CLINICAL LABS RFI ANSWERS.docx

DOCX document 15 KB Posted

Attached to
Z1DA-- Clinical Labs Minor Improvements Brooklyn VAMC
Solicitation number
36C24224Q0381
Issued by

About this file

This document contains answers and clarifications provided in response to a Request for Information (RFI) for the "Clinical Labs Minor Improvements" project (Solicitation Number: 36C24224Q0381) at the Brooklyn VA Medical Center.

The key details are:

  • The existing lab flooring will not be removed but rather overlaid with new flooring. The lab cabinets will not be removed, but the lab islands and asbestos-containing benchtop surfaces shall be removed by the contractor.
  • The lab hood will only be capped off at the drop ceiling height, not the ceiling deck above the grid. The VA will strip the existing floor of paraffins prior to the new flooring installation, but the contractor is still required to complete any additional floor preparation.
  • All movable items in the room will be completed by the VA. The work will be performed Monday through Friday, 7:30am to 4:30pm, with no weekend or overtime work required.
  • The contractor may use 4" rubber cove base instead of the specified integral base on the remaining walls.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT- CLINICAL LABS MINOR IMPROVEMENTS

36C24224Q0381

REQUEST FOR INFORMATION ANSWERS/CLARICATIONS

1. The Lab room flooring is not being Removed and will be an Over lay. That is correct, the existing flooring will not be removed. The new flooring will be overlaid on the existing flooring.

1. The Lab Flooring in not consider having any asbestos and the Lab Cabinets will not be removed. The lab islands including asbestos-containing benchtop surfaces shall be removed by the contractor, as described in the revised SOW.

1. The Lab Hood will only be Capped off at the Drop Ceiling Height not Ceiling Deck above the Grid. That is correct.

1. The Lab Floor was discussed being Stripped by Maintenance Prior to New Flooring being installed of paraffins. This will be performed by VA, however the contractor is still required to complete all additional floor preparation necessary to install the new flooring in accordance with the manufacturer’s directions.

1. All movable Items in the room that can be moved will be completed by the VA. That is correct

1. Will the Back Wall by the Sink in the Lab be Painted. Not included in work scope

1. Work will only be based on Monday – Through – Friday 7:30am to 4:30pm. That is correct

1. Please advise if any of Proposal work will be Completed on Weekend or Over Time at any locations. No Weekend or Overtime work is required

1. Page-74 of the SOW says integral base, Can 4” Rubber Cove Base be used instead and integral base on remaining walls? Yes