This is a Request for Information (RFI) issued by Cleveland Public Power (CPP), a municipal electric utility owned and operated by the City of Cleveland, Ohio. CPP seeks commercial insights from qualified vendors, developers, integrators, and technology providers regarding the deployment of a utility-scale Battery Energy Storage System (BESS) sized between 30-50 MW (120-200 MWh) capable of supporting frequency regulation services within the PJM market. The RFI addresses system capabilities, control strategies, participation models, performance expectations, risks, and cost considerations. Key deadlines include a question submission deadline of September 11, 2026, at 1:00 pm and a response deadline of September 18, 2026, at 12:00 pm. Responses must be submitted electronically in PDF format through the OpenGov Procurement portal at https://procurement.opengov.com/signup. This RFI is informational only and does not constitute a solicitation for proposals or a commitment to contract; CPP will use collected information to refine project objectives and assess potential procurement pathways for future BESS projects.
Detailed pricing is not required; however, respondents should provide general cost insights suitable for high-level planning, including indicative cost ranges, typical cost drivers, and lifecycle cost considerations for system design, frequency regulation participation, and operations and maintenance needs. CPP specifically requests information on market compensation models, potential revenue generation, capital expenses, operational and maintenance requirements, system degradation impacts, and lifecycle costs. Respondents should address market participation approaches, frequency regulation capabilities with expected response times and ramp rates, cost models and fee structures for BESS frequency regulation operations, market-based returns and economic value potential, operational behavior and degradation patterns, and recommendations for multi-functional BESS deployment. The City will not pay for information submitted nor compensate respondents for costs incurred in developing responses. CPP maintains four 138-kV transmission interconnections with PJM and currently serves over 74,000 customers with peak system demand exceeding 300 megawatts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cover_Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Community Owned Renewable Energy BESS
CLEVELAND PUBLIC POWER RFI FOR UTILITY SCALE
BESS FREQUENCY REGULATION
City of Cleveland
Department of Public Utilities
601 Lakeside Ave
Cleveland, OH 44114
RELEASE DATE: August 28, 2026
DEADLINE FOR QUESTIONS: September 11, 2026
RESPONSE DEADLINE: September 18, 2026, 12:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/clevelandoh
City of Cleveland
Cleveland Public Power RFI for Utility Scale BESS Frequency
Regulation
I. Introduction
II. Project Details
III. Vendor Submissions
IV. General Terms and Conditions
Attachments:
A - Cover Letter
#Community Owned Renewable Energy BESS Title: Cleveland Public Power RFI for Utility Scale BESS Frequency Regulation
1. Introduction
1.1. Summary
Cleveland Public Power (CPP) is issuing this Request for Information (RFI) to obtain commercial insights to evaluate risks and benefits related to the deployment of a utility-scale Battery Energy Storage
System (BESS). CPP is evaluating how a BESS in the 30–50 MW range could support participation in frequency regulation services within the PJM market and provide customer-focused economic value through operational savings and market compensation mechanisms.
CPP seeks feedback from qualified vendors, developers, integrators, and technology providers regarding system capabilities, control strategies, participation models, performance expectations, risks, and cost considerations associated with frequency regulation. This information will support CPP’s internal cost-benefit analysis and assist in evaluating the financial feasibility of implementing a BESS for frequency regulation and other system support functions such as peak shaving.
This RFI is informational only and is not a solicitation for proposals or pricing. CPP will use the information collected to refine project objectives and assess potential procurement pathways for future
BESS projects.
1.2. Background
CPP is a municipal electric utility owned and operated by the City. CPP ranks as the largest municipally owned utility in Ohio. CPP currently serves over 74,000 residential, commercial and industrial customers with a peak system demand exceeding 300 megawatts.
CPP maintains four 138-kV transmission interconnections with the PJM market, supplying 36 substations throughout Cleveland and supporting distribution voltages of 13.8 kV, 11.5 kV, and 2.4 kV. CPP is evaluating the deployment of BESS at selected substations, including one 138kV transmission site and multiple 138kV to 13.8kV distribution substations.
1.3. Contact Information
Project Contact:
Alicia Moyers Project Coordinator 1300 Lakeside Ave E Cleveland, OH 44114 Email: amoyers@cpp.org Phone: (216) 664-3922 Ext: 76129
Procurement Contact:
Charlie Rosol Procurement Specialist 1201 Lakeside Ave.
4th floor South Cleveland, OH 44114 Email: charlie_rosol@clevelandwater.com Phone: (216) 644-2444 Ext: 75411 mailto:amoyers@cpp.org tel:(216)664-3922;ext=76129 mailto:charlie_rosol@clevelandwater.com tel:(216)644-2444;ext=75411
Department:
Public Utilities
Department Head:
Martin J. Keane Director
1.4. Timeline
Release Project Date August 28, 2026
Question Submission Deadline September 11, 2026, 1:00pm
Submission Deadline September 18, 2026, 12:00pm
2. Project Details
2.1. Important Instructions for Electronic Submittal
The City of Cleveland is accepting electronic submissions. Vendors shall create a FREE account with
OpenGov Procurement by signing up at https://procurement.opengov.com/signup. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
2.2. Purpose
Through this RFI, CPP seeks to better understand how BESS technology can be utilized for participation in frequency regulation, including revenue generation, capital expenses, expected operational and maintenance needs, system degradation impacts, and lifecycle cost considerations. CPP is also requesting information on how participation in frequency regulation services could create cost offsets or provide economic value that ultimately benefits CPP’s customers. This information will support high-level planning and feasibility analysis as CPP considers a BESS installation capable of supporting both frequency regulation and peak shaving.
2.3. Scope
Provide information to support evaluation of a utility-scale BESS sized approximately 30–50 MW (120–
200 MWh). Respondents should tailor their feedback to this general range unless an alternative size is recommended for technical or operational reason(s).
The BESS may serve multiple operational roles within CPP’s system, CPP’s primary interest in this RFI is understanding how a resource of this size could participate in frequency regulation within the PJM market and what customer-focused economic value such participation could provide.
CPP is seeking general, non-technical information related to expected performance assumptions, market participation models, and operational cost considerations associated with frequency regulation.
Respondents should also provide the type of cost model, fee structure, or cost ranges typically used when operating or managing a BESS in the frequency regulation market. This may include high-level estimates or projection frameworks sufficient to support CPP’s early-stage cost analysis and evaluation of potential customer benefits from frequency regulation participation.
Technical specifications, detailed design documentation, and project-specific engineering information are not required as part of this RFI. Responses should remain high-level and relevant to CPP’s early-stage evaluation and planning process.
2.4. Information Requested from Vendors
1. Market Participation Approach
What model or operating approach would you recommend for a BESS of this size participating in frequency regulation within PJM? Aside from frequency regulation and peak shaving, are there other ancillary services you would recommend with a BESS of this size? What are the opportunity costs of only participating in frequency regulation?
2. Frequency Regulation Capability Provide detailed information on how the proposed system could support frequency regulation services.
https://procurement.opengov.com/signup
Include expected response times, ramp rates, accuracy of response tracking, and any certifications or performance standards the system adheres to for frequency regulation applications.
3. Cost Model for Frequency Regulation Operations
What cost model and fee structures are offered for providing BESS frequency regulation services? Please include cost ranges or drivers sufficient to support CPP’s early-stage analysis.
4. Market Compensation and Customer Value Based on your experience with similar projects, please provide high level estimates or projection models that illustrate the potential market-based returns, cost offsets, or other forms of economic value that could be generated through frequency regulation participation by a BESS of this size. CPP also requests estimated cost ranges associated with operating in the frequency regulation market, including any participation-related operational or maintenance costs beyond standard asset-level O&M. Estimates may be provided in ranges or through representative models suitable for early-stage cost analysis.
5. Operational Behavior and Degradation What general operational or lifecycle impacts should CPP anticipate for a BESS regularly providing frequency regulation services, including expected cycling behavior, degradation patterns, or major O&M considerations? What are the risks of participation in frequency response and other ancillary services, like peak shaving.
6. Recommendations and Best Practices Offer any additional insights, considerations, or best practices CPP should be aware of when planning a
BESS that may serve multiple operational roles.
3. Vendor Submissions
3.1. Respondent Submittals*
Respondents should provide clear, concise, and complete information aligned with the questions listed in this RFI. Responses must be submitted electronically in PDF format and include the following components:
A. Vendor Background and Qualifications
Provide an overview of your organization, including relevant experience with utility scale battery energy storage systems, participation in frequency regulation markets, and any prior projects comparable in size or scope to the system described in this RFI. Include certifications, technical expertise, or partnerships that support your credibility as a qualified respondent.
B. Narrative Response to RFI Questions
Submit a structured narrative that addresses each question included in the RFI. Respondents may include supporting materials such as diagrams, data sheets, or brief case studies if they directly relate to the requested information.
C. Cost-Related Information
While detailed pricing is not required, CPP requests general cost insights relevant to high level planning. Respondents may provide indicative ranges, typical cost drivers, or lifecycle cost considerations associated with system design, frequency regulation participation, and expected
O&M needs. Cost information should be presented at a level suitable for early-stage analysis rather than procurement evaluation.
D. Additional Materials (Optional)
Respondents may include any additional information, recommendations, or resources they believe would assist CPP in evaluating the feasibility and operational value of implementing a BESS for frequency regulation and other system needs.
*Response required
3.2. I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company.*
☐ Please confirm
*Response required
4. General Terms and Conditions
Disclaimer:
This RFI is issued solely for information and planning purposes and does not constitute a Request for
Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the City of
Cleveland (the City) to contract for any supply or service whatsoever. All information submitted in response to this RFI is voluntary, and the City will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the City.
| 1. Introduction |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Project Details |
| 2.1. Important Instructions for Electronic Submittal |
| 2.2. Purpose |
| 2.3. Scope |
| 2.4. Information Requested from Vendors |
| 3. Vendor Submissions |
| 3.1. Respondent Submittals* |
| 3.2. I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company.* |
4. General Terms and Conditions