also on quality, references and other subjective criteria as may be deemed and determined as necessary in their respective sole discretions.

A Mandatory Pre-Proposal Conference/Site Inspection will be conducted on August 26, 2026 beginning at 1 PM. The meeting will be held at the Pickens County Administration Building located at 1266 East Church Street Jasper, Georgia 30143. This meeting is mandatory for proposal submission eligibility.

Pickens County will assume no responsibility for representations or understandings concerning conditions made by its officials or employees unless they are included in the RFQ/P.

All proposals will be evaluated in accordance with applicable rules, regulations, and laws to which Pickens County is subject.

Thank you for your interest in this RFQ/P.

Miranda McDowell Chief Financial Officer Pickens County Government

PICKENS COUNTY GOVERNMENT

REQUEST FOR QUALIFICATIONS AND PRICE PROPOSALS

RoperPark
ImprovementsProject

Construction Management at Risk Services

Aquatic Facility Construction and Major Park Improvements

[ PAGE 2 OF 32 ]

Table of Contents

I. General Project Information

II. The Selection of the Construction Manager

III. Substantive Contractual Provisions

IV. General Contract Information

Af#idavit and Exhibits

S.A.V.E. Program Af#idavit

Exhibit A – Indemnity

Exhibit B – Construction Manager Price Proposal Forms and Cost Estimate Form

[ PAGE 3 OF 32 ]

I. General Project Information

A. ThePickensCountyGovernment(“PickensCounty”),operatingunderthedirectionoftheof
theBoardofCommissionersofPickensCounty,Georgia(“BOC”)anditsChairman,is
solicitingproposalsfromqualiDiedDirms(“ProposingFirms”)toprovideConstruction
ManagementatRiskServices(“CMARServices”)forPickensCounty’sRoperPark
ImprovementsProject(“Project”).1
B. ProposingFirmsmustrespondtothisRequestforQualiDicationsandPriceProposal
(“RFQ/P”)tobeconsideredforselectionastheConstructionManager(“CM”)thatwill
provideCMARServicesontheProject.
C. ByrespondingtothisRFQ/P,aProposingFirmrepresentstoPickensCountythatitis
properlyqualiDiedandfullyexperiencedtoperformtheCMARServicesapplicabletoall
functionsdescribedhereinandthatitisproperlystaffed,equipped,organizedandDinanced
toperformsuchfunctions.
D. TheProjectwillbecomprisedoftwo(2)components,bothofwhichwillincludea
PreconstructionPhaseandaConstructionPhaserequiringCMARServicesfromtheCM:

1. The “Aquatic Facility Component”

Thiscomponentwillinvolvetheconstructionofanew21,385squarefoot,single-story
aquaticfacility.

2. The “Major Park Improvements Component”

Thiscomponentwillinvolvetheconstructionofvariousmajornon-aquaticpark
improvements,whichwillincludethefollowing:

a. Build four (4) new baseball Dields

b. Renovation of Dive (5) existing baseball Dields

c. Renovation of three (3) soccer Dields

d. Construction of a new maintenance shop

1 Design Services have already been engaged on the Project.

[ PAGE 4 OF 32 ]

e. Construction of two (2) new concession buildings

f. Landscape and irrigation system installation.2

E. Designdocumentsforbothcomponentscanbeaccessedbyemailingpmillard@DCCM.com
torequestthepreliminarybidsetofconstructionplans.
F. ThePreconstructionPhaseandtheConstructionPhaseoftheAquaticFacilityComponent
andtheMajorParkImprovementsComponentwillrespectivelycommenceatthetimesthat
PickensCountydeemsappropriatebasedonfactorsdeemedrelevantbyPickensCounty.
G. TherewillbenopenaltytoPickensCountyconcerningtheconstructiondateoftheProject
orthenonconstructionoftheProjectinwholeorinpart.
H. TheobjectiveoftheworktobeperformedbytheCMwillbetheefDicient,economical,and
timelydeliveryoftheProjectresultingfromthequalitydrivenmanagementofongoingand
ultimatelycompletedprojectconstructionwithintimelimitations,withincostlimitations
andinaccordancewithestablishedqualityrequirements.
I. ThescopeoftheworktobeperformedbytheCMduringthePreconstructionPhaseandthe
ConstructionPhaseoftheProjectwillincludeworkingwithPickensCountyandtheProject
Architectintheconductofthefollowingactivities:

1. Project planning

2. Project estimating

3. Value engineering

4. Arrangements of proposal packages for individual trade contracts

5. Evaluating individual trade contract proposals and awarding individual trade contracts

6. Management of construction until occupancy and/or functionality is achieved

7. Implementation of the one (1) year warranty and one (1) year warranty inspection

2 Refer to Exhibit D for current <loor plans and program information from the Project Architect.

[ PAGE 5 OF 32 ]

II. The Selection of the Construction Manager

A. The Five-Step Process of Evaluating Proposing Firms and Selecting the CM

1. Step One - Preliminary Evaluations

a. Countystaff,underthedirectionoftheChairmanoftheBOC,willevaluatethe
proposalsandqualiDicationspresentedbytheProposingFirmsand“short-list”the
topDirmsforfurtherconsideration.
b. Tobedeemedeligibleforevaluation,ProposingFirmsmustmeetthefollowing
minimumqualiDications:
i. AProposingFirmmusthavesufDicientbondingcapacityfortheanticipated
totalcostofwork.
ii. AProposingFirmmusthaveacurrentContractor’sPublicLiabilityInsurance
policyandmustbeinsurableinthefollowingamounts:[n]Bodilyinjury,
includingdeath-limitsof$1,000,000foreachaccident;[n]Propertydamage-
limitsof$2,000,000foreachaccidentand$10,000,000fortheaggregateof
operations;and[n]Workers’Compensation:Statutorylimitsasrequiredby
Georgialaw,includingEmployer’sLiabilityof$500,000/$500,000/$500,000.
Contractorsclaimingexemptionmustprovideacceptabledocumentationof

exemption.

iii. PickensCountyreservestherighttorequireadditionallimitsand/orcoverage
foractualcontract.

2. Step Two - Interviews

Countystaffwillscheduleandconductinterviewsofthe“short-listed”ProposingFirms
ifitdeemsnecessarytofurthervetthem.

[ PAGE 6 OF 32 ]

3. Step Three - Evaluations for Recommendations

a. AfterCountystaffnarrowtheDieldofProposingFirmstothemostqualiDied
candidates,PriceProposalsofthe“short-listed”candidatewillbereviewedand

evaluated.

b. The following criteria will be used as the basis for the evaluation of the proposals:

i. Experience and Workload 20%

ii. References 10%

iii. Firm Personnel Experience 20%

iv. Project Approach 20%

v. Price Proposal 30%

§§ Total Possible Score 100%

4. Step Four - Recommendations

CountystaffwillmakerecommendationsofProposingFirmstotheBOCthatitbelieves
arethemostqualiDiedtoserveasCMontheProject.

5. Step Five - Selection

a. The BOC will consider and act upon the recommendations received from County staff.

b. TheBOCreservestherighttorejectanyandallproposalsortoselectanyProposing
FirmtoserveasCMontheProject.
c. ShouldtheBOCchoosetoproceedforwardbyselectingaProposingFirmtoserveas
CMontheProject,theBOCwillseektoconcludeanAgreementwiththeProposing
FirmandexecuteacontracttherewithinconjunctionwiththisRFQ/P.
d. AnundersignedpartyofaProposingFirmonaproposalexpresslyunderstandsthat
theproposalofhisorherProposingFirmmayberejectedbyPickensCountyforany
reasonwithoutliabilityonpartofPickensCountytotheProposingFirmortothe

[ PAGE 7 OF 32 ]

undersigned party.

B. Nondiscrimination

AnyrecommendationorselectionmadeasaresultofthisRFQ/Pwillbemadewithout
regardtosex,race,creed,religion,color,nationalorigin,age,veteranormilitarystatus,
sexualorientation,genderexpressionoridentity,disability,ortheuseofatrainedservice

animal.

C. Content and Format of Proposals

Theproposalsmustcontainthefollowinginformationandmustbesubmittedintheformat
prescribedinthebalanceofthissubsection.3

1. Introductory Information

a. Firm name

b. Business address

c. Contact name

d. Former Dirm names

e. Out-of-state ofDices

f. The names of all afDiliated entities

g. ThenamesofanyafDiliatedentitiesand/orjointventurepartnerswhichmaybe
involvedintheProject

h. Statement of which ofDice(s) will handle the service, if multiple ofDices.

i. AclearandconcisestatementastowhyPickensCountyshouldselecta
particularProposingFirmtoprovidetherelevantservice.
3Thefailuretomeettherequirementsimposedbythissubsectionwillbeconsidered“non-responsive,”andtheentire
submittedproposalwillberejected.

[ PAGE 8 OF 32 ]

j. Alistingofanylitigations,arbitrations,ormediationsinwhichtheDirmorany
afDiliatedentitieshasbeeninvolvedinthepastDive(5)yearsinvolvingclaimsfor
morethan$50,000.00madebyaclientagainsttheDirmorbytheDirmagainst
theclient,andindicatethedispositionofeachclaim,thenameoftheadverse
party,andthenatureoftheclaim.
k. Statementthattheproposalwillremainineffectforandnotbewithdrawnfor
ninety(90)daysafterthedateduetoPickensCounty.
l. StatementacknowledgingthereceiptofeachandeveryaddendumthatPickens
CountymayissuetotheRFQ/P.
m. Statementthat,ifinitiallyselected,theProposingFirmwillnegotiateingood
faithwithPickensCounty.

2. Experience, Current Workload and ConKlicts of Interests

a. Experience and References of the Firm

ProvideaminimumofDive(5)toamaximumoften(10)exampleprojectsthat
demonstratetheProposingFirm’sexperienceinthepastDive(5)yearsasCMfor
constructingfacilitiessimilartothisProject,includingthefollowinginformation
foreachexampleprovided:

i. Project name, location and dates during which services were performed

ii. Briefdescriptionofprojectandphysicaldescriptionwithsquarefootage,
numberofstories,siteareaandothersimilarrelevantinformation

iii. Total cost of the project

iv. Services performed

v. Project photographs

vi. WrittenreferencefromtheArchitect/Client/User,withcurrentphone
numbers,familiarwithyourperformanceoneachprojectlisted,including
aProgramManagerreference,ifapplicable.

[ PAGE 9 OF 32 ]

vii. AlistoftheindividualswhoservedastheProjectExecutive/Director,
ProjectManager,Superintendent,CostEstimatorandotherkeyroleson
theproject.4
viii. Thetotalquantityofchangeordersandnettotalcostincreaseofchange
orderstotheproject.
ix. Summaryoftheactualscheduleperformancerelativetotheinitialproject
schedulefortheproject.
x. ThenameofaClientrepresentative,withacurrentphonenumber,whois
mostfamiliarwithyourDirm’sperformanceoneachproject.
xi. Anexampleofanaquaticcenterandoutdoorpoolprojectcompletedby
yourDirmand/oraqualiDiedconstructionmanagementpartner.

b. Experience of Involved Firm Personnel

Provide the following:

i. AdescriptionofyourDirm'sproposedinternalteamorganizationasCMfor
theconstructionmanagementteamfortheProject,includingany
Superintendent,ProjectManager,ProjectDirector,CostEstimator,Project
ExecutiveandanyotherkeyparticipantsintheProject.5

Include an organizational chart.

ii. Aresumeandexperiencerecordforeachteammember,includingyearsof
experience,education,andanticipatedamountoftimeeachwillworkon
theProjectandlocationofeachperson.
iii. Identifytheindividualwho,fromstarttoDinish,willbetheleaderofyour
constructionteamandtheprincipalpointofcontactbetweenyourDirm
andPickensCountyandtheProjectArchitect.
4Pleasenotewhethertheseindividualsarestillemployedwithyourfirm.
5Thisdisclosuremustincludeemployeesofanyaffiliatedentityorjointventurepartnerthatwillormightbeinvolvedin
theProject.

[ PAGE 10 OF 32 ]

c. Current Workload

Providealistofcurrentcontracts,withpercentagecompleted,andthetotal
possibleworkloadforthepersonnelproposedfortheProject.

d. ConKlicts of Interest

ProvidealistofanyconDlictsofinterestorpotentialthatyourDirmorpersonnel
mayhavewithPickensCountyoritsofDicialsoremployees.

3. Construction Management Approach

ProvideadetaileddescriptionandoutlineofthestrategyandapproachthattheDirm
proposestoapproachandcompletetheproposedCMARServices.
a. IncludesufDicientdiscussionofproposedvalueservices,methodologies,
techniques,andproceduresforeachworkreferencedintheaforementioned
scopeofwork.
b. DescribehowyourDirmmanagescost,procurementandworkforce,schedule,
quality,andsafety.

c. Provide a timeline schedule for execution of work and completion of the Project.

4. Price Proposal

a. APriceProposalmustbesubmittedalongwiththeProposalbutinaseparate
sealedenvelopeseparateandapartanyotherproposalinformationrelatedto
theProject.
b. InthePriceProposal,eachProposingFirmmustprovidethefollowingin
relationtotheCMARServicesthatitwilldeliverrelatedtothePreconstruction
andConstructionPhasesoftheAquaticFacilityComponentandtheMajorPark
ImprovementsComponent:

i. A percentage fee to be mutually agreed upon by Pickens County and the CM.

ii. PromptpaymentdiscountsofferedforaperiodoflessthanDifteen(15)days
willnotbeconsideredindeterminingthelowestproposedfeeandcosts.

[ PAGE 11 OF 32 ]

iii. AGuaranteedMaximumPrice(“GMP”)forthecostoftheconstructionofthe
twocomponentsoftheProjectbasedonthedesigndocuments,withthe
supportandassistanceoftheProjectArchitect.throughwhichtheCMwill
assumeresponsibilityforthecostsofconstructionconductedduringthe

Project.

c. TheFeeProposalForms,ExhibitB,attachedtothisRFQ/P,mustbesubmittedby
eachProposingFirm.
i. Detaileditemizationofeachfeeproposalmustbeattachedtotherespective
FeeProposalForm.
ii. Additionally,witheachfeeproposal,provideacostestimatefortheAquatic
FacilityComponentandtheMajorParkImprovementsComponentbased
upontheDesignDevelopmentDocuments.

The Cost Estimate Form is included as part of Exhibit B.

d. PromptpaymentdiscountsofferedforaperiodoflessthanDifteen(15)dayswill
notbeconsideredindeterminingthelowestproposedfeeandcosts.

D. Submission and Receipt of Proposals

1. Proposing Firms should submit six (6) hardcopy copies of their proposal:

a. One (1) of which must be marked “Original”

b. Five (5) marked as “Copy”

2. In addition, one (1) copy must be submitted in digital format or in PDF format.

3. ThePriceProposalmustbesubmittedinaseparatesealedenvelopeatthetime
proposalsaresubmitted.
4. Allproposalsareduenolaterthan4:30p.m.ETonSeptember11,2026.andmustbe
senttothefollowingaddressbycourierserviceand/ormail:
CourierService(FedEx,UPS)orHandDelivery
PickensCountyGovernmentAttn:MirandaMcDowell,FinanceDirector
1266EastChurchStreet
Jasper,GA30143

[ PAGE 12 OF 32 ]

5. PickensCountyacceptsnoresponsibilityforanyexpensesincurredbyProposingFirms
respondingtothisRFQ/PassuchexpensesaretheresponsibilityoftheProposing

Firms.

6. ProposalssubmittedafterthedeadlineofSeptember11,2026,willnotbeaccepted
underanycircumstances.

a. Such proposals will be returned to the sender unopened.

b. Faxed or emailed qualiDications are not acceptable.

7. ProposalsmustbeboundandcontainamaximumofDifty(50)pages(coverpage,
schedule,andsectiondividersarenotincludedintotal).

8. All questions regarding this RFQ/P must be submitted in writing via email to:

mmcdowell@pickenscountyga.gov

9. All proposal responses become the property of Pickens County and will not be returned.

10. Noproposalmaybewithdrawnforaperiodofninety(90)daysaftertimehasbeen
calledonthedateofopening.
11. AllqualiDicationsubmittalswillbeevaluatedinaccordancewithapplicablePickens
CountyrulesandFederal,Georgiaregulations,andlaws.
12. EvaluationofDirmssubmittingstatementsofqualiDicationfortheProjectwillbebased
onqualiDications,experience,andperformanceonpastprojectsalongwithreferences.
13. Duringtheevaluationprocess,PickensCountyreservestheright,whenitmayserve
PickensCounty’sbestinterest,torequestinformationorclariDicationfromProposing
Firmsortoallowcorrectionsoferrorsoromissions.

E. Exceptions to SpeciKications

1. AnyawardresultingfromthisRFQ/PwillbindthesuccessfulProposingFirmtoall
terms,conditions,andspeciDicationssetforthintheRFQ/P.

2. Proposing Firms whose Proposals do not conform must note that on a separate page if necessary.

[ PAGE 13 OF 32 ]

3. WhilePickensCountyreservestherighttomakeanawardtoanonconforming
ProposingFirm,wheninitsbestinterest,suchawardswillnotbereadilymade,and
ProposingFirmsareurgedtoconformtothegreatestextentpossible.
4. NoexceptionswillbeconsideredtohavebeentakenbyaProposingFirmunlessitis
properlysetoutasprovidedabove.
5. NoexceptionwillbedeemedtohavebeentakenbyPickensCountyunlessincorporated
inanawardresultingfromthisRFQ/Pandsostated.

F. Questions and Requests for Interpretations

1. AllquestionsandrequestsforinterpretationoftheRFQ/Pmustbeinwritingand
receivedatleastten(10)calendardayspriortothetimesetforopeningofproposalsin
writingviaemailviaemailtommcdowell@pickenscountyga.gov.
2. Responsestoquestions,clariDications,andanyresultingchangestotheRFQ/Pwillbe
issuedbywrittenaddendumandpostedonthePickensCountywebsite.
3. Itwillbetheresponsibilityofinterestedpartiestoperiodicallycheckthiswebsitefor
anynewinformation.
4. NoresponsestoquestionsorinterpretationsoftheprovisionsofthisRFQ/Pwillbe
madetoanyinterestedpartyorally.
5. PickensCountywillassumenoresponsibilityforrepresentationsorunderstandings
concerningconditionsmadebyitsofDicialsoremployeesunlesstheyareincludedinthe

RFQ/P.

G. Addenda and ClariKications

1. PickensCountyreservestherighttorevise,clarify,interpret,amend,orotherwise
modifythisRFQ/Patanytimebywrittenaddendum.
2. AlladdendashallbecomepartofthisRFQ/PandshallbepostedonPickensCounty's
ofDicialprocurementwebsite.ThiswebsiteshallbethesoleofDicialsourceforthis
RFQ/P,alladdenda,responsestoquestions,andanyotherprocurement-related

communications.

[ PAGE 14 OF 32 ]

3. ItshallbethesoleresponsibilityofinterestedProposingFirmstomonitorthewebsite
andobtainalladdendaandrelatedprocurementinformation.
4. ProposingFirmsshallacknowledgereceiptofalladdendaintheirproposals.Failureto
acknowledgereceiptofanaddendummayresultinaproposalbeingdeemednon-
responsive.ThisrequirementsupplementsSectionII.C.1.l.
5. Nooralstatement,interpretation,clariDication,representation,orinstructionbyany
CountyofDicial,employee,consultant,architect,orrepresentativeshallbebindingunless
incorporatedintoawrittenaddendumissuedbyPickensCounty.
6. Requestsforchanges,clariDications,orinterpretationsofthisRFQ/Pmustbesubmitted
inwritingandreceivedatleastten(10)calendardayspriortotheproposalduedate.
7. PickensCountyreservestherighttoextendtheproposalduedate,reviseprocurement
deadlines,ormodifyanyrequirementofthisRFQ/Pbywrittenaddendum.

H. Pre-Proposal Conference/Site Inspection RFQ/P

1. ThePre-ProposalConference/SiteInspectionisamandatoryrequirementtosubmita
proposalifapplicable.
2. TheMandatoryPre-ProposalConference/SiteInspectionwillbeconductedonAugust
26,2026beginningat1PM.
3. ThemeetingwillbeheldatthePickensCountyAdministrationBuildinglocatedat1266
EastChurchStreetJasper,Georgia30143.
4. PickensCountywillassumenoresponsibilityforrepresentationsorunderstandings
concerningconditionsmadebyitsofDicialsoremployeesunlesstheyareincludedinthis

RFQ/P.

5. AnyinformationpresentedatthePre-ProposalConference/SiteInspection,including
meetingnotes,questionsraisedbyattendees,responsesprovidedbyPickensCounty,
interpretations,clariDications,corrections,orrevisionstothisRFQ/P,willbe
documentedandissued,asdeterminedappropriatebyPickensCounty,througha
writtenaddendum.

[ PAGE 15 OF 32 ]

OnlyinformationcontainedinawrittenaddendumissuedbyPickensCountyshallbe
bindinguponPickensCounty.

I. Signing of Proposal

Thefailuretosigntheproposalonacoverletterin“originalform”providedwithaproposal
willresultintheproposalbeingdeclaredas“nonresponsive”andnotconsideredforaward.

J. Proposal Acceptance Time

ProposalsrequiringacceptancebyPickensCountyinlessthanninety(90)calendardays
couldberejected,unlesssostatedandacceptedbyPickensCounty.

K. Proposal IdentiKication

Allproposalsmustbereturnedinasealedenvelopewiththefollowinginformationinthe
lowerleft-handcorneroftheenvelope:RFPNumber/openingdate.

L. Withdrawal of Proposals

1. Proposalsmaybewithdrawnbywrittenrequestonlyiftherequestisreceivedpriorto
thetimeanddatesetfortheopeningofproposals.
2. NegligenceonthepartoftheProposingFirminpreparingitsproposalconfersnoright
ofwithdrawalormodiDicationofitsproposalaftertheproposalhasbeenopened.
3. Noproposalmaybewithdrawnforaperiodofninety(90)daysaftertimehasbeen
calledonthedateofopening.

M. Right to Retain Proposals and Utilize Ideas

PickensCountywillhavetherighttoretainallsubmittedproposalsandtouseanyidea(s)
containedthereinwithoutregardtowhetheranyproposalisselectedorrejected.

N. GMP Related Data and Information

Priortotheaward,theCMwillsharewithPickensCountythedraftandDinalcalculations,
estimatesandalldocumentsonwhichtheCM’sproposedGMPisbased.

O. Award of the Contract

[ PAGE 16 OF 32 ]

1. AwardwillbemadetothatProposingFirmwhoseproposal,conformingtotheRFQ/P,
willbemostadvantageoustoPickensCountyconsideringallfactorsanalyzed.
2. PickensCountyreservestherighttorejectanyand/orallproposalssubmittedandto
waiveanytechnicalities,informalitiesminorirregularitiesinsubmittedproposals.
3. Awrittenawardmailed(orotherwisefurnished)willbedeemedtoresultinabinding
contractwithoutfurtheractionbyeitherparty.
4. Anyawardedcontractorcontractswillbeonalumpsumbasisorindividualitembasis,
whicheverisfoundtobeinthebestinterestofPickensCounty.

P. Proposal Results

Interestedpartiesmayrequest,inwriting,aproposaltabulationaftertheRFQ/Phasbeen
approvedbyPickensCounty.

[ PAGE 17 OF 32 ]

III. Substantive Contractual Provisions

ThecontractthatwilleffectuatetheAgreementbetweenPickensCountyandthesuccessful
ProposingFirmwillcontainthefollowingnon-exclusivelistofsubstantiveprovisions.

A. At-Risk Nature of CM

TheCMwillbe“atrisk”intheproposedundertakingandwillberesponsiblefor
completingtheProjectattheGMPandbytheGuaranteedDeliveryDate(“GDD”),both
providedbythesuccessfulProposingFirmattheappropriatetimes.

B. Project Costs Less Than the GMP

Should the Dinal cost of the Project be less than the GMP, all savings will revert to Pickens County.

C. Bonds

The CM will be required to provide the following bonds:

1. Payment and Performance Bonds

a. PickensCountywillrequiretheselectedCMtofurnishaPaymentBondanda
PerformanceBond,eachinanamountnotlessthan(100%)onehundred
percentofthetotalproposalamountawardedpriortobeingissueda"notice
toproceed"onceaGMPhasbeendeterminedunderacontractissuedasa
resultoftheRFQ/P.
b. Thebondsmustbesubmittedwithin(15)Difteencalendardaysafterbeing
furnishedwitha"noticeofaward"orupondeterminationoftheGMP.

c. All bonds must be written on a surety company licensed to do business in Georgia.

d. Failuretosupplybondswillforceyourproposaltobedeclared“non-
responsive”andnotbeconsideredforaward.

2. Bid Bond

Bid Bonds will not be required for the Project.

[ PAGE 18 OF 32 ]

D. Open-Book Project

TheProjectwillbeopen-bookandallsavings,includingunusedcontingency,willbe
returnedtoPickensCounty.

E. GMP Package

InconjunctionwithSubsectionA,theCMwillsubmitaGMPpackagetoPickensCounty
forreviewandapprovalforthetwocomponentsoftheProject,whichpackagemustbe
baseduponfeedbackfromtheprocessofinteractingwithindividualtradecontactors
solicitedbytheCMcomprisedof:

1. Arranging proposal packages

2. Developingrequirementstoensuretimemanagement,costmanagementand
qualitycontrolduringconstruction
3. Providinganestimatedprovisionalconstructionscheduleforissuancewiththe
proposalpackage

4. Advertising and distributing proposal documents

5. Generating proposer interest

6. Identifying qualiDied proposers

7. Scheduling and conducting pre-proposal conferences

8. Reviewing and analyzing proposals and recommending contract awards

9. Finalizing and awarding contracts

F. Project Schedule

The CM will also develop an overall Project schedule, which will also be a contractual obligation.

G. Commencement of Work

1. WorkwillcommenceonthePreconstructionPhasewithinten(10)calendardays
aftertheissuancebyPickensCountyofa“NoticetoProceed”ontheProject

[ PAGE 19 OF 32 ]

2. Commencementmustbedoneinaroutine,orderlymanneruntilcompletionand
acceptancebyPickensCounty.

H. Value Engineering, Maintainability and Constructability

DuringthePreconstructionPhaseoftheProject,theCMwillberesponsibleforpricing,
valueengineering,andmaintainabilityandconstructabilityissues.

I. Individual Trade Contracts

1. Individual trade contracts will be between the CM and independent trade contractors.

2. TheCMmustcompetitivelyselectallconstructionsubcontractsandotherwork
appropriateforcompetitiveselectionusingcostandotherfactors.

J. Retention of Pay Applications

PickensCountywillrequiretenpercent(10%)retainageuntilDifty(50%)completion,
thenDivepercent(5%)retainagethroughouttheremainderoftheProjectandwill
releaseretainageatthepointofDinalcompletionandDinalacceptancebyPickens

County.

K. Termination of Project

PickensCountywillhavetheauthoritytosuspendorterminateperformanceofthe
Projectinwholeorinpart.

L. Project Planning

TheCMwillworkwithPickensCountyandtheProjectArchitecttoplantheProjectwith
planningtasksincluding:
1. Reviewingdesignconcepts,ideas,andsuggestionsofferedbyPickensCounty
andtheProjectArchitectwithregardtofeasibilityandconstructability.

2. Evaluating design with respect to constructability issues.

3. Evaluating value engineering opportunities.

4. Providing the following estimates for the two components of the Project:

[ PAGE 20 OF 32 ]

a. The Aquatic Facility Component

i. Design development

ii. Fifty percent (50%) construction documents

iii. One hundred percent (100%) construction documents (GMP)

b. Major Park Improvements Component

i. Schematic design

ii. Design development

iii. Fifty percent (50%) construction documents (GMP)

M. Commencement of Construction

Constructionwillcommencewiththereleaseofdistinctworkpackagesbasedonthe
designdocuments.

N. Construction Phase Obligations of the CM

The CM’s assigned obligations regarding the Construction Phase of the Project will be as follows:

1. Submit a GMP package to Pickens County for review and approval.

2. TheGMPpackagewillbebaseduponproposalfeedbackfromtradecontractors
requestedbytheCM.

3. Maintain a system for review and approval of shop drawings.

4. MaintainrecordsandsubmitroutinereportstotheProjectArchitectand
PickensCounty.

5. Maintain quality control and ensure conformity to contract documents.

6. ProvidecostcontrolthroughprogresspaymentreviewandveriDication
accordingtotheapprovedscheduleandcontractamounts.

[ PAGE 21 OF 32 ]

7. Coordinationofpostcompletionactivities,includingtheassemblyofguarantees,
manuals,as-builtdrawings,andPickensCounty’sDinalacceptance.

8. Implement and coordinate the one (1) year warranty and one (1) year warranty inspection.

9. TheCMwillberesponsibleforallrequiredpermitsorlicenserequiredby
Federal,Georgiaandlocalregulatoryagencies.
10. APickensCountyandProjectArchitectWalk-Through(PunchList)musttake
placepriortosubstationcompletionacceptance.

O. Payment

1. Paymentswillbemadeuponallitemscompletedeachmonthorcompletionofall
workandacceptancebyPickensCountyoninvoicessubmittedandapprovedbyan
appropriatePickensCountyrepresentative.-AllinvoicesmusthaveaPurchase
Order(PO)number.
2. Paymenttermsandprovisionshereinorotherwisefoundwithinthecontract
documentssupersedeallprovisionsoftheGeorgiaPromptPayAct(HB837;13
OCGAChapter11etseq.).
3. PromptpaymentdiscountsofferedforaperiodoflessthanDifteen(15)dayswillnot
beconsideredindeterminingthelowestproposedfeeandcosts.
4. However,suchdiscounts,whenoffered,willbetakenprovidedpaymentismade
withinthetimespeciDied.
5. Time,inconnectionwithdiscountsforpromptpayments,willbecomputedfromthe
dateofacceptanceofworkforwhichpaymentisclaimed,orthedatethecorrect
invoiceisreceivedbyPickensCounty,whicheverislater.
6. AllinquiriesregardingpaymentofinvoicesaretobedirectedtoAccountsPayableat
accountspayable@pickenscountyga.gov,ormailedtothefollowingaddress:
PickensCountyBoardofCommissioners
FinancialServicesDepartment
Attn:AccountsPayable1266EastChurchStreet,Suite162
Jasper,GA30143

[ PAGE 22 OF 32 ]

P. CertiKicate of Insurance

The CM must procure the insurance speciDied below during the life of the contract.

1. Workers’CompensationInsuranceforallemployeeswhoareengagedinthe
workunderthecontract.
2. PublicLiabilityandMotorVehicleLiabilityInsuranceasnecessarytoprotectit
whileperformingworkcoveredbythiscontractfromclaimsfordamageswhich
mayarisefromoperationsbyitsemployeesorbyanyotherpartydirectlyor
indirectlycontractedbyit.
a. PublicLiabilityInsuranceinanamountnotlessthan$1,000,000onaccount
ofoneoccurrence.
b. MotorVehicleLiabilityInsuranceonallmotorvehiclesowned,leasedor
otherwiseusedbytheCMinanamountnotlessthan$500,000(combined
singlelimit)forbodilyinjuryincludingdeathandpropertydamage

combined.

c. Professional Liability Insurance in an amount not less than $1,000,000.

3. Involved insurance companies must be licensed to do business in the state of Georgia.

4. AnyprofessionalcertiDicateofinsurancecoveringtheworkrequiredaboveas
evidencethattheinsurancerequiredwillbemaintainedinforcefortheentire
durationoftheworkperformedunderthisAgreement.
5. ThecancellationofanypolicyofinsurancerequiredbythisAgreementmust
meettherequirementsofnoticeunderthelawsoftheStateofGeorgiaas
presentlysetforthinO.C.G.A.§33-24-44.
a. EachpolicyofinsurancerequiredunderthisAgreementmustprovidefor
noticerequirementsunderthelawsoftheStateofGeorgiaassetforthin
O.C.G.A.§33-24-44andbyendorsementmustprovidethatPickensCounty
willreceiveacopyofsaidnoticeofcancellation.
b. AcertiDicateofinsurancewithacancellationprovisionwhichprovidesfor
lessnoticethanthatrequiredbyO.C.G.A.§33-24-44,orwhichprovidesthat

[ PAGE 23 OF 32 ]

failuretogivethewrittennoticewillnotImposeanyresponsibilityuponthe
insurer,willbeconsideredasanendorsementofthereferredtointhe
certiDicateandwillconstituteabasisforinsurancerejectionoftheinsurance
byPickensCounty.
c. Inadditiontoitsagreementtoobtainandmaintaintheinsuranceassetforth
hereinabove,theCMagreestoindemnifyandholdharmlessPickensCounty,
itsofDicials,agentsandemployeesfromanyandallclaimsagainstPickens
County,itsofDicials,agents,andemployees,whichariseoutofanyactor
omissionoftheCMoranyconsultantemployedbytheCMoranyofits
ofDicers,agentsoremployees,andanyandallclaimswhichresultfromany
conditioncreatedormaintainedbytheCMoranyconsultantretainedbythe
CMoranyoftheirofDicers,employeesoragents,whichconditionwhicha
resultofworkperformedunderthecontract.
d. Iftheinsuranceiscanceled,theCMmustdelivertoPickensCountynew
policiesofinsurance.ShouldtheCMneglecttoobtainandmaintaininforce
suchinsuranceanddeliversuchpolicyorpolicies,thenitmustbelawfulfor
PickensCountytoobtainandmaintainsuchinsurance.
Q. OtherSubstantiveRequirementsandConditions
Thecontractwillalsoincorporateothersubstantiverequirementsandconditionsas
statedinthisRFQ/P:

[ PAGE 24 OF 32 ]

IV. General Contract Information

A. Contract Execution

1. Subsequenttotheaward,thesuccessfulProposingFirmwillbepresentedwitha
contracttoeffectuatetheAgreementtoserveasCM.
2. PickensCountywillutilizeAIADocumentsA133-2019andA201-2017,asmodiDied
byPickensCounty,astheproposedfortheProject.

3. The contract is to be executed within ten (10) calendar days of “Notice of Award.”

4. The date of presentation will be deemed to be the postmark date.

5. The CM’s proposal and this RFQ/P will be incorporated into the contract.

B. The CM is an Independent Contractor

Onceselected,theCMwillconstituteanindependentcontractorandnotasanagentof
PickensCountyintheperformanceofitsdutiesregardingtheProject.
1. Accordingly,nothingcontainedinthisRFQ/Poracontractresultingtherefrom
willbeconstruedtoconstitutetheCMoranyofitsemployees,agents,
contractorsorsubcontractorsasapartner,employeeoragentofPickensCounty
2. TheCMmustDinanceitsownoperationspursuanttoperformingitsduties
regardingtheProject.

C. ConKlicting Provisions

ShouldanyprovisionoftheRFQ/PconDlictwiththeprovisionofthecontract,the
provisionofthecontractwillprevail.

D. Assignment of Contractual Rights

TheCMwillnotassign,transfer,convey,orotherwisedisposeofacontractthatresults
fromthisRFQ/Poritsright,title,orinterestinortothesame,oranypartthereof,
withoutthewrittenconsentofPickensCounty.

E. Non-Discrimination

[ PAGE 25 OF 32 ]

TheCMandanyassociatedcontractorsandsubcontractorsmustprovideservicesina
mannerthatdoesnotdiscriminateonthebasisofsex,race,creed,religion,color,
nationalorigin,age,veteranormilitarystatus,sexualorientation,genderexpressionor
identity,disability,ortheuseofatrainedserviceanimal.

F. Americans with Disabilities Act (ADA)

1. TheCMandanyassociatedcontractorsandsubcontractorsmustcomplywith
PickensCounty’sADAnoticeandprocedures,whichareavailableuponrequestand
areaccessibleonPickensCounty’swebsite.
2. AnypersonwhorequiresaccommodationtoaccessPickensCounty’sservicesor
programsbecausetheyhaveaqualiDieddisabilitymaycontactPickensCounty’sADA
Coordinatorat706-253-8809fortyeight(48)hourspriortothescheduledeventor
assoonaspossibleifwithinthefortyeight(48)hourperiod.

G. Inclusion

Allitemsand/orservicesstandard,expected,necessary,and/orroutinetosuchaProject
asthisandnotactuallystatedinthisRFQ/PwillbetheresponsibilityoftheCMto
provideatnoothercosttoPickensCountyunlesssostatedontheCM’sproposalas
additionalcostitemsandacceptedbyPickensCountyatthetimeoftheawardand/or

contract.

H. Change Orders

1. Anyworkperformedoutsideofthecontractforwhichcompensationoverandabove
thecontract’stermsoccurs;mustbeconductedpursuanttoanaccompanying
changeorder.

2. Any and all change order requests made by the CM must be approved by Pickens County.

3. Shouldworkperformedoutsideofthecontractbeperformedbeforechangeorder
approval,theworkmayberejectedordeniedforcompensation.

I. Indemnity

TheCMagrees,ifenteringintoacontractasaresultofthisRFQ/P,todefend,indemnify,
andholdharmlessPickensCountyfromanyandallcoursesofactionorclaimsof

[ PAGE 26 OF 32 ]

damagesarisingoutoforrelatedtotheCM’sperformanceoractionsorthoseofits
employeesoragents,underthecontract.

J. Termination

PursuanttoO.C.G.A.§36-60-13,ifapplicable,anycontractresultingfromthisRFQ/P,if
notsoonerterminatedpursuanttotheprovisionsofterminationcontainedherein,is
terminablebytheBOConDecember31ofeachcalendaryearduringthetermofthe
contract,exceptthatthecontractwillberenewedautomaticallyonsuchdate,and
withoutanylapse,unlesspositiveactionistakentoterminatesaidcontractbytheBOC
inapublicmeetingandsuchactionenteredintheofDicialminutesoftheBOC.

K. Cancellation for Cause

1. Shouldeitherpartyfailtocomplywiththetermsandconditionsofthiscontract,the
aggrievedpartymustgive,inwriting,totheotherpartyanycomplaintfornon-
complianceofthetermsandconditionsofthiscontract.

2. The other party will have Difteen (15) calendar days to correct the matter.

3. IfcorrectedtothesatisfactionofbothpartieswithintheDifteen(15)calendardays
andstatedinwriting,thenthecontractwillcontinueuninterrupted.
4. Failuretocorrectthematterwillresultinterminationofthiscontractattheendof
thirty(30)calendardaysfollowingthedateoftheinitialletterofcomplaint.

L. Appropriation of Funds

Theinitialcontractandanycontinuationcontractswillterminateimmediatelyand
absolutelyatanysuchtimeastherearenotappropriatedandotherwiseunobligated
fundsavailabletosatisfyPickensCounty’sobligationsunderthecontracts.

M. Governing Law Clause

TheAgreementwillbegovernedbyandconstruedinaccordancewiththesubstantive
lawsoftheStateofGeorgia.

N. Venue

TheSuperiorCourtofPickensCountyGeorgiawillhaveauthorityoveranylegalmatters
arisingfromthisAgreement

[ PAGE 27 OF 32 ]

Af$idavit and Exhibits

[ PAGE 28 OF 32 ]

S.A.V.E. Program Af.idavit

SystematicAlienVeri0icationforEntitlements(SAVE)ProgramOf0iceofU.S.Citizenship
andImmigrationService(USCIS)

o

Background

Pursuanttothe“GeorgiaSecurityandImmigrationComplianceAct,”PickensCountycannot
contractforthephysicalperformanceofservicesunlessthecontractorregistersandparticipatesin
thefederalworkauthorizationprogramtoverifyinformationofallnewemployees.Neithermay
anycontractororsubcontractorenteracontractwithPickensCountyinconnectionwiththe
physicalperformanceofservicesunlessthecontractororsubcontractorregistersandparticipates
inthefederalworkauthorizationprogramtoverifyinformationofallnewemployees.O.C.G.A.§13-
10-91.EachcontractorisurgedtoDillouttheafDidavitbelowstatingtheycomplywiththisGeorgia
ComplianceActbeforePickensCountycanlegallyacceptthebidsfromeachcontractor/vendor.
ToregisterfortheE-VerifyProgramvisitwww.uscis.gov.YourbidwillnotbeacceptedwithoutthisE-
VerifyNumber.

Procedure

AfDirmativelanguagewillbesetforthincontractsfortheperformanceofservicesregardingthe
aboverequirement.PickensCountywillrequireanafDidavitfromacontractorshowingits
compliancewiththerequirementsofO.C.G.A.§13-10-91atthetimeacontractfortheperformance
ofphysicalservicesisexecuted.Thecontractwillincludelanguagereferencingthisobligationand
providingthatfailuretosupplyanafDidavitevidencingsuchcompliance(ortocontinuetomeetthe
statutoryobligationduringthelifeofthecontract)willconstituteamaterialbreachofthecontract.
Uponnoticeofsuchbreach,thecontractorwillbeentitledtocurethebreachwithinten(10)days
andprovideevidenceofsuchcure.Shouldthebreachnotbecured,PickensCountyshouldbe
entitledtoallavailableremedies,includingterminationofthecontractanddamages.

See afHidavit on following page

[ PAGE 29 OF 32 ]

S.A.V.EProgramAf.idavit
SystematicAlienVeri0icationforEntitlements(SAVE)ProgramOf0iceofU.S.Citizenshipand

Immigration Service (USCIS)

ByexecutingthisafDidavit,theundersignedcontractorveriDiesitscompliancewithO.C.G.A.§13-10-
91,statingafDirmativelythattheindividual,DirmorcorporationwhichiscontractingwithPickens
County,Georgia,hasregisteredandisparticipatinginafederalworkauthorizationprogram*(an
electronicveriDicationofworkauthorizationprogramoperatedbytheU.S.DepartmentofHomeland
SecurityoranyequivalentfederalworkauthorizationprogramoperatedbytheU.S.Departmentof
HomelandSecuritytoverifyinformationofnewlyhiredemployees,pursuanttotheImmigration
ReformAndControlActof1986(IRCA),inaccordancewiththedeadlinesestablishedinthe
referencedstatute.
*TheapplicablefederalworkauthorizationprogramasoftheeffectivedateofthestatuteistheE-
VerifyProgramoftheSystematicAlienVeri0icationforEntitlements(SAVE)ProgramOf0iceofU.S.
CitizenshipandImmigrationService(USCIS).ToregisterfortheE-VerifyProgramvisitwww.uscis.gov
.yourbidwillnotbeacceptedwithoutthisE-VerifyNumber.

Company Name

Street Address

By: Authorized OfDicer or Agent Date [Contractor Name]

Printed Name Contractor’s/Vendor’s E-Verify #

Subscribed and sworn before me on this the ___ day of _______________________, 20

Notary Public

My commission expires ____________________________

[ PAGE 30 OF 32 ]

EXHIBIT A

Indemnity

Tothefullestextentpermittedbylaw,theContractorshallindemnifyandholdharmlessthePickens
County,GAfromandagainstliability,claims,damages,lossesandexpenses,includingattorneys'
fees,arisingoutoforresultingfromperformanceofthework,providedthatsuchliability,claims,
damage,lossorexpenseisattributabletobodilyinjury,sickness,diseaseordeath,ortoinjurytoor
destructionoftangibleproperty(otherthantheworkitself)includinglossofuseresulting
therefrom,butonlytotheextentcausedinwholeorinpartbynegligentactsoromissionsofthe
Contractor,aSubcontractor,anyonedirectlyorindirectlyemployedbythemoranyoneforwhose
actstheymaybeliable.InclaimsagainstanypersonorentityindemniDiedunderthisParagraphby
anemployeeoftheContractor,aSubcontractor,anyonedirectlyorindirectlyemployedbythemor
anyoneforwhoseactstheymaybeliable,theindemniDicationobligationunderthisParagraphshall
notbelimitedbyalimitationonamountortypeofdamages,compensationorbeneDitspayableby
orfortheContractororaSubcontractorunderworkers'compensationacts,disabilitybeneDitacts
orotheremployeebeneDitacts.InsuranceRequirements:Priortocommencingwork,theFirm,atits
ownexpense,shallfurnishinsurancecertiDicateshowingthecertiDicateholderasPickensCounty,
GA.Ataminimum:CommercialGeneralLiabilityandAutomobileLiability:combinedsinglelimitat
least$1,000,000peroccurrence;Umbrellaliabilityintheamountofatleast$1,000,000thatfollows
thecoverageformsforunderlyingliabilitypoliciesorisbroader;Worker’sCompensationpolicy
providingstatutorylimits;ArchitectsandEngineersProfessionalLiability–errorsandomissions
policyintheamountofatleast$1,000,000peroccurrence.Coverageshallprovideforprofessional
errorsand/oromissionsinthepreparationofdesignsand/orspeciDicationsandincludethe
renderingofsupervisory,inspection,orengineeringservices.TitleVI:InaccordancewithTitleVIof

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .