Club_West_HVAC_Replacement.pdf

PDF 416 KB Posted

Attached to
Club West HVAC Replacement
Solicitation number
26-088-ITB
Issued by
Yolo County, California

About this file

Club West HVAC Replacement Invitation to Bid

This Invitation to Bid (ITB #26-088-ITB) is issued by the City of West Sacramento, California, for the replacement of four wall-mounted HVAC units at Club West, located at 1125 Riverbank Road. The project requires qualified mechanical/HVAC contractors holding a C-20 license to furnish and install replacement units equivalent to existing Bard Manufacturing models currently serving the kitchen area, dance room, game room, and administration/office spaces. The scope includes removal of existing equipment, installation of new units, electrical and controls connections, manufacturer-authorized start-up, testing and balancing, calibration, and full system commissioning. Additionally, the contractor must coordinate with AT&T for relocation of telecommunications panels obstructing access to one unit. All work must be completed within 60 working days from Notice to Proceed, with preferred completion dates of February 12-15, 2027, or March 20-30, 2027. Work hours are restricted to 7:30 AM to 5:00 PM, Monday through Friday, to minimize disruption to facility operations. The mandatory pre-proposal meeting is scheduled for November 18, 2026, at 10:00 AM. Questions must be submitted by December 11, 2026, at 5:00 PM, and sealed bids are due electronically through the City's OpenGov portal by December 17, 2026, at 2:00 PM. Contract award is anticipated for January 20, 2027.

The bidder must submit all required documentation electronically, including a signed W-9 form, legal company name, cost proposal using the electronic pricing table, certified debarment status, and proof of appropriate licensure and insurance coverage. The cost table includes nine line items: communication panel relocation, mobilization and site access, removal and disposal of existing units, installation of new units, electrical connections and modifications, controls and thermostat integration, manufacturer start-up and commissioning, cleanup and demobilization, and building permits and inspections. All work is subject to prevailing wage requirements under California Labor Code, and the contractor must register with the Department of Industrial Relations. The City requires a minimum one-year warranty on labor and a minimum five-year warranty on parts and compressor. Replacement units must comply with current Title 24 energy standards, be compatible with existing electrical infrastructure, and not exceed 75 dB noise levels. The project is funded locally by the City of West Sacramento. No set-aside programs are identified in this solicitation. The City reserves the right to reject any or all bids and to award the contract to the lowest responsive, responsible bidder.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

26-088-ITB

CLUB WEST HVAC REPLACEMENT

City of West Sacramento

1110 W Capitol Ave

West Sacramento, CA 95691

RELEASE DATE: November 6, 2026

DEADLINE FOR QUESTIONS: December 11, 2026

RESPONSE DEADLINE: December 17, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d

City of West Sacramento

INVITATION TO BID

Club West HVAC Replacement

I. Introduction II. Project Details

III. Terms and Conditions IV. Bid Submittal V. Cost Table

VI. Contract Award

Attachments:

A - Construction Bid Packet Club West HVAC Replacement

B - Insurance Checklist

Invitation to Bid #26-088-ITB Title: Club West HVAC Replacement

1. Introduction

1.1. Summary

The City of West Sacramento is accepting sealed responses for qualified mechanical/HVAC firms to replace four (4) wall mount HVAC units to be received no later than Thursday, December 17, 2026 at

2:00 pm.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full

1.2. Background

West Sacramento is a vibrant riverfront community centrally located in Northern California. West

Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and nearly 500 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.

1.3. Contact Information

Christina Livingstone-Wilson

Project Manager I

1110 West Capitol Avenue

1st Floor

West Sacramento, CA 95691

Email: christinali@cityofwestsacramento.org

Phone: (916) 617-4909

Department:

Capital Projects - Construction

1.4. Timeline

Release Project Date November 6, 2026 https://secure.procurenow.com/portal/cityofwestsacramento/projects/310217/document?section=undefined mailto:christinali@cityofwestsacramento.org tel:(916)617-4909

Pre-Proposal Meeting (Mandatory) November 18, 2026, 10:00am

1125 Riverbank Road, West Sacramento, CA 95691

On-street Parking may be required.

Question Submission Deadline December 11, 2026, 5:00pm

Proposal Submission Deadline December 17, 2026, 2:00pm

Public Bid Opening (Non-Mandatory) December 17, 2026, 2:00pm

Microsoft Teams meeting

Join:

https://teams.microsoft.com/meet/283877484135

2036?p=2b2khjH6gOteV5gx7q

Meeting ID: 283 877 484 135 203 6

Passcode: Lz9nM7xt

Need help? | System reference

Dial in by phone

+1 619-485-0116,,624129633# United States, All locations

Find a local number

Phone conference ID: 624 129 633#

For organizers: Meeting options | Reset dial-in PIN

Contract Award Date January 20, 2027 https://teams.microsoft.com/meet/2838774841352036?p=2b2khjH6gOteV5gx7q https://teams.microsoft.com/meet/2838774841352036?p=2b2khjH6gOteV5gx7q

2. Project Details

2.1. Important Instructions for Electronic Submittal

The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full

2.2. Project Scope

Summary

The City of West Sacramento (“City”) is soliciting bids from qualified contractors to provide a like-for-like replacement of four (4) wall-mounted HVAC units at Club West, 1125 Riverbank Road. Work to include coordination with the responsible telecommunications agency (e.g., AT&T) for relocation of telecommunications panels on the north side of the building.

• Base Scope – Equipment Installation: The Contractor shall furnish and install new HVAC units in the designated areas as specified in the equipment schedule. Units shall be commissioned using their native, standalone manufacturer controls (e.g., standard wall-mounted thermostats). Work shall include services required to remove the existing HVAC units as specified in the equipment schedule.

• Additional Requirements: All disconnect boxes shall be sized and installed such that they fit entirely within the limits of the existing security cage, which shall remain in place and secured at all times. The City prefers that the existing thermostats, approximately three to four (3–4) years old, be replaced with newer models equipped with Wi-Fi–enabled control capabilities.

• Work to include coordination with the responsible telecommunications agency (e.g., AT&T) for relocation of telecommunications panels on the north side of the building. Communication

Panel Coordination: The Contractor shall coordinate with the responsible telecommunications agency (AT&T or other applicable provider) for the relocation of the existing AT&T panel boxes currently obstructing maintenance access to AC Unit 1. All physical relocation work shall be performed by the agency responsible. Contractor’s responsibilities include scheduling, site access facilitation, and ensuring relocation occurs prior to installation of the replacement HVAC unit.

https://secure.procurenow.com/portal/cityofwestsacramento/projects/310217/document?section=undefined

Work Hours

The Contractor shall perform all work in a manner that minimizes disruption to Club West operations. All work shall take place between 7:30 AM and 5:00 PM, Monday through Friday.

Preferred completion dates are February 12–15, 2027, or March 20–30, 2027; however, the schedule may be adjusted as needed in coordination with project contact to accommodate operational or project-related changes.

Contractor Responsibilities

The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, fees, and incidentals necessary to complete the Work, including but not limited to:

• Field verification of existing conditions

• Removal and lawful disposal of existing equipment and refrigerants

• Furnishing and installation of replacement HVAC units

• Electrical, mechanical, and controls connections.

• Manufacturer-authorized start-up

• Testing and Balancing (TAB)

• Calibration of controls and sensors

• Commissioning

• Documentation and project closeout

• Coordinate all site access, equipment removal, planned shutdowns, and work-hour impacts with

City staff to ensure minimal disruption to Club West operations. Provide at least 48-hour notice for any activities impacting access or electrical service.

Contractor License Requirement: C-20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor

Unit Requirements

Replacement units shall be equivalent in capacity and function to the existing units listed below and compliant with current codes and manufacturer requirements:

• AC-HP (Heat Pump) Unit 1 Kitchen Area

Manufacturer: Bard Manufacturing

Make: Wall Mount

Model: WH361-B09 xx4xxx

Serial: 133H072361102-02

• AC- HP Unit 2 Dance Room

Make: Wall Mount

Model: WH421-509

Serial: 127B90766597-02

• AC-HP Unit 3 Game Room

Make: Wall Mount

Model: W60H1-B09 VP4xxx

Serial: 325K129936511-02

• AC-HP Unit 4 Admin/Office

Make: Wall Mount

Model: WH361-B09

Serial: 133C930771762-02

Replacement units shall meet or exceed the following:

• Compliant with current Title 24 energy standards

• Compatible with existing electrical infrastructure

• Noise level not to exceed 75 dB

• Replacement units shall be Bard Manufacturing.

Removal and Installation

The Contractor shall:

• Verify dimensions and compatibility of existing wall sleeves and ensure replacement units fit appropriately. Any modifications required to accommodate new units shall be included in the base bid.

• Disconnect and remove existing wall-mounted units.

• Install new units in existing openings/wall sleeves.

• Connect to existing ductwork, electrical systems, and controls.

Start-Up, Testing, Balancing, Calibration, and Commissioning Manufacturer-Authorized Start-Up

• Coordinate and obtain manufacturer-authorized start-up for all new units.

• Verify proper installation, refrigerant charge, airflow, and electrical connections.

• Activate all manufacturer warranties.

Testing and Balancing (TAB)

The Contractor shall:

• Provide independent Testing and Balancing for all replaced units.

• Verify airflow, temperatures, and system performance.

• Adjust dampers, fans, and controls as needed.

• Submit a stamped TAB report to the City.

Calibration

The Contractor shall:

• Calibrate all sensors, thermostats, and control devices.

• Provide written calibration records to the City.

Commissioning

• Perform full system commissioning.

• Test operational sequences, alarms, and system performance.

• Correct any deficiencies prior to final acceptance.

Final Commissioning Report and Closeout

All manufacturer start-up documentation, TAB reports, calibration records, and commissioning results must be completed, submitted, and accepted prior to final acceptance and shall be included in the closeout package. Prior to final payment, the Contractor shall submit:

• Manufacturer start-up documentation

• Final TAB report

• Calibration records

• Commissioning test results

• As-built documentation

• Equipment manuals

• Warranty certificates

• Permit closeout documentation

Codes and Standards

All work shall comply with the latest editions of:

• California Mechanical Code (CMC)

• California Electrical Code (CEC)

• California Energy Code (Title 24)

• ASHRAE Standards

• Manufacturer installation requirements

Permits and Inspections

• Obtain and pay all required building permits prior to starting work.

• Coordinate all required inspections.

• Address any inspection corrections at no additional cost to the City.

• Achieve final permit closeout prior to project completion.

Schedule

The Contractor shall complete the Work within 60 working days from Notice to Proceed. The Contractor shall submit a detailed project schedule identifying key milestones, including equipment procurement, installation, manufacturer start-up, TAB, calibration, and commissioning activities.

Warranty

The Contractor shall provide:

• Minimum one-year warranty on labor.

• Minimum five-year warranty on parts and compressor.

Final Acceptance

Final acceptance will be contingent upon:

• Successful completion of all work.

• Passing all inspections.

• Submission of all required documentation.

• Resolution of all punch list items.

• Delivery of the Final Commissioning Report.

3. Terms and Conditions

3.1. Prevailing Wages

A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this

ITB is subject to compliance monitoring and enforcement by the DIR.

B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification.

3.2. Statement of Offer

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

3.3. Project Management Documentation & Administration

Virtual Project Manager (VPM)

The City anticipates using an online cloud-based project management system to manage, assign, and coordinate specific tasks with the City's selected Contractor within the Scope of Work. By way of this section, the City reserves the right to utilize an online cloud-based project management system. By submitting a bid, bidder acknowledges and agrees that they are prepared to use the system, as may be required by the City. The City's specific system is Virtual Project Manager (VPM). VPM allows for paperless documentation and project administration. For more information on VPM, go to www.virtual-pm.com

A. Submittal Procedures and Construction Progress Documentation for requirements for administering and using VPM.

1. The Contractor shall submit the items associated with this section via Virtual Project

Manager (VPM), an online cloud-based project management system, as specified below.

2. Virtual Project Manager (VPM) allows for paperless documentation and project administration. All posted information is available to all personnel involved with the project at any time using the internet.

3. The use of VPM by the Contractor is mandatory. Access to VPM will be provided at no cost to the contractor.

4. In order to utilize VPM, the contractor needs a computer, internet access, a digital camera, and a scanner. For more information, go to www.virtual-pm.com. To Login, from the homepage, select LOGIN and enter the Username and Password that will be provided to you by the agency.

B. The contractor shall use the following features:

1. Daily Logs: Contractor’s daily reports shall be entered electronically via VPM.

2. Change Order Manager: Contractor requests for change order shall be submitted electronically via VPM.

3. Transmittals: Schedules, Pay applications, etc. shall be submitted electronically via VPM.

4. Submittals: Submittals requiring approval shall be submitted electronically via VPM.

5. RFIs: Requests for information (RFIs) shall be submitted electronically via VPM.

C. Technical Submittals

1. Submittal Procedure

a. The Contractor shall utilize the agency’s online cloud-based project management system

(Virtual Project Manager) for submittals.

3.4. Questions and/or Objections

It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).

A Proposer may submit Questions related to this ITB to the City through the City’s e-Procurement Portal at or before:

Friday, December 11, 2026 at 5:00 pm.

Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.

3.5. Amendment and Cancellation

The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications.

https://secure.procurenow.com/portal/CityofWestSacramento

3.6. Right of Rejection

A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety.

B. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected.

C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.

D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.

3.7. Prohibition of Respondent Terms and Conditions

A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB.

3.8. Joint Ventures and Partnering

A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:

A. The Proposal shall respond to each section and subsection of this ITB.

B. The Proposal shall clearly set forth the respective responsibilities and functions that each

Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB.

C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB.

D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.

3.9. Proposal of Alternate Services

A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected.

3.10. Proposal of Additional Services

A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the

Contract before execution.

3.11. Severability

If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and

Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid.

3.12. Licensure and Special Certification

Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all

Proposers to submit evidence of proper licensure and certifications.

3.13. Disclosure of Proposal Contents

All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals shall be open for review by the public to the extent required by the California Public

Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.

Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

3.14. Conflict of Interest and Restrictions

By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB.

3.15. Proprietary Information

A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.

Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.

Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.

If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.

4. Bid Submittal

4.1. Please upload a signed W-9 form*

Please download the IRS 2024 Form W-9 and upload a completed, signed copy. Acceptable signatures include either a handwritten (wet) signature or a valid electronic signature.

• W-9_Form_ver._2024_-_BLANK.pdf

*Response required

4.2. Please enter Legal Company Name and related DBA*

Please state your company name and any related DBA's based on your California Secretary of State

Filing.

*Response required

4.3. Cost Proposal using Electronic Pricing Table*

The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder.

☐ Please confirm

*Response required

4.4. Response (without Cost Proposal)*

Please Upload Your Response Here, excluding your Cost Proposal.

*Response required

4.5. Statement of Offer*

Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost

Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.

☐ Please confirm

*Response required

4.6. Bid Bond*

Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs

*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/4713e161-0e9b-428f-be7a-2b0ae306a414_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HFWRFP3G%2F20261106%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261106T160002Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEBcaCXVzLXdlc3QtMiJHMEUCIBTkURzyRPnwikqRXgUvoOs6ob3GtPE3pOvjthTpiXEXAiEA1GRAuYTZtyobyOJueU5ARm95S62wA5Rb0w7FFGWQvmAqlQUI4P%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAEgHEA5yDXjFip64irpBBx0PzXqyEbzuL4U8xx8aV8Bi6hzsGNCQXxQMlvQ%2B6cr7TlyeePylb3igdXe7ebfW0BKfulACzp9QbHI6Hnni7RmzoHXSGNKFfaz%2F5DECff0U8ru6QoZZ9nnadNtT2faw74L0w%2FAqh5JlfrQ2ja5qNCmsRKx33YCltf2ypGAjuRwpBkbYxu8R4l3J9SvSRJB1fIdi0auEGfWT%2FO%2BHSf2isYMgc4UGpg%2B%2BVtSMtV%2F%2F9pe0fZTVk4jtBOptA1tt5lyVvy3LyxZB01vDMq61%2Fa2GOlkGF%2FLYDx8dsK0NxTW%2FXSNifsH8zgzC0Wti6Xqw21cnjjB1Fd%2BNHn6KgOjOSSO%2FLRjkR9q2aQqWXAA9thJGMWc663SRglVD0ZxXK02lAqSWMh6iUWKIENvjbUA6FWjMK%2BjLqrU2mf8CorSubv2yGvnEMxsB5Pzsg4j2eU483q8nGOsjYBfsE3CiDl4U6RIhpvke3gqCxYUiDtsIG6ztEWxF8kvg%2FIvy3TSgAgHyIc6nOaJBz0LT6GrBNf1Wzihy%2BlhzNuFf4tjfEnK979qxLKqfzHGVt5eTSE864gCaBNL3qtMVjK34LjltTcrsBrkxbglx9f8hnsvY8xEsBqVyWD6AFbMFz%2B3f%2BP9g1LVDWWcl5sf9whWzWovbhMmeHfnuI5fa3XBtHvPL8d0oWGKx%2BgaLRtGZpxaoTnNHywiipyF4KOmJl4LRMP5pe0Mvv9Cye%2FGPRk%2F%2BtNLXuuKE2ylGlUqZZQSU3NVZ47FO8Gw%2FTemk0ZV919hpN0gy%2B6Psq4LmqKkgXJ8T%2BniyKwQiqIEyAS2GZagX6Wy5cl%2FMJHOt9cGOpkBXuwzlLgu2mX6hR7J0HrmFLwqBj4dKKrtH1Z9kcLLDPjNnwIc5U2cAHN%2FeBmsKvoojC7X9IqV7y%2B14eS9eL%2Blo7IJRCgDflBl9%2B18DzIiOE1enj9HGpymynEy6WblZAi7m3KFXO61%2BGnzCL3iJysUiAWCkQgBlPmnekN6m2MzxQYA5ZW7PRwN2neaDAJ%2FDHKkdR4gGsIY0B3q&X-Amz-Signature=b208ef3c76c7f382316cc6aa40ccf00d39250a4c737388271bfd4f92d614798c&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/310217/document?section=2959978

4.7. California Contractors State License Board

Please enter your contractor license number for verification.

4.8. Certification regarding Debarment

The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.

A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.

Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.

For all other proposers, the completed form is sufficient.

• Certification_Regarding_Deb...

4.9. City Contract *

The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract.

☐ Yes

☐ No

*Response required

4.10. Insurance Requirements*

The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the

Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.

☐ Yes

☐ No

*Response required

4.11. Authorized Contract Signer *

Please provide the name, title and email address of the authorized contract signer.

*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/7fbcd8f3-7d1e-4b79-a50c-03f71fe54e62_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4HFWRFP3G%2F20261106%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20261106T160002Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEBcaCXVzLXdlc3QtMiJHMEUCIBTkURzyRPnwikqRXgUvoOs6ob3GtPE3pOvjthTpiXEXAiEA1GRAuYTZtyobyOJueU5ARm95S62wA5Rb0w7FFGWQvmAqlQUI4P%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDAEgHEA5yDXjFip64irpBBx0PzXqyEbzuL4U8xx8aV8Bi6hzsGNCQXxQMlvQ%2B6cr7TlyeePylb3igdXe7ebfW0BKfulACzp9QbHI6Hnni7RmzoHXSGNKFfaz%2F5DECff0U8ru6QoZZ9nnadNtT2faw74L0w%2FAqh5JlfrQ2ja5qNCmsRKx33YCltf2ypGAjuRwpBkbYxu8R4l3J9SvSRJB1fIdi0auEGfWT%2FO%2BHSf2isYMgc4UGpg%2B%2BVtSMtV%2F%2F9pe0fZTVk4jtBOptA1tt5lyVvy3LyxZB01vDMq61%2Fa2GOlkGF%2FLYDx8dsK0NxTW%2FXSNifsH8zgzC0Wti6Xqw21cnjjB1Fd%2BNHn6KgOjOSSO%2FLRjkR9q2aQqWXAA9thJGMWc663SRglVD0ZxXK02lAqSWMh6iUWKIENvjbUA6FWjMK%2BjLqrU2mf8CorSubv2yGvnEMxsB5Pzsg4j2eU483q8nGOsjYBfsE3CiDl4U6RIhpvke3gqCxYUiDtsIG6ztEWxF8kvg%2FIvy3TSgAgHyIc6nOaJBz0LT6GrBNf1Wzihy%2BlhzNuFf4tjfEnK979qxLKqfzHGVt5eTSE864gCaBNL3qtMVjK34LjltTcrsBrkxbglx9f8hnsvY8xEsBqVyWD6AFbMFz%2B3f%2BP9g1LVDWWcl5sf9whWzWovbhMmeHfnuI5fa3XBtHvPL8d0oWGKx%2BgaLRtGZpxaoTnNHywiipyF4KOmJl4LRMP5pe0Mvv9Cye%2FGPRk%2F%2BtNLXuuKE2ylGlUqZZQSU3NVZ47FO8Gw%2FTemk0ZV919hpN0gy%2B6Psq4LmqKkgXJ8T%2BniyKwQiqIEyAS2GZagX6Wy5cl%2FMJHOt9cGOpkBXuwzlLgu2mX6hR7J0HrmFLwqBj4dKKrtH1Z9kcLLDPjNnwIc5U2cAHN%2FeBmsKvoojC7X9IqV7y%2B14eS9eL%2Blo7IJRCgDflBl9%2B18DzIiOE1enj9HGpymynEy6WblZAi7m3KFXO61%2BGnzCL3iJysUiAWCkQgBlPmnekN6m2MzxQYA5ZW7PRwN2neaDAJ%2FDHKkdR4gGsIY0B3q&X-Amz-Signature=c5e1313e3b990c33f86bf212ed5810448a3f4ed50c4f040fa19d93c4498908e2&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/310217/document?section=undefined

5. Cost Table

BID SCHEDULE

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Communication (AT&T) Panel

Relocation

1 LS

2 Mobilization, Staging, and Site Access 1 LS

3 Removal and Proper Disposal of

Existing Wall-Mounted HVAC Units

4 EA

4 Install New Wall-Mounted HVAC Units 4 EA

5 Electrical Connections and

Modifications

1 LS

6 Controls, Thermostats, and

Equipment-Level Integration

1 LS

7 Manufacturer-Authorized Start-Up, Testing & Balancing (TAB), Calibration, and System Commissioning (including final commissioning report)

1 LS

8 Cleanup and Demobilization 1 LS

9 Building Permit, Plan Review, and

Inspections (Contractor to Pull Permit)

1 LS

TOTAL

6. Contract Award

6.1. Opening & Award of Contract

Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders.

Bid Summaries may be made available to Bidders after the Bid Date.

The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001

The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids.

Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection.

Award of Contract

The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose

Bid complies with the requirements set forth herein. The City reserves the right to award the Contract based on the Base Bid alone or the Base Bid plus any combination of Additive Alternate Bid items, in any order, as determined to be in the best interest of the City.

The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of

Award”) shall be deemed the Award of Contract.

6.2. Bid Protests

The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the

City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure.

Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the

City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening.

(a) The initial protest document must contain a complete statement of the basis for the protest, and all supporting documentation.

(b) The party filing the protest must have actually submitted a Bid for the Work. A Subcontractor of a party submitting a Bid for the Work may not submit a Bid protest. A party may not rely on the Bid protest submitted by another Bidder, but must timely pursue its own protest.

(c) The protest must refer to the specific portion of the Contract Documents which forms the basis for the protest.

(d) The protest must include the name, address and telephone number of the person representing the protesting party.

(e) The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

(f) The City will give the protested Bidder five (5) working days after the receipt of the protest to submit a written response. The responding Bidder shall transmit the response to the protesting Bidder concurrent with delivery to the City.

(g) The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest. The Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government

Code Claim or legal proceedings.

(h) If the City determines that a protest is frivolous, the protesting Bidder may be determined to be non-responsible and that Bidder may be determined to be ineligible for future contract awards.

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Project Details
2.1. Important Instructions for Electronic Submittal
2.2. Project Scope
3. Terms and Conditions
3.1. Prevailing Wages
3.2. Statement of Offer
3.3. Project Management Documentation & Administration
3.4. Questions and/or Objections
3.5. Amendment and Cancellation
3.6. Right of Rejection
3.7. Prohibition of Respondent Terms and Conditions
3.8. Joint Ventures and Partnering
3.9. Proposal of Alternate Services
3.10. Proposal of Additional Services
3.11. Severability
3.12. Licensure and Special Certification
3.13. Disclosure of Proposal Contents
3.14. Conflict of Interest and Restrictions
3.15. Proprietary Information
4. Bid Submittal
4.1. Please upload a signed W-9 form*
4.2. Please enter Legal Company Name and related DBA*
4.3. Cost Proposal using Electronic Pricing Table*
4.4. Response (without Cost Proposal)*
4.5. Statement of Offer*
4.6. Bid Bond*
4.7. California Contractors State License Board
4.8. Certification regarding Debarment
4.9. City Contract *
4.10. Insurance Requirements*
4.11. Authorized Contract Signer *
5. Cost Table
6. Contract Award
6.1. Opening & Award of Contract
6.2. Bid Protests

File details come from the government source that posted it. Updated .