CLIN 0007 EXHIBIT AA-AL_52793039 CDRL 1-10.pdf

PDF 5 MB Posted

Attached to
DISPOSAL CONTAINERS
Solicitation number
SPMYM226Q5194
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) consisting of ten separate data item specifications for CDC (Cellular Damage Container) refurbishment and production, issued under Document No. 5279-3039 with an effective date of December 2, 2025. The CDRL specifies detailed documentation and certification requirements that contractors must submit throughout the contract lifecycle, with all submissions required via the Wide Area Workflow (WAWF) e-Business Suite and email notifications sent to PSNS.WAWFQACertifications.FCM@navy.mil. Distribution is limited to DoD and DoD contractors only for administration and operations purposes, with other U.S. requests referred to COMNAVSEASYSCOM.

The ten data items required include: (A001) Product Quality Assurance Test, Demonstration, and Evaluation Plan covering first article inspection of fully refurbished CDC containers with specified workmanship and compliance demonstrations including lift attachment verification, Go/No-Go gage checks, safety hoist ring insertion, equipment observation, and record-keeping verification; (A002) Non-Destructive Test Report for each CDC container; (A003) Vertical Load Test Report for CDC lift attachments; (A004) Weight Record Report for each container with actual values traceable to materials via unique markings; (A005) Material Certificates for all materials and paints used; (A006) Paint/Blasting Quality Conformance certification; (A007) Calibration Records for all calibrated equipment including scales, thread gages, and torque wrenches; (A008) Welding Quality Conformance statement certifying compliance with AWS D1.1 standards for carbon steel welding; (A009) Overall Certificate of Compliance signed by company President or Project Manager listing applicable drawings, container quantities, and identification numbers; and (A010) Horizontal Load Test Report for CDC lift attachments. All deliverables are required on a one-time basis (ONE/R frequency) with submission timing specified in Block 16 of each form, and acceptance or rejection will be accomplished concurrently with corresponding material delivery rather than prior to shipment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP _________________ TM ____________ OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

PRODUCT QUALITY ASSURANCE TEST, DEMONSTRATION,

AND EVALUATION PLAN

3. SUBTITLE

FIRST ARTICLE (INITIAL PRODUCTION)

INSPECTION

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81199

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D*

10. FREQUENCY

ONE/R

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

N/A Draft Reg Repr o 16. REMARKS

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 12/2/2025. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.

BLOCK 12 –

First Article Inspection of CDC:

A first article unit shall be fully refurbished, repaired, inspected and tested CDC container per contract requirements. A buyer representative will inspect the first article for workmanship and compliance to contract requirements at the seller’s facility. Upon acceptance of the first article, the seller is released to manufacture all remaining CDC units. The First Article Inspection will cover the following workmanship and compliance items:

a) A demonstration that key features such as lift attachments and holes are properly located, dimensions conform with DWG details, and lid lays flat with mating flange/gaskets such that no visible gaps are present, lid fasteners are inserted into mating holes and seat properly, container is free of sharp edges and weld splatter (inside and out), welds are smooth and properly sized free of visible voids, porosity, or undercutting.

b) A demonstration of Go/No-Go gage checks of threaded lift hole in the container lid to confirm compliance with Go/NoGo criteria specified in contract drawings and ensure holes are free of dirt/debris or thread defects

CONTINUE ON PAGE 2

N4523A 0 1 0

TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

12/2/2025

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 2 Pages

For Document no: 5279-3039

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A001

PRODUCT QUALITY ASSURANCE TEST, DEMONSTRATION,

AND EVALUATION PLAN

FIRST ARTICLE (INITIAL PRODUCTION)

INSPECTION

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-81199

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

A. ADDRESSEE

Final

c) A demonstration of inserting a safety hoist ring into each threaded lift hole to observe fit-up of safety hoist ring with mating surfaces. Threaded lift holes shall be perpendicular to base metal mating surfaces such that the bearing washer of the safety hoist ring makes full contact with mating surface when inserted into the applicable threaded lift hole.

d) Observation of equipment used for performing the torque tests, load tests, weighing, gaging holes, and similar processes to ensure tools are in-test and in accordance with contract drawing requirements.

e) Observation of in-process record keeping methods used for documenting load tests, weight, go/no-go gage checks, materials used, and similar processes.

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900.F.32

12/2/2025

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 2 of 2 Pages

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

TDP ___________ TM _______________ OTHER NDTI

D. SYSTEM/ITEM

E. CONTRACT/PR NO. F. CONTRACTOR

A002

TEST/INSPECTION REPORT

NON DESTRUCTIVE TEST REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

A. ADDRESSEE

Final

Draft Reg Repr referred to COMNAVSEASYSCOM.

Block 12: Personnel Qualifications and Test Procedures, when ordered on separate contract line item, shall be submitted and approved before testing unless otherwise specified in contract.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.

NDT/Proof Test Report for each CDC container in accordance with contract DWG requirements

ATAT

N4523A 0 1 0

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

12/2/2025

DD Form 1423-1, JUN 90 Page 1 of 1 Page(s)

S/N 0102-LF-010-5600

Document no: 5279-3039

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

1. DATA ITEM NO

A003

VERTICAL LOAD TEST

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

SUBMISSION

A. ADDRESSEE

Final referred to COMNAVSEASYSCOM.

Block 12: Personnel Qualifications and Test Procedures, when ordered on separate contract line item, shall be submitted and approved before testing unless otherwise specified in contract.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Vertical Load Test Report for CDC lift attachments of each container in accordance with contract DWGs

/s/ M. Shamion C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

DD Form 1423-1, FEB 2001 Previous edition may be used. Page 1 of 1 Pages

Document No: 5279-3039

17. PRICE

GROUP

18.

ESTIMATE

D

TOTAL

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

TDP ________ TM ____________ OTHER MISC

A004

CERTIFICATION/DATA REPORT

WEIGHT RECORD REPORT

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.1, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 12/2/2025. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Weight Record Report for each CDC container in accordance with contract DWG requirements

/s/ M. Shamion 12/2/2025 /s/ D. FRANCIS C/900F.32

DOCUMENT NO.: 5279-3039

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A005

MATERIAL CERTIFICATES

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.1, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 12/2/2025. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding

Material Certificates for materials used for each CDC container (including paints used) in accordance with DWG requirements.

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

TDP ___________ TM _______________ OTHER MISC

A006

PAINT/BLASTING QUALITY

CONFORMANCE

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

SUBMISSION

N/A

A. ADDRESSEE

Final

Draft Reg Repr o

16. REMARKS

Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.1, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 12/2/2025. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Blasting/Painting Certification for each CDC container confirming blast preparation and application of paint is accordance with DWG requirements.

/s/ M. Shamion C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

12/2/2025

DD Form 1423-1, JUN 90 Page 1 of 1 Page(s)

S/N 0102-LF-010-5600

DOCUMENT NO.: 5279-3039

17. PRICE

GROUP

18. ESTIMATED

PRICE

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A007

CALIBRATION CERTIFICATE/REPORT

CALIBRATION RECORDS

4. AUTHORITY (Data Acquisition Document No.)

DI-QCIC-80798C

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Certification records for calibrated equipment used for CDC contract work including scales, thread inspection gages, test load recording nstruments, torque wrenches, and similar calibrated tools.

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

DOCUMENT NO.: 5279-3039

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A008

WELDING QUALITY CONFORMANCE

DI-MISC-80678

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

SUBMISSION

N/A

A. ADDRESSEE

Final

Draft Reg Repr o

16. REMARKS

Block 4: Tailored to allow the vendor to only provide: 10.1, 10.2, 10.2.1, 10.3, 10.3.1-Provide actual values IAW procurement specification. Ensure certs provided are traceable to material via unique markings, 10.5.

Block 9: Distribution Statement D. Distribution authorized to DoD and DoD contractors only. Administration and operations only, effective 12/2/2025. Other U.S. requests shall be referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Certification statement that all new welding performed in accordance with AWS D1.1 (for carbon steel welding), including welding procedures used for CDCs. Welder qualifications should be made available upon request but need not be submitted with documentation package.

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

12/2/2025

DD Form 1423-1, JUN 90 Page 1 of 1 Page(s)

S/N 0102-LF-010-5600

DOCUMENT NO.: 5279-3039

17. PRICE

GROUP

18. ESTIMATED

PRICE

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

TDP _______________ TM _____________ Other MISC

A009

CERTIFICATE OF COMPLIANCE

COMPLIANCE

DI-MISC-81356A

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

SUBMISSION

N/A

A. ADDRESSEE

Final

Draft Reg Repr referred to COMNAVSEASYSCOM.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of Certification/Data Report documentation will be accomplished with the corresponding material and will not be accomplished prior to shipment of material.

Overall Certificate of Compliance (COC) on company letter-head signed by the company President or cognizant Project Manager for CDC Containers. As a minimum, the COC should include the contact #, applicable DWGs used, quantity and identification numbers of containers COC is applicable to, and a statement that the CDC containers comply with contract requirements.

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

12/2/2025

DD Form 1423-1, JUN 90 Page 1 of 2 Page(s)

S/N 0102-LF-010-5600

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Please DO NOT RETURN your form to either of these address. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A010

HORIZONTAL LOAD TEST

5. CONTRACT REFERENCE

PER CONTRACT

6. REQUIRING OFFICE

PURCHASING ACTIVITY

REQUIRED

SUBMISSION

SEE BLOCK 16*

14. DISTRIBUTION

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A referred to COMNAVSEASYSCOM.

Block 12: Personnel Qualifications and Test Procedures, when ordered on separate contract line item, shall be submitted and approved before testing unless otherwise specified in contract.

Block 12 - Certification/Data Report documentation shall be attached in the Wide Area Workflow (WAWF) e-Business Suite.

Upon submission in WAWF send email notifications to:

PSNS.WAWFQACertifications.FCM@navy.mil. Acceptance/Rejection of

Horizontal Load Test Report for CDC lift attachments of each container in accordance with contract DWGs

/s/ M. SHAMION C/2370 12/2/2025 /s/ D. FRANCIS C/900F.32

Document No: 5279-3039

17. PRICE

GROUP

18.

ESTIMATE

D

File details come from the government source that posted it. Updated .