Cleaning and Trash-Debris Removal Services - ARMD.pdf

PDF 518 KB Posted

Attached to
March Mountain High School Modernization and CTE Project
Solicitation number
26-27-08
Issued by
Orange County, Anaheim City, California

About this file

This Invitation for Bid (IFB) document is issued by the City of Anaheim, Public Works Department for comprehensive Cleaning and Trash/Debris Removal Services in the Anaheim Resort Maintenance District (ARMD). The solicitation requests qualified vendors to provide outdoor cleaning, trash, litter, and debris removal services across approximately 1.9 million square feet of landscape areas and designated hardscape surfaces. The pre-bid meeting is mandatory and scheduled for November 17, 2026 at 10:00 AM at City of Anaheim Public Works Operations (400 E. Vermont St., Anaheim, CA 92805), with check-in beginning at 9:45 AM and strict attendance requirements. Questions must be submitted by November 24, 2026 at 2:00 PM, and bids are due December 1, 2026 at 2:00 PM through the City's electronic bidding portal. The contract term is one year with up to four one-year optional renewals based on budget appropriations and initial performance. Work is scheduled Monday through Sunday, with maintenance workers operating 6:30 AM to 3:30 PM daily, including twice-daily service for trash receptacles and graffiti removal, daily patrols for litter and debris, and monthly cleaning of poles and control boxes.

Pricing must be submitted as a lump sum monthly cost plus hourly rates for maintenance workers and working supervisors at regular and overtime rates, with all costs fully loaded to include labor, tools, equipment, consumables, and disposal fees. Bidders must account for the anticipated California minimum wage increase effective January 1, 2027, with no adjustments permitted after bid submission. A bid bond equal to 10% of the total bid amount is required at submission. The City reserves the right to award to a single bidder and to make multiple awards if deemed in the City's best interest. Contractor must maintain comprehensive general liability insurance of $2,000,000 per occurrence/$4,000,000 aggregate, auto liability of $2,000,000 combined single limit, and workers' compensation as required by statute with employers' liability of $1,000,000. Liquidated damages apply for missed work, safety violations, and failure to meet response time requirements ranging from $150 to $1,000 per occurrence depending on violation type. The solicitation includes detailed performance specifications, comprehensive reporting requirements, weekly coordination meetings, and strict compliance standards with penalties for non-performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

CLEANING AND TRASH/DEBRIS REMOVAL

SERVICES - ARMD

26-27-08

IFB SCHEDULE

Release Date November 3, 2026

IFB | CLEANING AND TRASH/DEBRIS REMOVAL SERVICES - ARMD

Pre-Bid Meeting (Mandatory) November 17, 2026, 10:00am

City of Anaheim Public Works - Operations

400 E. Vermont St., Anaheim, CA 92805

Meeting is on 11/17/26, 9:45 AM check-in and begins promptly at 10:00 AM

Important Requirements:

Mandatory Attendance: Only those who attend the entire pre-bid meeting will be eligible to submit a proposal.

Preparation: Please review the complete solicitation package prior to attending.

Check-In: Provide a business card to the City’s

Buyer upon arrival and complete sign-in sheet.

Punctuality: No late arrivals will be admitted.

No exceptions.

Duration: Attendees are required to stay for the full duration of the meeting.

Meeting Agenda:

General project information and bidding requirements will be discussed at the Public

Works Operations building. This is your opportunity to ask questions.

Question Submission Deadline November 24, 2026, 2:00pm

Bid Submission Deadline December 1, 2026, 2:00pm

1. Divider

1.1. GENERAL INFORMATION

1.1.1. INTRODUCTION

The City of Anaheim, Public Works Department, (hereinafter referred to as City) is requesting competitive bids from qualified vendors (hereinafter referred to as Bidder) for Cleaning and Trash Debris Removal

Services - ARMD. The awarded Contract, (hereinafter referred to as Contract) will be between the City and awarded Bidder, (hereinafter referred to as Contractor) in accordance with the City Master Agreement

Terms & Conditions, conditions and scope of work. This is a fully electronic solicitation – only electronic bids submitted through the City’s online bidding system will be allowed; no other form of bid submittals will be accepted. Prior to submitting a bid, Bidders are advised to carefully read the instructions below, including the City Master Agreement Terms & Conditions and any solicitation attachments and/or exhibits.

1.1.2. IMPORTANT NOTICE

The City has attempted to provide all information available. It is the responsibility of each Bidder to review, evaluate, and, where necessary, request any clarification prior to submission of a bid. If any person contemplating submitting a bid in response to this IFB is in doubt as to the true meaning of any part of the solicitation documents attached hereto or finds discrepancies in or omissions from the specifications, they must submit a written request for clarification/interpretation to the City via the City’s online biding system.

1.1.3. IMPORTANT DATES

These dates only apply to IFB# 26-27-08

Release Date: November 3, 2026

Pre-Bid Meeting (Mandatory): November 17, 2026, 10:00am

City of Anaheim Public Works - Operations

400 E. Vermont St., Anaheim, CA 92805

Meeting is on 11/17/26, 9:45 AM check-in and begins promptly at 10:00 AM

Important Requirements:

Mandatory Attendance: Only those who attend the entire pre-bid meeting will be eligible to submit a proposal.

Preparation: Please review the complete solicitation package prior to attending.

Check-In: Provide a business card to the City’s

Buyer upon arrival and complete sign-in sheet.

Punctuality: No late arrivals will be admitted.

No exceptions.

Duration: Attendees are required to stay for the full duration of the meeting.

Meeting Agenda:

General project information and bidding requirements will be discussed at the Public

Works Operations building. This is your opportunity to ask questions.

Question Submission Deadline: November 24, 2026, 2:00pm

Bid Submission Deadline: December 1, 2026, 2:00pm

1.1.4. COMMUNICATION

Bidders are not to contact other City personnel with any questions or clarifications concerning this

Invitation for Bid (IFB). City will provide all official communication concerning this IFB. Any City response relevant to this IFB other than through or approved by City is unauthorized and will be considered invalid.

All questions regarding this IFB must be submitted via the City’s eProcurement Portal at:

https://procurement.opengov.com/portal/anaheim.

1.1.5. CLARIFICATION/INTERPRETATION

If clarification or interpretation of this solicitation is considered necessary by City, a written addendum shall be issued and the information will be posted on City’s online bid system. Any interpretation of, or correction to, this solicitation will be made only by addendum issued by the City. All addenda will be submitted and posted on the City’s online bidding system. It is the responsibility of each Bidder to https://procurement.opengov.com/portal/anaheim periodically check the City's online biding system to ensure that they have received and reviewed any and all addenda to this solicitation. The City will not be responsible for any other explanations, corrections to, or interpretations of the documents, including any oral information.

All questions or requests for interpretation must be received by Tuesday, November 24, 2026 before

2:00 pm.

1.1.6. REVIEW

Before submitting a bid, Bidders shall carefully review the General Instructions and examine the solicitation contents, including the City Master Agreement Terms & Conditions and Scope of Work. Bidders shall include in their bid response a monetary sum to cover the cost of all items included in the Contract. The

City Master Agreement Terms & Conditions contained in this solicitation is the Contract proposed for execution. Upon award, awarded Bidder will be required to sign and submit Contract for execution.

1.1.7. RESPONSIVENESS

Responsive bids shall include completed submittals/attachments provided in the VENDOR

QUESTIONNAIRE.

1.1.8. BID SUBMISSION

Electronic Bids shall be submitted via the City’s online bidding system via the following link https://procurement.opengov.com/portal/anaheim. All required sections of the IFB as listed above, must be submitted via the City’s eProurement Portal. Bidder is solely responsible for “on time” submission of their electronic bid. The City will not accept late bids and no exceptions shall be made. City will only receive those bids that were transmitted successfully.

Note: Electronic Bids cannot be viewed by City until after the IFB deadline. If you encounter any problems with your registration, system, bid submission, or other system issues please contact OpenGov’s support staff via the live chat option or via email at procurement-support@opengov.com.

1.1.9. AWARD

Upon recommendation of Contract award, Bidder will be required to submit the following documents within seven (7) days of City notification, unless otherwise specified in the solicitation:

A. Insurance: Certificate(s) of Insurance, including additional Insured Endorsement(s); refer to City

Master Agreement Terms & Conditions, Article O-Insurance

B. W-9 Form: Current signed W-9 (Taxpayer ID No & Certification), which includes Contractor’s

Legal Business Name(s). Out of State Vendors may be required to submit a 587/590 Form.

1.1.10. PRICING

A. Bid Prices: The bid prices quoted on this solicitation shall be firm for the entire contract term of the awarded Contract.

B. Addenda: Bid prices offered shall reflect all addenda issued by City.

C. Scope of Work: Bids shall be submitted only for the items and/or services as stated in the Scope of Work, Attachment A of City Master Agreement Terms & Conditions; bids for other than the items and/or services listed will not be considered.

https://procurement.opengov.com/portal/ocgov/projects/298269/document?section=2864398 https://procurement.opengov.com/portal/ocgov/projects/298269/document?section=2864398 https://procurement.opengov.com/portal/anaheim mailto:procurement-support@opengov.com

D. Firm Prices: The City will only consider firm price bids.

E. Profit: The net amount of profit will remain firm for the entire term of the Contract. Contract adjustments which increase Contractor’s profit will not be allowed.

F. Price Decreases: All price/rate decreases will automatically be extended to the City. Please reference Paragraph – Price Increase/Decrease provision for additional information.

G. Acceptance: Bids must be provided for each item separately, “all-or-none” bids will not be accepted unless in the best interest of the City.

1.1.11. NO SUBSTITUTION

The bidder is required to meet all specifications and requirements contained in this solicitation. No substitutions will be accepted, unless prior City written approval is received.

1.1.12. DISCREPANCIES

Bidder shall take all responsibility for any errors or omissions in their bids. Any discrepancies in numbers or calculations shall be interpreted to reflect the lowest price to the City.

If prior to contract award, a Bidder discovers a mistake in their bid which renders the Bidder unwilling to perform under any resulting contract, the Bidder must immediately notify the buyer and request to withdraw the bid. It shall be solely within the City's discretion as to whether withdrawal will be permitted. If the solicitation contemplated evaluation and award of "all or none" of the items, then any withdrawal must be for the entire bid. If the solicitation provided for evaluation and award on a line item or combination of items basis, the City may consider permitting withdrawal of specific line item(s) or combination of items.

1.1.13. Waivable Informality

The City reserves the right to waive any informality or irregularity in any bid or proposal, provided such waiver does not result in a material deviation from the requirements of the bid or proposal. The City, at its sole discretion, may accept a bid that contains minor defects or discrepancies as long as such defects or discrepancies do not affect the fairness, competitiveness, or outcome of the bid process. Any bid with minor noncompliance or errors may be corrected and considered for evaluation, unless such correction would alter the intended outcome of the bid or give the bidder an unfair advantage.

1.1.14. BID EXPENSES

The City shall not be liable for any expenses incurred by potential Contractors in the preparation or submission of their bids. Pre-contractual expenses are not to be included in the Contractor’s Pricing Sheet.

Pre-contractual expenses are defined as, but not limited to, expenses incurred by Bidder in:

A. Preparing its bid in response to this IFB.

B. Submitting that bid to the City.

C. Negotiating with the City any matter related to the bid; and, D. Any other expenses incurred by the Bidder prior to the date of the award and execution, if any, of the Contract.

1.1.15. PROTEST PROCEDURES

Any actual or prospective bidder or proposer who alleges an error or impropriety in the solicitation or award of a contract may submit a protest to the appropriate Procurement Contact as set forth herein.

Protest Instructions

All protests shall be typed under the protester’s letterhead and submitted in accordance with the provisions stated herein and emailed to the Assigned Buyer/Purchasing Liaison. All protests shall include, at a minimum, the following information:

A. The name, address, telephone number, and email address of the protester;

B. The signature of the protester or the protester’s representative;

C. The solicitation number;

D. A detailed statement of the legal and/or factual grounds for the protest; and

E. The form of relief requested.

Protest of the Solicitation Specifications

All protests related to the solicitation specifications must be submitted to the appropriate soliciting department’s Assigned Buyer/Purchasing Liaison no later than three (3) business days prior to the close of the solicitation.

A. Protests received after the three (3) business days deadline will not be considered by the City.

B. In the event the protest of specifications is denied, and the protester wishes to continue in the solicitation process, they must still submit a bid or proposal prior to the close of the solicitation in accordance with the solicitation submittal procedures provided in the solicitation.

Protest of Award of Contract

A protest for an award of contract in relation to a solicitation must be received no later than three (3) business days after the Notice of Award is posted on the City’s online bidding system.

A. Protests relating to a proposed contract award received after the three (3) business day deadline will not be considered by the City.

B. If the three (3) business day period expires without the receipt of a protest, the department may move forward with the Contract award or if necessary, file the item for approval by the City

Council.

Protest Process

In the event of a timely protest, the City shall not proceed with the solicitation or award of the contract until the Procurement Contact issues a decision on the protest.

A. Upon receipt of a timely protest, the Assigned Buyer/Purchasing Liaison will within five (5) business days of the receipt of the protest, issue a decision in writing which shall state the reason for the actions taken.

B. The City may, after providing written justification to be included in the purchasing file, make the determination that an immediate award of the contract is necessary to protect the substantial interests of the City. The award of a contract shall in no way compromise the protester’s right to the protest procedures outlined herein.

C. If the protester disagrees with the decision of the Procurement Contact, the protester may submit a written notice to the City of Anaheim Purchasing Agent requesting an appeal.

Appeal Process

A. If the protester wishes to appeal the decision of the Procurement Contact, the protester must submit, within three (3) business days from the receipt of the Procurement Contact decision, a written appeal to the City of Anaheim Purchasing Agent.

B. All appeals must be emailed to purchasing@anaheim.net.

C. Within ten (10) business days, the City of Anaheim Purchasing Agent will review all materials in connection with the appeal, assess the merits of the appeal and provide a written determination that shall contain their decision. The decision of the City of Anaheim Purchasing Agent will be final.

1.1.16. ACCEPTANCE/REJECTION/AWARD

Acceptance/Rejection/Award

A. Bids submitted in response to this IFB may become subject to public disclosure under the California

Public Records Act, and other applicable law. The City shall not be liable in any way for disclosure of any such records. Additionally, all bids shall become the property of the City.

B. The lowest responsive, responsible Bidder will be recommended for contract award.

C. Bids will be reviewed by the City for responsiveness to all requirements. The City has the right to reject any bid deemed unresponsive or lacking the resources or experience to adequately perform the services described herein.

D. Only those responsible, responsive bids meeting all solicitation requirements and specifications shall be further reviewed for consideration for award. Award shall be based on the lowest, responsive, responsible bid.

E. Please take notice, non-acceptance of the City terms and conditions, incorporated in City

Master Agreement Terms & Conditions, may deem a bid non-responsive. City may not accept any other terms, conditions, or provisions contrary to those contained within this solicitation.

F. Final award determination shall be based upon the lowest responsive, responsible bid, and may also include a review of Bidder’s ability to meet the requirements and perform the services specified in this solicitation; Bidder’s references and past performance; and Bidder’s acceptance of City terms and conditions. In addition, City reserves the right to verify and validate any information prior to Contract Award and during the entire term of the Contract.

G. By submitting a response to this solicitation, Bidders agree to accept the decision of the City as final.

H. Awarded Bidder will be required to sign a contract upon award. If Bidder is a corporation, signature will be provided in accordance with the corporation’s code as specified in this solicitation.

1.1.17. RIGHTS RESERVED TO CITY

The City reserves the right to:

mailto:purchasing@anaheim.net

A. Waive, at its discretion, any irregularity or informality, which City deems correctable or otherwise not warranting rejection of the bid.

B. City reserves the right, at its sole discretion, to make multiple awards to Bidders for services requested in this solicitation.

C. Accept or reject in whole or in part any or all bids received as a result of this solicitation at its sole discretion and to solicit for new bids, as the best interest of the City may require.

D. Negotiate the final Contract with the lowest, responsive and responsible Bidder or Bidders as necessary to serve the best interests of the City.

E. Withdraw or cancel in part or in its entirety this solicitation at any time without prior notice and furthermore makes no representation that any contract will be awarded to any Bidder responding to this solicitation.

F. Award its total requirements to one Bidder or to apportion those requirements among two or more

Bidders as the City may deem to be in its best interests; therefore, bids must be provided for each item separately; “all-or-none” bids will not be accepted unless in the best interest of the City.

1.1.18. UNFAIR PRACTICES AND OTHER LAWS

Bidder warrants that its bid complies with the Unfair Practices Act (Business and Professions Code Section

17000 et seq.) and all applicable Local, State and Federal laws and regulations.

1.1.19. INDEPENDENCE OF BID

By submitting a bid, Bidder swears under penalty of perjury that it did not conspire with any other supplier to set prices in violation of anti-trust laws.

1.1.20. AMERICANS WITH DISABILITY ACT (ADA)

To comply with the non-discrimination requirements of the ADA, it is the policy of the City to make every effort to ensure that its programs, activities and services are available to all persons, including persons with disabilities. For persons with a disability needing a reasonable modification to participate in the procurement process, or for persons having questions regarding reasonable modifications for the procurement process, you must contact the buyer listed in the solicitation.

1.1.21. UNIQUE IDENTITY IDENTIFIER NUMBER (UEI)

The City requires a valid UEI number prior to Contract Award of Human Services. If needed, your company may obtain one at no cost at www.usfcr.com. If you are unable to provide/obtain a UEI number, please indicate so in your bid submission response.

1.1.22. BID VALIDITY

Bids will be valid for a period of 180 days after IFB closing date.

1.2. SCOPE OF WORK

1.2.1. OVERVIEW OF REQUIREMENTS

A. City of Anaheim desires the services of a qualified Company to provide outdoor cleaning, trash, litter, and debris removal services in the Anaheim Resort Maintenance District (ARMD) per

Scope of Work.

B. Company must provide everything necessary at company’s expense including, but not limited to all labor, materials, supplies, tools, and the like required to perform and complete the required work.

C. All work must be done per these specifications, according to all applicable and acceptable industry standards, of the highest quality workmanship commensurate with the required work, and completed by the time required.

D. Contractor is required to provide and perform all requirements listed hereunder by the times required at Contractor’s expense unless it is stated specifically that the work is optional or extra.

E. Contractor must have the capability to use the City landscape management app/technology via

Smart Phone and/ or tablet as requested by City for reporting and tracking purposes. Devices will need to be provided to all areas of work.

1.2.2. PROJECT LOCATION & PROJECT SCHEDULE

A. Location: Work is within the area known as the Anaheim Resort Maintenance District (ARMD);

see the included attachments herein for ARMD area maps.

B. Schedule: Work is scheduled by the Company and is to be approved by the City representative in advance. Please refer to the Scope of Work for detailed information.

1.2.3. BIDDER QUALIFICATIONS

A. License and Certification Requirements

1. Have applicable licenses, certifications, and registrations appropriate to the work.

B. References

1. Provide Client References with at least three references for whom bidder has provided similar services with your bid.

2. Note that any unsatisfactory references or unsatisfactory work performance with the City of

Anaheim may eliminate the bidder from further consideration.

C. Minimum Qualifications

1. Bidders who do not meet the Minimum Qualifications will be disqualified.

D. Bid Award - The City will evaluate the bids submitted and intends to award the entire contract to a single bidder.

1.2.4. MANDATORY PRE-BID CONFERENCE

A. Attendance is Mandatory to be able to bid on this project.

B. Date: The Job Walk will begin promptly at 10:00 AM. on November 4, 2026.

C. Location: The job walk will begin at the offices of the City of Anaheim located at 400 E.

Vermont Ave., 92805. The job walk will cover the bid documents and a review of various items to be maintained.

D. Review the entire request for bids (RFB) package and the sites prior to attending the conference.

E. Indicate if you will be attending the Pre-Bid Conference through the City of Anaheim OpenGov

Vendor Portal.

F. Arrive early, plan accordingly; provide a business card to City’s buyer. Late arrivals will not be permitted to participate in the job walk

1.2.5. PREVAILING WAGES

A. Public Works

1. Labor Code § 1720 and § 1771 defines “public works” as construction, alteration, demolition, installation, or repair work (including maintenance), done under contract and paid for in whole, or in part, with public funds.

B. Exception

1. Specifications and Scope of Work does not fall within the above Labor Code § 1720 and §

1771 definition; therefore, this work is not subject to prevailing wage requirements.

1.2.6. DEFINITIONS

A. Other Definitions

1. Estimated Bid Value = as this work is for cleaning services, therefore there is no engineer’s estimate.

2. Clean = includes, but is not limited to:

a. Free of foreign material including, but not be limited to = decals, debris, graffiti, grease, gum, litter, papers, stains, trash, and the like on the items and in the designated work areas.

b. Free of unwanted natural or environmental material including, but not be limited to = feces, dirt, nests, silt, soot, weeds, and the like on the items and in the designated work areas.

3. Maintain = keep in an existing state or better, to preserve from failure or decline, to maintain in optimal condition.

4. Amenities = are bus shelters, bus benches, trash receptacles, , changeable message signs

(CMS); digital message signs (DMS); electrical control cabinets (ECC), gateway monuments, lighting, traffic signals, street signs, traffic signal poles; tree lights; fire hydrants, and the like.

5. Hardscapes = are bus pads, concrete crosswalks, curbs, driveway, gutters, medians, pads, sidewalks, streets, and the like.

6. Designated Work Areas = note that the designated work areas are defined on the maps, attachments or tables made hereto, or references herein; these areas include immediately adjacent areas.

7. Daily = is each and every day of the year including holidays and weekends; seven days a week, 52 weeks every year.

8. Mandatory Required Daily Staff = provide an adequate number of Supervisors and

Maintenance Workers to accomplish all of the required tasks by the times required.

1.2.7. BID SECURITY - BID BOND

A. Due at the time of bid submittal.

B. A complete bid bond is required from each bidder to be eligible for award consideration.

C. The bid bond must be for 10% of your total bid amount. A sample bid bond document is included under Attachments. Include notary and power of attorney pages.

D. City reserves the right to require the original bond documents to be submitted separately following the bid deadline.

1.2.8. POST AWARD SUBMITTALS (Awarded Bidder Only)

A. Submit an Anaheim Business License and Insurance Certificates and Policies per General

Terms and Conditions section.

B. Provide any additional items required by City or elsewhere in the Specifications.

C. The City reserves the right to request a performance bond from the successful bidder, and if requested, will provide compensation for the bond cost.

1.2.9. LEGAL AND BEST PRACTICE REQUIREMENTS

A. Be self-informed, abide by, and comply with all, current and applicable, local, county, state, federal or other legal requirements and best practices at all times.

B. Do not cause, allow to be caused, or permit the continuance of any violation of any legal requirements or best management practices.

C. Be responsible and bear all associated costs should any work be performed in contrary to any laws, ordinances, codes, rules, or regulations.

1.2.10. SPECIFICATIONS CONFLICT

A. All applicable laws, ordinances, and codes govern over any City of Anaheim written specifications and referred to specifications.

B. Any issued addendums shall govern over its predecessor.

C. Any conflicts between the requirements of the specification, related specifications, addendums, purchase orders, master agreements, or drawings, shall be referred to City for clarification prior to proceeding with any work of the effected equipment or components thereof.

D. City will determine precedence in the event of any conflict or ambiguity.

1.2.11. ENVIRONMENTAL REQUIREMENTS

A. Comply with all applicable local, state, federal regulations and requirements.

B. Transport, store, apply, and dispose of hazardous materials as required by law.

C. Supply, if necessary, a trash container, for non-hazardous materials only.

D. Remove from the work site and properly dispose of all spent materials, hazardous materials, debris, and the like on a daily basis. Do NOT accumulate waste materials unless City otherwise allows.

E. Minimize contamination from materials, wastes, spills, or residues at the jobsite to street, drainage facilities, or adjoining property by wind or runoff.

F. Abide by all local sound control and noise level rule, regulations, and ordinances.

G. Be especially sensitive when working prior to 7:00 am or after 10:00 pm.

H. Provide dust control measures when dust is expected to be generated.

I. Abide by all applicable federal, state, county, and city regulations and requirements including but not limited to the Clean Water Act, National Pollutant Discharge Elimination System (NPDES), California Stormwater Quality Association, and Anaheim Municipal Code Section 10.09, no polluted discharge shall be allowed to reach or shall be washed to the street or storm drain system including the following: sidewalk or street wash-water, landscape materials or related debris, trash or litter, street sweeping debris or water.

1.2.12. SITE CONDITIONS

A. Note the locations may be occupied by City employees and the Public.

B. Maintain areas free of waste materials, debris, and rubbish.

C. Ensure all existing site conditions have been incorporated into your bid prices.

1.2.13. DAMAGES

A. Protect materials, products, and facilities against damage for project duration.

B. Make repairs, at Contractor’s sole expense, for Contractor-attributed damages within 5 calendar days. Contractor’s failure to make repairs within time allowance may cause City to make repairs and chargeback Contractor or deduct from invoices due plus administrative costs.

1.2.14. SAFETY & PROTECTION

A. Note it is Contractor’s responsibility to be fully self-informed regarding all legal and industry standard requirements regarding all applicable safety requirements.

B. Report, immediately, all safety concerns, incidents, or accidents to the City Representative.

C. Exercise all necessary and reasonable precautions regarding safety of persons and property in performance of the contract requirements and while on site.

D. Ensure that all Personal Protective Equipment (PPE) is provided as-needed for all persons engaged in work.

E. Ensure an adequate number of workers are onsite to ensure adequate safety.

F. Provide all necessary signage, barricades, safety tapes, cones, plates, etc.

G. Provide all Safety Data Sheets (SDS) for all hazardous materials used in conjunction with this work.

H. Maintain clear access to all entries and exits.

I. Provide all applicable traffic controls including:

1. Perform all work, as required, according to latest edition of the Work Area Traffic Control

Handbook (WATCH).

2. Maintain clear ingress and egress areas, sidewalks, vehicle travel lanes, driveways, and the like at all times unless the immediate work prohibits it.

3. Do not block traffic lanes during blackout dates unless authorized by City.

4. Do NOT delineate traffic and do NOT close any traffic lanes between the hours of 7:00 am and 7:00 pm without prior authorization by the City.

J. Provide a 24/7 call number for emergencies.

1.2.15. SECURITY

A. Do not admit any person into the work area who is not an employee of City, Contractor, or subcontractor.

B. Wear identification at all times, which shall be furnished by Contractor.

1.2.16. DELIVERING, STAGING, REMOVING OF MATERIALS &

EQUIPMENT

A. Deliver and store materials or equipment as City directs.

B. Provide a secured container/area for any staged materials or equipment at Contractor’s sole expense; Contractor is responsible for any loss thereof.

C. Remove materials, tools, and equipment immediately after completion of work.

1.2.17. QUALITY ASSURANCE

A. Perform all work according to all current applicable codes, manufacturer’s specifications, industry-standards, and to the highest quality commensurate with required work.

B. Ensure that all work is done only by experienced and professional personnel.

1.2.18. WORK SCHEDULES

A. Perform all work per work schedule listed elsewhere in these specifications, or as amended by

City.

B. Coordinate schedule changes due to inclement weather or blackout dates.

1.2.19. WORK DONE BY OTHERS

A. Note that the majority of the work must be done by the awarded Contractor.

B. Be solely responsible for any and all actions performed by Contractor and subcontractor workers.

C. Do not subcontract any work not referenced in the questionnaire unless City authorizes otherwise.

1.2.20. WORK DELAYS AND LIQUIDATED DAMAGES

A. Note force majeure applies only when delays are clearly beyond control of or could not have been anticipated by Contractor. City will grant a time extension equivalent to exact number of working days as caused by the force majeure incident. City will not grant any monetary relief unless City caused the delay, then only for mobilizing and demobilizing costs, which shall be subject to negotiation.

B. Agree to liquidated damages for exact number of working days when delays are within the control of or could have been anticipated by Contractor.

C. Note that City may assess Contractor liquidated damages per the Liquidated Damages Table (not as a penalty) to accommodate the work time extension and for safety violations and damages.

1.2.21. PAYMENTS

A. Standard pay terms are net 30 days. Payment will be made within 30 days of acceptance of goods or services and receipt of invoice, whichever occurs last.

B. Note that payments will NOT be made for any unsatisfactory work until corrected.

C. Note City may exercise the following measures should Contractor fail to correct any deficiencies within 3 calendar days of notification, or as directed by City:

1. Deduct amount from Contractor’s payment needed to correct deficiencies.

2. Utilize City forces or an alternate source, to correct the deficiency and deduct from

Contractor’s payment the total cost, including City overhead.

1.2.22. AUDIT REQUIREMENTS

A. City reserves the right to periodically inspect and audit Contractor’s accounting procedures and supporting documentation in conjunction with the performance of the Specifications.

B. City will notify Contractor in writing of any such requested audit.

C. City will inspect and audit in a reasonable manner and at City’s expense.

D. Contractor must fully cooperate with any such audit(s).

E. City will notify Contractor in writing of any exception taken as a result of an audit.

F. If an audit, in accordance with this article, discloses overcharges (of any nature) by Contractor to

City of the value of that portion of the Agreement that was audited, the actual cost of City’s audit shall be reimbursed to City by Contractor.

1.2.23. TERMINATION

A. If, in the opinion of Anaheim, Contractor fails to perform as specified herein, or fails to respond promptly, ANAHEIM shall have the right to terminate the Agreement for cause. The contractor shall have an opportunity to cure the breach prior to the City exercising their rights. The opportunity to cure does not apply to a repeated documented failure. City retains the right to terminate upon 5-day’s written notice and pay Contractor for the value of actual work satisfactorily performed to the date of termination. ANAHEIM shall have the right to terminate the Agreement upon 30-day’s written notice without cause and pay Contractor for the value of actual work satisfactorily performed to the date of termination. These rights are in addition to any other rights that City may have available.

1.2.24. CONTACT INFORMATION

A. Maintain an office at a fixed location.

B. Provide office and mobile telephone numbers to City for Management, Working Supervisor, and at the office.

C. Have a capable person employed by Contractor responsible for taking necessary actions regarding all inquiries and complaints that may be received from the ARMD and/or private citizens during regular work hours.

1.2.25. UNIFORMS

A. Contractor shall provide clean, professional, properly fitted uniforms and high-visibility safety apparel appropriate for the work being performed. Uniforms shall be approved by the City prior to use.

B. Ensure personnel exposed to vehicular traffic wear warning vests that meet ANSI 107 requirements with 360-degree visibility. Ensure night time crews wear Class 3 vests.

1.2.26. ALL CONTRACTOR EMPLOYEES

A. Ensure that all contractor employees performing work in conjunction with this project are always courteous, professional, competent, ordering, temperate, non-objectionable; do not cause any undue disturbances; have a well-groomed appearance including no visible tattoos or body piercing; and wear professional well-maintained uniforms and safety vests.

B. Replace, immediately, any employees who do not meet the foregoing as may be determined by in the City’s sole discretion.

C. Employees shall have sufficient communication skills to effectively communicate with City representatives, the public, and emergency personnel as necessary to perform the work safely and effectively.

1.2.27. WORKERS

A. Provide workers who are fully trained and knowledgeable in all work aspects.

B. Ensure that all workers, who perform work on this contract, have demonstrable skills appropriate to the required work, which may include any combination of, but not be limited to, the following:

1. Basic knowledge, experience, skills, and abilities in general labor, custodial maintenance, landscaping maintenance, cleaning, trash handling, graffiti removal, and street safety procedures to ensure that all requirements of the bid specifications are met at all times.

2. General maintenance and act as liaison with other maintenance personnel and public safety officials.

C. Provide clear information to the public as needed or requested.

D. Participate in safety meetings to ensure all regulations and codes are met.

1.2.28. WORKING SUPERVISOR

A. Provide a fully-trained knowledgeable working supervisor familiar required work.

B. Ensure a working supervisor is on-site daily from 6:30 am to 3:30 pm.

C. Ensure the supervisor has demonstrable skills and can:

1. Supervise, direct, plan, control, and train workers in all work aspects.

2. Direct workers engaged in activities in high vehicular and pedestrian traffic areas safely at all times.

3. Apply all applicable safety regulations and procedures to ensure a safe environment for guests and employees.

4. Communicate effectively in English in oral and written form to resolve daily Resort District maintenance issues.

D. Ensure that supervisor can sign documents and effect work changes.

E. Ensure that supervisor is equipped with a fully charged mobile telephone to enable immediate contact by City Representatives.

F. Ensure that supervisor tours ARMD with a City Represenative as-needed to determine compliance with these specifications or to discuss required work.

1.2.29. EQUIPMENT

A. Ensure that all contractor vehicles and equipment used in performing work in conjunction with this project are mechanically and operationally sound; have well-maintained exteriors; clean;

have well-organized tool racks; bear Contractor’s company name, which is to be visible on both sides of the vehicle; have current California registrations and licenses.

B. Furnish, provide, and operate, at contractor’s sole expense, mobile phones and email communications to the supervisor(s).

C. Replace, immediately, any equipment that does not meet the foregoing as may be determined by in the City Representative’s sole discretion.

D. Ensure that the appropriate equipment is selected and utilized to provide clean surfaces. Ensure that the equipment does not create a noise disruption to hotel guests.

E. Provide trucks of sufficient size to accommodate crews, equipment, and hauling of trash, debris, and litter removal. The City’s historical estimate is approximately 300 to 500 lbs. of trash per day; actual quantities will vary significantly from day to day.

F. Ensure that all crews, equipment, and trash are secure in vehicles at all times.

1.2.30. DUMPING FACILITIES

A. Non-Hazardous Waste Materials

1. Dump all non-hazardous waste materials at Republic Services, 1131 N Blue Gum St., Anaheim, CA 92806; no exceptions unless otherwise authorized by City.

2. Note that there is no need to presort the non-hazardous waste materials.

3. Expect to make two or more trips per day to accommodate non-hazardous waste materials disposal.

4. NOTE-ALL solid waste disposal fees shall be the responsibility of the contractor.

B. Hazardous Waste Materials

1. Coordinate with City regarding disposal of collected hazardous waste materials.

2. City will provide sharps container(s) as needed.

3. Note that a maximum of 15 gallons or 125 pounds may be transported per vehicle, per trip, per Department of Transportation Requirements.

4. Note that containers must have lids, be sturdy, non-leaking, labeled, and protected from breakage; not combined with different types of waste, may be up to five gallons, containers will not be returned.

1.2.31. PRODUCT SPECIFICATIONS

A. City is interested in protecting the environment, as such, City desires that environmentally-friendly products be used whenever possible.

B. Pre-approved cleaners for routine maintenance are: Tagnator products for Graffiti

Removal; Rejuvenate products to clean green furniture.

C. Provide a list of the proposed cleaners and Safety Data Sheets (SDS) for review by City. Use only those cleaners that have been subsequently approved by City and in accordance with manufacturer’s recommendation.

D. Provide new silver or gray trashcan liners that are equal to or greater than 40” x 48” and 22

Microns unless otherwise approved by a City Representative.

Note there are approximately 58 standard trash receptacles throughout the designated work areas.

New liners must be provided when each trash receptacle is half full or more.

E. Provide and install the manufacturer-specified bags/liners for all Big Belly trash receptable sets.

The City currently has eight (8) Big Belly sets, with each consisting on one (1) recycling receptacle and one (1) waste receptacle.

1. Required Big Belly Bag: Kleenline 40x48 1.15 ML Natural Coreless Liners – 150/cs or equal

2. The required Big Belly bags may be purchased through WAXIE or another City-approved supplier. Contractor shall provide all required Big Belly bags at Contractor’s expense. The bag/liner shall be compatible with the Big Belly equipment and shall be installed in accordance with the manufacturer’s recommendations.

F. Note that the twice-daily service requirement for the approximately 58 standard trash receptacles will require a minimum of 116 liners per day or 42,340 liners per year; additional trash bags are needed for cleanup in the designated work areas not contained by trash receptacles.

The City’s historical estimate is approximately 300 to 500 lbs. of trash generated each day; actual quantities will vary significantly from day to day.

1.2.32. SCOPE OF WORK - GENERAL

A. General

1. Provide a clean and attractive environment and amenities for the patrons visiting the Anaheim

Resort at all times.

2. Perform all work according to the bid specifications, the Best Maintenance Practices (BMP), and in a professional and thorough manner.

B. Public Relations: at All Times

1. Provide courteous interactions, directions, information, and referrals to all visitors, property owners, Police Officers, other City employees, or related agencies within the ARMD.

2. Note that all Contractor personnel must speak English sufficiently well enough to be able to interact verbally with all persons with whom they may come in contact in performing the requirements of these bid specifications.

C. Hazardous & Non-Hazardous Material Spills: Immediately

1. Report, immediately to City Representative, any suspected or known hazardous and non-hazardous spills.

2. Submit completed report to City by the next business day.

D. Public Nuisances: Immediately

1. Report, immediately to City, any public nuisances, undesirable and illegal behavior including, but not limited to the following: aggressive panhandling, public urination/defecation, sleeping or camping in inappropriate locations, vandalism, prostitution, loitering, graffiti, petty theft, intrusive or harassing behavior, and any unusual conditions.

2. Cooperate fully with all authorities regarding any investigations.

3. Submit completed report to City by the next business day.

1.2.33. REPORTS: Immediately/As-Needed/Daily/Weekly/Monthly

A. General

1. Ensure that all reports are submitted in the time required, in the method required, and on the forms required.

2. Include any pertinent information or backup documentation with reports.

3. Ensure that all reports are submitted prior to submission of the monthly invoice; otherwise, payment will be withheld and liquidated damages (Table: Liquidated Damages) may apply.

B. Immediately

1. General: Report, immediately, verbally and or in writing as soon as practically possible taking safety into consideration; especially concerning issues that may require immediate action to avoid potential escalation. If possible, take photos of the observation or interaction and attach to email, text, pix, and written reports. This includes areas that are adjacent to the

ARMD, such as: Disneyland, hotels, businesses, residences, and the like.

2. Safety, Injury, or Damage: any impending, occurring, or potential hazards, incidents, or accidents that have harmed, are harming, or could likely harm persons, animals, plants, property, environment, or the like.

3. Public Nuisances: any observations of any public nuisances.

4. Business Interactions: any interactions with business owners and or persons.

5. Work Performance Delays: any interruptions, obstacles, or occurrences that are, could potentially delay, or prevent work from being performed within the prescribed times.

6. Repair or Maintenance: any needed repairs or maintenance that are or could potentially cause a degradation in the functionality or appearance of the observed item or area (including damages to signs, furniture, amenities, due to accidents or vandalism).

C. Daily

1. General: Report, daily, which means the next calendar day, within 24 hours or less. Note that these daily reports will help ensure that Contractor is not only performing to the bid specifications, but is designed to help reduce or avoid liquidated damages (Table: Liquidated

Damages).

2. Follow up Activities: all action items from the above section, which may have been verbally reported, but a written report was not possible at the time; and all action items as required by CR.

3. Work Activities: Completed and In-Process: all work that was actually completed and all work that is in progress, but has not yet been completed.

4. Work Activities: Pending: all work that is pending, which has yet to begun, but would be occurring the next day or before the next cycle is scheduled to begin.

D. Weekly

1. Due: Monday of every week.

2. Attendees: Contractor Supervisor must attend all weekly coordination meetings.

3. Minutes: included any required or pending action items from the weekly coordination meeting.

4. Contents: Ensure that the report contains all the required and approved content, which may include, but not limited to: description of work completed; materials used; defects found;

results of patrol/observation and inspections; description of the actual inspection, observation, repair and/or maintenance of signage, furniture, and graffiti; observations of safety issues, potential hazards, public nuisances, and minutes (notes) from any other City-required meeting

(e.g. maintenance project meetings, field reviews, etc.)

E. Monthly

1. Due: The fourth Wednesday of every month.

2. Contents: Ensure that tailgate safety meetings are documented and maintained for the duration of this contract. Copies of tailgate safety meeting minutes are to be submitted with the monthly invoice. Include a summary of Weekly activity and pertinent notations.

F. Annually

1. Due: In conjunction with first monthly meeting after yearly renewal period.

2. Contents: Ensure that a summary of all weekly reports are included. Include a summary of

Monthly and Quarterly activity including and pertinent notations.

1.2.34. MEETINGS: As-Needed/Weekly/Monthly

A. General

1. Ensure that all meetings are documented and a corresponding action list is generated, initiated, and completed by the time required.

B. As-Needed

1. Purpose: to address immediate issues regarding: Safety, Injury, or Damage; Public Nuisances;

Business Interactions; Work Performance Delays; Repair or Maintenance issues; and other issues of immediate concern.

2. Held on: as needed.

3. Location: work site (Resort Area) or at ARMD office as appropriate.

4. Attendees: Contractor Supervisor and or Contractor Management Representative as appropriate to the nature of the meeting.

C. Weekly

1. Purpose: to address issues regarding: Follow up Activities; Work Activities: Completed and

In-Process; Work Activities: Pending; Scheduling; and other issues of concern.

2. Held on: Monday of every week

3. Location: work site (Resort Area) or at ARMD office as appropriate.

4. Attendees: Contractor Supervisor must attend all daily coordination meetings.

D. Monthly

1. Purpose: to address issues regarding: upcoming events, blackout dates, Scheduling; and other issues of concern.

2. Held on: Third Thursday of every month.

3. Location: ARMD office 400 E. Vermont.

4. Attendees: Contractor Management Representative and Contract Supervisor shall attend monthly operational meetings with the ARMD management team.

E. Annually

1. Purpose: to address issues regarding: Renewal, Scheduling, and other issues of concern.

2. Held on: in conjunction with first monthly meeting after yearly renewal period.

3. Location: ARMD office 400 E. Vermont.

4. Attendees: Contractor Management Representative and Contract Supervisor shall attend monthly operational meetings with the ARMD management team.

1.2.35. SCHEDULES

A. Provide a written schedule each Thursday of the work to be performed the following week. Contractor will be provided maximum latitude in establishing work schedules that correspond to the manpower requirements and related resources. Contractor will also be provided the opportunity and procedure for adjusting those schedules to meet special circumstances.

Therefore, all work shall be completed, as shown on the weekly schedule.

B. Note that failure to notify City of a change and/or failure to perform tasks during a scheduled week may result in a liquidated damages (Table: Liquidated Damages) being assessed against Contractor.

C. Note that the City reserves the right to request additional work, inspections, patrols, and cleaning to be performed based upon an agreed-upon schedule.

D. Coordinate schedule changes due to inclement weather or black-out dates.

E. The City reserves the right to change or cancel any daily or scheduled work, in whole or in part, at any time during that same day for any reason or purpose. Work may be cancelled on any day due to inclement weather or other occurrences that may compromise the safety and health of the citizens, visitors, City and contract employees, and/or the general public.

1.2.36. MISCELLANEOUS ACTIVITIES: AS DIRECTED

A. Perform City-required miscellaneous activities as directed at the OpenGov Line Items prices as appropriate to the tasks being performed.

B. Note the miscellaneous activities will be based upon an agreed-upon schedule.

1.2.37. CHANGES IN WORK

A. Perform any City-required additional work as specified by City Representative, according to all applicable recognized industry standards, using first quality materials and workmanship, at the

OpenGov Line Items prices, at the agreed-upon times.

B. Note that any City-required deletions of work will be reduced based on the corresponding at the

OpenGov Line Items prices.

1.2.38. SERVICE -LEVEL INSPECTIONS

A. Ensure Contractor Supervisor conducts service level inspections with City Representative.

B. Tour the designated work areas every two weeks and as-needed to determine compliance with the specifications and to discuss required work.

C. Affect all required remedies to any work deficiencies as soon as practicably possible, but not more than three business days after notification from City.

1.2.39. RESPONSE TIMES

A. Emergency: 1–hour response for anything that is or could harm life or property.

B. Urgency: 4-hour response for anything that could cause significant cost or loss of plant material, water, or irrigation system, which may present an immediate threat to life or property.

C. Rush: 24-hour response for anything that is or could cause moderate cost or loss of plant material, water, or irrigation system, but not an immediate…

This is the start of the file's text. The full file is on GovTribe.