CLIN_00010_Specifications_1.pdf

PDF 4 MB Posted

Attached to
ELECTRICAL IMPROVEMENTS Federal contract opportunity
Solicitation number
140P8225B0001
Issued by
Department of the Interior National Park Service

About this file

This document is a comprehensive set of construction specifications for electrical improvements at American Memorial Park (AMME) in Saipan, focusing on upgrades to the Administration and Maintenance Buildings. The project involves replacing electrical infrastructure, including conduits, panels, and transformers, with specific work outlined in two Contract Line Items (CLINs): CLIN 00010 covers electrical improvements at the Administration and Maintenance Buildings, involving removal and replacement of existing electrical components such as conduits, panel covers, and transformers, with new NEMA 4X panels and step-down transformers.

The specifications detail technical requirements for electrical systems, including specific product specifications for low-voltage conductors, raceways, distribution transformers, and panelboards. The project emphasizes compliance with electrical codes, proper installation techniques, and quality control measures. The work will be constructed under a single prime contract, with detailed requirements for submittals, safety protocols, waste management, and field testing. The electrical upgrades aim to improve the park's electrical system reliability and safety, addressing infrastructure that is approximately 25 years old and has been vulnerable to environmental conditions in Saipan.

View the file

Other files for this federal contract opportunity

Other files attached to ELECTRICAL IMPROVEMENTS, newest first.
File Type Posted
CLIN_00020_Specifications_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMERICAN MEMORIAL PARK (AMME)

SAIPAN

INSTALL ELECTRICAL IMPROVEMENTS AT THE

ADMINISTRATION BUILDING

PMIS #257310

CONSTRUCTION SPECIFICATIONS

NATIONAL PARK SERVICE

PACIFIC WEST REGION

December 16, 2024

THIS PAGE INTENTIONALLY LEFT BLANK

AMME #257310 TABLE OF CONTENTS Page 1 of 2

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS NO. OF PAGES

01 11 00 Summary of Work…………………………………………………………………..9

NPS Hot Work Permit (Form HW-1) ………………………………………………2

01 27 00 Definition of Contract Line Items (CLINs)

01 31 00 Project Management & Coordination

Request for Information (RFI) Form………………………………………………..1

01 32 16 Construction Schedule ……………………………………………………………. 2

01 33 23 Submittal Procedures

CM-16 Transmittal Form………………………………………………………… .. 1

Statement & Acknowledgement (Form SF1413)………………………………….. 1

01 35 23 Safety Requirements

01 40 00 Quality Requirements ……………………………………………………………. .. 3

Quality Control (QC) Daily Report Form…………………………………

01 50 00 Temporary Facilities & Controls

01 57 23 Temporary Stormwater Pollution Prevention ………………………………………5

01 67 00 Product Requirements ………………………………………………………………3

01 73 40 Execution

01 74 19 Construction Waste Management

01 77 00 Closeout Procedures

DIVISION 26 - ELECTRICAL

26 05 00 Common Work Results for Electrical ……………………………………………. . 4

26 05 05 Selective Demolition for Electrical ………………………………………………. . 3

26 05 19 Low-Voltage Electrical Power Conductors and Cables…………………………

26 05 29 Hangers and Supports for Electrical Systems……………………………………. .. 4

26 05 33 Raceways and Boxes for Electrical …………………………………………

26 12 19 Pad-Mounted, Liquid Filled, Medium Voltage Transformer……………

26 22 13 Low Voltage Distribution Transformers…………………………………………. .. 6

26 24 16 Panelboards ……………………………………………………………

AMME #257310 TABLE OF CONTENTS Page 2 of 2

DIVISION 01

GENERAL REQUIREMENTS

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 1 of 9

SECTION 01 00 00 – SUMMARY OF WORK

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes the following:

1. Work Covered by Contract Documents

2. Work Phases / Sequence

3. Work Under Other Contracts

4. Government-Furnished Items

5. Government-Furnished Documents

6. Conduct of Operations

7. Contractor Use of the Site

8. Public Use of the Site

9. Government Use of the Site

10. Occupancy Requirements for Buildings & Areas

11. Codes

12. Permits

13. Professional Services

14. Utility Interruptions

15. Vehicles & Equipment

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: American Memorial Park (AMME), Saipan.

B. Project Background: The Park’s electrical system is approximately 25 years old and in recent years the electrical power generation system has shown vulnerabilities in the wake of disasters such as typhoons as well as the natural corrosive environment on Saipan. An assessment of the

Park Administration Building and the Maintenance Building has identified the areas in need of improvements to recondition the system to an acceptable state. For the Administration building, the replacement of affected panels and the step-down transformer along with infrastructure refurbishment would ensure optimal functionality and enhance the safety and reliability of the power distribution system. For the Maintenance building, the replacement of the pad-mount transformer along with infrastructure refurbishment will revitalize the power distribution system’s efficiency and safety. The existing pad-mount transformer is offline and is awaiting disposal and replacement as part of this project.

C. Project Scope of Work: The Work consists of the following:

1. Administration Building

a. Remove and replace existing ¾ inch conduits with new rigid aluminum conduits and all appurtenances;

b. Remove and replace six (6) existing two (2) inch conduit clamps at three separate locations;

c. Remove an abandoned conduit and its wiring in addition to replacing an existing splice box with a new NEMA 4X box and reconnect the wiring;

d. Remove and replace existing ½ inch conduits with new rigid aluminum conduits and all appurtenances;

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 2 of 9

e. Remove and replace two (2) existing panels with new NEMA 4X panels and one (1) transformer with new 30 KVA step down transformer;

2. Maintenance Building

a. Remove and replace two (2) existing panel covers with new NEMA 4X panel covers and one (1) existing transformer with new 112.5 KVA transformer;

3. Project will be constructed under a single prime contract. Refer also to Section 01 27 00 –

Definition of Contract Line Items.

1.3 WORK PHASES / SEQUENCE

A. Work Phases: The Work will be completed in one (1) single work phase.

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate with separate contractors so that all contracts may be carried out smoothly without interfering with or delaying Work under this or other contracts. If another contract is awarded that may have an impact on this contract, the Contractor will be promptly notified.

1.5 GOVERNMENT-FURNISHED ITEMS

A. General: The Government may furnish items such as materials, equipment, facilities, services, or housing for Contractor use on this contract. The government may furnish these items to lower the overall project costs, make use of existing item(s), or out of necessity in a remote location. The

Contractor can assume that all items offered below are at no direct cost to the Contractor.

B. Government-Furnished Materials: NONE IDENTIFIED AT THE OUTSET OF THE

CONTRACT.

In the event government-furnished materials are offered (at the outset or furnished later):

a) The Government will arrange and pay for delivery of government-furnished materials to the project site or agreed upon location based on the contractor’s approved construction schedule.

b) The Government will inspect the delivered items for damage after delivery. The Contractor shall be present for, and assist in, the Government’s inspection.

c) The Government will arrange for the replacement of materials if the government-furnished materials are damaged, defective, or missing.

d) The Contractor shall do their due diligence to protect government-furnished materials from damage during storage and handling, including damage from exposure to the elements.

e) The Contractor shall install or otherwise incorporate government-furnished materials into the

Work of this contract, as outlined in the contract documents.

C. Government-Furnished Equipment / Transportation: NONE IDENTIFIED AT THE OUTSET OF

THE CONTRACT.

In the event government-furnished equipment is offered (at the outset or furnished later):

a) The Government will make the equipment available for Contractor use based on the

Contractor’s approved construction schedule.

b) The Government will inspect the equipment and document its condition prior to Contractor use. The Contractor shall be present for, and assist in, the Government’s inspection.

c) The Contractor shall provide all licensed, certified equipment operators.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 3 of 9

d) The Government will provide an orientation and training on the equipment prior to use.

e) The Contractor shall provide all fuels / oils to operate the equipment, unless stated otherwise.

f) The Government will arrange for the replacement or repair of equipment, or provide an alternative, if the government-furnished equipment breaks during use.

g) The Contractor shall do their due diligence to protect the government-furnished equipment from damage, including damage from exposure to the elements.

D. Government-Furnished Facilities: The following facilities will be available to the Contractor for use on this contract. Refer also to Section 01 50 00 Temporary Facilities & Controls.

1. Restroom: Public Restroom at Visitor Center.

2. Field Office: TBD, if needed.

3. Storage Space: TBD at Maintenance Building, if needed.

E. Government-Furnished Utilities: The following utilities will be available to the Contractor for use on this contract. Refer also to Section 01 50 00 Temporary Facilities & Controls.

1. Potable Water: NOT AVAILABLE

2. Non-Potable Water: NOT AVAILABLE

3. Wastewater Disposal: NOT AVAILABLE

4. Hydrotesting & Disinfection Water Disposal: NOT AVAILABLE

5. Electrical Power: Connect to Admin Building Electrical Power as needed.

F. Government-Furnished Housing: NOT AVAILABLE ON THIS PROJECT.

1.6 GOVERNMENT-FURNISHED DOCUMENTS (GFD)

A. General: The Government may furnish reports or other documents for informational purposes to supplement the contract documents (labeled as GFD). In cases of conflict between a GFD and the drawings and specifications, the drawings and specifications will govern.

1.7 CONDUCT OF OPERATIONS

A. Park Regulations: The Contractor shall conduct their operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service (NPS), and applicable park rules and regulations prescribed the Park Superintendent. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

B. Work Hours: Regular work hours shall be limited to daylight hours between 6:00 a.m. to 4:00 p.m. Monday through Friday, unless stated otherwise. No work shall be performed on weekends, state or federal holidays. Work outside regular hours requires advance approval from the

Contracting Officer to ensure key NPS personnel are present in the event of an emergency.

C. Advertisement: No signs or advertisements shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

D. COVID-19 (Coronavirus Disease 2019): The Contractor shall comply with the latest guidance on

Covid-19. The information provided below is not intended to provide a complete analysis of requirements for Contractor and is provided as a courtesy.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 4 of 9

1. COVID-19 (Coronavirus) - www.coronavirus.gov

2. Occupational Safety & Health Administration (United States Department of Labor).

www.osha.gov/coronavirus.

1. Center for Disease Control (CDC)

a. www.cdc.gov/coronavirus/2019-ncov/index.html

4. Federal Emergency Management Agency (FEMA) - www.fema.gov/disasters/coronavirus

5. Department of the Interior (DOI) - Our Response to COVID-19 | U.S. Department of the

Interior (doi.gov)

6. National Park Service (NPS) - www.nps.gov/aboutus/news/public-health-update.htm

1.8 CONTRACTOR USE OF THE SITE

A. Park Entry: Vehicles associated with the contract shall be waived the entrance fee upon entering in marked company vehicles or by providing the full names, vehicle type, and the license plate numbers of employees entering in personal vehicles.

B. Site Access: The Contractor shall access the site as outlined in the drawings or attached map.

C. Project Area Limits: The Contractor will have limited use of the site for construction operations.

Limit operations to the project area limits as outlined in the drawings or attached map. Do not disturb portions of the park or site beyond areas where Work is indicated.

D. Storage of Materials: Confine storage of materials to the areas as outlined in the drawings or attached map. If no specific site is shown, assume storage of materials is allowed within the project area limits and arrange for storage of materials with the park facility manager so as not to disrupt normal operations. The Contractor will be responsible for the protection and security of all materials stored in the park. The park will attempt to provide a covered area, if available.

E. Staging of Materials and Equipment: Confine staging of materials and equipment to the areas as outlined in the drawings or attached map. If no specific site is shown, assume staging of materials and equipment is allowed within the project area limits and arrange for staging of materials and equipment with the park facility manager so as not to disrupt normal operations.

The Contractor will be responsible for the protection and security of all materials and equipment staged at the jobsite.

F. Stockpiling: Confine stockpiling of excavated soils to the area immediately adjacent to the trench or excavation, and/or, remove stockpiled materials from the jobsite if the materials will not be reused as part of the project. Confine imported soils and/or aggregate to the area(s) outlined in the drawings or attached map. If no specific site is shown, assume imported soils or aggregate is allowed within the project limits; however, consult with the park facility manager on an optimal location so as not to disrupt normal park operations. Protect all surfaces from damage. Damage to surfaces shall be repaired to pre-construction conditions.

G. Rock Removal: When encountering large rock or a significant volume of rock during excavation, follow the guidance outlined in Section 1.8.F for initial stockpiling. If the contract documents involve rock work, use the excavated rocks before importing rock. If the contract documents do not specify instructions regarding rock removal, relocation, or disposal, please submit a Request for Information (RFI) with an estimated quantity of rock to the NPS for further instructions. All rock excavated at project sites on Molokai, Maui, and Big Island of Hawai’i will remain within the project area limits or be relocated to a different location within the park.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 5 of 9

H. Field Office: Establishment of a construction camp within the park will not be permitted. The park will make every attempt to furnish the contractor with indoor office space for up to two (2) contractor personnel; however, if the park cannot accommodate the Contractor with office space, the Contractor will be allowed to setup a temporary field office within the project area limits

(final location to be approved by the park facility manager). Note that connection to NPS internet or computer networks is prohibited for security purposes. Refer also to Section 01 50 00.

I. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or NPS

Dispatch at the first available opportunity at: (808) 985-6170.

J. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation.

Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

1.9 PUBLIC USE OF THE SITE

A. General: Cooperate with NPS and partner staff so that the Work may be carried out smoothly without interfering with or delaying the Work under this or other contracts.

B. Park Visitation: The project site will be CLOSED to park visitors during construction. The

Contractor shall conduct their operations to minimize the inconvenience to the public.

C. Park Events: The following park events are anticipated during the Work: NONE SCHEDULED.

1.10 GOVERNMENT USE OF THE SITE

A. General: Cooperate with NPS and partner staff so that the Work may be carried out smoothly without interfering with or delaying the Work under this or other contracts.

1.11 OCCUPANCY REQUIREMENTS FOR BUILDINGS & AREAS

A. Government Occupancy: The Government will OCCUPY the building(s) or area(s) under construction until the construction phase is complete and final acceptance has been issued.

Cooperate with the Government during construction activities to minimize conflicts. Perform the

Work so as not to interfere with the Government’s day-to-day operations. Maintain existing building ingress, egress, doorways, corridors, access walkways, access roads, and public space unless the Contractor obtains written permission from the Contracting Officer to close, partially close, or temporarily close specific areas.

B. Government Occupancy of Completed Areas: The Government reserves the right to occupy portions of buildings or areas and resume operations where the Work has been completed, provided such occupancy does not interfere with the completion of the remaining Work.

1. The Contractor shall ensure all Work is completed; all systems are operational; all testing, balancing, and inspections have been performed; and all final cleaning is completed prior to

Government occupancy.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 6 of 9

2. The Contracting Officer will prepare a Letter of Beneficial Use / Occupancy for the portion(s) of the building or areas to be re-occupied by the Government.

3. Upon Government occupancy, the Government will assume responsibility for the maintenance and custodial services for occupied portions of the building or areas.

1.12 CODES

A. General: The Contractor shall complete all Work in accordance with the latest versions of applicable federal, state, and local codes, standards, and regulations. Per Policy Memorandum

23-01 approved on May 9, 2023, the National Park Services (NPS) has adopted the International

Code Council’s (ICC) suite of codes and standards effective January 1, 2024. Additionally, the latest NFPA 70 (National Electric Code) is also adopted effective January 1, 2024. All work shall comply with the ICC suite of codes and standards and NFPA 70, where applicable. Additional codes, standards, and regulations may also apply. In the event of a conflict between codes, standards, regulations, and the contract documents, submit a Request for Information (RFI) with code references / citations to the Contracting Officer for a determination.

B. Accessibility: This project does not involve accessibility improvements.

1.13 PERMITS

A. General: The Contractor shall comply with all permit conditions, whether they are from permits furnished by the government (PART 1.13.C) or permits obtained as part of this contract (PART

1.13.D). Identify the start dates and durations to obtain all permits in the construction schedule.

Note: A general building permit is not required for work on NPS land; however, the Contractor must still comply with all state and local building code provisions.

B. Hot Work Permit: Hot work is defined as work activities (such as welding, cutting, blazing, and related work) that can be a source of ignition when flammable materials are present. All hot work operations shall be conducted in accordance with the procedures contained in RM-58, NPS policy on Hot Work Permits (see Appendix 35.8), and 29 CFR 1910.252(a). If the project requires any activities considered “hot work,” submit a NPS Hot Work Permit (Form HW-1) application to the

Contracting Officer at least 48 hours prior to the scheduled hot work. The NPS will then review and complete Form HW-1 and return a copy to the Contractor with the required conditions or precautions. No hot work shall occur without a completed and signed Form HW-1 and all the required precautions in place. See attached Form HW-1.

C. Government-Furnished Permits: NONE.

D. Required Permits: Department of Public Works Building Permit

1.14 PROFESSIONAL SERVICES

A. General: Professional services include any business, department, or individual whose core output is a service or expertise rather than a manufactured product.

B. Shop Drawings: The Contractor shall submit shop drawings per Section 01 33 23, PART 1.4.F for the following components:

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 7 of 9

1. Selective Demolition for Electrical: Section 26 05 05, PART 1.2.B

2. Pad-Mounted, Liquid Filled, Medium Voltage Transformers: Section 26 12 19, PART 1.4.B

3. Low Voltage Distribution Transformers: Section 26 22 13, PART 1.3.B

4. Panelboards and related equipment: Section 26 24 16, PART 1.4.B

C. Professional Land Surveyor (PLS): A professional land surveyor is NOT REQUIRED for this project.

D. Professional Engineer (P.E.): A professional engineer is NOT REQUIRED for this project.

E. Master Electrician: A Master Electrician or approved equal is REQUIRED for this project. Work shall be performed under the supervision of the Master Electrician or approved equal.

1.15 UTILITY INTERUPTIONS

A. General: All Work shall be generally performed during normal business hours.

B. Existing Utilities: Notify the Contracting Officer and all applicable utility companies of the

Work being performed on a utility prior to excavation or disruption. The Contractor shall be responsible for locating, and preventing damage to, known utilities. If damage occurs to a known utility, repair the utility at no additional expense to the Government. If damage occurs to an unknown utility: 1) submit a Request for Information (RFI) to the NPS for further instructions, or, if time is of essence, 2) repair the utility / restore service and an equitable adjustment will be made in accordance with the Change clause of the contract.

C. Utility Disruptions: Do not disrupt utility service to Government or NPS partner buildings or facilities unless required under the contract documents. If utility disruptions are required:

1. Notify the Contracting Officer and all applicable utility companies not less than seven (7) calendar days in advance of the proposed utility disruption.

2. Identify the affected services, location(s), start date, and duration of the disruption.

3. Install temporary utility services if required under the contract documents.

4. Do not proceed with utility disruptions without written permission from the Contracting

Officer and the local utility service provider (where applicable).

1.16 VEHICLES & HEAVY EQUIPMENT

A. General: The Contractor shall comply with the following work restrictions for vehicles and heavy equipment.

B. Rules of the Road: Vehicles and heavy equipment shall comply with posted traffic regulations, including speed limits and double-yellow center lane markings. Vehicles and heavy equipment shall take every safe opportunity to use paved pullouts to allow faster-moving traffic to pass.

Failure to comply with traffic regulations will result in a citation being issued to the driver.

C. Vehicle Parking: Confine parking of Contractor vehicles to the areas as outlined in the drawings or attached map. Vehicles are not permitted to park along park roads or in overlooks / pullouts.

D. Driveways and Entrances: Keep driveways and entrances serving the premises clear and available to Government employees, vendor deliveries, and emergency vehicles at all times.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 8 of 9

E. Vehicle Exhaust: Vehicles shall be properly maintained to ensure the exhaust produced is within legal limits. The effects of excessive vehicle exhaust may be subject to enforcement of State and

Federal laws regarding emissions as well as those regarding threatened and endangered species.

F. Spills: The Contractor shall be responsible for prevention of spills and/or cleanup efforts required in accordance with 40 CFR and all applicable state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes. The Contractor must immediately notify a Law

Enforcement Ranger or NPS Dispatch of any spills at: (808) 985-6170.

G. DOT Compliance: Vehicles and heavy equipment shall be compliant with all DOT requirements including but not limited to drivers with appropriate license class, possessing a medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, carrying a mounted fire extinguisher, and possessing a valid DOT safety sticker, as applicable.

H. Hauling & Load Restrictions: All vehicle load, weight, and size limitations, as established by

State law, apply to vehicles operated on the park road (36 CFR § 4.11). No loads heavier than the current load rating for park roads and bridges will be permitted. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the

Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.

I. Oversized Vehicles: Oversized vehicles are defined as vehicles where the width of the vehicle or load exceeds one lane (i.e., beyond the center line of the paved road). Oversized vehicles must not exceed the clearances along the park road corridor. Oversized vehicles will require an escort, and drivers must avoid driving on the shoulder of the road. Contractor shall notify the

Contracting Officer of oversized vehicles, scheduled arrival dates & times at the park entrance, and the identity of who is escorting the vehicle (e.g., police, contractor, etc.). Vehicles that are oversized are requested to enter the park AFTER 2:00 p.m. and exit the park BEFORE sunset.

J. Slow Vehicles: The Contractor is to notify the Contracting Officer of slow vehicles that may cause traffic delays or extended traffic lines. Vehicles that are slow are requested to enter the park AFTER 2:00 p.m. and exit the park BEFORE sunset.

K. Tracked Equipment: Heavy equipment with rubber tires is preferred on projects within national parks. Heavy equipment with metal tracks may be allowed on paved asphalt surfaces, concrete surfaces, or ceremonial lawn areas only with adequate surface protection to prevent permanent track marks, spalls, cracks, ruts, depressions, and other damage. The means and methods of surface protection (such as plywood sheets or steel plates) shall also not damage surfaces. The exceptions listed below may apply. If the Contractor anticipates one of these exceptions, submit a Request for Information (RFI) to the NPS for further instructions.

1. Tracked equipment may be allowed on paved asphalt or concrete surfaces in lieu of surface protection if the Contractor repairs all the affected surfaces to pre-construction condition or replaces the surface with new asphalt or new concrete, as applicable.

2. Tracked equipment may be allowed on older paved asphalt surfaces if the asphalt surface is scheduled for pavement preservation (by others) within one (1) year of contract completion.

3. Tracked equipment may be allowed on un-paved gravel roads if the tracked equipment stays on the road and does not create ruts, damage, or impacts the surface water flow. If damage occurs, the Contractor shall re-grade / restore the terrain to pre-construction conditions.

AMME – PMIS #257310 SUMMARY OF WORK (01 11 00) Page 9 of 9

4. Tracked equipment may be allowed on grass surfaces within the project area limits with adequate surface protection or the terrain is re-graded / restored to preconstruction conditions.

Reseeding of re-graded / restored areas is not required unless otherwise specified.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION 01 11 00

Hot Work Permit (Form HW-1)

Hot Work Permitting Hot work shall only be performed in designated or permit-required areas. Before hot work operations begin in a non-designated location, a signed Hot Work Permit, issued by the Permit Authorizing Individual or his/her designee, shall be issued.

Designated Area A designated area shall be a specific area designed for, or approved by the Permit Authorizing Individual or his/her designee for, such work. A designated area can be a maintenance shop or a detached outside location that is of noncombustible or fire-resistive construction, essentially free of combustible and flammable contents, and suitably segregated from adjacent areas. All designated areas shall have been inspected and approved by the Permit Authorizing Individual or his/her designee.

Permit-Required Area A permit-required area shall be an area that is made fire safe and authorized by the issuance of a signed NPS Hot Work Permit. The Hot Work Permit shall be signed by Permit Authorizing Individual or his/her designee.

Non-permissible Areas Hot work shall not be allowed in the following areas:

(a) In areas not authorized by the Permit Authorizing Individual or his/her designee

(b) In sprinklered buildings while such protection is impaired

(c) In the presence of explosive atmospheres (that is, where mixtures of flammable gases, vapors, liquids, or dusts with air exist)

(d) In explosive atmospheres that can develop inside unclean or improperly prepared drums, tanks, or other containers and equipment that have previously contained such materials

(e) In explosive atmospheres that can develop in areas with an accumulation of combustible dusts

GENERAL

Park: District: Building: Floor:

Work to be done:

Special precautions:

PERSON PERFORMING WORK

Contractor Business Name:

Contractor Representative:

Contractor Contact Number:

NPS Employee’s Name:

NPS Office:

NPS Employee’s Contact Number:

CHECK

Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite side of wall(s) were inspected every 20 minutes for 1 hour after the work was completed and were found fire safe.

ATTENTION

Before approving any hot work permit, the Permit Authorizing Individual or his/her designee shall inspect the work area and confirm that the proper precautions have been taken to prevent fire, in accordance with the NPS Hot Work Permit Form (Form HW-1) and the NPS Hot Work Policy.

PRECAUTIONS

Sprinklers in service Hot work equipment in good repair

WITHIN 35 FEET OF HOT WORK AREA

Floors swept, clean of combustibles Combustible floors wetted down, covered w/ damp sand or other shields in place All wall and floor openings covered

WORK ON WALLS OR CEILINGS

Combustibles moved away from opposite side of wall

WORK ON ENCLOSED EQUIPMENT (tanks, containers, ducts, dust collectors etc.)

Equipment cleaned of all combustibles Containers purged of all flammable vapors

FIRE WATCH

To be provided during and 60 minutes after operation Supplied with a fully charged and operable fire extinguisher Trained in use of equipment and activating fire alarm system

FINAL CHECK

To be made every 20 minutes for 60 minutes after completion of any operation unless fire watch is provided

Is a fire watch required? Yes No

The location where the work is to be done has been examined, necessary precautions taken, and permission is granted for this work.

Permit Issue Date: Permit Expires:

Permit Authorizing Individual or Designee:

Signature: Date:

AMME – PMIS #257310 DEFINITION OF CLINs (01 27 00) Page 1 of 1

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS (CLIN)

A. This section explains, in general, what is and is not included in a contract line item and defines where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

PART 3 – EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item (CLIN) 00010

1. This item consists of works within the Administration Building. The Work consists of the following:

a. Remove and replace existing ¾ inch conduits with new rigid aluminum conduits and all appurtenances;

b. Remove and replace six (6) existing two (2) inch conduit clamps at three separate locations;

c. Remove an abandoned conduit and its wiring in addition to replacing an existing splice box with a new NEMA 4X box and reconnect the wiring;

d. Remove and replace existing ½ inch conduits with new rigid aluminum conduits and all appurtenances;

e. Remove and replace two (2) existing panels with new NEMA 4X panels and one (1) transformer with new 30 KVA step down transformer;

2. Payment will be made at the contract lump sum price.

B. Contract Line Item (CLIN) 00020

1. This item consists of works within the Administration Building. The Work consists of the following:

a. Remove and replace two (2) existing panel covers with new NEMA 4X panel covers and one (1) existing transformer with new 112.5 KVA transformer;

2. Payment will be made at the contract lump sum price.

END OF SECTION 01 27 00

PROJECT MANAGEMENT (01 31 00) Page 1 of 2

SECTION 01 31 00 – PROJECT MANAGEMENT & COORDINATION

A. This section includes administrative provisions for coordinating construction operations on the

Project including, but not limited to, the following:

1. Construction Coordination

2. Requests for Information (RFI)

3. Project Meetings

1.2 CONSTRUCTION COORDINATION

A. Contractor Coordination: Coordinate construction operations included in different drawing sheets and/or specification sections to ensure efficient and orderly installation of each part of the Work.

1. Schedule construction operations in the sequence required to obtain the best results where installation of one part of the Work depends on installation of other components.

2. Coordinate installation of different components with other Contractors to ensure maximum access for required maintenance, service, and repair.

3. Plan and coordinate construction operations to incorporate applicable permit requirements.

B. Administrative Procedures: Coordinate scheduling of administrative procedures with other construction activities to avoid conflicts and ensure orderly progress of the Work.

1.3 REQUEST FOR INFORMATION (RFI)

A. General: Upon discovery of the need for additional information or an interpretation of the contract documents, the Contractor shall prepare and submit an RFI. The Contracting Officer will only respond to RFIs submitted by the prime Contractor. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. RFI Form: Include a detailed, legible description of the subject or item needing more information or interpretation on the NPS RFI Form with the information below. Submit the RFI form in MS Word format to allow the NPS to provide a response.

1. RFI number, numbered sequentially.

2. Date of RFI.

3. RFI subject.

4. Specification Section, section title, and related paragraphs, if applicable.

5. Drawing number and detail references, if applicable.

6. Description of the issue or question.

7. Photographs or sketches, if applicable.

8. Contractor's suggested resolution. State whether the suggested resolution results in “no additional time / cost” to the contract or if it will result in “additional time / cost.” Do not provide a detailed price proposal unless requested to do so by a Contracting Officer.

C. RFI Response: The Contracting Officer, or authorized representative, will review each RFI, determine the action required, and respond accordingly.

PROJECT MANAGEMENT (01 31 00) Page 2 of 2

1.4 PROJECT MEETINGS

A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting (typically by MS Teams or teleconference). A meeting agenda will forwarded to the group prior to the meeting. During the meeting, the agenda will be updated by the Contracting Officer or designee and distributed to the group as the meeting minutes.

B. Progress Meetings: The NPS may schedule periodic meetings to discuss the progress of the

Work with the Contractor, subcontractor(s), and key NPS staff. The need for and frequency of these meetings with be discussed at the preconstruction meeting. Progress meetings are typically held once per week via teleconference and last no more than 30 minutes. These weekly meetings are mainly to discuss progress for team situational awareness. Meeting minutes are not required.

END OF SECTION 01 31 00

REQUEST FOR INFORMATION (RFI)

Park Name & Project Title:

NPS Solicitation / Contract No:

Contractor Name:

Subject of RFI:

RFI Number: Date Submitted: Response Required By:

Please provide additional information or clarifications to the questions below:

Contractor Recommendation, if applicable

NPS SECTION

Name of NPS Respondent: Date of Response:

Below is additional information or clarifications in response to the Contractor RFI:

CONTRACTOR SECTION

CONSTRUCTION SCHEDULE (01 32 16) Page 1 of 2

SECTION 01 32 16 – CONSTRUCTION SCHEDULE

A. This section consists of Construction Schedule requirements including:

1. Schedule of Values

2. Construction Baseline Schedule

3. Construction Schedule Updates

4. Look-Ahead Schedule

B. Purpose: The construction schedule ensures adequate planning, coordination, scheduling, and reporting during execution of the Work by the Contractor. The construction schedule will assist the NPS and the Contractor in the monitoring the progress of the work, evaluating the proposed changes, and the processing the Contractor’s progress payments.

1.2 DEFINITIONS

A. Schedule of Values (SOV): A document that helps define the payment process on contracts. The SOV allocates the entire awarded contract sum to various portions or activities of the Contractor’s work. The value for each portion of work in the SOV shall generally coincide with the value(s) outlined in the accepted price proposal (where applicable).

B. Activity: A discrete part of a project identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources. Critical activities are activities on the critical path. They start and finish on the planned early start and finish times. Predecessor activities are activities that precede another activity in the schedule network. Successor activities are activities that follow another activity in the schedule network.

C. Critical Path: Longest connected chain of interdependent activities through the schedule network that establishes the minimum overall project duration and contains no float.

D. Float: Measure of leeway in starting and completing an activity.

1.3 SUBMITTALS

A. Schedule of Values (SOV): Submit a schedule of values (SOV) with a breakdown of all major work activities for which progress payments will be requested. The SOV should identify the park, project title, contract number, and Contractor name. In addition, the SOV must also include the following columns (at a minimum): Item #, Activity Description, Total Contract Value ($), Previous Pay Applications ($), Work this Period ($), % Complete (%), and Balance to Complete ($). The SOV must also have a total value for all ($) columns.

Ensure each portion of work or activity is assigned to the appropriate Contract Line Item (CLIN), Bid Option, or Contract Modification. Ensure an updated SOV is submitted with each invoice.

CONSTRUCTION SCHEDULE (01 32 16) Page 2 of 2

Ensure the SOV is updated with each contract modification. Failure to submit an accurate SOV reflecting the work completed at the time of invoice submission may delay invoice approval.

B. Construction Baseline Schedule: Submit a construction baseline schedule with all major work activities. At a minimum, the schedule must have the following information:

• Milestone: Contract Award (actual date)

• Activity: Permit Applications & Approvals, if applicable

• Activity: Division 01 Plan Preparation & Review

• Milestone: Preconstruction Meeting & Notice to Proceed (anticipated)

• Activity: Material Submittal Preparation & Review

• Activity: Material Purchasing & Delivery

• Activity: Initial Invasive Species Inspections & Field Mobilization

• Activities: All Major Work Activities (with start and end dates) with critical path identified

• All Federal and State Holidays.

• Activities: Testing and Service Interruptions

• Milestone: Pre-Final Inspection (at Substantial Completion)

• Activity: Punchlist Completion (within 30 days after Substantial Completion)

• Milestone: Final Inspection (within 30 days after Substantial Completion)

• Activity: Field Demobilization (after all field work is complete and accepted)

• Activity: Preparation of Final Closeout Documents

• Milestone: End Contract Period of Performance

MS Project is the preferred computer software for developing a construction schedule; however, the NPS will accept any format that relays the requested information and can be easily updated and understood. No work shall be performed or shown on weekends, state, and federal holidays.

Ensure coordination of the work with subcontractors and vendors in the development of the construction schedule and schedule updates.

C. Construction Schedule Updates: Submit updates to the construction baseline schedule: 1) when requested, 2) when there is a change to the critical path, 3) when the previously approved schedule is no longer accurate, or 4) when there is a change to the contract such as a modification.

Construction schedule updates must be approved in advance of the Work.

D. Look-Ahead Schedule (Optional): The Contractor may submit a 1-3 week look-ahead schedule at the beginning of each week to notify the NPS of planned work and potential disruption to park operations. The look-ahead schedule typically shows proposed work planned for each day of the week. The look-ahead schedule does not need to be approved, but it must be consistent with the approved schedule. If the look-ahead schedule is not consistent with the approved schedule, submit a construction schedule update for approval. The look-ahead schedule can be submitted in any format, but weekly / monthly calendar view seems to work well.

END OF SECTION 01 32 16

SUBMITTAL PROCEDURES (01 33 23) Page 1 of 4

SECTION 01 33 23 – SUBMITTAL PROCEDURES

A. Section includes administrative and procedural requirements for submittals including:

1. Submittal Procedures

2. Submittals

3. Submittal Review

A. Action Submittals: Written, graphic information, and physical samples that require the Government’s approval.

B. Informational Submittals: Written information that does not require the Government’s approval.

Submittals may be rejected for not complying with the requirements.

C. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a fixed-layout document format.

D. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access the files.

1.3 SUBMITTAL PROCEDURES

A. General: Prepare and submit all submittals required by individual specification section, contract clause, or as requested in the drawings. The Contracting Officer reserves the right to require submittals in addition to those called for in individual specification sections. Review submittals for legibility, accuracy, completeness, and compliance with the contract documents prior to submittal to the Contracting Officer.

B. Submittal Format: All submittals shall be transmitted using the NPS CM-16 form via email (or approved FTP / Sharepoint Site). Each submittal item shall have its own CM-16 form. Complete all applicable fields of the CM-16 form; provide a submittal number not previously used; and attach all supporting documentation. Resubmittals shall retain the original submittal number followed by a letter starting with “a, b, and so forth. The completed submittal may be submitted in PDF format (or optimized PDF format if file size is > 10 mb). Ensure all pages of the submittal are positioned upright (rotate page if needed), and all blank pages removed. No action will be taken on a submittal item unless it is accompanied by a properly formatted CM-16 form.

C. File Transfer: For attachments with file size < 10 mb, transmit file(s) via email. For attachments with file size > 10 mb, transmit file(s) via FTP or secure Sharepoint Site. Note that Dropbox and similar commercial file share services are not secure and not allowed on the NPS network.

SUBMITTAL PROCEDURES (01 33 23) Page 2 of 4

1.4 SUBMITTALS

A. General: At a minimum, prepare and submit the following submittals for the project:

B. Submittal Log (Optional): The Contractor may submit and update a submittal log to help keep track of the progress of all action and informational submittals.

C. Contract Submittals: The following contract submittals shall be submitted within 7 days after contract award. Failure to submit these submittals may delay the notice to proceed. Note that the Contracting Officer (CO) will typically review and approve these submittals.

1. Satisfactory evidence of Liability Insurance Coverage and Workers Compensation for the

Contractor and all Subcontractors (per contract clause).

2. Performance and Payment Bonds.

D. Division 01 Informational Submittals: The following Division 01 informational submittals shall be received within 14 calendar days after contract award and at least 7 calendar days prior to the preconstruction meeting. If any of these documents have not been received within 7 calendar days of the preconstruction meeting, the meeting may be cancelled and the Notice to Proceed (NTP) may be delayed. Work shall not commence until written NTP has been issued by the Contracting Officer. Submit each document separately with its own CM-16 form for acceptance.

Refer to applicable specification sections for the required content of each submittal. Note that the Contracting Officer’s Representative (COR) will typically review and accept these submittals.

1. Letter designating the Job Superintendent (comply with Section 01 73 40, PART 1.2.A).

2. List of Subcontractors / Written Statement & Acknowledgement (SF1413 Form) for all

Subcontractors certifying compliance with applicable labor clauses (per contract clause).

3. Construction Schedule (comply with Section 01 32 16, PART 1.3.B).

4. A comprehensive Schedule of Values (comply with Section 01 32 16, PART 1.3.A).

5. Accident Prevention Plan (comply with Section 01 35 23, PART 1.2.A).

6. Quality Control Plan (comply with Section 01 40 00, PART 1.4.A).

7. Under-an-Acre Pollution Prevention Plan (UPPP) (comply with Section 01 57 23, PART 1.4).

8. Construction Waste Management Plan (comply with Section 01 74 19, PART 1.4.A).

E. Division 01-49 Action Submittals: All Division 01–49 action submittals shall be received and approved prior to construction start (i.e. field mobilization). If any of the required documents have not been received and approved prior to construction start, the start date could be delayed.

Items shall not be purchased by the Contractor until written NTP has been issued by the Contracting Officer and the applicable Division 01-49 action submittals have been approved.

Submit each submittal separately with its own CM-16 form for approval. Refer to applicable specification sections for the required content of each submittal. Note that the Contracting Officer’s Representative (COR) will typically review and approve these submittals with assistance from key park personnel regarding colors, styles, or substitutions.

1. Product Data - Submit product cut sheets / data on all materials & products to be used on the project or as required in the Division 01-49 specification sections. Highlight the size, model, or type of each required or recommended product. Ensure all products meet the Buy American Act provisions and are commercially available in the United States.

SUBMITTAL PROCEDURES (01 33 23) Page 3 of 4

2. Samples – If applicable, submit a physical sample of a product and/or an array of color choices for approval.

F. Shop Drawings – A shop drawing is a drawing or set of drawings produced by the Contractor, supplier, manufacturer, subcontractor, or fabricator. Shop drawings are typically required for prefabricated components or to illustrate the coordination work between trades. The shop drawing’s primary emphasis is on the particular product or installation. Note that the Contracting Officer’s Representative (COR) will typically review and approve these submittals.

1. Shop Drawings shall be developed in AutoCAD or similar drafting software.

2. Shop Drawings shall include details, dimensions, notational information and other data to ensure the Contractor has a complete understanding of the work.

3. Shop Drawings shall be submitted in DRAFT to the Contracting Officer along with a CM-16 form. Allow 7 calendar days for the drawings to be reviewed by the NPS. The Contractor shall correct any issues with the shop drawings as identified in the review comments and resubmit on a CM-16 form for final approval.

4. Update shop drawings during and after installation if changes are necessary, and submit the final as-built shop drawings as part of the Closeout Documents.

G. Permit Applications & Permit Approvals: All applicable permit applications and permit approvals shall be received prior to construction start (comply with Sections 011100, PART 1.13;

Section 015723, PART 1.4; and Section 017340, PART 3.2.A). Note that the Contracting Officer’s Representative (COR) will typically review and approve these submittals.

H. Submittals (During Construction):

1. Construction Schedule Updates (comply with Section 01 32 16).

2. Quality Control (QC) Daily Reports (comply with Section 01 40 00, PART 1.4.B).

3. Testing & Inspection Data, if applicable (comply with Section 01 40 00, PART 1.4.C).

4. Field Surveying Data, if applicable (comply with Section 01 73 40, PART 1.2.B).

5. Field Engineering Data, if applicable (comply with Section 01 73 40, PART 1.2.C).

6. Product Data for Newly Introduced Products (comply with Section 01 33 23, PART 1.4.D).

I. Closeout Submittals: All closeout submittals shall be received and accepted prior to contract final acceptance. If any of these documents have not been received within 30 days after issuance of the Letter of Substantial Completion, final acceptance may not be issued. Note that the Contracting Officer’s Representative (COR) will typically review and approve these submittals.

1. Project Record Drawings (comply with Section 017700, PART 1.2.B).

2. Warranties (comply with Section 017700, PART 1.2.C)

3. Operation & Maintenance (O&M) Manual (comply with Section 017700, PART 1.2.D).

4. Project Photos (comply with Section 017700, PART 1.2.E)

5. Project Closeout Binders (comply with Section 017700, PART 1.2.F).

1.5 SUBMITTAL REVIEW

A. General: All submittals will be reviewed by the Contracting Officer, or authorized representative, to ensure compliance with the contract documents. Acceptance or approval of a Contractor’s submittal does not relieve a Contractor from complying with the contract requirements.

SUBMITTAL PROCEDURES (01 33 23) Page 4 of 4

B. Informational Submittals: The Contracting Officer, or authorized representative, will review the informational submittal or resubmittal and indicate the appropriate action on the CM-16 Form as follows:

1. ACCEPT: Acceptable with no corrections.

2. REJECT: Rejected as not in accordance with the contract or requiring major corrections, clarifications, or missing information.