CLES gym seismic RFP~1.docx
DOCX document 57 KB Posted
- Attached to
- CLES Gym/Cafeteria Seismic Rehab
- Solicitation number
- S-P22100-00015297
- Issued by
- Linn County, Oregon
About this file
This is a Request for Proposals (RFP) issued by Central Linn School District for engineering and architectural services to design and oversee the seismic retrofit of the Central Linn Elementary School Gym & Cafeteria located at 239 W 2nd St., Halsey, Oregon. The District seeks a prime consultant to provide comprehensive design and construction administration services, including all design work, site analysis, assistance with contractor solicitation and award, construction oversight, and procurement of necessary government permits. The scope encompasses pre-design and schematic design phases beginning immediately upon contract award, with construction anticipated to commence in summer 2026 and project completion required by October 31, 2026. A mandatory pre-proposal walk-thru is scheduled for November 13, 2025, at 10:00 a.m. Sealed proposals must be received by 1:30 p.m. on December 4, 2025, with no electronic submissions accepted. Optional interviews may be conducted on December 9, 2025. Board approval of award is anticipated for December 15, 2025, with notice of intent to award issued on December 16, 2025. The intent to award protest deadline is December 22, 2025.
The District was awarded $2,498,762 through the Seismic Rehabilitation Grant Program (SRGP) from the Infrastructure Finance Authority: Business Oregon in May 2025, and the consultant must adhere to SRGP requirements while not exceeding the maximum grant funding level. The District has no additional available funds to contribute to the project. The selected firm must be licensed to practice engineering and architecture in Oregon and must actively pursue the plans as detailed in the proposal. Qualifications-based selection (QBS) will be used as mandated under Oregon's Public Contracting Code (ORS 279C.110) for contracts exceeding $100,000. Evaluation criteria include seismic-only rehabilitation experience with SRGP-funded projects (35 points), project team composition (5 points), special qualifications (10 points), project quality control approaches (20 points), construction cost control strategy (20 points), and identification of immediate project "must haves" (10 points). Proposals are limited to 20 single-sided pages, excluding key staff resumes and front matter, and must be signed by a firm officer with authority to commit the organization.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit A - Central Linn SD~1.pdf | ||
| CLES gym seismic engineering public notice~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
FOR ENGINEERING/ARCHITECTURAL SERVICES
Central Linn School District Elementary School Gym & Cafeteria Seismic Rehabilitation
Issue Date: October 29, 2025 RFP Closing Date: December 4, 2025
SEALED PROPOSALS ONLY
No Late Responses Will Be Accepted
Submit in person or via postal mail
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 1
Request For Proposals The Central Linn School District (the “District”) is conducting a selection procedure for an engineering/architectural firm to design and oversee the seismic retrofit of the Central Linn Elementary School Gym & Cafeteria (the “Project”). The District plans to award a contract to the highest ranked proposer selected from those submitting proposals. The anticipated contract or contracts will include: all design work; site analysis; assistance with contractor solicitation and award process; construction oversight; and procurement of all necessary government permits.
The full Request for Proposals may be obtained from:
Celeste Van Cleave Business Manager Central Linn School District
541.369.2813 ext. 3223 celeste.vancleave@centrallinn.k12.or.us www.centrallinn.k12.or.us
Sealed proposals will be received by the District until closing at 1:30PM, December 4, 2025. Responses received after this time will be rejected as non-responsive. Electronic proposals will be rejected as non-responsive.
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 2
Section I - Request for Proposals The Central Linn School District (the “District”) intends to select an engineer/architect for the Seismic Rehabilitation of the Central Linn Elementary School Gym & Cafeteria (the “Project”), as described in Section II, Project Description, from among proposers who respond to this Request for Proposals (RFP). The District intends to enter into a contract with the selected Proposer after negotiating a maximum not to exceed dollar amount. The contract amount will be based upon all design work rendered, through selection of a construction contractor, procurement of government permits, construction oversight and project closeout.
No drawings are required for this proposal. Proposal clarifications or additional information requested by the District must be provided by Proposer within 24 hours of request, excluding weekends and holidays.
Section II - Project Description The project includes Seismic Rehabilitation of the Central Linn Elementary School Gym & Cafeteria, located at 239 W 2nd St., Halsey, OR 97348. In May 2025, the District received a Seismic Rehabilitation Grant Program (“SRGP”) award for the Project from the Infrastructure Finance Authority: Business Oregon, based on the application prepared by WRK Engineers, Inc., now IMEG Consultants Corp. The intent of this RFQ is for the consultant to use the Grant Application as a basis for providing integrated seismic strengthening solutions for the building while adhering to the SRGP requirements. As part of this grant, Seismic Evaluation Reports were prepared (provided as Exhibits A). The District was awarded $2,498,762 for the design and construction of Central Linn Elementary School Gym & Cafeteria.
It is anticipated that the selected Engineering/Architectural firm will provide comprehensive design and construction administration services throughout the lifespan of the Project. The Scope of Services listed herein is provided to establish a general understanding of the project requirements. The actual scope of services will be finalized during fee/contract negotiations.
The selected consultant will work with the District to determine the sequence of construction as well as any phasing requirements that will be needed to keep the Gym & Cafeteria in operation during construction activities.
The District intends to use either the typical Design-Bid-Build procurement project delivery method or the CM/GC procurement project delivery method for this Project. Pre-Design/Schematic Design would begin immediately upon award and approval of the resulting design contract. Construction is anticipated to start in the summer of 2026 with Project completion required by the end of October 2026. The buildings will not be vacated during the construction period.
Scope of Work The Project scope of work will include the following:
· Use the SRGP application as the basis for developing the final engineering design solution to meet the SRGP requirements while not exceeding the maximum grant funding level. The District does not have any additional available funds to contribute to the project.
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 3
· If the District elects to use the CM/GC project procurement method, Proposer will develop all construction documents required for a CM/GC construction delivery method. Proposer will assist the District in the selection process for a CM/GC firm. The selection process will include the preparation and administration of the “Facts and Finding Report” and the “RFP” for the proposed alternative contracting method as outlined in OAR 137-049-0600.
· Assist the District with the entitlement of the project through the Authorities Having Jurisdiction and the State Historical Preservation Office (SHPO).
· Provide all construction administration services necessary for the implementation of the project. These include, but are not limited to:
· Review of contractor’s submittals, shop drawings, and material samples.
· Responding to contractor’s requests for clarification.
· Reviewing and processing change orders.
· Oversight and inspection of construction and repair work.
· Weekly site visits and attendance at occasional meetings, unless otherwise directed by District.
· Ensure smooth construction transitions to facilitate ongoing operations.
· Monitor budget and maintain costs within grant parameters.
· Assist District Staff with SRGP reporting requirements as required.
· Conduct project closeout procedures as required by SRGP.
Section III - Anticipated Contract Performance Schedule
| Advertise and Issue RFP | October 29, 2025 | |||||
| Mandatory Pre-Proposal walk thru | November 13, 2025 | 10:00am | ||||
| Question Submittal Deadline | November 19, 2025 | 8:00am | ||||
| Response to Questions Issued | November 25, 2025 | 2:00pm | ||||
| Deadline for Submittal of Proposals | December 4, 2025 | 1:30pm | ||||
| Interviews (Optional) | December 9, 2025 | 1:00pm | ||||
| Board of Directors Approval of Award | December 15, 2025 | |||||
| Notice of Intent to Award | December 16, 2025 | |||||
| Deadline for Intent to Award Protest | December 22, 2025 |
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 4
Section IV - Pre-proposal Walk Thru Mandatory Pre-Proposal Walk Thru A pre-proposal walk thru will be held at the Central Linn Elementary School Gym & Cafeteria located at 239 W 2nd St., Halsey, OR 97348, on the date and time shown in Section III. The purpose of the walk thru is to share information about the Project and give Proposers the opportunity to view the Project sites. Attendance at the meeting is Mandatory.
Section V - Submittal Information Sealed bid proposal is to be received by the District no later than 1:30PM on December 4, 2025. Electronic proposals will be rejected as non-responsive. Any late proposals cannot be considered and will not be reviewed. Send proposals to:
Central Linn School District By mail:
PO Box 200 Halsey, OR 97348 In person:
32433 Hwy 228 Halsey, OR 97348 Section VI - Instructions to Proposers The District may modify this RFP via addenda before the proposal due date. Receipt of all addenda must be acknowledged in submitted proposals.
Proposers responding to this RFP do so solely at their own expense. The District is not responsible for any proposer’s expenses associated with responding to this RFP.
Proposers are directed to the protest procedures as set forth in the OAR Rule 137-048-0240.
Each proposal must include the information set forth in Section VII, Proposal Requirements, and address the criteria by which the proposals will be evaluated and ranked, set forth in Section VIII, Proposal Evaluation.
All proposals submitted are the property of the District, thus subject to disclosure pursuant to the public records law, as qualified by ORS 279C.107. Accordingly, proposals received and opened shall not be available for public inspection until after the District has awarded and executed the attached Contract. Thereafter, except for information marked “Proprietary,” all documents received by Agency shall be available for public disclosure. Agency will attempt to maintain the confidentiality of materials marked “Proprietary” to the extent permitted under the Oregon Public Records law.
Your response must be contained in a document not to exceed twenty (20) single-sided pages including pictures, charts, graphs, tables, and text the firm deems appropriate to be part of the review of the firm’s response. Resumes of key individuals proposed to be involved in this project are exempted from the 20-page limit and should be appended to the end of your response. No supplemental information to the 20-page Proposal will be allowed. Transmittal letter, table of contents, front and back covers, and blank section/numerical dividers, etc., will not be counted in the 20-page limit.
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 5
Information shall be presented in the same order as the Evaluation Criteria listed in Section VIII. The basic text information of the response should be presented in standard business font size (minimum 10-point), and reasonable margins. Your response must be signed by an officer of your firm with the authority to commit the firm.
Section VII - Proposal Requirements The Proposer and all firms, subsidiaries and individuals providing professional services shall be currently licensed to practice in each of their respective areas of professional expertise in the State of Oregon and shall comply with all State of Oregon Architect and Professional Engineer licensure requirements.
The submittal must include the following, in addition to what is required to comply with the Evaluation Criteria below:
· The firm’s name, address, and phone number.
· The name of the contact person within the firm and his/her email address.
· Brief resumes of key staff the firm proposes to provide services on this project, along with relevant projects each of these persons has worked on in the past three years. Resumes of sub-consultants are not required.
· The name and registration number of the Oregon Professional Structural Engineer who will serve as the Engineer-of-Record.
If awarded the Contract, the Proposer must accept, as Contract performance obligations, the duty to actively pursue the plans as set forth in the Proposer’s response.
Section VIII - Proposal Evaluation A. Evaluation Criteria Please indicate in writing the following information about your firm’s ability and desire to perform this work. The Proposers shall provide the following information in the order listed below. Each scoring criteria will be scored by the number of points listed next to the information; the points listed are the maximum amount that can be given during evaluation.
· Seismic-Only Rehabilitation Experience. Describe your firm’s recent experience (past 7 years) serving as the prime consultant designing seismic-only rehabilitation projects for public clients, preferably SRGP funded projects. Include at least three (3) completed relevant school projects with photographs or illustrations. Project information shall include project size, building uses, construction budget, construction delivery method, and project timeline/completion date. Provide your firm’s approach to seismic rehabilitation projects. Provide references the Owner can contact to discuss performance. (35 points)
· Project Team. Provide an organizational chart and summary resumes of key personnel assigned to the project including the Project Manager and all other potential sub-consultants for the project. (5 points)
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 6
· Special Qualifications. Describe attributes that distinguish your firm from other firms offering similar services and how your specialty qualifications will specifically benefit the Owner. (10 points)
· Project Quality Control. Describe how your firm ensures quality control throughout the design and construction process. Discuss lessons learned and examples of how your firm has worked with Owners and Contractors to minimize surprises during seismic rehabilitation projects. Include examples of value engineering applied on recent projects. (20 points)
· Project Construction Cost Control. Provide your firm’s strategy to address near-term volatile construction market conditions as they may affect public project bidding in rural project location. (20 points)
· Project “Must Haves”. Provide a list of immediate “must haves” from the Owner to enhance project delivery timelines. (10 points)
B. Evaluation Process Proposals will be initially screened pursuant to the following minimum qualifications:
1. Proposer is an Engineer/Architect licensed to work in the State of Oregon.
2. Proposer’s ability to provide the engineering and architectural work needed by the District on or before the anticipated Project schedule set in Section II to the standards required by the City, County, and State.
Once the initial screening process is completed, the remaining proposals will be evaluated under the criteria and weights accorded in Section VIII. If the District deems it desirable, the District may elect to interview one or more of the top candidates.
The District is using a qualifications-based selection (QBS) process as mandated for contracts anticipated to exceed $100,000 by Oregon’s Public Contracting Code (ORS 279C.110) and OAR 137-048-0220. As a result, selection of the most qualified candidate will be made without regard to the price of the services. If the District does not cancel the RFP, only after selecting the most qualified candidate, will the District and the selected candidate enter into contract negotiations for the price of the services. The District shall direct negotiations toward obtaining written agreement on the engineer/architect’s performance obligations, a payment methodology that is fair and reasonable to the District, and any other provisions the District believes to be in the District’s best interest to negotiate.
If the District and the selected candidate are unable for any reason to negotiate a contract at a compensation level that is reasonable and fair to the District, the District shall, either orally or in writing, formally terminate negotiations with the selected candidate. The District may then negotiate with the next most qualified candidate. The negotiation process may continue in this manner through successive candidates until an agreement is reached or the District terminates the RFP.
RFP FOR ENGINEERING/ARCHITECTURAL SERVICES 7
Section IX - Execution of Contract The District intends to select the highest scoring responsive responsible Proposer. After the Selection Committee scores and ranks the Proposals, the Selection Committee will make a written recommendation on awardee selection to the Board. The Board will make the final decision on selection of the most suitable candidate for District’s Project. All Proposers will be notified of the Board’s decision.
If the District and a selected candidate are unable for any reason to negotiate a contract at a compensation level that is reasonable and fair to the District, the District shall, either orally or in writing, formally terminate negotiations with that selected candidate. The District may then negotiate with the next most qualified candidate. The negotiation process may continue in this manner through the identified top three candidates until an agreement is reached or the District terminates the RFP.
Section X - Miscellaneous The District reserves the right to: 1) Seek clarifications of each proposal; 2) Negotiate a final contract that is in the best interests of the District and the public; 3) Reject any or all proposals or cancel this RFP at any time if doing either would be in the public interest, as determined by the District in its sole discretion; 4) Award the contract to any proposer based on the evaluation criteria set forth in this RFP; 5) Waive minor informalities contained in any proposal, when, in the District’s sole judgment, it is in the District’s best interest to do so; and 6) Request any additional information the District deems reasonably necessary to allow the District to evaluate, rank and select the most qualified proposer to perform the services described in this RFP.
The services and responsibilities set forth in this RFP, together with any other documents required herein, shall be included in the contract executed by the successful proposer.
Section XI - Contact Information Direct all inquiries regarding the Project and this RFQ to:
Celeste Van Cleave Business Manager Central Linn School District PO Box 200 Halsey, OR 97348
541.369.2813 ext. 3223 celeste.vancleave@centrallinn.k12.or.us Section XII - Exhibits The following appendices are included in this RFP:
Exhibit A: Seismic Evaluation Report for Central Linn School District prepared by WRK Engineers, Inc., now IMEG Central Linn School District is an Equal Opportunity/Affirmative Action Employer Women, Minorities, and Disabled Persons are encouraged to apply.
THIS RFP IS NOT AN IMPLIED CONTRACT AND MAY BE MODIFIED OR REVOKED WITHOUT NOTICE.