Closed_loop_Teatment_Service_SOW_FY24_.docx
DOCX document 19 KB Posted
- Attached to
- BOST- BOILER LOOP TREATMENT CONTRACT Federal contract opportunity
- Solicitation number
- 140P4324Q0065
About this file
This document is a Scope of Work (SOW) for a federal contract opportunity to provide monthly water testing and treatment of closed loop heating systems at several National Park Service (NPS) buildings in the Boston National Historical Park and surrounding area. The work will involve an initial chemical cleaning process, flushing, refilling, and testing, followed by continuous monthly testing and treatment of the closed loop systems to maintain boiler water at acceptable industry standards. The contract period is from September through April, with the option for four additional bid periods. The SOW includes details on the location of the work, square footage of the buildings, and inventory of the boiler equipment. The related federal contract opportunity is Solicitation Number 140P4324Q0065, titled "BOST- BOILER LOOP TREATMENT CONTRACT", issued by the Department of the Interior National Park Service Northeast Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4324Q0065_Amd_0001.pdf | ||
| Sol_140P4324Q0065.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Heating System Closed Loop Treatment Contract Scope of Work
SUMMARY OF WORK
Project Location: All work is located at the Boston National Historical Park specifically Charlestown Navy Yard 5th Ave buildings, Bldg-109, Bldg-10, Bldg-32, Bldg-5, Bldg-265, and Bldg-I & -G together. On 1st Ave Bldg-32, and on 3rd Ave Bldg-107. Outside the park on Monument Square we have Bunker Hill Lodge, and Bunker Hill Museum in Charlestown MA.
General Scope: From September through April Monthly water testing and treatment of closed loop heating systems will be performed to adequately maintain the boiler water to the acceptable industry standards.
During the Base Bid period Maintenance on all boiler systems shall include a chemical pipe system cleaning process, flushed, refilled, tested and treated along with the continual monthly testing and treatment on the 1st week of each month for 8 months, September through April.
During the Base Bid Period we anticipate that the initial cleaning process and first treatment will cause strainers to clog, and they will be required to be cleaned within this SOW.
The four additional bid periods are for continuous monthly testing and treatment of closed loop heating systems and treatment to keep boiler water at acceptable industry standards and or working levels. (Reference section G-1 for building square footage and G-2 boiler type information) Contractor’s Use of Premises General: Company is responsible for contacting the designated maintenance personnel decided by COR in order to have access to utility rooms to service equipment.
Storage of Materials: There is limited use of storage for materials and must be approved by Contracting Officer and or Contracting Officer Representative prior to bringing on-site.
Work Restrictions On-Site Work Hours: Work shall be performed during normal business working hours of 7:30 a.m. to 4:30 p.m., Monday through Friday, except as otherwise arranged with Contracting Officer.
Parking at the site: Limited at each building site contractor to plan according.
0. Project Contacts: To arrange a site visit or to address any specific questions in regard to the project requirements, contact the following:
Timothy Croteau Facilities Directorate- Contracting Officers Representative
| Timothy_Croteau@nps.gov |
| 617-242-5606 |
Bid schedule quotes shall include labor, equipment, materials, transportation and overhead costs.
SUBMITTALS
Submit any catalogue cut sheets (supplier information) and SDS’s of proposed chemicals, product and associated features for approval.
Hard copies of SDS related material for all chemicals to be used must be turned in to NPS for review and approval along with any changes of chemicals during this contract life.
G. BNHP Building square footage and boiler type closed loop treatment systems.
0. BOST Building square footage of each building for closed loop treatment.
Building -109 SF-6,668
| Building -32 | SF-6,847 | |
| Building -5 | SF-62,260 | |
| Building -265 | SF-26,488 | |
| Building -107 | SF-3,896 | |
| Building –I & -G | SF-42,328 | |
| Building –Bunker Hill Lodge | SF-3,896 | |
| Building –Bunker Hill Museum | SF-12,810 |
BOST Hot Water Boiler Inventory list.
| Equipment Description |
| Bldg |
| Brand |
| Model |
| Boiler, 798.00 MBH, Gas, BL 16 (B-1) |
| B-109 |
| IBR |
| SGD800 |
| Boiler, 798.00 MBH, Gas, BL 02 (B-2) |
| B-109 |
| IBR |
| SGD800 |
Boiler, 1517.00 MBH, Gas, (B-1) Boiler, 1517.00 MBH, Gas, (B-2) Boiler, 1517.00 MBH, Gas, (B-3) B-5 B-5 B-5 Burnham Burnham Burnham V1108 V1108 V1108
Boiler, 342.00 MBH, Gas Boiler, 240 MBH, Gas, Boiler, 200 MBH, Gas B-32 Hydrotherm Bldg-10 Weil McLain BH Lodge Peerless
EGH-95
61-06-SPAKWS
| Boiler 1M MBH, Gas |
| B-I |
| Fulton |
| ENDURA |
| Boiler 1M MBH, Gas |
| B-I |
| Fulton |
| ENDURA |
| Boiler, 1200.00 MBH, Natural Gas (new in 2006) |
| B-265 |
| Caravan |
| GGT-1500 |
| Boiler, 1200.00 MBH, Gas, B01 |
| B-107 |
| Hydrotherm |
| MR-1500B |
| Boiler, 1200.00 MBH, Gas, B02 |
| B-107 |
| Hydrotherm |
| MR-1500B |
| Boiler, 978.00 MBH, Natural Gas, BH Museum |
| BHM |
| Smith |
| GB300-S/W-13-INT |
File details come from the government source that posted it. Updated .